FRIO IH 35 (0017-06-085)

Items: 87

County: FRIO
Length: N/A
Highway: IH 35
District: SAN ANTONIO
Control Number: 0017-06-085
DBE Goal: N/A
Project: NH 2019(900)
Guaranty: N/A
Time: 303 WORKING DAYS
Engineer's Estimate: $28,275,867.04
Date: 05/08/2019 (7 years ago)
Contract Number: N/A
Type: BASE REPAIR, SEALCOAT, OVERLAY & PAV MRK ON MAINLN
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$28,275,867.04
$25,532,106.02
Over/Under Est: -9.7% -$2,743,761.02
$27,775,102.44
Over/Under Est: -1.77% -$500,764.60
Amt Left: 8.79% $2,242,996.42
Over/Under Est: 6% $1,695,548.48
Amt Left: 17.39% $4,439,309.50
Delta: -7.91% -$2,196,313.08
Over/Under Est: 12.78% $3,615,030.68
Amt Left: 24.91% $6,358,791.70
Delta: -6.40% -$1,919,482.20

Bid Items & Bid Tabulations

87 Total 0 of 87
FRIO  |  IH 35  |  SAN ANTONIO  |  0017-06-085  |  05/08/2019  |  $28,275,867.04  |  NH 2019(900)  |  BASE REPAIR, SEALCOAT, OVERLAY & PAV...  |  303 WORKING DAYS
Alt
Item Code
Description
Unit
Quantity
Engineer's Estimate
ANDERSON COLUMBIA CO., INC.
HUNTER INDUSTRIES, LTD.
ANGEL BROTHERS HOLDINGS CORP.
CLARK CONSTRUCTION OF TEXAS, INC.
REMOVING CONCRETE(MOW STRIP)
LF 19,852.500 $10.000 $10.000 $4.470 $10.000 $16.800
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 50.200 $25.000 $25.000 $240.900 $110.000 $120.000
BACKFILL (TY B)
STA 3,227.000 $100.000 $75.000 $148.500 $25.000 $187.750
BLADING
HR 92.000 $100.000 $125.000 $91.200 $75.000 $100.000
COMPOST MANUF TOPSOIL (4")
SY 101,574.000 $1.500 $1.620 $0.980 $1.250 $1.080
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
SY 101,574.000 $0.500 $0.320 $0.320 $0.320 $0.550
VEGETATIVE WATERING
MG 1,584.820 $20.000 $25.000 $19.980 $25.000 $50.000
SUPERPAVE MIXTURES SP-C SAC-B PG70-22
TON 15,007.000 $80.000 $77.000 $76.420 $91.000 $87.890
SUPERPAVE MIXTURES SP-C SAC-A PG76-22
TON 166,657.000 $80.000 $80.000 $84.840 $93.000 $93.480
TBPFC (MEMBRANE)
GAL 30,407.000 $3.250 $3.780 $2.630 $2.800 $3.000
TBPFC (ASPHALT)(PG 76-22)
TON 321.000 $95.000 $115.000 $104.240 $130.000 $156.070
TBPFC (AGGREGATE) (SAC-A)
TON 5,028.000 $95.000 $115.000 $104.240 $130.000 $156.070
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 3,000.000 $27.000 $48.000 $43.380 $47.500 $86.770
PLANE ASPH CONC PAV(0" TO 2")
SY 50,746.000 $1.500 $1.100 $2.100 $1.600 $1.000
PLANE ASPH CONC PAV (1.5")
SY 757.000 $1.500 $12.000 $4.200 $5.500 $9.110
PLANE ASPH CONC PAV (2")
SY 1,458,556.000 $1.000 $0.820 $1.310 $1.600 $1.590
RIPRAP (CONC) (CL A )
CY 3,939.800 $400.000 $395.000 $351.770 $425.000 $472.500
RIPRAP (STONE COMMON)(DRY)(6 IN)
CY 267.000 $200.000 $95.000 $120.000 $100.000 $204.750
RIPRAP (MOW STRIP)(4 IN)
CY 1,075.900 $425.000 $475.000 $475.000 $415.000 $509.250
CLEANING AND SEALING JOINTS
LF 7,414.000 $20.000 $12.280 $12.280 $12.500 $12.890
HEADER TYPE EXPANSION JOINT
CF 1,384.100 $350.000 $296.520 $296.520 $298.000 $311.350
MOBILIZATION
LS 1.000 $2,310,000.000 $1,100,000.000 $2,263,262.850 $1,100,000.000 $869,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 19.000 $6,654.150 $2,000.000 $5,191.480 $4,000.000 $3,500.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 71,970.000 $4.000 $2.500 $2.500 $2.600 $4.730
BIODEG EROSN CONT LOGS (REMOVE)
LF 71,970.000 $1.000 $0.250 $0.250 $0.150 $1.050
INTRSCT, DRVWAYS, & TURNOUT (ACP)
SY 1,282.000 $15.500 $55.000 $30.660 $42.000 $105.070
RUMBLE STRIPS (SHOULDER)
LF 567,818.000 $0.250 $0.110 $0.120 $0.150 $0.200
MTL W-BEAM GD FEN (TIM POST)
LF 16,612.500 $20.000 $19.750 $19.300 $18.750 $23.940
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 44.000 $1,800.000 $1,975.000 $1,800.000 $1,700.000 $2,415.000
MTL BEAM GD FEN TRANS (T101)
EA 8.000 $1,500.000 $1,160.000 $1,041.000 $1,025.000 $1,093.050
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 46.000 $1,000.000 $850.000 $1,090.000 $1,000.000 $971.250
MTL BM GD FEN TRANS (NON - SYM)
EA 44.000 $800.000 $1,360.000 $1,065.000 $780.000 $1,590.750
REMOVE METAL BEAM GUARD FENCE
LF 16,262.500 $1.400 $1.750 $1.000 $1.500 $2.630
REMOVE TERMINAL ANCHOR SECTION
EA 46.000 $150.000 $170.000 $125.000 $135.000 $157.500
RM MTL BM GD FEN TRANS (T101)
EA 56.000 $165.000 $200.000 $100.000 $145.000 $173.250
CABLE BARRIER SYSTEM (TL-4)
LF 141,194.000 $15.000 $7.500 $7.500 $16.250 $16.590
CABLE BARRIER TERMINAL SECTION (TL-4)
EA 34.000 $4,000.000 $1,300.000 $1,300.000 $3,000.000 $3,097.500
REMOVE CABLE BARRIER
LF 26,205.000 $4.000 $5.000 $5.000 $7.250 $7.350
REMOVE CABLE BARRIER TERMINAL SECTION
EA 6.000 $1,000.000 $500.000 $500.000 $1,875.000 $1,942.500
GUARDRAIL END TREATMENT (INSTALL)
EA 46.000 $2,500.000 $2,620.000 $2,730.000 $2,400.000 $3,024.000
GUARDRAIL END TREATMENT (REMOVE)
EA 41.000 $175.000 $370.000 $100.000 $170.000 $367.500
IN SM RD SN SUP&AM TYS80(1)SB(T)
EA 14.000 $625.000 $815.000 $856.150 $961.000 $1,009.500
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND
EA 576.000 $50.000 $45.000 $39.790 $45.000 $52.500
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 66.000 $14.000 $19.000 $10.500 $12.000 $18.900
INSTL DEL ASSM (D-SY)SZ 2(WC)GND
EA 14.000 $50.000 $60.000 $39.990 $60.000 $52.500
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 66.000 $9.500 $9.000 $10.500 $9.000 $18.900
INSTL DEL ASSM (D-SY)SZ (BRF)GF1
EA 99.000 $13.000 $12.000 $10.750 $12.000 $18.900
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 46.000 $55.000 $45.000 $42.830 $45.000 $55.650
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 131.000 $14.000 $18.000 $13.750 $18.000 $22.310
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 75,830.000 $0.450 $0.200 $0.200 $0.200 $0.320
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 331,777.000 $0.450 $0.180 $0.180 $0.180 $0.320
WK ZN PAV MRK NON-REMOV (W)(ENTR GORE)
EA 17.000 $350.000 $250.000 $250.000 $250.000 $420.000
WK ZN PAV MRK NON-REMOV (W)(EXIT GORE)
EA 16.000 $350.000 $250.000 $250.000 $250.000 $420.000
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 332,204.000 $0.450 $0.180 $0.180 $0.180 $0.320
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 2,988.000 $0.610 $1.500 $1.500 $1.500 $1.310
WK ZN PAV MRK REMOV (Y)4"(DOT)
LF 262.000 $1.230 $4.000 $4.000 $4.000 $1.310
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 3,005.000 $0.630 $1.500 $1.500 $1.500 $1.310
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 28,794.000 $0.750 $1.000 $1.250 $0.550 $1.000
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 143.000 $1.910 $1.500 $1.500 $1.500 $2.630
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 12.000 $0.800 $20.000 $20.000 $20.000 $1.310
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 4.000 $155.280 $130.000 $130.000 $130.000 $131.250
REFL PAV MRK TY I(W)(ENTR GORE)(100MIL)
EA 17.000 $900.000 $650.000 $650.000 $650.000 $420.000
REFL PAV MRK TY I(W)(EXIT GORE)(100MIL)
EA 17.000 $900.000 $650.000 $650.000 $650.000 $420.000
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
EA 48.000 $109.740 $48.000 $48.000 $48.000 $26.250
PAVEMENT SEALER 6"
LF 938,617.000 $0.180 $0.140 $0.140 $0.140 $0.190
PAVEMENT SEALER (WORD)
EA 4.000 $51.810 $70.000 $70.000 $70.000 $68.250
PAVEMENT SEALER (ENTR GORE)
EA 17.000 $310.000 $200.000 $200.000 $200.000 $210.000
PAVEMENT SEALER (EXIT GORE)
EA 16.000 $315.000 $200.000 $200.000 $200.000 $210.000
PAVEMENT SEALER (SYMBOL)
EA 2.000 $35.310 $70.000 $70.000 $70.000 $105.000
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 82,651.000 $0.650 $0.600 $0.600 $0.600 $0.470
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 331,777.000 $0.650 $0.560 $0.560 $0.560 $0.440
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 332,204.000 $0.650 $0.560 $0.560 $0.560 $0.440
REF PROF PAV MRK TY I(W)6"(SLD)(100MIL)
LF 59,317.000 $0.650 $0.850 $0.850 $0.850 $0.890
REF PROF PAV MRK TY I(Y)6"(SLD)(100MIL)
LF 33,122.000 $0.650 $0.850 $0.850 $0.850 $0.890
PREFAB PAV MRK TY C (W) (SYMBOL)
EA 2.000 $229.160 $140.000 $140.000 $140.000 $420.000
REFL PAV MRKR TY I-R
EA 434.000 $4.000 $8.000 $8.000 $8.000 $10.500
REFL PAV MRKR TY II-C-R
EA 5,068.000 $4.000 $4.000 $4.000 $4.000 $3.150
FULL - WIDTH MOWING
CYC 2.000 $2,650.000 $10,000.000 $32,080.000 $5,000.000 $10,000.000
CLEANING / SWEEPING (OUTSIDE MAIN LANE)
CYC 8.000 $2,000.000 $1,700.000 $4,591.570 $3,500.000 $12,875.000
UNDERSEAL COURSE
GAL 305,263.000 $2.500 $3.880 $2.630 $2.800 $3.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 168.000 $65.000 $70.000 $94.180 $100.000 $100.000
TMA (STATIONARY)
DAY 331.000 $125.000 $164.000 $290.110 $155.000 $265.000
TMA (MOBILE OPERATION)
DAY 60.000 $135.000 $220.000 $290.110 $250.000 $400.000
1
ASPH(AC-15P,AC-20-5TR,AC-20XP,AC10-2TR)
GAL 33,786.000 $1.750 $0.000 $0.000 $0.000 $0.000
1
AGGR (TY-PB GR-4)
CY 979.000 $40.550 $0.000 $0.000 $0.000 $0.000
1
PFC (ASPHALT) PG76-22
TON 321.000 $95.000 $0.000 $0.000 $0.000 $0.000
1
PFC-C (AGGREGATE)(PG76 MIX) SAC-A
TON 5,028.000 $95.000 $0.000 $0.000 $0.000 $0.000
Totals: $28,882,846.750 $25,532,106.032 $27,775,102.457 $29,971,415.525 $31,890,897.735