Show Job Controls
Bid Cobra

GALVESTON FM 1765 (0686-02-029)

Items: 49

County: GALVESTON
Length: N/A
Highway: FM 1765
District: HOUSTON
Control Number: 0686-02-029
DBE Goal: N/A
Project: STP 2023(549)HES
Guaranty: N/A
Time: 60 WORKING DAYS
Engineer's Estimate: $1,008,995.00
Date: 04/05/2023 (3 years ago)
Contract Number: N/A
Type: HAZARD ELIMINATION & SAFETY
Mail/Deliver Bids To: N/A
DAVID LAZARO
JOEL CLARKE
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (1)
E
Engineer's Estimate
$1,008,995.00
$1,425,058.66
Over/Under Est: 41.24% $416,063.66

Bid Items & Bid Tabulations

49 Total 0 of 49
GALVESTON  |  FM 1765  |  HOUSTON  |  0686-02-029  |  04/05/2023  |  $1,008,995.00  |  STP 2023(549)HES  |  HAZARD ELIM & SAFETY  |  60 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
RAGLE CONSTRUCTION, INC.
PREPARING ROW
STA 44.000 $700.000 $3,200.000
REMOVING CONC (DRIVEWAYS)
SY 820.000 $9.000 $57.190
REMOVING CONC (CURB)
LF 51.000 $12.000 $27.950
REMOVING CONC (SIDEWALK OR RAMP)
SY 205.000 $10.000 $14.640
REMOVING CONC (SAWCUT)
LF 750.000 $15.000 $7.680
REMOVING STAB BASE AND ASPH PAV (6")
SY 491.000 $8.000 $9.500
EXCAVATION (ROADWAY)
CY 1,438.000 $4.000 $92.500
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 229.000 $9.000 $28.180
BLOCK SODDING
SY 2,164.000 $4.000 $7.530
BROADCAST SEED (TEMP) (WARM)
SY 120.000 $1.000 $0.750
FERTILIZER
AC 1.000 $750.000 $1,000.000
VEGETATIVE WATERING
MG 74.000 $50.000 $32.140
SALV, HAUL & STKPL RCL APH PV (2 TO 4")
SY 391.000 $4.000 $10.810
CEM STABIL BKFL
CY 830.000 $65.000 $151.530
RETAINING WALL (CAST - IN - PLACE)
SF 902.000 $110.000 $58.800
STR STEEL (MISC NON - BRIDGE)
LB 1,722.000 $15.000 $17.580
ADJUSTING MANHOLES (WATER VALVE BOX)
EA 2.000 $3,500.000 $898.880
ADJUSTING MANHOLES (WATER METER)
EA 2.000 $3,500.000 $948.880
ADJUSTING MANHOLES (ELECTRIC BOX)
EA 2.000 $3,500.000 $1,111.100
MOBILIZATION
LS 1.000 $95,000.000 $142,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 4.000 $10,000.000 $60,000.000
CONC CURB (MONO) (TY II)
LF 51.000 $10.000 $21.180
CONC CURB & GUTTER (TY II)
LF 25.000 $12.000 $42.670
DRIVEWAYS (CONC)
SY 496.000 $95.000 $83.560
DRIVEWAYS (ACP)
SY 313.000 $55.000 $82.000
DRIVEWAYS (CONC) (FAST TRACK)
SY 75.000 $105.000 $136.750
CONC SIDEWALKS (4")
SY 3,668.000 $95.000 $63.480
CURB RAMPS (TY 1)
EA 9.000 $2,000.000 $1,800.000
CURB RAMPS (TY 5)
EA 2.000 $3,000.000 $3,250.000
CURB RAMPS (TY 7)
EA 9.000 $3,000.000 $1,800.000
CURB RAMPS (TY 10)
EA 6.000 $2,500.000 $1,800.000
CONDT (PVC) (SCH 80) (2")
LF 85.000 $15.000 $20.000
CONDT (PVC) (SCH 80) (2") (BORE)
LF 210.000 $20.000 $15.000
CONDT (PVC) (SCH 80) (3") (BORE)
LF 35.000 $22.000 $25.000
ELEC CONDR (NO.8) BARE
LF 330.000 $3.000 $3.000
GROUND BOX TY D (162922)
EA 4.000 $1,500.000 $1,050.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 19.000 $1,000.000 $400.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 1,157.000 $5.000 $5.460
ELIM EXT PAV MRK & MRKS (12")
LF 1,226.000 $2.000 $1.100
ELIM EXT PAV MRK & MRKS (24")
LF 398.000 $2.000 $3.230
PAV SURF PREP FOR MRK (24")
LF 1,157.000 $2.000 $1.150
PED SIG SEC (LED)(COUNTDOWN)
EA 6.000 $650.000 $600.000
TRF SIG CBL (TY A)(12 AWG)(2 CONDR)
LF 760.000 $4.000 $2.000
TRF SIG CBL (TY A)(12 AWG)(4 CONDR)
LF 790.000 $3.000 $2.400
PED POLE ASSEMBLY
EA 6.000 $2,200.000 $2,250.000
PED DETECT PUSH BUTTON (APS)
EA 6.000 $700.000 $700.000
PED DETECTOR CONTROLLER UNIT
EA 1.000 $4,000.000 $2,950.000
TREE PROTECTION
EA 7.000 $300.000 $2,202.690
TMA (STATIONARY)
DAY 90.000 $350.000 $312.380
Totals: $1,008,995.000 $1,425,058.660