Show Job Controls
Bid Cobra

GALVESTON IH 45 (0500-01-107)

Items: 288

County: GALVESTON
Length: N/A
Highway: IH 45
District: HOUSTON
Control Number: 0500-01-107
DBE Goal: N/A
Project: NH 2B20(048)
Guaranty: N/A
Time: 1470 WORKING DAYS
Engineer's Estimate: $122,641,385.55
Date: 08/06/2020 (5 years ago)
Contract Number: N/A
Type: RECONSTRUCT FREEWAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$122,641,385.55
Over/Under Est: -15.81% -$19,389,928.87
$141,740,793.83
Over/Under Est: 15.57% $19,099,408.28
Amt Left: 37.28% $38,489,337.15
Over/Under Est: 34.28% $42,039,744.24
Amt Left: 59.5% $61,429,673.11
Delta: -16.18% -$22,940,335.96
Subcontractor Percentage Amount
BASE CONSTRUCTION L.L.P. 5.15% $5,744,317.46
ALLSTATE SIGNAL & CONSTRUCTION, LLC 2.09% $2,331,189.03
SOUTHWEST ROAD & SAFETY CONTRACTORS, LTD. 0.66% $736,164.96
PMI PAVEMENT MARKING, LLC 0.53% $591,162.77
BATTERSON, LLP 0.52% $580,008.75
QUALITY TURF FARMS, L.C. 0.49% $546,546.71
SK CONCRETE SERVICES LLC 0.31% $345,774.45
HIGHWAY PAVEMENT SPECIALTIES, INC. 0.12% $133,848.17
SWEEPING SERVICES OF TEXAS - OPERATING, L.P. 0.04% $44,616.06
SCOTT DERR PAINTING CO, LLC 0.03% $33,462.04
TRP CONSTRUCTION GROUP, LLC 0.01% $11,154.01
HIGHWAY 1 LLC 0.00% $0.00
PAVEMENT MARKINGS INC. 0.00% $0.00
Total: 9.95% $11,098,244.41

Bid Items & Bid Tabulations

288 Total 0 of 288
GALVESTON  |  IH 45  |  HOUSTON  |  0500-01-107  |  08/06/2020  |  $122,641,385.55  |  NH 2B20(048)  |  RECON FREEWAY  |  1470 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
WILLIAMS BROTHERS CONSTRUCTION CO., INC.
WEBBER, LLC
ZACHRY CONSTRUCTION CORPORATION
PREPARING ROW
STA 83.150 $3,300.000 $124,100.000 $48,070.090 $190,066.150
REMOVING CONC (PAV)
SY 107,820.000 $5.000 $6.000 $3.980 $25.000
REMOVING CONC (RIPRAP)
SY 5,717.000 $5.000 $5.000 $2.690 $2.700
REMOVING CONC (DRIVEWAYS)
SY 784.000 $18.500 $9.000 $2.660 $8.000
REMOVING CONC (OTHER APPURTENANCES)
SY 82.000 $5.000 $50.000 $29.330 $55.000
REMOVING CONC (CTB)
LF 11,116.000 $18.000 $10.000 $9.040 $9.000
REMOVING CONC (RETAINING WALLS)
SY 5,486.000 $33.000 $40.000 $4.720 $5.000
REMOVING CONC (WHEELCHAIR RAMP)
SY 5.000 $5.000 $40.000 $2.660 $2.750
REMOVE CONC (RAIL)
LF 620.000 $18.000 $10.000 $11.050 $12.750
REMOVING STAB BASE AND ASPH PAV (2"-8")
SY 97,088.000 $2.900 $3.000 $2.570 $15.000
REMOVING STAB BASE AND ASPH PV (8"-22")
SY 62,530.000 $3.350 $5.000 $5.300 $2.000
EXCAVATION (ROADWAY)
CY 37,296.000 $6.700 $11.000 $3.590 $3.300
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 377,759.000 $8.500 $4.000 $7.800 $14.000
EMBANK(FINAL)(DC)(TY E)(CSBE)
CY 39,327.000 $40.000 $40.000 $41.320 $50.000
EMB(FNL)(DC)(TYE)(CSBE)(RWALL FND IMPR
CY 21,491.000 $40.000 $40.000 $42.030 $55.000
EMB(FINAL)(DC)(TYE)(CSBE)(EMB FND IMPR)
CY 18,844.000 $40.000 $40.000 $42.130 $53.000
BLOCK SODDING
SY 125,466.000 $2.000 $2.450 $2.450 $2.980
STRAW OR HAY MULCH
SY 213,718.000 $0.200 $0.160 $0.160 $0.270
DRILL SEED (TEMP)(WARM OR COOL)
SY 169,592.000 $0.150 $0.090 $0.090 $0.070
DRILL SEEDING (PERM)(WARM OR COOL)
SY 44,126.000 $0.170 $0.140 $0.140 $0.200
FERTILIZER
AC 70.000 $1,401.820 $500.000 $500.000 $605.460
VEGETATIVE WATERING
MG 8,408.000 $16.850 $18.000 $26.000 $15.000
FL BS (CMP IN PLC)(RAP) (6")
SY 5,645.000 $13.000 $1.000 $10.370 $5.000
LIME TRT (EXST MATL) (6")
SY 170,396.000 $3.000 $1.500 $2.730 $4.900
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
TON 2,447.000 $170.000 $180.000 $183.960 $173.000
CEM TRT(PLNT MX) (CL N)(TY E)(GR 4)(6")
SY 181,264.000 $7.500 $4.000 $12.170 $12.350
CEM TRT(PLNT MX) (CL N)(TYE)(GR 4)(10")
SY 380.000 $15.800 $20.000 $30.330 $30.000
ASPHALT STAB BASE (GR 2)(PG 70)
TON 12,996.000 $80.000 $63.000 $95.000 $110.000
ASPHALT STAB BASE (GR 4)(PG 64)
TON 9,870.000 $75.000 $67.000 $100.000 $73.000
SALV, HAUL & STKPL RCL ASH PV (12")
SY 20,719.000 $3.700 $8.000 $5.410 $12.000
SALV, HAUL & STKPL RCL APH PV (0 TO 8")
SY 127,036.000 $4.500 $4.000 $2.150 $3.250
SALV, HAUL, STKPL, RCL APH PV (12"-20")
SY 7,285.000 $7.000 $8.000 $5.440 $6.000
PLAN & TEXT ASPH CONC PAV(0" TO 8")
SY 3,626.000 $1.500 $2.000 $2.950 $4.000
CONC PVMT (CONT REINF - CRCP) (9")
SY 73,805.000 $33.500 $40.000 $47.550 $40.000
CONC PVMT (CONT REINF - CRCP) (14")
SY 99,250.000 $48.350 $37.500 $70.890 $50.000
CURB (TYPE II)
LF 15,369.000 $4.400 $5.000 $4.340 $2.300
CONC PVMT (CONT REINF)(FAST TRK)(13")
SY 5,000.000 $90.000 $85.000 $72.660 $120.000
STRUCT EXCAV
CY 47,056.000 $7.000 $1.000 $8.010 $8.000
CEM STABIL BKFL
CY 3,279.000 $40.000 $41.400 $40.750 $48.000
CUT & RESTORING PAV
SY 65.000 $59.000 $450.000 $109.000 $125.000
CEMENT STAB BACKFILL (INLET OR MH)
CY 379.000 $40.000 $41.400 $59.410 $48.000
TRENCH EXCAVATION PROTECTION
LF 12,023.000 $2.400 $2.800 $2.260 $6.000
TEMPORARY SPL SHORING
SF 83,488.000 $20.300 $1.000 $2.970 $45.000
TEMPORARY SPL SHORING (COFFERDAM)
SF 24,710.000 $40.000 $1.000 $22.880 $45.000
DRILL SHAFT (18 IN)
LF 377.000 $73.600 $100.000 $123.280 $165.660
DRILL SHAFT (36 IN)
LF 21,126.000 $201.700 $125.000 $192.770 $198.620
DRILL SHAFT (42 IN)
LF 60.000 $235.290 $420.510 $390.000 $420.510
DRILL SHAFT (48 IN)
LF 56,982.000 $335.000 $150.000 $315.810 $327.320
DRILL SHAFT (72 IN)
LF 2,088.000 $540.000 $300.000 $809.920 $840.980
DRILL SHAFT (NON - REINFORCED) (12 IN)
LF 7.000 $114.850 $100.000 $80.000 $80.000
DRILL SHAFT (SIGN MTS) (42 IN)
LF 262.000 $343.000 $200.000 $540.000 $391.410
DRILL SHAFT (SIGN MTS) (54 IN)
LF 300.000 $660.000 $250.000 $610.000 $466.600
DRILL SHAFT (HIGH MAST POLE) (60 IN)
LF 400.000 $735.700 $560.000 $600.000 $600.000
DRILL SHAFT (NON-REINFORCED) (36 IN)
LF 185,835.000 $50.000 $50.000 $87.510 $91.350
CL C CONC (ABUT)(HPC)
CY 354.400 $1,369.200 $750.000 $1,002.610 $1,000.000
CL C CONC (COLUMN)(HPC)
CY 4,708.700 $1,076.700 $650.000 $959.540 $800.000
CL C CONC (FOOTING)(HPC)
CY 8,342.800 $661.950 $450.000 $687.150 $400.000
CL C CONC (CRASHWALL)(HPC)
CY 880.700 $761.400 $350.000 $707.030 $700.000
CL C CONC (SIGN COLUMN)
CY 157.250 $1,016.350 $800.000 $960.510 $1,750.000
CL E CONC (SEAL SLAB)
CY 2,943.200 $500.000 $150.000 $200.320 $85.000
CL F CONC (CAP)(HPC)
CY 6,787.800 $760.000 $550.000 $674.120 $900.000
CL C CONC (SIGN FOOTING)
CY 50.600 $1,013.000 $750.000 $1,066.160 $800.000
REINF CONC SLAB
SF 519,057.000 $11.000 $10.000 $16.090 $13.000
RETAINING WALL (TEMP WALL)
SF 22,638.000 $12.000 $11.000 $14.940 $1.000
RETAINING WALL (MSE) (WAVE SCHEME)
SF 138,435.000 $30.000 $30.000 $42.590 $48.000
PRESTR CONC GIRDER (TX54)
LF 59,199.900 $100.000 $90.000 $129.010 $144.000
PRESTR CONC GIRDER (TX70)
LF 5,826.660 $164.500 $115.000 $170.740 $140.000
RIPRAP (CONC)(4 IN)
CY 2,765.300 $397.700 $450.000 $379.640 $375.000
RIPRAP (CONC)(6 IN)
CY 190.000 $435.000 $450.000 $403.030 $470.000
RIPRAP (CONC)(CL B)(RR8&RR9)
CY 507.300 $414.000 $450.000 $406.860 $470.000
RIPRAP (CONC) (CL B) (4")
CY 5.200 $470.000 $450.000 $386.890 $1,200.000
RIPRAP (MOW STRIP)(4 IN)
CY 464.000 $500.000 $500.000 $518.740 $500.000
RAIL (TY SSTR)
LF 25,365.000 $47.200 $30.000 $48.610 $50.000
RAIL (TY SSTR) (W/DRAIN SLOTS)
LF 10,221.000 $38.250 $30.000 $48.970 $42.000
RAIL (CLF-RO)
LF 1,952.300 $30.000 $100.000 $87.410 $112.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 2,859.000 $105.450 $100.000 $122.690 $113.000
CONC BOX CULV (4 FT X 2 FT)
LF 264.000 $323.000 $216.650 $226.560 $220.000
CONC BOX CULV (6 FT X 4 FT)
LF 468.000 $436.000 $394.500 $450.970 $420.000
RC PIPE (CL III)(18 IN)
LF 12,224.000 $80.000 $68.850 $55.180 $50.000
RC PIPE (CL III)(24 IN)
LF 878.000 $85.000 $78.250 $62.200 $61.000
RC PIPE (CL III)(36 IN)
LF 786.000 $115.000 $119.150 $93.230 $110.000
JCTBOX(COMPL)(PJB)(4FTX4FT)
EA 5.000 $4,700.000 $4,552.000 $5,908.470 $5,600.000
INLET (COMPL)(PSL)(FG)(4FTX4FT-3FTX3FT)
EA 2.000 $5,906.000 $3,317.000 $5,683.990 $5,400.000
INLET (COMPL)(TY AD)
EA 4.000 $2,600.000 $4,314.000 $3,972.630 $4,700.000
INLET (COMPL)(TY AZ)
EA 59.000 $3,803.000 $3,712.000 $4,112.620 $4,325.000
INLET (COMPL)(TY AZR)
EA 9.000 $6,200.000 $6,877.000 $6,535.780 $6,850.000
INLET (COMPL)(TY AZR2G)
EA 6.000 $9,295.000 $8,182.000 $9,056.570 $8,200.000
INLET (COMPL)(CURB)(TY C)
EA 7.000 $6,500.000 $3,713.000 $5,141.790 $4,500.000
INLET (COMPL)(TY AZ2G)
EA 17.000 $7,253.000 $5,763.000 $5,925.780 $6,500.000
HEADWALL (CH - FW - 30) (DIA= 18 IN)
EA 1.000 $2,000.000 $9,792.000 $3,265.290 $5,300.000
HEADWALL (CH - FW - 45) (DIA= 18 IN)
EA 1.000 $2,000.000 $11,430.000 $3,415.290 $5,000.000
WINGWALL (FW - 0) (HW=3 FT)
EA 1.000 $9,725.000 $14,314.000 $7,247.580 $7,600.000
WINGWALL (FW - 0) (HW=5 FT)
EA 1.000 $12,500.000 $14,207.000 $7,806.690 $10,000.000
WINGWALL (FW - S) (HW=3 FT)
EA 2.000 $7,841.000 $11,324.000 $9,896.090 $5,650.000
WINGWALL (PW - 1) (HW=3 FT)
EA 1.000 $9,770.000 $15,237.000 $7,776.800 $13,000.000
WINGWALL (PW - 1) (HW=6 FT)
EA 2.000 $13,375.000 $37,887.000 $11,941.260 $41,300.000
WINGWALL (SW - 0) (HW=5 FT)
EA 1.000 $6,665.000 $17,337.000 $9,925.950 $37,400.000
SET (TY II) (18 IN) (RCP) (3: 1) (C)
EA 12.000 $613.000 $1,103.000 $2,772.660 $1,500.000
SET (TY II) (18 IN) (RCP) (4: 1) (C)
EA 10.000 $1,211.000 $1,173.000 $1,082.660 $1,500.000
SET (TY II) (18 IN) (RCP) (6: 1) (C)
EA 1.000 $1,092.000 $1,213.000 $1,112.650 $1,700.000
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 1.000 $978.000 $1,387.000 $1,117.650 $1,550.000
SET (TY II) (24 IN) (RCP) (3: 1) (P)
EA 1.000 $1,275.000 $1,387.000 $1,117.650 $1,735.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 3.000 $2,003.000 $1,562.000 $1,262.660 $1,730.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 1.000 $1,300.000 $1,715.000 $1,509.900 $1,800.000
SET (TY II) (36 IN) (RCP) (4: 1) (C)
EA 2.000 $2,957.000 $3,417.000 $3,013.860 $2,200.000
SET (TY II) (36 IN) (RCP) (6: 1) (C)
EA 2.000 $4,042.000 $3,417.000 $2,636.900 $2,300.000
REMOV STR (INLET)
EA 2.000 $870.000 $619.000 $723.920 $1,500.000
REMOV STR (SET)
EA 24.000 $270.000 $966.000 $587.120 $235.000
REMOV STR (HEADWALL)
EA 8.000 $1,388.000 $1,497.000 $966.860 $1,700.000
REMOV STR (PIPE)
LF 963.000 $10.000 $21.050 $16.580 $11.000
REMOV STR (BOX CULVERT)
LF 302.000 $68.000 $42.350 $35.160 $57.000
REMOV STR (BRIDGE 1000 FT OR GREATER)
EA 2.000 $170,096.000 $100,000.000 $389,587.210 $390,000.000
MOBILIZATION
LS 1.000 $12,000,000.000 $11,304,903.000 $14,000,000.000 $15,233,360.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 58.000 $6,800.000 $5,000.000 $20,234.440 $22,000.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 50.000 $25.000 $50.000 $38.950 $38.950
ROCK FILTER DAMS (REMOVE)
LF 50.000 $9.250 $10.000 $12.600 $12.600
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 3,042.000 $26.100 $27.000 $25.660 $25.660
CONSTRUCTION EXITS (REMOVE)
SY 3,042.000 $6.650 $9.000 $7.590 $7.590
CONSTRUCTION PERIMETER FENCE
LF 2,668.000 $7.000 $4.000 $5.000 $6.250
TEMP SEDMT CONT FENCE (INSTALL)
LF 14,788.000 $2.200 $2.000 $2.030 $2.030
TEMP SEDMT CONT FENCE (REMOVE)
LF 14,423.000 $1.750 $0.500 $0.430 $0.430
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 3,365.000 $5.000 $4.000 $3.750 $3.750
BIODEG EROSN CONT LOGS (REMOVE)
LF 3,365.000 $1.950 $0.500 $0.610 $0.610
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 80.000 $52.000 $100.000 $69.490 $94.000
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
LF 17,560.000 $9.000 $5.000 $8.410 $7.000
PORT CTB (DES SOURCE)(LOW PROF)(TY 1)
LF 8,300.000 $8.000 $4.000 $8.040 $7.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 35,610.000 $7.000 $4.000 $2.830 $4.500
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 24,270.000 $3.600 $4.000 $2.370 $7.000
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 540.000 $7.950 $4.000 $4.920 $6.000
PORT CTB (STKPL)(SGL SLP)(TY 1)
LF 17,560.000 $11.200 $4.000 $7.440 $7.500
PORT CTB (STKPL)(LOW PROF)(TY 1)
LF 8,300.000 $13.000 $4.000 $6.500 $7.700
PORT CTB (STKPL)(LOW PROF)(TY 2)
LF 80.000 $7.100 $4.000 $8.710 $26.000
PORT CTB CONNECT HARDWARE
EA 966.000 $120.000 $25.000 $33.020 $32.000
PERM CTB (SGL SLOPE) (TY 1) (42 )
LF 5,261.000 $60.000 $80.000 $63.070 $86.000
CONC CURB (DOWEL)(SLOTTED)
LF 404.000 $15.000 $10.000 $23.000 $33.000
CONC CURB (U-TURN)
LF 758.000 $23.250 $35.000 $25.000 $24.000
DRIVEWAYS (CONC)
SY 394.000 $70.000 $70.000 $67.700 $48.000
DRIVEWAYS (ACP)
SY 325.000 $35.000 $60.000 $29.260 $67.000
CONC SIDEWALKS (5")
SY 520.000 $45.950 $60.000 $60.490 $67.000
CURB RAMPS (TY 1)
EA 6.000 $3,167.000 $2,000.000 $2,000.000 $1,900.000
CURB RAMPS (TY 7)
EA 8.000 $1,908.000 $2,100.000 $2,100.000 $1,750.000
CURB RAMPS (TY 21)
EA 1.000 $2,983.000 $3,300.000 $2,200.000 $2,500.000
MTL W-BEAM GD FEN (TIM POST)
LF 3,570.000 $26.700 $19.290 $18.250 $19.330
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 3.000 $1,300.000 $1,050.000 $1,140.000 $1,013.230
REMOVE METAL BEAM GUARD FENCE
LF 5,232.000 $3.500 $3.000 $1.500 $2.540
GUARDRAIL END TREATMENT (INSTALL)
EA 3.000 $3,010.000 $2,630.000 $2,550.000 $2,534.750
GUARDRAIL END TREATMENT (REMOVE)
EA 19.000 $430.000 $450.000 $175.000 $111.540
CRASH CUSH ATTEN (MOVE & RESET)
EA 17.000 $3,000.000 $1,700.000 $4,000.000 $1,445.020
CRASH CUSH ATTEN (REMOVE)
EA 7.000 $800.000 $750.000 $900.000 $148.720
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 12.000 $25,000.000 $24,200.000 $23,200.000 $25,341.500
CRASH CUSH ATTEN (INSTL)(L)(W)(TL3)
EA 1.000 $37,000.000 $28,000.000 $35,000.000 $21,543.000
RELOCATE RD IL ASM (BRIDGE MOUNT)
EA 3.000 $1,500.000 $750.000 $2,600.000 $2,600.000
REMOVE RD IL ASM (U/P)
EA 6.000 $383.000 $200.000 $80.000 $80.000
IN RD IL (U/P) (TY 1) (150W EQ) LED
EA 26.000 $1,267.000 $1,067.000 $830.000 $830.000
HI MST IL POLE (150 FT)(100 MPH)
EA 10.000 $33,445.000 $30,183.000 $30,000.000 $30,000.000
CONDT (HDPE) (2")
LF 890.000 $46.250 $11.620 $6.000 $6.000
CONDT (PVC) (SCH 40) (3") (CONC ENCSE)
LF 11,548.000 $10.100 $7.210 $9.000 $9.000
CONDT (PVC) (SCH 80) (2")
LF 5,772.000 $8.500 $7.000 $8.000 $8.000
CONDT (PVC) (SCH 80) (2") (BORE)
LF 668.000 $13.150 $13.290 $37.000 $37.000
CONDT (PVC) (SCH 80) (3")
LF 5,760.000 $12.000 $17.820 $9.500 $9.500
CONDT (PVC) (SCH 80) (3") (BORE)
LF 2,040.000 $14.400 $25.980 $38.000 $38.000
CONDT (RM) (3/4")
LF 1,784.000 $14.100 $13.100 $14.000 $14.000
CONDT (RM) (2")
LF 230.000 $57.300 $17.690 $18.000 $18.000
ELEC CONDR (NO.14) INSULATED
LF 3,300.000 $1.050 $0.800 $1.000 $1.000
ELEC CONDR (NO.12) BARE
LF 1,808.000 $0.850 $0.740 $1.050 $1.050
ELEC CONDR (NO.12) INSULATED
LF 3,616.000 $1.000 $0.740 $1.100 $1.100
ELEC CONDR (NO.8) BARE
LF 5,965.000 $0.850 $0.960 $1.250 $1.250
ELEC CONDR (NO.8) INSULATED
LF 13,888.000 $1.350 $1.080 $1.450 $1.450
ELEC CONDR (NO.6) BARE
LF 893.000 $1.500 $1.210 $1.450 $1.450
ELEC CONDR (NO.4) BARE
LF 190.000 $2.400 $2.500 $1.850 $1.850
ELEC CONDR (NO.4) INSULATED
LF 4,142.000 $2.800 $2.500 $1.900 $1.900
ELEC CONDR (NO.2) BARE
LF 2,200.000 $2.300 $2.300 $2.300 $2.300
ELEC CONDR (NO.2) INSULATED
LF 4,880.000 $2.400 $2.410 $2.500 $2.500
GROUND BOX TY A (122311)
EA 5.000 $575.000 $685.000 $525.000 $525.000
GROUND BOX TY D (162922)W/APRON
EA 20.000 $1,068.000 $855.000 $850.000 $850.000
ZINC-COAT STL WIRE STRAND (5/16")
LF 1,470.000 $5.600 $2.950 $2.250 $2.250
TIMBER POLE (CL 2) 50 FT
EA 13.000 $1,568.000 $1,285.000 $1,000.000 $1,000.000
REMOVE ELECTRICAL SERVICES
EA 2.000 $353.000 $500.000 $400.000 $400.000
ELC SRV TY A 240/480 060(SS)SS(E)GC(U)
EA 5.000 $5,300.000 $7,480.000 $5,100.000 $5,100.000
ELC SRV TY D 120/240 100(NS)SS(N)SP(O)
EA 5.000 $4,200.000 $5,560.000 $3,600.000 $3,600.000
ALUMINUM SIGNS (TY A)
SF 1,449.000 $30.000 $14.700 $16.500 $19.500
ALUMINUM SIGNS (TY G)
SF 75.000 $27.850 $24.000 $30.000 $31.000
ALUMINUM SIGNS (TY O)
SF 1,226.000 $23.500 $21.920 $17.000 $21.920
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 61.000 $444.000 $440.000 $412.330 $340.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 4.000 $523.000 $525.000 $428.730 $575.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 22.000 $637.500 $600.000 $477.130 $470.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T-2EXT)
EA 2.000 $540.000 $730.000 $563.530 $515.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 9.000 $796.000 $760.000 $569.280 $495.000
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
EA 1.000 $1,129.000 $650.000 $617.380 $715.000
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
EA 2.000 $685.000 $970.000 $715.980 $660.000
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 9.000 $840.000 $900.000 $705.580 $900.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 5.000 $2,500.000 $1,500.000 $154.000 $154.000
IN SM RD SN SUP&AM (RAIL MOUNT)
EA 7.000 $2,800.000 $2,400.000 $1,750.000 $1,595.000
INSTALL LRSS (STRUCT STEEL)
LB 649.000 $9.600 $4.500 $10.000 $4.150
REMOVE LRSA
EA 9.000 $2,071.000 $1,455.000 $875.000 $1,500.000
INS OH SN SUP(25 FT BAL TEE)
EA 2.000 $24,192.850 $28,635.000 $33,000.000 $28,635.000
INS OH SN SUP(30 FT CANT)(SPAN ONLY)
EA 1.000 $9,860.000 $11,745.000 $13,000.000 $11,745.000
INS OH SN SUP(35 FT CANT)(SPAN ONLY)
EA 1.000 $11,205.000 $12,705.000 $15,000.000 $12,705.000
INS OH SN SUP(160 FT BRDG)(SPAN ONLY)
EA 1.000 $100,000.000 $87,425.000 $114,000.000 $87,425.000
REMOVE OVERHD SIGN SUP
EA 2.000 $6,455.000 $6,000.000 $750.000 $3,500.000
SIGN WALKWAY (36 IN) WITH HNDRL
LF 70.000 $320.000 $275.000 $285.000 $275.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 307.000 $25.000 $16.000 $18.000 $18.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 130.000 $20.600 $16.000 $18.000 $18.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
EA 183.000 $20.000 $16.000 $18.500 $18.500
INSTL OM ASSM (OM-3L)(TWT)GND
EA 1.000 $300.000 $200.000 $195.000 $195.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 19.000 $39.600 $35.000 $28.000 $28.000
WK ZN PAV MRK REMOV (W)4"(BRK)
LF 27,784.000 $1.100 $0.860 $0.860 $0.860
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 100,893.000 $1.100 $0.840 $0.840 $0.840
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 12.000 $5.300 $10.450 $10.450 $10.450
WK ZN PAV MRK REMOV (Y)4"(BRK)
LF 378.000 $1.000 $0.860 $0.860 $0.860
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 112,053.000 $1.100 $0.860 $0.860 $0.860
REFL PAV MRK TY II (Y) 12" (SLD)
LF 1,048.000 $2.000 $3.700 $3.700 $3.700
PREFAB PAV MRK TY C (W) (ARROW)
EA 21.000 $266.500 $242.000 $242.000 $242.000
PREFAB PAV MRK TY C (W) (DBL ARROW)
EA 13.000 $399.500 $403.000 $403.000 $403.000
PREFAB PAV MRK TY C (W) (U-LT ARROW)
EA 4.000 $537.000 $450.000 $450.000 $450.000
PREFAB PAV MRK TY C (W) (NUMBER)
EA 3.000 $330.000 $248.000 $248.000 $248.000
PREFAB PAV MRK TY C (W) (WORD)
EA 21.000 $358.000 $305.000 $305.000 $305.000
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 43.000 $38.250 $60.000 $60.000 $60.000
REFL PAV MRKR TY I-C
EA 5.000 $6.000 $3.250 $3.250 $3.250
REFL PAV MRKR TY I-R
EA 56.000 $7.000 $4.000 $4.000 $4.000
REFL PAV MRKR TY II-A-A
EA 204.000 $4.250 $3.650 $3.650 $3.650
REFL PAV MRKR TY II-C-R
EA 2,554.000 $4.850 $3.650 $3.650 $3.650
ELIM EXT PAV MRK & MRKS (4")
LF 226,644.000 $0.550 $0.280 $0.280 $0.280
ELIM EXT PAV MRK & MRKS (24")
LF 24.000 $2.300 $2.200 $2.200 $2.200
PAV SURF PREP FOR MRK (4")
LF 222,973.000 $0.150 $0.010 $0.040 $0.010
PAV SURF PREP FOR MRK (6")
LF 127,653.000 $0.100 $0.010 $0.080 $0.010
PAV SURF PREP FOR MRK (8")
LF 13,068.000 $0.100 $0.100 $0.100 $0.100
PAV SURF PREP FOR MRK (10")
LF 26,050.000 $0.200 $0.120 $0.120 $0.120
PAV SURF PREP FOR MRK (12")
LF 5,828.000 $0.200 $0.140 $0.140 $0.140
PAV SURF PREP FOR MRK (24")
LF 1,095.000 $0.500 $0.200 $0.200 $0.200
PAV SURF PREP FOR MRK (ARROW)
EA 21.000 $34.000 $13.000 $13.000 $13.000
PAV SURF PREP FOR MRK (DBL ARROW)
EA 13.000 $39.000 $19.850 $19.850 $19.850
PAV SURF PREP FOR MRK (U/LT ARROW)
EA 4.000 $10.000 $13.800 $13.800 $13.800
PAV SURF PREP FOR MRK (NUMBER)
EA 3.000 $335.000 $25.500 $25.500 $25.500
PAV SURF PREP FOR MRK (WORD)
EA 21.000 $39.000 $13.150 $13.150 $13.150
PAV SURF PREP FOR MRK (36")(YLD TRI)
EA 43.000 $20.000 $2.950 $2.950 $2.950
FULL - WIDTH MOWING
CYC 14.000 $2,045.000 $2,800.000 $2,361.050 $2,500.000
LITTER REMOVAL
CYC 14.000 $3,040.000 $2,100.000 $4,588.500 $3,500.000
CLEANING / SWEEPING (OUTSIDE MAIN LANE)
CYC 29.000 $1,400.000 $2,400.000 $1,834.160 $1,800.000
WIDE FLANGE PAVEMENT TERMINALS
LF 505.000 $270.000 $500.000 $661.360 $434.950
D-GR HMA TY-D SAC-A PG70-22
TON 554.000 $86.000 $86.000 $115.000 $88.200
D-GR HMA TY-D PG70-22 (LEVEL-UP)
TON 2,803.000 $86.000 $77.000 $115.000 $76.200
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 185.000 $27.000 $10.000 $100.000 $280.860
FIBER OPTIC CBL (SNGLE-MODE)(6 FIBER)
LF 7,200.000 $2.650 $1.210 $2.200 $2.200
FIBER OPTIC CBL (SNGLE-MODE)(12 FIBER)
LF 5,290.000 $2.750 $1.420 $2.900 $2.900
FIBER OPTIC PATCH PANEL (12 POSITION)
EA 9.000 $780.000 $1,210.000 $800.000 $800.000
FIBER OPTIC PATCH PANEL (144 POSITION)
EA 1.000 $2,698.000 $3,750.000 $6,500.000 $6,500.000
FIBER OPTIC FUSION SPLICE
EA 72.000 $86.000 $95.120 $16.000 $16.000
REMOVE FIBER OPTIC CABLE
LF 252.000 $2.500 $5.000 $0.850 $0.850
ITS GRND MNT CAB (TY 6) (CONF 2)
EA 1.000 $11,000.000 $11,950.000 $12,000.000 $12,000.000
CCTV FIELD EQUIPMENT (ANALOG)
EA 6.000 $7,741.000 $7,335.000 $6,500.000 $6,500.000
REMOVE CCTV FIELD EQUIPMENT
EA 7.000 $1,916.000 $200.000 $280.000 $280.000
ITS MULTI-DUCT CND (PVC-40)(CONC ENCSE)
LF 11,802.000 $13.900 $11.050 $13.000 $13.000
ITS MULTI-DUCT CND (PVC-80)
LF 1,180.000 $18.250 $17.210 $13.500 $13.500
ITS MULTI-DUCT CND (PVC-80)(BORE)
LF 120.000 $18.200 $62.140 $120.000 $120.000
ITS MULTI-DUCT COND (FIBERGLASS)
LF 2,980.000 $1.000 $71.180 $52.000 $52.000
PREFB PV MK W/WNTY TY B(W)6"(BRK)CNTST
LF 26,050.000 $5.700 $7.100 $7.100 $7.100
CONDUIT (PREPARE)
LF 1,900.000 $1.850 $2.500 $1.000 $1.000
CTMS RELOCATION (CCTV)
EA 3.000 $5,158.000 $5,074.000 $4,900.000 $4,900.000
CTMS RELOCATION (HUB BLDG)
EA 1.000 $15,000.000 $5,011.000 $5,600.000 $5,600.000
CTMS RELOCATION (DMS)
EA 1.000 $17,000.000 $9,750.000 $17,000.000 $17,000.000
FIBER OPTIC VIDEO DATA TRANSMITTER
EA 7.000 $15,000.000 $1,250.000 $1,250.000 $1,250.000
FIBER OPTIC VIDEO DATA RECEIVER
EA 7.000 $1,800.000 $1,250.000 $1,250.000 $1,250.000
MULTIPOLYMER PAV MRK (W)(6")(SLD)
LF 64,281.000 $0.650 $0.600 $0.600 $0.600
MULTIPOLYMER PAV MRK (W)(6")(BRK)
LF 3,982.000 $0.750 $0.610 $0.610 $0.610
MULTIPOLYMER PAV MRK (W)(6")(DOT)
LF 335.000 $0.950 $0.610 $0.610 $0.610
MULTIPOLYMER PAV MRK (W)(8")(SLD)
LF 13,068.000 $1.100 $0.800 $0.800 $0.800
MULTIPOLYMER PAV MRK (W)(12")(SLD)
LF 2,713.000 $3.450 $1.350 $1.350 $1.350
MULTIPOLYMER PAV MRK (W)(12")(LNDP)
LF 2,067.000 $1.750 $1.250 $1.250 $1.250
MULTIPOLYMER PAV MRK (W)(24")(SLD)
LF 376.000 $6.500 $2.700 $2.700 $2.700
MULTIPOLYMER PAV MRK (Y)(6")(SLD)
LF 54,798.000 $0.650 $0.600 $0.600 $0.600
MULTIPOLYMER PAV MRK (Y)(6")(BRK)
LF 275.000 $0.750 $0.650 $0.650 $0.650
MULTIPOLYMER PAV MRK (Y)(24")(SLD)
LF 695.000 $6.000 $2.950 $2.950 $2.950
MULTIPOLYMER PAV MRK (BLK)(6")(BRK)
LF 3,982.000 $0.700 $0.600 $0.600 $0.600
ITS POLE (55 FT)(130 MPH)
EA 4.000 $11,767.000 $12,412.000 $12,500.000 $12,500.000
ITS POLE MNT CAB (TY 2)(CONF 1)
EA 3.000 $5,597.500 $4,200.000 $8,100.000 $8,100.000
REMOVE HIGH MAST ILLUMINATION
EA 6.000 $5,695.000 $7,000.000 $3,500.000 $3,500.000
LED HI MST IL ASM (6 FIXT)(ASYM)(TY A)
EA 10.000 $35,120.000 $23,632.000 $22,300.000 $22,300.000
TMA (STATIONARY)
DAY 2.000 $494.000 $365.000 $900.000 $750.000
TMA (MOBILE OPERATION)
HR 60.000 $197.250 $67.000 $300.000 $250.000
ITS GND BOX(PCAST) TY 1 (243636)W/APRN
EA 21.000 $3,873.000 $2,871.550 $4,000.000 $4,000.000
3" ITS FIBERGLASS CONDUIT
LF 2,980.000 $50.000 $49.980 $38.000 $38.000
WATER METER AND VAULT
EA 4.000 $41,122.000 $9,750.000 $6,073.000 $10,762.500
BLOW OFF VALVE (6IN)
EA 4.000 $15,000.000 $10,779.000 $7,167.000 $17,425.000
AIR RELEASE/VACUUM RELEASE VALVE (6 IN)
EA 4.000 $12,000.000 $16,415.000 $12,764.000 $43,050.000
WET CONNECTION (36 IN)
EA 4.000 $13,000.000 $49,257.000 $36,819.000 $44,587.500
WATER MAIN PIPE (HDPE) (36IN)
LF 10,025.000 $300.000 $238.500 $310.000 $471.500
GATE VALVE (36 IN)
EA 7.000 $18,000.000 $69,713.000 $72,498.000 $81,487.500
Totals: $122,641,385.548 $103,251,456.680 $141,740,793.908 $164,681,129.792