GALVESTON SL 108 (0367-07-009)

Items: 51

County: GALVESTON
Length: N/A
Highway: SL 108
District: HOUSTON
Control Number: 0367-07-009
DBE Goal: N/A
Project: BR 2023(926)
Guaranty: N/A
Time: 116 WORKING DAYS
Engineer's Estimate: $1,773,346.00
Date: 09/07/2023 (2 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$1,773,346.00
$2,472,329.00
Over/Under Est: 39.42% $698,983.00
Over/Under Est: 74.7% $1,324,725.75
Amt Left: 25.31% $625,742.75
Subcontractor Percentage Amount
TRAFFIC SIGNS & LINES, LLC 2.36% $58,346.96
GARNER PAVING & CONSTRUCTION, LTD. 0.44% $10,878.25
Total: 2.80% $69,225.21

Bid Items & Bid Tabulations

51 Total 0 of 51
GALVESTON  |  SL 108  |  HOUSTON  |  0367-07-009  |  09/07/2023  |  $1,773,346.00  |  BR 2023(926)  |  BRIDGE REPL  |  116 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
JOHN REED AND COMPANY, LLC
RAGLE CONSTRUCTION, INC.
PREPARING ROW
STA 7.200 $3,000.000 $20,000.000 $26,000.000
REMOVING CONC (RIPRAP)
SY 355.000 $10.000 $20.000 $16.000
REMOVING STAB BASE & ASPH PAV(14")
SY 1,881.000 $5.000 $14.000 $21.000
EXCAVATION (ROADWAY)
CY 800.000 $10.000 $25.000 $52.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 102.000 $15.000 $35.000 $43.000
BLOCK SODDING
SY 1,844.000 $4.000 $4.000 $13.000
STRAW OR HAY MULCH
SY 1,844.000 $0.500 $1.000 $1.000
BROADCAST SEED (TEMP) (WARM)
SY 922.000 $0.500 $0.500 $1.000
DRILL SEED (TEMP)(WARM OR COOL)
SY 922.000 $0.500 $0.500 $1.000
FERTILIZER
AC 0.380 $1,000.000 $500.000 $1,000.000
VEGETATIVE WATERING
MG 46.000 $20.000 $50.000 $67.000
CEM TRT(PLNT MX) (CL N)(TYE)(GR 4)(12")
SY 2,494.000 $30.000 $80.000 $61.000
TACK COAT
GAL 150.000 $13.000 $6.000 $15.000
CEM STABIL BKFL
CY 101.000 $120.000 $80.000 $172.000
PRESTR CONC PIL (16 IN SQ)
LF 1,584.000 $140.000 $120.000 $94.500
PRESTR CONC SHEET PIL (12")(HPC)
SF 7,358.000 $60.000 $90.000 $93.000
CL C CONC (ABUT)
CY 59.000 $1,200.000 $1,800.000 $1,050.000
REINF CONC SLAB
SF 3,780.000 $24.000 $32.000 $33.000
APPROACH SLAB
CY 64.000 $700.000 $950.000 $750.000
PRESTR CONC GIRDER (TX40)
LF 447.500 $200.000 $280.000 $217.000
RIPRAP (CONC)(CL B)(RR8&RR9)
CY 45.000 $500.000 $350.000 $860.000
RIPRAP (STONE COMMON)(DRY)(18 IN)
CY 692.000 $180.000 $140.000 $265.000
RIPRAP (MOW STRIP)(4 IN)
CY 26.000 $580.000 $450.000 $1,000.000
RAIL (TY T223)
LF 240.000 $100.000 $120.000 $150.000
ARMOR JOINT
LF 81.000 $140.000 $90.000 $221.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 1.000 $30,000.000 $180,000.000 $316,000.000
MOBILIZATION
LS 1.000 $139,000.000 $240,000.000 $309,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $8,000.000 $2,000.000 $38,750.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 156.000 $30.000 $40.000 $35.000
CONSTRUCTION EXITS (REMOVE)
SY 156.000 $10.000 $10.000 $15.000
CONSTRUCTION PERIMETER FENCE
LF 100.000 $5.000 $6.000 $15.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,501.000 $5.000 $3.000 $3.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,501.000 $1.000 $1.000 $1.000
MTL W-BEAM GD FEN (TIM POST)
LF 250.000 $26.000 $30.250 $28.250
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,500.000 $1,840.000 $2,065.000
REMOVE METAL BEAM GUARD FENCE
LF 225.000 $3.000 $2.500 $3.250
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 4.000 $250.000 $225.000 $250.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,300.000 $3,185.000 $3,185.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $280.000 $225.000 $390.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 4.000 $800.000 $584.500 $765.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 2.000 $950.000 $984.000 $915.000
REMOVE SM RD SN SUP&AM
EA 4.000 $150.000 $70.000 $85.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 6.000 $30.000 $25.000 $25.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 10.000 $30.000 $28.000 $27.000
REFL PAV MRK TY II (W) 6" (SLD)
LF 1,440.000 $1.000 $1.000 $1.000
REFL PAV MRK TY II (Y) 6" (SLD)
LF 1,440.000 $1.000 $1.000 $1.000
PAVEMENT SEALER 6"
LF 520.000 $0.500 $0.100 $0.100
REFL PAV MRKR TY II-A-A
EA 18.000 $5.000 $8.000 $8.000
PAV SURF PREP FOR MRK (6")
LF 520.000 $0.500 $0.100 $0.100
D-GR HMA TY-D SAC-A PG70-22 (EXEMPT)
TON 548.000 $300.000 $230.000 $250.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 240.000 $75.000 $40.000 $87.000
Totals: $1,773,346.000 $2,472,329.000 $3,098,071.750