GAINES US 180 (0294-02-023)

Items: 108

County: GAINES
Length: N/A
Highway: US 180
District: LUBBOCK
Control Number: 0294-02-023
DBE Goal: N/A
Project: C 294-2-23
Guaranty: N/A
Time: 412 WORKING DAYS
Engineer's Estimate: $56,190,976.81
Date: 10/02/2020 (5 years ago)
Contract Number: N/A
Type: SUPER 2 PASSING LANES
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (8)
E
Engineer's Estimate
$56,190,976.81
$48,813,789.52
Over/Under Est: -13.13% -$7,377,187.29
$52,890,798.11
Over/Under Est: -5.87% -$3,300,178.70
Amt Left: 8.35% $4,077,008.59
Over/Under Est: -2.48% -$1,391,599.16
Amt Left: 12.26% $5,985,588.13
Delta: -3.61% -$1,908,579.54
$56,567,917.60
Over/Under Est: 0.67% $376,940.79
Amt Left: 15.89% $7,754,128.08
Delta: -3.23% -$1,768,539.95
$57,345,200.64
Over/Under Est: 2.05% $1,154,223.83
Amt Left: 17.48% $8,531,411.12
Delta: -1.37% -$777,283.04
Over/Under Est: 2.78% $1,561,023.31
Amt Left: 18.31% $8,938,210.60
Delta: -0.71% -$406,799.48
Over/Under Est: 5.13% $2,885,314.57
Amt Left: 21.02% $10,262,501.86
Delta: -2.29% -$1,324,291.26
$59,268,714.92
Over/Under Est: 5.48% $3,077,738.11
Amt Left: 21.42% $10,454,925.40
Delta: -0.33% -$192,423.54

Bid Items & Bid Tabulations

108 Total 0 of 108
GAINES  |  US 180  |  LUBBOCK  |  0294-02-023  |  10/02/2020  |  $56,190,976.81  |  C 294-2-23  |  SUPER 2 PASSING LANES  |  412 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
JAMES HAMILTON CONSTRUCTION CO.
DUININCK, INC.
ALLEN BUTLER CONSTRUCTION, INC.
A. L. HELMCAMP, INC.
RK HALL, LLC
JAMES CONSTRUCTION GROUP, L.L.C.
KIEWIT INFRASTRUCTURE SOUTH CO.
FNF CONSTRUCTION, INC.
REMOVING CONC (DRIVEWAYS)
SY 418.000 $30.000 $30.000 $14.500 $23.440 $45.000 $44.320 $19.000 $19.990 $68.000
EXCAVATION (ROADWAY)
CY 100,000.000 $10.000 $7.000 $12.000 $11.650 $8.000 $10.950 $9.000 $8.930 $19.000
EXCAVATION (CHANNEL)
CY 4,380.000 $15.000 $9.000 $18.500 $13.980 $15.000 $20.750 $10.000 $13.990 $22.000
SUBGRADE WIDENING (DENS CONT)
SY 274,927.780 $4.000 $4.600 $9.650 $10.090 $4.200 $7.100 $3.350 $8.960 $11.000
BACKFILL (TY B)
STA 1,982.500 $150.000 $330.000 $140.000 $191.000 $200.000 $119.380 $133.000 $170.120 $48.000
BLADING
STA 1,982.500 $150.000 $330.000 $50.500 $80.940 $95.000 $59.910 $19.000 $53.860 $66.000
DRILL SEEDING (PERM) (RURAL) (SANDY)
AC 285.260 $500.000 $330.000 $320.000 $394.490 $320.000 $329.400 $350.000 $346.890 $420.000
PROOF ROLLING
HR 100.000 $100.000 $100.000 $155.000 $101.740 $95.000 $132.940 $175.000 $199.210 $103.000
PRIME COAT (MC-30)
GAL 54,985.550 $4.000 $3.300 $3.900 $3.590 $3.700 $7.390 $4.350 $4.150 $5.500
EMULS ASPH (EROSN CONT)(CSS-1H)
GAL 179,481.040 $4.000 $2.400 $3.050 $3.370 $2.500 $3.110 $4.000 $3.260 $3.000
FOG SEAL (CSS-1H)
GAL 71,869.500 $4.000 $2.400 $3.300 $3.330 $3.500 $3.200 $3.500 $3.030 $3.000
ASPH (AC-20-5TR)
GAL 11,244.800 $4.000 $2.600 $3.300 $3.240 $3.500 $3.150 $2.900 $3.400 $3.500
AGGR(TY-PB GR-4 SAC-B)
CY 254.980 $150.000 $120.000 $205.000 $433.280 $160.000 $223.280 $175.000 $300.800 $193.000
STONE-MTRX-ASPH SMA-D SAC-A PG70-28
TON 109,106.830 $130.000 $109.000 $122.000 $129.450 $129.000 $129.500 $121.000 $125.240 $110.000
TACK COAT
GAL 1,351.930 $4.000 $2.600 $2.650 $2.820 $3.000 $73.480 $2.950 $3.010 $40.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 28,636.120 $40.000 $33.000 $49.500 $44.530 $56.000 $56.170 $53.000 $58.670 $59.000
CEM STABIL BKFL
CY 150.600 $400.000 $185.000 $265.000 $214.150 $260.000 $270.000 $133.000 $300.740 $232.000
CUT & RESTORE ASPH PAVING
SY 136.000 $100.000 $300.000 $58.000 $491.160 $58.000 $580.630 $280.000 $414.970 $393.000
TRENCH EXCAVATION PROTECTION
LF 75.000 $20.000 $100.000 $26.500 $429.880 $27.000 $27.000 $1.000 $30.070 $150.000
TEMPORARY SPL SHORING (COFFERDAM)
SF 688.000 $60.000 $25.000 $58.000 $18.080 $58.000 $59.400 $23.000 $66.160 $10.000
CONC STR REPAIR (STANDARD)
SF 10.000 $500.000 $225.000 $210.000 $357.370 $220.000 $216.000 $165.000 $240.590 $350.000
RIPRAP (CONC)(4 IN)
CY 34.350 $500.000 $1,200.000 $605.000 $820.930 $600.000 $621.000 $560.000 $779.160 $760.000
RIPRAP (CONC)(5 IN)
CY 16.400 $600.000 $1,200.000 $605.000 $1,014.480 $600.000 $621.000 $560.000 $761.690 $650.000
CMP (GAL STL 24 IN)
LF 4.000 $200.000 $300.000 $79.000 $1,283.660 $79.000 $81.000 $790.000 $90.220 $630.000
CMP (GAL STL 30 IN)
LF 94.000 $250.000 $215.000 $89.500 $274.760 $90.000 $91.800 $162.000 $102.250 $320.000
CMP (GAL STL 36 IN)
LF 22.000 $300.000 $195.000 $105.000 $414.140 $110.000 $108.000 $315.000 $120.300 $400.000
CMP (GAL STL 48 IN)
LF 48.000 $350.000 $142.000 $140.000 $375.190 $140.000 $145.800 $125.000 $162.400 $285.000
CMP AR (GAL STL DES 3)
LF 9.000 $200.000 $258.000 $100.000 $573.480 $100.000 $102.600 $365.000 $114.280 $330.000
CMP AR (GAL STL DES 4)
LF 9.000 $250.000 $313.000 $120.000 $458.370 $120.000 $124.200 $370.000 $138.340 $353.000
CONC BOX CULV (6 FT X 4 FT)
LF 225.000 $500.000 $734.000 $685.000 $447.420 $690.000 $702.000 $465.000 $781.920 $633.000
CONC BOX CULV (5 FT X 3 FT)(EXTEND)
LF 10.000 $1,000.000 $930.000 $685.000 $1,428.510 $690.000 $702.000 $950.000 $781.920 $1,350.000
RC PIPE (CL IV)(24 IN)
LF 200.000 $250.000 $142.000 $145.000 $112.950 $150.000 $151.200 $155.000 $168.410 $166.000
RC PIPE (CL IV)(30 IN)
LF 32.000 $300.000 $158.000 $190.000 $150.120 $190.000 $194.400 $178.000 $216.530 $187.000
SET (REPLACE PIPE RUNNER)
EA 1.000 $5,000.000 $1,020.000 $2,100.000 $1,221.300 $2,200.000 $2,160.000 $1,895.000 $2,405.920 $1,670.000
SET (TY I)(S= 5 FT)(HW= 4 FT)(4:1) (C)
EA 1.000 $4,000.000 $17,500.000 $10,000.000 $16,025.760 $10,000.000 $10,260.000 $18,170.000 $11,428.120 $15,000.000
SET (TY I)(S= 6 FT)(HW= 5 FT)(4:1) (C)
EA 6.000 $5,000.000 $9,750.000 $7,400.000 $9,897.790 $8,000.000 $7,560.000 $8,040.000 $8,420.720 $8,200.000
SET (TY II) (24 IN) (CMP) (4: 1) (C)
EA 2.000 $1,500.000 $1,375.000 $1,100.000 $3,247.100 $1,100.000 $1,080.000 $1,720.000 $1,202.960 $2,500.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 14.000 $2,000.000 $1,540.000 $1,300.000 $2,416.330 $1,300.000 $1,350.000 $2,440.000 $1,503.700 $2,600.000
SET (TY II) (30 IN) (CMP) (4: 1) (C)
EA 17.000 $2,000.000 $1,860.000 $2,600.000 $3,664.300 $2,700.000 $2,700.000 $1,665.000 $3,007.400 $3,000.000
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 2.000 $2,500.000 $2,250.000 $3,400.000 $4,824.320 $3,400.000 $3,456.000 $4,390.000 $3,849.470 $3,400.000
SET (TY II) (36 IN) (CMP) (4: 1) (C)
EA 4.000 $3,000.000 $3,500.000 $3,400.000 $5,422.070 $3,400.000 $3,456.000 $2,595.000 $3,849.470 $4,600.000
SET (TY II) (48 IN) (CMP) (4: 1) (C)
EA 4.000 $4,000.000 $7,000.000 $4,000.000 $4,934.990 $4,000.000 $4,104.000 $3,555.000 $4,571.250 $9,000.000
SET (TY II) (DES 3) (CMP) (4: 1) (C)
EA 1.000 $2,000.000 $1,660.000 $2,600.000 $4,577.690 $2,700.000 $2,700.000 $3,170.000 $3,007.400 $2,800.000
SET (TY II) (DES 4) (CMP) (4: 1) (C)
EA 2.000 $2,500.000 $2,480.000 $3,200.000 $2,984.590 $3,200.000 $3,240.000 $3,465.000 $3,608.880 $3,600.000
CLEAN EXIST CULVERTS
EA 30.000 $2,000.000 $1,200.000 $2,100.000 $3,020.730 $2,200.000 $3,896.540 $2,790.000 $2,405.920 $3,500.000
REMOV STR (PIPE)
EA 5.000 $1,500.000 $1,040.000 $210.000 $1,407.210 $220.000 $6,078.820 $3,330.000 $240.590 $3,800.000
MOBILIZATION
LS 1.000 $5,108,000.000 $4,000,000.000 $2,950,000.000 $4,120,095.790 $4,300,000.000 $2,012,094.380 $5,100,000.000 $4,719,211.850 $5,900,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 37.000 $10,000.000 $5,000.000 $20,000.000 $10,645.890 $25,000.000 $10,000.000 $16,000.000 $30,000.000 $27,050.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 1,200.000 $30.000 $20.000 $24.000 $20.540 $15.000 $80.000 $25.000 $26.160 $30.000
CONSTRUCTION EXITS (REMOVE)
SY 1,200.000 $10.000 $6.000 $10.500 $8.830 $3.000 $15.470 $10.000 $11.370 $12.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 36,840.000 $3.000 $3.000 $1.600 $2.230 $2.300 $4.850 $2.890 $1.710 $3.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 36,840.000 $1.000 $0.500 $0.530 $1.130 $0.500 $3.760 $0.500 $0.570 $0.500
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 26,394.000 $5.000 $5.000 $5.550 $3.270 $4.300 $6.170 $4.750 $5.970 $6.000
INTERSECTIONS (ACP)
SY 7,266.000 $50.000 $30.000 $29.000 $57.990 $55.000 $33.370 $25.500 $42.440 $41.000
DRIVEWAYS (CONC)
SY 472.000 $120.000 $104.000 $110.000 $95.250 $110.000 $165.740 $86.000 $152.020 $120.000
DRIVEWAYS (ACP)
SY 22,638.000 $50.000 $45.000 $61.000 $49.040 $45.000 $58.350 $37.000 $88.190 $65.000
TURNOUTS (ACP)
SY 2,727.000 $50.000 $39.000 $52.000 $50.490 $50.000 $62.260 $64.000 $79.490 $59.000
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 415,140.000 $0.150 $0.080 $0.150 $0.150 $0.140 $0.130 $0.160 $0.170 $0.110
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 207,570.000 $0.150 $0.080 $0.210 $0.170 $0.140 $0.180 $0.220 $0.170 $0.110
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 42.000 $250.000 $275.000 $265.000 $440.330 $260.000 $270.000 $250.000 $284.340 $260.000
MAILBOX INSTALL-D (TWW-POST) TY 4
EA 11.000 $300.000 $310.000 $295.000 $521.010 $300.000 $302.400 $280.000 $318.460 $290.000
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 63.000 $400.000 $680.000 $655.000 $857.370 $650.000 $669.600 $620.000 $705.150 $630.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 118.000 $800.000 $580.000 $570.000 $608.650 $570.000 $583.200 $540.000 $614.170 $560.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 71.000 $850.000 $610.000 $610.000 $653.730 $610.000 $626.400 $580.000 $659.660 $600.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 14.000 $900.000 $980.000 $970.000 $1,036.960 $970.000 $993.600 $920.000 $1,046.360 $950.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 1.000 $900.000 $890.000 $885.000 $946.780 $880.000 $907.200 $840.000 $955.370 $900.000
IN SM RD SN SUP&AM TYS80(1)SA(T-2EXT)
EA 3.000 $1,200.000 $1,160.000 $1,200.000 $1,239.840 $1,200.000 $1,188.000 $1,100.000 $1,251.080 $1,200.000
REMOVE SM RD SN SUP&AM
EA 150.000 $90.000 $95.000 $95.000 $101.440 $95.000 $135.290 $90.000 $102.360 $95.000
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND(BI)
EA 38.000 $80.000 $95.000 $95.000 $101.440 $95.000 $97.200 $90.000 $102.360 $95.000
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 62.000 $80.000 $95.000 $96.000 $102.570 $95.000 $98.280 $91.000 $103.500 $95.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 129.000 $30.000 $50.000 $47.500 $50.720 $48.000 $135.280 $45.000 $51.180 $50.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 1,763,166.000 $0.200 $0.110 $0.110 $0.140 $0.130 $0.130 $0.120 $0.110 $0.130
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 433,624.000 $0.300 $0.170 $0.160 $0.200 $0.190 $0.230 $0.180 $0.170 $0.250
WK ZN PAV MRK NON-REMOV (W)8"(LNDP)
LF 575.000 $0.500 $0.220 $0.210 $0.270 $0.250 $0.590 $0.240 $0.230 $0.600
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 13,030.000 $0.500 $0.220 $0.210 $0.270 $0.250 $0.260 $0.240 $0.230 $0.250
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 1,336.000 $5.000 $2.500 $2.500 $1.690 $1.600 $2.160 $1.500 $2.710 $2.100
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 1,158.000 $0.200 $0.110 $0.110 $0.150 $0.140 $0.220 $0.130 $0.110 $0.240
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 890,276.000 $0.200 $0.110 $0.110 $0.140 $0.130 $0.130 $0.120 $0.110 $0.130
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 34,557.000 $2.000 $0.800 $1.050 $0.970 $0.650 $3.110 $0.500 $2.270 $2.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 24,758.000 $2.000 $1.000 $1.050 $0.990 $0.650 $3.120 $0.500 $2.270 $2.000
REFL PAV MRK TY I (W)8"(LNDP)(100MIL)
LF 575.000 $0.400 $1.100 $1.050 $0.920 $0.860 $0.920 $0.820 $1.140 $0.900
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 13,030.000 $0.800 $1.100 $1.050 $0.920 $0.860 $0.720 $0.820 $1.140 $0.700
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 410,840.000 $0.400 $0.350 $0.350 $0.460 $0.430 $0.350 $0.410 $0.380 $0.350
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 3,161.000 $0.500 $0.700 $0.680 $0.610 $0.570 $0.510 $0.540 $0.740 $0.500
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 1,158.000 $0.400 $0.450 $0.450 $0.460 $0.430 $0.380 $0.410 $0.490 $0.400
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 328,940.000 $0.400 $0.350 $0.350 $0.460 $0.430 $0.350 $0.410 $0.380 $0.350
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 1,365.000 $20.000 $20.000 $20.000 $19.720 $19.000 $14.040 $17.500 $21.610 $14.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 20.000 $250.000 $220.000 $215.000 $309.960 $290.000 $237.600 $275.000 $233.160 $230.000
PREFAB PAV MRK TY C (W) (LNDP ARROW)
EA 22.000 $300.000 $500.000 $500.000 $760.810 $710.000 $432.000 $675.000 $540.240 $410.000
PREFAB PAV MRK TY C (W) (WORD)
EA 20.000 $300.000 $300.000 $290.000 $417.040 $390.000 $270.000 $370.000 $312.770 $260.000
REFL PAV MRKR TY I-C
EA 1,803.000 $2.000 $3.300 $3.150 $3.380 $3.200 $3.240 $3.000 $3.410 $3.250
REFL PAV MRKR TY II-A-A
EA 4,333.000 $2.000 $3.300 $3.150 $3.380 $3.200 $3.240 $3.000 $3.410 $3.250
ELIM EXT PAV MRK & MRKS (4")
LF 534,600.000 $0.600 $0.090 $0.420 $0.490 $0.200 $0.810 $0.810 $0.910 $0.600
ELIM EXT PAV MRK & MRKS (12")
LF 469,150.000 $0.800 $0.090 $0.420 $0.480 $0.300 $0.870 $0.810 $0.910 $0.600
ELIM EXT PAV MRK & MRKS (24")
LF 24.000 $1.000 $25.000 $3.150 $11.270 $0.500 $37.270 $5.000 $167.510 $5.000
TEMP TRAF SIGNALS
EA 2.000 $10,000.000 $7,000.000 $4,700.000 $5,072.070 $7,000.000 $9,864.280 $866.000 $6,014.800 $50,000.000
FULL - WIDTH MOWING
CYC 4.000 $60,000.000 $8,000.000 $10,500.000 $16,061.540 $8,600.000 $12,628.110 $14,220.000 $18,197.500 $5,600.000
LITTER REMOVAL
CYC 4.000 $45,000.000 $4,800.000 $10,500.000 $6,424.610 $7,400.000 $28,776.680 $9,090.000 $10,938.540 $5,500.000
REINFORCED FAB FOR ASPH PVMNT OVERLAYS
SY 790,305.560 $6.000 $5.850 $5.900 $6.200 $6.000 $6.320 $5.800 $6.650 $5.900
ASPH FOR REINF FAB (AC-20-5TR)
GAL 158,061.110 $5.000 $2.600 $2.750 $3.960 $3.600 $3.560 $3.120 $3.690 $3.000
D-GR HMA TY-B PG70-28
TON 122,747.160 $100.000 $85.000 $93.000 $88.320 $111.000 $114.000 $121.000 $97.620 $106.000
D-GR HMA TY-C SAC-B PG70-28
TON 27,297.390 $95.000 $98.000 $99.000 $99.660 $111.000 $115.620 $121.000 $101.000 $100.000
D-GR HMA TY-D PG70-28
TON 45,281.630 $95.000 $104.000 $100.000 $94.470 $114.000 $111.330 $123.000 $109.290 $107.000
TACK COAT
GAL 220,596.500 $4.000 $2.600 $2.650 $3.460 $3.000 $3.170 $2.500 $3.010 $4.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $15,000.000 $22,000.000 $13,000.000 $21,351.980 $20,000.000 $17,110.940 $15,000.000 $20,450.320 $25,000.000
TMA (STATIONARY)
DAY 1,648.000 $150.000 $250.000 $160.000 $104.450 $100.000 $122.610 $91.000 $337.270 $175.000
TMA (MOBILE OPERATION)
DAY 135.000 $250.000 $850.000 $735.000 $586.570 $100.000 $474.870 $578.000 $842.250 $600.000
TEMP SPEED MONITOR SYS
EA 1.000 $15,000.000 $10,000.000 $9,500.000 $10,675.990 $15,000.000 $9,323.270 $5,090.000 $17,232.400 $15,000.000
Totals: $56,190,976.810 $48,813,789.559 $52,890,798.140 $54,799,377.718 $56,567,917.617 $57,345,200.708 $57,752,000.140 $59,076,291.464 $59,268,714.929