Job Info for 0301-06-018

County: FRIO Highway: SH 85 Date: 06/05/2019 (5 years ago) Engineer's Estimate: $19,884,678 Control Number: 0301-06-018
Project: STP 1902(059) District: SAN ANTONIO Time: 388 WORKING DAYS Type: REHAB & WIDEN TO PROVIDE PASS LNS & OP IMPROV

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $19,884,677.95
ANDERSON COLUMBIA CO., INC.   $22,794,970.10 1
14.64% | $2,910,292.15
HUNTER INDUSTRIES, LTD.   $24,126,032.68 2
21.33% | $4,241,354.73
5.84% | $1,331,062.58
ANGEL BROTHERS HOLDINGS CORP.   $24,989,600.96 3
25.67% | $5,104,923.01
9.63% | $2,194,630.86
3.58% | $863,568.28

Bid Items

Items: 114, 0 filtered
FRIO SH 85  |  SAN ANTONIO  |  0301-06-018  |  06/05/2019  |  $19,884,678  |  STP 1902(059)  |  REHAB & WIDEN TO PROVIDE PASS LNS & OP IMPROV  |  388 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate ANDERSON COLUMBIA CO., INC. HUNTER INDUSTRIES, LTD. ANGEL BROTHERS HOLDINGS CORP.
100 6002 PREPARING ROW STA 333.000 $1,000.000 $500.000 $496.170 $2,920.000
104 6028 REMOVING CONC (MISC) SY 85.000 $28.500 $11.000 $19.980 $25.000
110 6001 EXCAVATION (ROADWAY) CY 142,225.000 $6.560 $11.000 $9.470 $11.650
132 6003 EMBANKMENT (FINAL)(ORD COMP)(TY B) CY 19,783.000 $6.750 $10.000 $8.940 $5.000
150 6002 BLADING HR 132.000 $103.320 $140.000 $96.900 $100.000
161 6017 COMPOST MANUF TOPSOIL (4") SY 321,120.000 $1.320 $0.750 $0.750 $0.600
164 6033 DRILL SEEDING (PERM) (RURAL) (SANDY) SY 321,120.000 $0.140 $0.140 $0.180 $0.170
164 6051 DRILL SEED (TEMP)(WARM OR COOL) SY 321,120.000 $0.100 $0.120 $0.120 $0.120
168 6001 VEGETATIVE WATERING MG 5,009.000 $19.810 $21.000 $23.310 $15.000
169 6002 SOIL RETENTION BLANKETS (CL 1) (TY B) SY 321,120.000 $0.890 $0.800 $0.700 $0.600
216 6001 PROOF ROLLING HR 100.000 $61.730 $75.000 $79.800 $65.000
247 6053 FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS) CY 123,220.000 $33.700 $50.000 $54.100 $56.000
310 6027 PRIME COAT(MC-30 OR AE-P) GAL 69,098.000 $3.100 $4.500 $3.830 $4.000
341 6027 D-GR HMA TY-C SAC-B PG70-22 TON 39,032.000 $59.420 $77.000 $88.680 $84.000
341 6076 D-GR HMA TY B SAC-B PG (64-22) TON 13,853.000 $67.950 $77.000 $75.900 $77.000
344 6048 SUPERPAVE MIXTURES SP-C SAC-B PG70-22 TON 41,526.000 $80.000 $89.000 $84.210 $84.000
400 6005 CEM STABIL BKFL CY 639.000 $122.490 $88.000 $110.000 $140.000
400 6008 CUT & RESTORE ASPH PAVING SY 238.000 $80.430 $45.000 $63.000 $30.000
402 6001 TRENCH EXCAVATION PROTECTION LF 104.000 $2.870 $7.250 $20.000 $30.000
420 6066 CL C CONC (RAIL FOUNDATION) CY 16.000 $419.320 $1,100.000 $600.000 $1,300.000
420 6136 CL C CONC (RAC-R) CY 66.000 $825.000 $1,050.000 $825.000 $1,400.000
432 6002 RIPRAP (CONC)(5 IN) CY 154.000 $336.000 $484.000 $410.000 $440.000
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 339.000 $426.250 $450.000 $430.000 $480.000
450 6004 RAIL (TY T221) LF 444.000 $135.000 $150.000 $185.000 $170.000
450 6018 RAIL (TY T631) LF 3,232.000 $73.070 $74.000 $95.000 $85.000
462 6007 CONC BOX CULV (5 FT X 3 FT) LF 20.000 $253.000 $468.000 $530.000 $800.000
464 6005 RC PIPE (CL III)(24 IN) LF 420.000 $63.230 $68.000 $80.000 $80.000
464 6007 RC PIPE (CL III)(30 IN) LF 266.000 $88.690 $88.000 $90.000 $90.000
467 6171 SET (TY I)(S= 5 FT)(HW= 3 FT)(3:1) (C) EA 2.000 $3,770.690 $4,970.000 $4,100.000 $7,300.000
467 6172 SET (TY I)(S= 5 FT)(HW= 3 FT)(4:1) (C) EA 2.000 $5,012.000 $5,288.000 $4,700.000 $7,500.000
467 6388 SET (TY II) (24 IN) (RCP) (3: 1) (C) EA 7.000 $1,335.190 $1,220.000 $1,250.000 $1,200.000
467 6390 SET (TY II) (24 IN) (RCP) (4: 1) (C) EA 16.000 $1,677.040 $1,251.000 $1,500.000 $1,500.000
467 6394 SET (TY II) (24 IN) (RCP) (6: 1) (C) EA 2.000 $1,550.000 $1,415.000 $1,700.000 $1,600.000
467 6417 SET (TY II) (30 IN) (RCP) (3: 1) (C) EA 12.000 $1,600.000 $2,950.000 $1,925.000 $1,700.000
496 6042 REMOV STR (SMALL) EA 2.000 $1,029.430 $881.000 $1,500.000 $1,000.000
500 6001 MOBILIZATION LS 1.000 $1,923,588.460 $1,465,000.000 $1,960,622.880 $1,970,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 26.000 $7,581.890 $3,000.000 $5,428.060 $4,000.000
506 6001 ROCK FILTER DAMS (INSTALL) (TY 1) LF 2,000.000 $27.400 $23.250 $19.000 $20.000
506 6002 ROCK FILTER DAMS (INSTALL) (TY 2) LF 485.000 $25.090 $26.500 $55.000 $25.000
506 6003 ROCK FILTER DAMS (INSTALL) (TY 3) LF 640.000 $52.610 $78.740 $48.000 $50.000
506 6011 ROCK FILTER DAMS (REMOVE) LF 3,125.000 $7.560 $7.250 $8.000 $7.000
506 6020 CONSTRUCTION EXITS (INSTALL) (TY 1) SY 1,092.000 $13.430 $12.560 $25.000 $13.000
506 6024 CONSTRUCTION EXITS (REMOVE) SY 1,092.000 $4.460 $4.350 $2.000 $2.000
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 29,065.000 $1.980 $1.850 $1.690 $2.000
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 29,065.000 $0.500 $0.250 $0.400 $0.300
510 6001 ONE-WAY TRAF CONT (FLAGGER CONT) HR 5,000.000 $71.980 $56.000 $96.900 $45.000
510 6003 ONE-WAY TRAF CONT (PORT TRAF SIG) MO 18.000 $3,539.280 $4,000.000 $2,706.250 $2,000.000
512 6001 PORT CTB (FUR & INST)(SGL SLOPE)(TY 1) LF 1,380.000 $45.000 $26.000 $20.000 $35.000
512 6009 PORT CTB (FUR & INST)(LOW PROF)(TY 1) LF 10,480.000 $22.050 $14.000 $18.000 $32.000
512 6010 PORT CTB (FUR & INST)(LOW PROF)(TY 2) LF 600.000 $24.540 $14.000 $21.000 $32.000
512 6025 PORT CTB (MOVE)(SGL SLP)(TY 1) LF 9,520.000 $4.150 $11.000 $6.500 $15.000
512 6033 PORT CTB (MOVE)(LOW PROF)(TY 1) LF 157,200.000 $5.400 $4.000 $6.000 $6.000
512 6034 PORT CTB (MOVE)(LOW PROF)(TY 2) LF 900.000 $7.940 $4.000 $6.000 $6.000
512 6049 PORT CTB (REMOVE)(SGL SLP)(TY 1) LF 1,380.000 $4.480 $17.000 $13.000 $10.000
512 6057 PORT CTB (REMOVE)(LOW PROF)(TY 1) LF 10,480.000 $8.800 $14.000 $11.000 $10.000
512 6058 PORT CTB (REMOVE)(LOW PROF)(TY 2) LF 600.000 $10.740 $14.000 $11.000 $10.000
530 6005 DRIVEWAYS (ACP) SY 2,414.000 $36.670 $60.000 $29.610 $46.000
540 6001 MTL W-BEAM GD FEN (TIM POST) LF 4,563.000 $21.130 $20.500 $19.000 $20.000
540 6006 MTL BEAM GD FEN TRANS (THRIE-BEAM) EA 16.000 $1,736.390 $2,050.000 $1,850.000 $1,700.000
540 6014 SHORT RADIUS LF 19.000 $26.000 $30.000 $30.000 $32.000
540 6016 DOWNSTREAM ANCHOR TERMINAL SECTION EA 1.000 $1,010.000 $965.000 $1,000.000 $1,050.000
540 6033 MTL BM GD FEN (LONG SPAN SYSTEM) EA 2.000 $1,132.250 $990.000 $1,150.000 $1,200.000
542 6001 REMOVE METAL BEAM GUARD FENCE LF 2,400.000 $2.930 $2.000 $2.000 $2.000
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 35.000 $2,450.290 $2,615.000 $2,350.000 $2,450.000
544 6003 GUARDRAIL END TREATMENT (REMOVE) EA 16.000 $268.670 $315.000 $150.000 $160.000
545 6001 CRASH CUSH ATTEN (INSTL) EA 22.000 $10,530.950 $7,000.000 $7,000.000 $7,700.000
545 6003 CRASH CUSH ATTEN (MOVE & RESET) EA 46.000 $1,488.040 $500.000 $1,000.000 $700.000
545 6005 CRASH CUSH ATTEN (REMOVE) EA 22.000 $825.000 $100.000 $500.000 $500.000
560 6011 MAILBOX INSTALL-S (TWW-POST) TY 4 EA 1.000 $200.000 $220.000 $180.000 $185.000
644 6001 IN SM RD SN SUP&AM TY10BWG(1)SA(P) EA 55.000 $394.810 $440.000 $360.000 $370.000
644 6004 IN SM RD SN SUP&AM TY10BWG(1)SA(T) EA 63.000 $463.860 $490.000 $450.000 $460.000
644 6007 IN SM RD SN SUP&AM TY10BWG(1)SA(U) EA 6.000 $590.130 $610.000 $570.000 $590.000
644 6030 IN SM RD SN SUP&AM TYS80(1)SA(T) EA 6.000 $623.470 $680.000 $640.000 $660.000
644 6031 IN SM RD SN SUP&AM TYS80(1)SA(T-2EXT) EA 4.000 $738.430 $712.000 $740.000 $770.000
644 6033 IN SM RD SN SUP&AM TYS80(1)SA(U) EA 12.000 $685.080 $729.000 $705.000 $730.000
644 6076 REMOVE SM RD SN SUP&AM EA 132.000 $67.020 $85.000 $40.000 $100.000
658 6047 INSTL OM ASSM (OM-2Y)(WC)GND EA 14.000 $47.920 $52.000 $56.000 $58.000
658 6061 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2 EA 5.000 $17.910 $25.000 $25.000 $26.000
658 6062 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) EA 130.000 $18.180 $25.000 $26.000 $27.000
662 6004 WK ZN PAV MRK NON-REMOV (W)4"(SLD) LF 627,249.000 $0.280 $0.280 $0.250 $0.300
662 6034 WK ZN PAV MRK NON-REMOV (Y)4"(SLD) LF 93,024.000 $0.270 $0.280 $0.250 $0.300
662 6109 WK ZN PAV MRK SHT TERM (TAB)TY W EA 62,724.000 $0.970 $1.390 $1.250 $1.000
662 6110 WK ZN PAV MRK SHT TERM (TAB)TY Y EA 9,302.000 $1.000 $1.390 $1.250 $1.000
666 6006 REFL PAV MRK TY I (W)4"(DOT)(100MIL) LF 1,308.000 $0.830 $0.750 $2.500 $0.780
666 6036 REFL PAV MRK TY I (W)8"(SLD)(100MIL) LF 1,127.000 $0.730 $0.840 $0.950 $0.870
666 6048 REFL PAV MRK TY I (W)24"(SLD)(100MIL) LF 84.000 $5.090 $10.000 $6.500 $10.500
666 6054 REFL PAV MRK TY I (W)(ARROW)(100MIL) EA 4.000 $93.750 $134.000 $200.000 $140.000
666 6072 REFL PAV MRK TY I(W)(LNDP ARW)(100MIL) EA 8.000 $339.130 $244.000 $250.000 $260.000
666 6078 REFL PAV MRK TY I (W)(WORD)(100MIL) EA 4.000 $127.150 $157.000 $200.000 $165.000
666 6093 REFL PAV MRK TY I (W)(RR XING)(100MIL) EA 1.000 $520.150 $555.000 $450.000 $570.000
666 6102 REF PAV MRK TY I(W)36"(YLD TRI)(100MIL) EA 4.000 $58.180 $55.000 $25.000 $58.000
666 6224 PAVEMENT SEALER 4" LF 161,068.000 $0.080 $0.120 $0.150 $0.120
666 6225 PAVEMENT SEALER 6" LF 150,366.000 $0.140 $0.200 $0.180 $0.200
666 6226 PAVEMENT SEALER 8" LF 1,127.000 $0.270 $0.440 $0.300 $0.460
666 6230 PAVEMENT SEALER 24" LF 84.000 $2.380 $3.500 $2.500 $3.600
666 6231 PAVEMENT SEALER (ARROW) EA 4.000 $43.610 $77.000 $75.000 $80.000
666 6232 PAVEMENT SEALER (WORD) EA 4.000 $47.910 $77.000 $75.000 $80.000
666 6237 PAVEMENT SEALER (LNDP ARROW) EA 8.000 $142.830 $147.000 $95.000 $155.000
666 6242 PAVEMENT SEALER (RR XING) EA 1.000 $42.030 $344.000 $125.000 $360.000
666 6243 PAVEMENT SEALER (YLD TRI) EA 4.000 $16.240 $33.000 $10.000 $35.000
666 6285 REF PROF PAV MRK TY I(W)6"(SLD)(090MIL) LF 145,112.000 $0.970 $0.970 $0.850 $1.000
666 6287 REF PROF PAV MRK TY I(Y)4"(SLD)(090MIL) LF 147,604.000 $0.640 $0.670 $0.650 $0.700
666 6300 RE PM W/RET REQ TY I (W)4"(BRK)(100MIL) LF 9,340.000 $0.390 $0.380 $0.750 $0.400
666 6309 RE PM W/RET REQ TY I (W)6"(SLD)(100MIL) LF 5,254.000 $0.470 $0.520 $0.750 $0.550
666 6315 RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL) LF 2,816.000 $0.340 $0.380 $0.750 $0.400
672 6007 REFL PAV MRKR TY I-C EA 518.000 $3.340 $3.880 $5.000 $4.000
672 6009 REFL PAV MRKR TY II-A-A EA 2,033.000 $3.050 $3.770 $5.000 $3.900
672 6010 REFL PAV MRKR TY II-C-R EA 6.000 $3.580 $20.000 $5.000 $21.000
681 6001 TEMP TRAF SIGNALS EA 1.000 $20,000.000 $5,700.000 $1,000.000 $2,500.000
3071 6001 UNDERSEAL COURSE GAL 107,797.000 $2.730 $4.200 $3.720 $2.000
6001 6001 PORTABLE CHANGEABLE MESSAGE SIGN DAY 180.000 $57.740 $60.000 $81.190 $90.000
6185 6002 TMA (STATIONARY) DAY 152.000 $185.580 $175.000 $162.370 $350.000
6185 6003 TMA (MOBILE OPERATION) HR 2.000 $43.040 $60.000 $162.370 $100.000
6343 6001 DRIVEWAY ASSISTANCE DEVICE SYSTEM MO 18.000 $8,013.750 $5,700.000 $4,735.940 $2,800.000
Totals: $19,884,677.95 $22,794,970.10 $24,126,032.68 $24,989,600.96