Show Job Controls
Bid Cobra

FRIO SH 85 (0301-07-013)

Items: 149

County: FRIO
Length: N/A
Highway: SH 85
District: SAN ANTONIO
Control Number: 0301-07-013
DBE Goal: N/A
Project: STP 1902(060)
Guaranty: N/A
Time: 463 WORKING DAYS
Engineer's Estimate: $30,085,513.27
Date: 06/04/2019 (7 years ago)
Contract Number: N/A
Type: REHAB & WIDEN TO PROVIDE PASS LNS & OP IMPROVEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$30,085,513.27
$35,430,890.75
Over/Under Est: 17.77% $5,345,377.48
$35,777,434.21
Over/Under Est: 18.92% $5,691,920.94
Amt Left: 0.98% $346,543.46
Over/Under Est: 27.51% $8,276,084.48
Amt Left: 8.27% $2,930,707.00
Delta: -7.22% -$2,584,163.54

Bid Items & Bid Tabulations

149 Total 0 of 149
FRIO  |  SH 85  |  SAN ANTONIO  |  0301-07-013  |  06/04/2019  |  $30,085,513.27  |  STP 1902(060)  |  REHAB & WIDEN TO PROVIDE PASS LNS &...  |  463 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ANGEL BROTHERS HOLDINGS CORP.
HUNTER INDUSTRIES, LTD.
ANDERSON COLUMBIA CO., INC.
PREPARING ROW
STA 964.000 $800.000 $775.000 $369.630 $337.000
PREPARING ROW(TREE)(12" TO 24" DIA)
EA 10.000 $300.000 $1,350.000 $2,205.000 $2,310.000
REMOVING CONC (RIPRAP)
SY 590.000 $8.500 $20.000 $8.940 $10.000
EXCAVATION (ROADWAY)
CY 181,175.000 $11.400 $11.000 $9.510 $10.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 37,355.000 $10.000 $3.250 $8.940 $18.000
COMPOST MANUF TOPSOIL (4")
SY 183,212.000 $1.320 $1.000 $0.790 $0.870
DRILL SEEDING (PERM) (RURAL) (SANDY)
SY 183,212.000 $0.140 $0.400 $0.180 $0.200
DRILL SEED (TEMP)(WARM OR COOL)
SY 183,212.000 $0.100 $0.400 $0.120 $0.140
VEGETATIVE WATERING
MG 2,857.000 $19.810 $18.250 $23.310 $37.000
SOIL RETENTION BLANKETS (CL 1) (TY B)
SY 183,212.000 $0.890 $1.900 $0.700 $0.780
PROOF ROLLING
HR 292.000 $58.300 $62.000 $85.500 $72.000
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
CY 84,003.000 $60.000 $60.000 $51.870 $62.000
PRIME COAT(MC-30 OR AE-P)
GAL 100,805.000 $3.120 $3.500 $3.830 $4.600
D-GR HMA TY-B PG64-22
TON 148,013.000 $52.000 $72.500 $80.500 $83.900
D-GR HMA TY-C SAC-B PG70-22
TON 25,788.000 $65.000 $83.000 $86.420 $88.000
SUPERPAVE MIXTURES SP-C SAC-B PG70-22
TON 52,552.000 $80.000 $83.500 $87.050 $103.000
FLEX PAVEMENT STRUCTURE REPAIR (5"-10")
SY 4,500.000 $38.000 $55.000 $50.250 $72.000
PLANE ASPH CONC PAV(0" TO 2")
SY 3,114.000 $1.600 $3.000 $4.430 $2.970
PLANE ASPH CONC PAV (1/2")
SY 156,293.000 $0.700 $1.250 $1.280 $1.010
CEM STABIL BKFL
CY 313.000 $104.240 $140.000 $125.000 $138.000
TRENCH EXCAVATION PROTECTION
LF 354.000 $2.870 $40.000 $10.000 $11.000
TEMPORARY SPL SHORING
SF 358.000 $13.000 $100.000 $15.000 $33.000
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 52.800 $300.000 $350.000 $325.000 $347.000
CL C CONC (MISC)
CY 8.000 $509.000 $2,500.000 $1,170.000 $880.000
RIPRAP (CONC)(5 IN)
CY 119.000 $335.500 $550.000 $400.000 $424.000
RIPRAP (MOW STRIP)(4 IN)
CY 143.000 $405.000 $550.000 $420.000 $435.000
CLEANING AND SEALING EXISTING JOINTS
LF 412.000 $26.000 $3.500 $12.500 $15.000
HEADER TYPE EXPANSION JOINT
CF 34.000 $26.000 $300.000 $659.000 $579.000
JOINT SEALANT
LF 412.000 $26.000 $32.000 $8.500 $13.000
CONC BOX CULV (4 FT X 2 FT)
LF 282.000 $229.410 $225.000 $342.000 $261.000
CONC BOX CULV (7 FT X 4 FT)
LF 690.000 $477.680 $650.000 $560.000 $688.000
RC PIPE (CL III)(18 IN)
LF 583.000 $60.240 $65.000 $59.000 $59.000
RC PIPE (CL III)(24 IN)
LF 433.000 $72.620 $90.000 $75.000 $70.000
RC PIPE (CL III)(30 IN)
LF 95.000 $110.640 $225.000 $98.000 $92.000
HEADWALL (CH - PW - S) (DIA= 30 IN)
EA 2.000 $6,189.000 $6,000.000 $6,500.000 $6,221.000
WINGWALL (PW - 2) (HW=5 FT)
EA 2.000 $9,000.000 $17,000.000 $19,500.000 $14,419.000
WINGWALL (PW - 2) (HW=6 FT)
EA 8.000 $10,000.000 $11,500.000 $16,000.000 $10,904.000
WINGWALL (PW - 2) (HW=8 FT)
EA 1.000 $12,000.000 $26,000.000 $26,000.000 $21,293.000
SET (TY I)(S= 4 FT)(HW= 3 FT)(4:1) (C)
EA 6.000 $5,500.000 $5,250.000 $5,000.000 $4,125.000
SET (TY I)(S= 7 FT)(HW= 4 FT)(4:1) (C)
EA 10.000 $5,500.000 $7,000.000 $6,500.000 $6,160.000
SET (TY II) (18 IN) (RCP) (4: 1) (C)
EA 2.000 $5,800.000 $1,650.000 $1,000.000 $1,210.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 30.000 $903.090 $1,200.000 $1,000.000 $1,265.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 14.000 $1,335.190 $1,350.000 $1,100.000 $1,320.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 16.000 $1,540.830 $1,500.000 $1,500.000 $1,320.000
SET (TY II) (30 IN) (RCP) (4: 1) (C)
EA 6.000 $1,599.650 $3,250.000 $1,900.000 $1,430.000
REMOV STR (SET)
EA 46.000 $462.210 $325.000 $420.000 $880.000
REMOV STR (WINGWALL)
EA 30.000 $1,456.350 $1,500.000 $450.000 $990.000
REMOV STR (HEADWALL)
EA 32.000 $967.620 $1,500.000 $450.000 $935.000
REMOV STR (PIPE)
LF 8.000 $12.910 $150.000 $25.000 $33.000
REMOV STR (PIPE)
EA 23.000 $800.000 $450.000 $900.000 $880.000
MOBILIZATION
LS 1.000 $2,286,600.000 $2,635,000.000 $3,352,934.300 $2,678,036.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 30.000 $4,500.000 $7,500.000 $6,666.390 $3,060.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 4,050.000 $27.400 $26.500 $19.000 $21.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 880.000 $25.090 $30.000 $24.000 $26.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 810.000 $51.440 $45.000 $48.000 $53.000
ROCK FILTER DAMS (REMOVE)
LF 5,740.000 $7.560 $10.000 $8.000 $9.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 1,092.000 $13.430 $21.000 $25.000 $14.000
CONSTRUCTION EXITS (REMOVE)
SY 1,092.000 $4.460 $10.500 $6.000 $2.200
TEMP SEDMT CONT FENCE (INSTALL)
LF 28,945.000 $1.980 $2.500 $1.690 $1.850
TEMP SEDMT CONT FENCE (REMOVE)
LF 28,945.000 $0.500 $0.750 $0.400 $0.440
CONSTRUCTING DETOURS
SY 3,129.000 $50.000 $65.000 $50.460 $69.000
ONE-WAY TRAF CONT (FLAGGER CONT)
HR 1,392.000 $45.000 $93.000 $96.900 $73.000
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 29.000 $4,500.000 $2,100.000 $4,073.050 $6,000.000
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 5,760.000 $35.000 $25.000 $35.000 $38.000
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 5,600.000 $21.740 $30.000 $34.000 $25.000
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 160.000 $18.960 $30.000 $35.000 $25.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 96,840.000 $4.000 $6.000 $5.500 $6.700
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 98,100.000 $5.230 $6.000 $5.500 $5.000
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 840.000 $5.830 $6.000 $5.500 $5.000
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 5,760.000 $5.000 $25.000 $13.000 $13.000
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 5,600.000 $5.690 $11.500 $11.000 $13.000
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 160.000 $5.930 $11.500 $11.000 $13.000
DRIVEWAYS AND TURNOUTS (ACP)
SY 2,075.000 $11.000 $72.000 $44.670 $73.000
DRIVEWAYS AND TURNOUTS (SURF TREAT)
SY 3,752.000 $22.610 $14.000 $21.900 $12.000
DRIVEWAYS (BASE)
SY 752.000 $11.000 $27.000 $13.140 $32.000
MTL W-BEAM GD FEN (TIM POST)
LF 2,125.000 $19.000 $26.500 $19.000 $20.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 12.000 $1,800.000 $1,900.000 $1,350.000 $1,430.000
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 200.000 $2.000 $60.000 $55.000 $58.000
REMOVE METAL BEAM GUARD FENCE
LF 1,090.000 $2.000 $1.500 $1.000 $1.100
REMOVE TERMINAL ANCHOR SECTION
EA 12.000 $252.000 $130.000 $150.000 $110.000
GUARDRAIL END TREATMENT (INSTALL)
EA 22.000 $2,450.000 $3,000.000 $2,300.000 $2,200.000
GUARDRAIL END TREATMENT (REMOVE)
EA 12.000 $318.000 $125.000 $150.000 $110.000
CRASH CUSH ATTEN (INSTL)
EA 6.000 $10,500.000 $7,500.000 $11,800.000 $12,100.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 128.000 $1,300.000 $1,000.000 $1,000.000 $550.000
CRASH CUSH ATTEN (REMOVE)
EA 6.000 $800.000 $500.000 $500.000 $110.000
MAILBOX INSTALL-M (TWG-POST) TY 1
EA 1.000 $326.210 $400.000 $380.000 $350.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 2.000 $165.000 $185.000 $180.000 $242.000
CONDT (PVC) (SCH 80) (2")
LF 99.000 $8.000 $12.000 $15.000 $14.000
CONDT (PVC) (SCH 80) (2") (BORE)
LF 28.000 $22.000 $100.000 $50.000 $107.000
CONDT (PVC) (SCH 80) (3")
LF 198.000 $13.000 $16.000 $20.000 $18.000
CONDT (PVC) (SCH 80) (3") (BORE)
LF 56.000 $28.000 $105.000 $60.000 $110.000
ELEC CONDR (NO.6) BARE
LF 381.000 $1.400 $2.500 $1.300 $2.540
TRAY CABLE (4 CONDR) (12 AWG)
LF 514.000 $2.050 $3.250 $1.850 $3.000
GROUND BOX TY D (162922)W/APRON
EA 3.000 $1,080.000 $1,400.000 $945.000 $1,430.000
ZINC-COAT STL WIRE STRAND (3/16")
LF 432.000 $4.000 $6.000 $6.000 $6.000
ZINC-COAT STL WIRE STRAND (5/16")
LF 432.000 $4.200 $6.000 $6.000 $6.000
REMOVE ELECTRICAL SERVICES
EA 1.000 $700.000 $300.000 $685.000 $330.000
ELC SRV TY D 120/240 070(NS)AL(E)TP(O)
EA 1.000 $4,150.000 $6,500.000 $460.000 $6,600.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 61.000 $393.700 $425.000 $405.000 $464.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 32.000 $475.000 $525.000 $515.000 $531.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 6.000 $583.580 $650.000 $640.000 $668.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 3.000 $577.600 $700.000 $680.000 $748.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 6.000 $713.000 $750.000 $710.000 $781.000
REMOVE SM RD SN SUP&AM
EA 87.000 $61.760 $150.000 $45.000 $94.000
INSTL DEL ASSM (D-SY)SZ (BRF)GF1
EA 54.000 $10.000 $21.000 $20.000 $31.000
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 96.000 $39.260 $55.000 $52.000 $79.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 98.000 $11.800 $8.500 $8.000 $6.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 372,839.000 $0.170 $0.300 $0.260 $0.280
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 188,547.000 $0.170 $0.300 $0.260 $0.280
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 218,938.000 $0.600 $0.600 $0.530 $0.590
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 893.000 $8.000 $6.250 $6.000 $7.000
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 89,731.000 $0.650 $0.600 $0.530 $0.590
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 18,364.000 $0.900 $1.000 $1.250 $1.810
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 12,872.000 $1.000 $1.000 $1.250 $1.810
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
LF 2,157.000 $0.800 $0.600 $0.500 $0.560
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 475.000 $3.500 $1.050 $1.000 $1.100
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 693.000 $0.700 $0.850 $0.800 $0.880
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 56.000 $5.500 $8.500 $8.000 $9.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 2.000 $95.000 $125.000 $121.000 $133.000
REFL PAV MRK TY I(W)(LNDP ARW)(090MIL)
EA 13.000 $200.000 $250.000 $237.000 $261.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 2.000 $109.000 $140.000 $134.000 $147.000
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
EA 14.000 $27.800 $45.000 $44.000 $48.000
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
LF 929.000 $5.040 $5.750 $5.440 $6.000
PAVEMENT SEALER 4"
LF 133,025.000 $0.080 $0.150 $0.120 $0.140
PAVEMENT SEALER 6"
LF 238,773.000 $0.140 $0.200 $0.180 $0.200
PAVEMENT SEALER 8"
LF 1,167.000 $0.270 $0.450 $0.400 $0.440
PAVEMENT SEALER 24"
LF 985.000 $2.380 $2.600 $2.440 $2.680
PAVEMENT SEALER (ARROW)
EA 2.000 $43.500 $67.500 $63.000 $69.000
PAVEMENT SEALER (WORD)
EA 2.000 $47.800 $67.500 $63.000 $69.000
PAVEMENT SEALER (LNDP ARROW)
EA 13.000 $142.800 $115.000 $110.000 $121.000
REF PROF PAV MRK TY I(W)6"(SLD)(090MIL)
LF 191,944.000 $0.600 $0.950 $0.890 $0.970
REF PROF PAV MRK TY I(Y)4"(SLD)(090MIL)
LF 158,872.000 $0.600 $0.700 $0.640 $0.700
REF PROF PAV MRK TY I(Y)4"(BRK)(090MIL)
LF 6,565.000 $0.600 $0.700 $0.640 $0.700
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 11,928.000 $0.300 $0.400 $0.360 $0.400
REFL PAV MRKR TY I-C
EA 643.000 $3.000 $4.250 $4.000 $4.000
REFL PAV MRKR TY II-A-A
EA 2,270.000 $2.700 $3.500 $3.440 $4.000
ELIM EXT PAV MRK & MRKS (4")
LF 21,230.000 $0.480 $0.500 $0.470 $0.510
INSTALL HWY TRF SIG (FLASH BEACON)
EA 1.000 $4,500.000 $4,000.000 $8,800.000 $4,400.000
VEH SIG SEC (12")LED(YEL)
EA 8.000 $280.000 $350.000 $220.000 $396.000
VEH SIG SEC (12")LED(RED)
EA 8.000 $275.000 $350.000 $220.000 $396.000
TRF SIG CBL (TY A)(12 AWG)(4 CONDR)
LF 1,010.000 $1.800 $2.500 $1.650 $2.760
REMOVE RDSD FLASH BEACON ASSEMBLY
EA 1.000 $1,100.000 $625.000 $1,845.000 $660.000
INS TRF SIG PL AM (S)STR(TY B)
EA 2.000 $4,500.000 $4,750.000 $4,600.000 $5,060.000
INS TRF SIG PL AM (S)STR(TY B)LUM
EA 2.000 $5,200.000 $6,000.000 $6,400.000 $6,380.000
UNDERSEAL COURSE
GAL 91,396.000 $3.000 $3.000 $3.610 $4.100
PORTABLE CHANGEABLE MESSAGE SIGN
EA 3.000 $12,000.000 $15,000.000 $8,118.750 $51,840.000
TMA (STATIONARY)
DAY 531.000 $190.000 $125.000 $162.380 $173.000
TMA (MOBILE OPERATION)
DAY 60.000 $210.000 $400.000 $227.330 $288.000
DRIVEWAY ASSISTANCE DEVICE SYSTEM
MO 30.000 $2,000.000 $2,400.000 $4,073.050 $6,050.000
Totals: $30,086,178.400 $35,430,890.750 $35,777,434.210 $38,361,597.750