REMOVING CONCRETE(MOW STRIP)
|
LF
|
19,852.500
|
$10.000
|
$10.000
|
$4.470
|
$10.000
|
$16.800
|
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
50.200
|
$25.000
|
$25.000
|
$240.900
|
$110.000
|
$120.000
|
|
|
|
BACKFILL (TY B)
|
STA
|
3,227.000
|
$100.000
|
$75.000
|
$148.500
|
$25.000
|
$187.750
|
|
|
|
BLADING
|
HR
|
92.000
|
$100.000
|
$125.000
|
$91.200
|
$75.000
|
$100.000
|
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
101,574.000
|
$1.500
|
$1.620
|
$0.980
|
$1.250
|
$1.080
|
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
|
SY
|
101,574.000
|
$0.500
|
$0.320
|
$0.320
|
$0.320
|
$0.550
|
|
|
|
VEGETATIVE WATERING
|
MG
|
1,584.820
|
$20.000
|
$25.000
|
$19.980
|
$25.000
|
$50.000
|
|
|
|
SUPERPAVE MIXTURES SP-C SAC-B PG70-22
|
TON
|
15,007.000
|
$80.000
|
$77.000
|
$76.420
|
$91.000
|
$87.890
|
|
|
|
SUPERPAVE MIXTURES SP-C SAC-A PG76-22
|
TON
|
166,657.000
|
$80.000
|
$80.000
|
$84.840
|
$93.000
|
$93.480
|
|
|
|
TBPFC (MEMBRANE)
|
GAL
|
30,407.000
|
$3.250
|
$3.780
|
$2.630
|
$2.800
|
$3.000
|
|
|
|
TBPFC (ASPHALT)(PG 76-22)
|
TON
|
321.000
|
$95.000
|
$115.000
|
$104.240
|
$130.000
|
$156.070
|
|
|
|
TBPFC (AGGREGATE) (SAC-A)
|
TON
|
5,028.000
|
$95.000
|
$115.000
|
$104.240
|
$130.000
|
$156.070
|
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
|
SY
|
3,000.000
|
$27.000
|
$48.000
|
$43.380
|
$47.500
|
$86.770
|
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
50,746.000
|
$1.500
|
$1.100
|
$2.100
|
$1.600
|
$1.000
|
|
|
|
PLANE ASPH CONC PAV (1.5")
|
SY
|
757.000
|
$1.500
|
$12.000
|
$4.200
|
$5.500
|
$9.110
|
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
1,458,556.000
|
$1.000
|
$0.820
|
$1.310
|
$1.600
|
$1.590
|
|
|
|
RIPRAP (CONC) (CL A )
|
CY
|
3,939.800
|
$400.000
|
$395.000
|
$351.770
|
$425.000
|
$472.500
|
|
|
|
RIPRAP (STONE COMMON)(DRY)(6 IN)
|
CY
|
267.000
|
$200.000
|
$95.000
|
$120.000
|
$100.000
|
$204.750
|
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
1,075.900
|
$425.000
|
$475.000
|
$475.000
|
$415.000
|
$509.250
|
|
|
|
CLEANING AND SEALING JOINTS
|
LF
|
7,414.000
|
$20.000
|
$12.280
|
$12.280
|
$12.500
|
$12.890
|
|
|
|
HEADER TYPE EXPANSION JOINT
|
CF
|
1,384.100
|
$350.000
|
$296.520
|
$296.520
|
$298.000
|
$311.350
|
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$2,310,000.000
|
$1,100,000.000
|
$2,263,262.850
|
$1,100,000.000
|
$869,000.000
|
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
19.000
|
$6,654.150
|
$2,000.000
|
$5,191.480
|
$4,000.000
|
$3,500.000
|
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
71,970.000
|
$4.000
|
$2.500
|
$2.500
|
$2.600
|
$4.730
|
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
71,970.000
|
$1.000
|
$0.250
|
$0.250
|
$0.150
|
$1.050
|
|
|
|
INTRSCT, DRVWAYS, & TURNOUT (ACP)
|
SY
|
1,282.000
|
$15.500
|
$55.000
|
$30.660
|
$42.000
|
$105.070
|
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
567,818.000
|
$0.250
|
$0.110
|
$0.120
|
$0.150
|
$0.200
|
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
16,612.500
|
$20.000
|
$19.750
|
$19.300
|
$18.750
|
$23.940
|
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
44.000
|
$1,800.000
|
$1,975.000
|
$1,800.000
|
$1,700.000
|
$2,415.000
|
|
|
|
MTL BEAM GD FEN TRANS (T101)
|
EA
|
8.000
|
$1,500.000
|
$1,160.000
|
$1,041.000
|
$1,025.000
|
$1,093.050
|
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
46.000
|
$1,000.000
|
$850.000
|
$1,090.000
|
$1,000.000
|
$971.250
|
|
|
|
MTL BM GD FEN TRANS (NON - SYM)
|
EA
|
44.000
|
$800.000
|
$1,360.000
|
$1,065.000
|
$780.000
|
$1,590.750
|
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
16,262.500
|
$1.400
|
$1.750
|
$1.000
|
$1.500
|
$2.630
|
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
46.000
|
$150.000
|
$170.000
|
$125.000
|
$135.000
|
$157.500
|
|
|
|
RM MTL BM GD FEN TRANS (T101)
|
EA
|
56.000
|
$165.000
|
$200.000
|
$100.000
|
$145.000
|
$173.250
|
|
|
|
CABLE BARRIER SYSTEM (TL-4)
|
LF
|
141,194.000
|
$15.000
|
$7.500
|
$7.500
|
$16.250
|
$16.590
|
|
|
|
CABLE BARRIER TERMINAL SECTION (TL-4)
|
EA
|
34.000
|
$4,000.000
|
$1,300.000
|
$1,300.000
|
$3,000.000
|
$3,097.500
|
|
|
|
REMOVE CABLE BARRIER
|
LF
|
26,205.000
|
$4.000
|
$5.000
|
$5.000
|
$7.250
|
$7.350
|
|
|
|
REMOVE CABLE BARRIER TERMINAL SECTION
|
EA
|
6.000
|
$1,000.000
|
$500.000
|
$500.000
|
$1,875.000
|
$1,942.500
|
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
46.000
|
$2,500.000
|
$2,620.000
|
$2,730.000
|
$2,400.000
|
$3,024.000
|
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
41.000
|
$175.000
|
$370.000
|
$100.000
|
$170.000
|
$367.500
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SB(T)
|
EA
|
14.000
|
$625.000
|
$815.000
|
$856.150
|
$961.000
|
$1,009.500
|
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND
|
EA
|
576.000
|
$50.000
|
$45.000
|
$39.790
|
$45.000
|
$52.500
|
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
66.000
|
$14.000
|
$19.000
|
$10.500
|
$12.000
|
$18.900
|
|
|
|
INSTL DEL ASSM (D-SY)SZ 2(WC)GND
|
EA
|
14.000
|
$50.000
|
$60.000
|
$39.990
|
$60.000
|
$52.500
|
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
|
EA
|
66.000
|
$9.500
|
$9.000
|
$10.500
|
$9.000
|
$18.900
|
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)GF1
|
EA
|
99.000
|
$13.000
|
$12.000
|
$10.750
|
$12.000
|
$18.900
|
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
46.000
|
$55.000
|
$45.000
|
$42.830
|
$45.000
|
$55.650
|
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
131.000
|
$14.000
|
$18.000
|
$13.750
|
$18.000
|
$22.310
|
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
|
LF
|
75,830.000
|
$0.450
|
$0.200
|
$0.200
|
$0.200
|
$0.320
|
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
331,777.000
|
$0.450
|
$0.180
|
$0.180
|
$0.180
|
$0.320
|
|
|
|
WK ZN PAV MRK NON-REMOV (W)(ENTR GORE)
|
EA
|
17.000
|
$350.000
|
$250.000
|
$250.000
|
$250.000
|
$420.000
|
|
|
|
WK ZN PAV MRK NON-REMOV (W)(EXIT GORE)
|
EA
|
16.000
|
$350.000
|
$250.000
|
$250.000
|
$250.000
|
$420.000
|
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
332,204.000
|
$0.450
|
$0.180
|
$0.180
|
$0.180
|
$0.320
|
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
2,988.000
|
$0.610
|
$1.500
|
$1.500
|
$1.500
|
$1.310
|
|
|
|
WK ZN PAV MRK REMOV (Y)4"(DOT)
|
LF
|
262.000
|
$1.230
|
$4.000
|
$4.000
|
$4.000
|
$1.310
|
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
3,005.000
|
$0.630
|
$1.500
|
$1.500
|
$1.500
|
$1.310
|
|
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
28,794.000
|
$0.750
|
$1.000
|
$1.250
|
$0.550
|
$1.000
|
|
|
|
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
|
LF
|
143.000
|
$1.910
|
$1.500
|
$1.500
|
$1.500
|
$2.630
|
|
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
12.000
|
$0.800
|
$20.000
|
$20.000
|
$20.000
|
$1.310
|
|
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
4.000
|
$155.280
|
$130.000
|
$130.000
|
$130.000
|
$131.250
|
|
|
|
REFL PAV MRK TY I(W)(ENTR GORE)(100MIL)
|
EA
|
17.000
|
$900.000
|
$650.000
|
$650.000
|
$650.000
|
$420.000
|
|
|
|
REFL PAV MRK TY I(W)(EXIT GORE)(100MIL)
|
EA
|
17.000
|
$900.000
|
$650.000
|
$650.000
|
$650.000
|
$420.000
|
|
|
|
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
|
EA
|
48.000
|
$109.740
|
$48.000
|
$48.000
|
$48.000
|
$26.250
|
|
|
|
PAVEMENT SEALER 6"
|
LF
|
938,617.000
|
$0.180
|
$0.140
|
$0.140
|
$0.140
|
$0.190
|
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
4.000
|
$51.810
|
$70.000
|
$70.000
|
$70.000
|
$68.250
|
|
|
|
PAVEMENT SEALER (ENTR GORE)
|
EA
|
17.000
|
$310.000
|
$200.000
|
$200.000
|
$200.000
|
$210.000
|
|
|
|
PAVEMENT SEALER (EXIT GORE)
|
EA
|
16.000
|
$315.000
|
$200.000
|
$200.000
|
$200.000
|
$210.000
|
|
|
|
PAVEMENT SEALER (SYMBOL)
|
EA
|
2.000
|
$35.310
|
$70.000
|
$70.000
|
$70.000
|
$105.000
|
|
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
82,651.000
|
$0.650
|
$0.600
|
$0.600
|
$0.600
|
$0.470
|
|
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
331,777.000
|
$0.650
|
$0.560
|
$0.560
|
$0.560
|
$0.440
|
|
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
332,204.000
|
$0.650
|
$0.560
|
$0.560
|
$0.560
|
$0.440
|
|
|
|
REF PROF PAV MRK TY I(W)6"(SLD)(100MIL)
|
LF
|
59,317.000
|
$0.650
|
$0.850
|
$0.850
|
$0.850
|
$0.890
|
|
|
|
REF PROF PAV MRK TY I(Y)6"(SLD)(100MIL)
|
LF
|
33,122.000
|
$0.650
|
$0.850
|
$0.850
|
$0.850
|
$0.890
|
|
|
|
PREFAB PAV MRK TY C (W) (SYMBOL)
|
EA
|
2.000
|
$229.160
|
$140.000
|
$140.000
|
$140.000
|
$420.000
|
|
|
|
REFL PAV MRKR TY I-R
|
EA
|
434.000
|
$4.000
|
$8.000
|
$8.000
|
$8.000
|
$10.500
|
|
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
5,068.000
|
$4.000
|
$4.000
|
$4.000
|
$4.000
|
$3.150
|
|
|
|
FULL - WIDTH MOWING
|
CYC
|
2.000
|
$2,650.000
|
$10,000.000
|
$32,080.000
|
$5,000.000
|
$10,000.000
|
|
|
|
CLEANING / SWEEPING (OUTSIDE MAIN LANE)
|
CYC
|
8.000
|
$2,000.000
|
$1,700.000
|
$4,591.570
|
$3,500.000
|
$12,875.000
|
|
|
|
UNDERSEAL COURSE
|
GAL
|
305,263.000
|
$2.500
|
$3.880
|
$2.630
|
$2.800
|
$3.000
|
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
168.000
|
$65.000
|
$70.000
|
$94.180
|
$100.000
|
$100.000
|
|
|
|
TMA (STATIONARY)
|
DAY
|
331.000
|
$125.000
|
$164.000
|
$290.110
|
$155.000
|
$265.000
|
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
60.000
|
$135.000
|
$220.000
|
$290.110
|
$250.000
|
$400.000
|
|
1
|
|
ASPH(AC-15P,AC-20-5TR,AC-20XP,AC10-2TR)
|
GAL
|
33,786.000
|
$1.750
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
1
|
|
AGGR (TY-PB GR-4)
|
CY
|
979.000
|
$40.550
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
1
|
|
PFC (ASPHALT) PG76-22
|
TON
|
321.000
|
$95.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
1
|
|
PFC-C (AGGREGATE)(PG76 MIX) SAC-A
|
TON
|
5,028.000
|
$95.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
Totals: |
$28,882,846.750
|
$25,532,106.032
|
$27,775,102.457
|
$29,971,415.525
|
$31,890,897.735
|