FRIO FM 117 (0236-04-029)

Items: 126

County: FRIO
Length: N/A
Highway: FM 117
District: SAN ANTONIO
Control Number: 0236-04-029
DBE Goal: N/A
Project: C 236-4-29
Guaranty: N/A
Time: 0 X
Engineer's Estimate: $25,996,381.46
Date: 08/05/2021 (4 years ago)
Contract Number: N/A
Type: REHAB AND WIDEN NARROW ROADWAY TO ADD SHOULDERS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (4)
E
Engineer's Estimate
$25,996,381.46
$23,587,273.08
Over/Under Est: -9.27% -$2,409,108.38
Over/Under Est: -3.99% -$1,037,501.70
Amt Left: 5.82% $1,371,606.68
Over/Under Est: 1.42% $368,835.02
Amt Left: 11.78% $2,777,943.40
Delta: -5.63% -$1,406,336.72
Over/Under Est: 7.62% $1,981,948.61
Amt Left: 18.62% $4,391,056.99
Delta: -6.12% -$1,613,113.59
Subcontractor Percentage Amount
FLASHER EQUIPMENT COMPANY 2.98% $670,437.36
LONE STAR EROSION CONTROL 2.91% $654,688.83
GEOSOURCE, INC. 1.10% $247,476.88
EGGEMEYER LAND CLEARING, LLC 0.26% $58,494.54
BARRICADES UNLIMITED 0.10% $22,497.90
Total: 7.35% $1,653,595.51

Bid Items & Bid Tabulations

126 Total 0 of 126
FRIO  |  FM 117  |  SAN ANTONIO  |  0236-04-029  |  08/05/2021  |  $25,996,381.46  |  C 236-4-29  |  REHAB AND WIDEN NARROW ROADWAY TO AD...  |  0 X
Alt
Item Code
Description
Unit
Quantity
Engineer's Estimate
HUNTER INDUSTRIES, LTD.
TEXAS MATERIALS GROUP, INC.
ANDERSON COLUMBIA CO., INC.
H. L. ZUMWALT CONSTRUCTION, INC.
PREPARING ROW
STA 864.000 $2,500.000 $983.000 $1,500.000 $1,000.000 $800.000
REMOVING CONC (RIPRAP)
SY 210.000 $8.740 $16.650 $20.000 $15.000 $16.000
EXCAVATION (ROADWAY)
CY 15,922.000 $8.560 $9.990 $16.000 $12.000 $16.000
SUBGRADE WIDENING (ORD COMP)
STA 564.000 $502.170 $492.750 $675.000 $200.000 $300.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 11,815.000 $7.400 $11.130 $9.000 $7.000 $13.000
COMPOST MANUF TOPSOIL (4")
SY 319,017.000 $1.060 $0.780 $1.750 $3.300 $1.600
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 319,017.000 $0.160 $0.160 $0.180 $0.180 $0.130
DRILL SEED (TEMP)(WARM OR COOL)
SY 319,017.000 $0.120 $0.120 $0.130 $0.130 $0.100
VEGETATIVE WATERING
MG 4,985.000 $15.000 $19.980 $20.000 $28.000 $25.000
SOIL RETENTION BLANKETS (CL 1) (TY B)
SY 319,017.000 $1.180 $0.880 $0.630 $0.640 $1.000
PROOF ROLLING
HR 119.000 $98.900 $79.800 $85.000 $50.000 $78.000
FL BS (CIP)(TY A GR 1-2 OR 5) FINAL POS
CY 27,455.000 $45.000 $48.460 $58.000 $61.500 $60.000
FL BS (RDWY DEL)(TYA GR 1, 2 OR 5)F POS
CY 19,943.000 $35.000 $43.790 $48.000 $48.000 $55.000
REWORK BS MATL (TY B)(10")(OC)
SY 61,468.000 $3.000 $2.570 $1.700 $1.500 $2.900
REWRK BS MATL (TY B)(10")(DENS CONT)
SY 84,436.000 $5.000 $2.570 $1.700 $1.600 $2.900
CEMENT
TON 1,681.000 $158.920 $160.650 $152.000 $177.000 $170.000
CEMENT TREAT (SUBGRADE) (8")
SY 121,141.000 $3.000 $2.050 $2.250 $1.300 $2.700
PRIME COAT (MC-30)
GAL 24,225.000 $4.120 $3.950 $4.250 $4.000 $3.000
FOG SEAL (CSS-1H)
GAL 13,916.000 $3.780 $3.080 $5.000 $3.800 $2.750
ASPH(AC-15P,AC-20-5TR,AC-20XP,AC10-2TR)
GAL 36,000.000 $2.000 $0.000 $0.000 $0.000 $0.000
AGGR (TY-B GR-5)
CY 825.000 $20.720 $0.000 $0.000 $0.000 $0.000
ASPH (AC-15P, AC-20-5TR OR AC-20XP)
GAL 59,616.000 $3.340 $3.830 $3.400 $3.000 $4.000
AGGR (TY-PB GR-4)
CY 2,006.000 $148.430 $80.490 $85.000 $170.000 $60.000
CEM STABIL BKFL
CY 1,866.000 $66.430 $95.000 $150.000 $164.000 $180.000
CUT & RESTORING PAV
SY 1,327.000 $116.460 $130.000 $61.000 $37.000 $88.000
TRENCH EXCAVATION PROTECTION
LF 255.000 $3.610 $5.000 $6.000 $6.000 $17.000
TEMPORARY SPL SHORING
SF 2,682.000 $14.970 $5.000 $17.000 $17.000 $28.000
RIPRAP (CONC)(4 IN)
CY 42.000 $438.690 $460.000 $470.000 $480.000 $600.000
GABION MATTRESSES (GALV)
CY 55.000 $222.640 $491.350 $445.000 $410.000 $300.000
CONC BOX CULV (3 FT X 2 FT)
LF 264.000 $194.540 $240.000 $210.000 $210.000 $280.000
CONC BOX CULV (4 FT X 2 FT)
LF 334.000 $233.980 $270.000 $225.000 $230.000 $300.000
CONC BOX CULV (5 FT X 2 FT)
LF 1,068.000 $245.720 $380.000 $325.000 $305.000 $390.000
CONC BOX CULV (9 FT X 5 FT)
LF 224.000 $801.910 $840.000 $725.000 $750.000 $890.000
RC PIPE (CL III)(24 IN)
LF 890.000 $73.530 $100.000 $49.000 $50.000 $85.000
RC PIPE (CL III)(36 IN)
LF 57.000 $117.880 $180.000 $105.000 $105.000 $150.000
RC PIPE (CL IV)(24 IN)
LF 517.000 $108.250 $95.000 $60.000 $60.000 $98.000
RC PIPE (ARCH)(CL III)(DES 1)
LF 916.000 $133.320 $135.000 $135.000 $135.000 $175.000
RC PIPE (ARCH)(CL III)(DES 3)
LF 279.000 $154.720 $160.000 $150.000 $150.000 $200.000
RC PIPE (ARCH)(CL IV)(DES 3)
LF 478.000 $162.660 $180.000 $180.000 $180.000 $220.000
HEADWALL (CH - FW - 0) (DIA= 36 IN)
EA 2.000 $6,053.450 $12,000.000 $9,500.000 $9,750.000 $6,800.000
HEADWALL (CH - PW - 0) (DIA= 48 IN)
EA 1.000 $10,977.580 $18,000.000 $10,250.000 $10,500.000 $7,800.000
WINGWALL (FW - S) (HW=3 FT)
EA 2.000 $10,084.070 $4,800.000 $9,200.000 $9,455.000 $7,800.000
WINGWALL (PW - 1) (HW=4 FT)
EA 6.000 $9,769.910 $11,000.000 $11,800.000 $11,975.000 $13,000.000
WINGWALL (PW - 1) (HW=6 FT)
EA 2.000 $16,721.580 $24,000.000 $20,000.000 $19,950.000 $24,000.000
SET (TY I)(S=3 FT)(HW=3FT)(3:1)(C)
EA 12.000 $5,769.610 $1,400.000 $5,400.000 $5,500.000 $5,000.000
SET (TY I)(S= 4 FT)(HW= 3 FT)(3:1) (C)
EA 2.000 $5,795.930 $1,800.000 $6,000.000 $6,100.000 $5,000.000
SET (TY I)(S= 4 FT)(HW= 3 FT)(4:1) (C)
EA 8.000 $7,299.290 $2,000.000 $6,300.000 $6,400.000 $5,300.000
SET (TY I)(S= 5 FT)(HW= 3 FT)(3:1) (C)
EA 2.000 $5,628.700 $6,200.000 $7,300.000 $7,300.000 $7,100.000
SET (TY I)(S= 5 FT)(HW= 3 FT)(4:1) (C)
EA 14.000 $6,761.400 $2,100.000 $7,600.000 $7,680.000 $5,400.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 19.000 $1,344.530 $2,300.000 $1,300.000 $1,300.000 $1,600.000
SET (TY II) (24 IN) (RCP) (6: 1) (C)
EA 28.000 $1,599.840 $2,800.000 $1,300.000 $1,300.000 $1,600.000
SET (TY II) (DES 1) (RCP) (4: 1) (P)
EA 54.000 $2,435.000 $2,600.000 $1,800.000 $1,800.000 $2,400.000
SET (TY II) (DES 3) (RCP) (4: 1) (C)
EA 4.000 $2,350.000 $3,200.000 $3,200.000 $2,100.000 $3,800.000
SET (TY II) (DES 3) (RCP) (6: 1) (C)
EA 24.000 $2,773.700 $5,000.000 $3,200.000 $3,130.000 $3,800.000
CLEAN EXIST CULVERTS
EA 7.000 $1,823.960 $750.000 $2,100.000 $2,080.000 $1,700.000
REMOV STR (SET)
EA 22.000 $427.160 $350.000 $675.000 $680.000 $880.000
REMOV STR (WINGWALL)
EA 2.000 $1,302.760 $2,000.000 $2,000.000 $2,050.000 $1,000.000
REMOV STR (HEADWALL)
EA 8.000 $1,068.440 $750.000 $1,900.000 $1,920.000 $1,000.000
REMOV STR (PIPE)
LF 2,447.000 $15.370 $15.000 $20.000 $20.000 $11.000
MOBILIZATION
LS 1.000 $2,250,000.000 $1,938,306.000 $2,360,000.000 $2,125,000.000 $2,000,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 33.000 $14,000.000 $2,224.120 $11,500.000 $2,000.000 $12,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 820.000 $30.010 $31.010 $32.000 $29.000 $26.000
ROCK FILTER DAMS (REMOVE)
LF 820.000 $8.780 $6.510 $5.000 $9.000 $14.000
CONSTRUCTION EXITS (INSTALL) (TY 2)
SY 2,808.000 $16.470 $42.090 $44.000 $42.000 $40.000
CONSTRUCTION EXITS (REMOVE)
SY 2,808.000 $6.590 $6.380 $5.000 $10.400 $7.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 117,730.000 $2.430 $2.350 $2.500 $2.400 $3.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 117,730.000 $0.670 $0.250 $0.100 $0.500 $1.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 3,505.000 $3.950 $6.270 $7.000 $4.000 $5.800
BIODEG EROSN CONT LOGS (REMOVE)
LF 3,505.000 $1.040 $0.750 $0.250 $1.000 $1.000
CONSTRUCTING DETOURS
SY 22,565.000 $52.410 $49.820 $30.000 $64.000 $60.000
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 8,095.000 $32.280 $12.000 $32.000 $31.000 $24.000
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 240.000 $37.700 $10.000 $32.000 $31.000 $24.000
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 75,980.000 $5.000 $9.000 $4.000 $7.000 $6.500
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 4,000.000 $9.100 $8.000 $4.000 $8.000 $6.500
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 8,095.000 $6.660 $12.000 $8.000 $13.000 $11.000
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 240.000 $9.140 $9.000 $8.000 $11.000 $11.000
TURNOUTS (ACP)
SY 233.000 $54.990 $39.420 $50.000 $28.000 $50.000
DRIVEWAYS (ACP)(TYPE 1)
SY 3,834.000 $29.090 $32.850 $35.000 $40.000 $30.000
DRIVEWAYS (ACP) (TYPE 2)
SY 9,327.000 $19.130 $39.420 $45.000 $55.000 $45.000
MAILBOX INSTALL-S (TWG-POST) TY 1
EA 9.000 $213.210 $187.000 $187.000 $195.000 $200.000
MAILBOX INSTALL-D (TWG-POST) TY 1
EA 1.000 $207.800 $226.000 $226.000 $235.000 $240.000
MAILBOX INSTALL-M (TWG-POST) TY 1
EA 3.000 $336.480 $394.000 $394.000 $410.000 $420.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 57.000 $536.880 $522.000 $522.000 $540.000 $550.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 24.000 $659.500 $597.000 $597.000 $620.000 $640.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 3.000 $1,299.320 $816.000 $816.000 $850.000 $880.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 15.000 $643.170 $619.000 $619.000 $645.000 $660.000
REMOVE SM RD SN SUP&AM
EA 75.000 $89.880 $87.000 $87.000 $91.000 $95.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 131.000 $26.140 $7.000 $7.000 $7.000 $8.000
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
EA 54.000 $71.420 $72.000 $72.000 $75.000 $76.000
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 122.000 $79.080 $72.000 $72.000 $75.000 $76.000
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 7,731.000 $3.570 $2.900 $2.900 $2.600 $3.100
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 237,363.000 $0.650 $0.440 $0.440 $0.600 $0.470
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 1,728.000 $7.050 $6.000 $6.000 $10.400 $6.300
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 312,450.000 $0.660 $0.440 $0.440 $0.600 $0.470
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 3,401.000 $0.840 $0.700 $0.700 $1.150 $0.740
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 362.000 $5.920 $6.000 $6.000 $7.000 $6.300
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 6.000 $133.630 $150.000 $150.000 $156.000 $165.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 6.000 $152.340 $150.000 $150.000 $156.000 $165.000
REF PAV MRK TY I (W)(MED NOSE)(100MIL)
EA 1.000 $157.000 $344.000 $344.000 $468.000 $380.000
PAVEMENT SEALER 4"
LF 88,058.000 $0.120 $0.130 $0.130 $0.160 $0.140
PAVEMENT SEALER 6"
LF 172,115.000 $0.180 $0.200 $0.200 $0.200 $0.210
PAVEMENT SEALER 8"
LF 3,401.000 $0.340 $0.440 $0.440 $0.300 $0.470
PAVEMENT SEALER 24"
LF 362.000 $1.850 $3.000 $3.000 $2.600 $3.200
PAVEMENT SEALER (ARROW)
EA 6.000 $43.580 $65.000 $65.000 $26.000 $70.000
PAVEMENT SEALER (WORD)
EA 6.000 $46.890 $65.000 $65.000 $36.000 $70.000
PAVEMENT SEALER (MED NOSE)
EA 1.000 $85.950 $244.000 $244.000 $78.000 $260.000
REF PROF PAV MRK TY I(W)6"(SLD)(100MIL)
LF 172,115.000 $0.730 $0.780 $0.780 $0.800 $0.830
REF PROF PAV MRK TY I(Y)4"(BRK)(100MIL)
LF 18,797.000 $0.450 $0.580 $0.580 $0.600 $0.630
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
LF 69,261.000 $0.500 $0.580 $0.580 $0.600 $0.630
REFL PAV MRKR TY II-A-A
EA 1,194.000 $2.910 $3.330 $3.330 $5.200 $3.500
ELIM EXT PAV MRK & MRKS (4")
LF 196,041.000 $0.320 $0.370 $0.370 $0.200 $0.380
FULL - WIDTH MOWING
CYC 11.000 $3,600.000 $12,000.000 $2,500.000 $4,990.000 $10,000.000
LITTER REMOVAL
CYC 33.000 $1,960.000 $2,000.000 $1,000.000 $2,080.000 $3,000.000
CLEANING / SWEEPING (OUTSIDE MAIN LANE)
CYC 33.000 $990.000 $1,050.000 $500.000 $555.000 $3,000.000
NO. OF WORKING DAYS
$/D 1,875.000 $645.000 $581.000 $551.000 $640.000 $517.000
D-GR HMA TY-B PG64-22
TON 26,411.000 $65.980 $68.460 $71.000 $68.000 $65.000
D-GR HMA TY-C PG70-22
TON 21,758.000 $81.000 $73.710 $78.500 $77.000 $85.000
SP MIXES SP-C SAC-B PG70-22
TON 36,143.000 $88.260 $79.140 $80.000 $92.000 $90.000
TACK COAT
GAL 19,701.000 $2.510 $3.380 $3.000 $3.000 $4.000
CEMENT
TON 841.000 $185.220 $160.650 $152.000 $177.000 $1,700.000
ASPHALT BINDER (PG 64-22)
TON 2,395.000 $475.000 $472.500 $525.000 $517.000 $580.000
FOAMED ASPHALT TREAT (9")(DC)
SY 198,677.000 $4.000 $2.820 $4.250 $4.500 $5.500
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $10,050.680 $7,500.000 $12,000.000 $35,000.000 $10,000.000
TMA (STATIONARY)
DAY 336.000 $164.080 $300.000 $150.000 $180.000 $250.000
TMA (MOBILE OPERATION)
DAY 222.000 $178.960 $500.000 $150.000 $620.000 $300.000
1
UNDERSEAL COURSE
GAL 29,698.000 $3.000 $3.380 $3.000 $4.000 $3.250
Totals: $26,085,475.460 $23,587,273.080 $24,958,879.760 $26,365,216.480 $27,978,330.070