Show Job Controls
Bid Cobra

FREESTONE IH 45 (0675-01-066)

Items: 89

County: FREESTONE
Length: N/A
Highway: IH 45
District: BRYAN
Control Number: 0675-01-066
DBE Goal: N/A
Project: NH 2017(348)
Guaranty: N/A
Time: 110 WORKING DAYS
Engineer's Estimate: $2,817,728.27
Date: 12/01/2016 (9 years ago)
Contract Number: N/A
Type: REHABILITATE EXISTING ROAD
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$2,817,728.27
$2,450,487.60
Over/Under Est: -13.03% -$367,240.67
Over/Under Est: -12.11% -$341,325.23
Amt Left: 1.06% $25,915.44
$2,919,532.36
Over/Under Est: 3.61% $101,804.09
Amt Left: 19.14% $469,044.76
Delta: -17.89% -$443,129.32
Over/Under Est: 20.38% $574,139.40
Amt Left: 38.42% $941,380.07
Delta: -16.18% -$472,335.31

Bid Items & Bid Tabulations

89 Total 0 of 89
FREESTONE  |  IH 45  |  BRYAN  |  0675-01-066  |  12/01/2016  |  $2,817,728.27  |  NH 2017(348)  |  REHAB EXIST ROAD  |  110 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
BIG CREEK CONSTRUCTION, LTD.
KNIFE RIVER CORPORATION - SOUTH
A. L. HELMCAMP, INC.
OLDCASTLE MATERIALS TEXAS, INC.
REMOVING CONC (RIPRAP)
SY 214.000 $13.000 $20.000 $32.000 $25.000 $15.100
REMOVING STAB BASE & ASPH PAV (9")
SY 3,154.000 $8.000 $8.000 $10.500 $8.000 $7.550
EXCAVATION (ROADWAY)
CY 477.000 $12.000 $15.000 $13.000 $12.000 $54.000
EXCAVATION (CHANNEL)
CY 80.000 $12.000 $35.000 $20.000 $27.000 $18.400
SUBGRADE WIDENING (DENS CONT)
STA 85.600 $590.000 $500.000 $350.000 $800.000 $1,489.860
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 1,115.000 $12.000 $25.000 $28.000 $25.000 $31.000
BACKFILL (TY A OR B)
STA 171.000 $179.000 $150.000 $152.000 $140.000 $1.000
FURNISHING AND PLACING TOPSOIL (4")
SY 25,662.000 $1.000 $1.000 $0.250 $0.500 $0.720
DRILL SEEDING (PERM) (URBAN) (SANDY)
SY 25,662.000 $0.200 $0.120 $0.130 $0.120 $0.100
DRILL SEEDING (TEMP) (WARM)
SY 12,831.000 $0.110 $0.180 $0.180 $0.120 $0.140
DRILL SEEDING (TEMP) (COOL)
SY 12,831.000 $0.110 $0.180 $0.180 $0.120 $0.150
VEGETATIVE WATERING
MG 257.000 $13.000 $15.000 $25.000 $18.000 $25.250
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
CY 610.000 $60.000 $60.000 $50.000 $55.000 $80.000
REWORKING BS MTL (TY C) (14")(ORD COMP)
SY 22,800.000 $3.250 $1.500 $1.600 $3.500 $3.600
CEMENT
TON 774.000 $150.000 $150.000 $140.000 $145.000 $155.100
CEMENT TREAT (EXIST MATL)(12")
SY 31,826.000 $2.540 $3.000 $1.120 $5.500 $3.750
ASPH (RC-250)
GAL 7,957.000 $4.000 $3.500 $3.600 $5.000 $4.500
ASPH (AC-20XP, AC-10-2TR, OR AC-20-5TR)
GAL 12,094.000 $3.500 $3.000 $2.520 $4.000 $4.500
AGGR (TY-PB GR-4 OR TY-PL GR-4 ( SAC-B)
CY 255.000 $110.000 $135.000 $150.000 $170.000 $297.000
AGGR (TY-PB OR PL GR 5 SAC-B)
CY 245.000 $90.000 $135.000 $140.000 $170.000 $236.000
SUPERPAVE MIXTURES SP-B PG64-22
TON 8,216.000 $78.000 $63.000 $70.000 $70.000 $82.200
SUPERPAVE MIXTURES SP-C SAC-A PG70-22
TON 4,068.000 $85.000 $75.000 $80.000 $80.000 $89.050
PLANE ASPH CONC PAV(0" TO 2")
SY 2,000.000 $2.950 $4.000 $7.000 $10.000 $11.100
STRUCT EXCAV (PIPE)
CY 573.000 $15.000 $25.000 $9.500 $24.000 $25.150
CEM STABIL BKFL
CY 268.000 $99.750 $125.000 $175.000 $165.000 $201.100
CUT & RESTORING PAV
SY 59.000 $150.000 $125.000 $50.000 $220.000 $125.700
TRENCH EXCAVATION PROTECTION
LF 398.000 $10.000 $10.000 $9.500 $13.000 $35.200
RIPRAP (CONC)(5 IN)
CY 31.000 $450.000 $550.000 $375.000 $660.000 $553.000
CMP (GAL STL 18 IN)
LF 28.000 $65.000 $70.000 $59.000 $55.000 $55.300
CMP (GAL STL 24 IN)
LF 5.000 $70.000 $150.000 $119.000 $85.000 $80.450
RC PIPE (CL III)(18 IN)
LF 220.000 $65.000 $65.000 $50.000 $64.000 $60.350
RC PIPE (CL III)(24 IN)
LF 27.000 $75.000 $75.000 $88.000 $106.000 $90.500
RC PIPE (CL III)(30 IN)
LF 135.000 $160.000 $85.000 $92.000 $149.000 $120.650
RC PIPE (CL III)(36 IN)
LF 160.000 $185.000 $120.000 $123.000 $248.000 $135.750
RC PIPE (CL III)(42 IN)
LF 86.000 $300.000 $130.000 $173.000 $330.000 $191.050
RC PIPE (CL IV)(18 IN)
LF 336.000 $125.000 $60.000 $55.000 $72.000 $60.350
MANH (COMPL)(PRM)(48IN)
EA 1.000 $3,500.000 $5,000.000 $3,620.000 $4,400.000 $3,871.000
INLET (COMPL)(PSL)(FG)(4FTX4FT-3FTX3FT)
EA 2.000 $5,000.000 $5,000.000 $4,480.000 $4,950.000 $4,600.000
INLET (COMPL)(PSL)(FG)(5FTX6FT-4FTX4FT)
EA 1.000 $6,000.000 $5,000.000 $5,675.000 $6,600.000 $5,605.000
INLET (COMPL)(PSL)(FG)(8FTX8FT-4FTX4FT)
EA 1.000 $10,000.000 $8,000.000 $8,550.000 $9,350.000 $9,551.000
SET (TY I)(S= 4 FT)(HW= 4 FT)(3:1) (C)
EA 1.000 $6,875.000 $9,500.000 $8,280.000 $6,600.000 $4,524.000
SET (TY II) (18 IN) (CMP) (6: 1) (P)
EA 22.000 $801.000 $1,000.000 $825.000 $1,100.000 $981.000
SET (TY II) (18 IN) (RCP) (4: 1) (C)
EA 1.000 $730.000 $975.000 $1,250.000 $990.000 $905.000
SET (TY II) (18 IN) (RCP) (6: 1) (C)
EA 3.000 $870.000 $1,000.000 $1,110.000 $1,100.000 $981.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 28.000 $713.000 $1,000.000 $1,090.000 $1,100.000 $1,006.000
SET (TY II) (24 IN) (CMP) (6: 1) (P)
EA 6.000 $1,350.000 $1,400.000 $915.000 $1,650.000 $1,559.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 2.000 $1,125.000 $1,350.000 $1,240.000 $1,650.000 $1,508.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 10.000 $977.000 $1,400.000 $1,410.000 $1,650.000 $1,584.000
SET (TY II) (30 IN) (RCP) (3: 1) (C)
EA 2.000 $1,225.000 $1,850.000 $1,800.000 $1,100.000 $2,187.000
SET (TY II) (30 IN) (RCP) (4: 1) (C)
EA 6.000 $1,525.000 $1,900.000 $2,070.000 $1,320.000 $2,212.000
SET (TY II) (36 IN) (RCP) (3: 1) (C)
EA 2.000 $2,550.000 $3,500.000 $2,400.000 $2,860.000 $3,368.000
SET (TY II) (36 IN) (RCP) (6: 1) (C)
EA 2.000 $3,525.000 $3,500.000 $3,700.000 $3,850.000 $4,524.000
SET (TY II) (42 IN) (RCP) (3: 1) (C)
EA 1.000 $3,283.000 $5,000.000 $5,250.000 $4,950.000 $5,530.000
REMOV STR (INLET)
EA 4.000 $723.000 $1,250.000 $1,070.000 $1,320.000 $1,006.000
REMOV STR (HEADWALL)
EA 11.000 $2,000.000 $1,000.000 $915.000 $1,650.000 $1,207.000
REMOV STR (PIPE)
LF 243.000 $18.970 $25.000 $9.500 $33.000 $15.100
MOBILIZATION
LS 1.000 $275,000.000 $240,000.000 $240,000.000 $264,000.000 $339,186.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $8,000.000 $5,000.000 $13,000.000 $20,000.000 $45,015.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 607.000 $25.980 $25.000 $34.000 $30.000 $35.200
ROCK FILTER DAMS (REMOVE)
LF 607.000 $6.470 $5.000 $10.000 $8.000 $15.100
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,562.000 $2.950 $4.000 $5.000 $3.500 $3.530
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,562.000 $0.500 $0.600 $0.660 $1.000 $1.020
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 1,013.000 $8.750 $5.000 $6.000 $4.500 $4.300
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,013.000 $0.690 $1.000 $0.660 $1.000 $0.800
DRIVEWAYS (CONC)
SY 1,422.000 $99.950 $100.000 $83.000 $130.000 $93.550
DRIVEWAYS (ACP)
SY 6,197.000 $35.250 $20.000 $22.000 $19.000 $22.350
TURNOUTS (SURF TREAT)
SY 103.000 $34.750 $50.000 $75.000 $50.000 $27.400
MAILBOX INSTALL-S (TWG-POST) TY 2
EA 6.000 $200.000 $160.000 $137.000 $150.000 $128.700
MAILBOX INSTALL-D (TWG-POST) TY 2
EA 2.000 $250.000 $200.000 $165.000 $170.000 $154.850
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 18.000 $452.340 $350.000 $387.000 $400.000 $361.950
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 13.000 $450.250 $450.000 $476.000 $490.000 $445.400
IN SM RD SN SUP&AM TY10BWG(2)SA(P)
EA 1.000 $1,000.000 $1,000.000 $725.000 $750.000 $678.600
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 6.000 $615.500 $600.000 $569.000 $600.000 $532.900
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 2.000 $720.000 $600.000 $582.000 $600.000 $544.900
IN SM RD SN SUP&AM TYS80(1)SA(U-2EXT)
EA 1.000 $1,100.500 $1,000.000 $898.000 $1,000.000 $840.500
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 1.000 $350.000 $350.000 $327.000 $350.000 $306.650
REMOVE SM RD SN SUP&AM
EA 40.000 $100.000 $50.000 $80.000 $100.000 $95.550
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND(BI)
EA 9.000 $60.000 $30.000 $31.000 $50.000 $29.200
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 12.000 $60.000 $40.000 $43.000 $50.000 $40.250
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 35,918.000 $0.160 $0.200 $0.220 $0.200 $0.250
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 18,818.000 $0.200 $0.200 $0.220 $0.200 $0.250
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 239.000 $1.300 $1.000 $1.250 $1.000 $1.070
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 62.000 $6.230 $15.000 $16.130 $11.000 $16.700
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
EA 30.000 $45.000 $40.000 $43.000 $38.500 $44.500
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 19,246.000 $0.360 $0.400 $0.410 $0.320 $0.450
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 590.000 $0.410 $0.450 $0.470 $0.320 $0.500
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 15,373.000 $0.370 $0.400 $0.410 $0.320 $0.450
REFL PAV MRKR TY II-A-A
EA 213.000 $3.950 $10.000 $8.600 $3.300 $8.950
PORTABLE CHANGEABLE MESSAGE SIGN
EA 6.000 $15,000.000 $12,000.000 $10,000.000 $5,000.000 $14,474.000
Totals: $2,817,728.270 $2,450,487.600 $2,476,403.040 $2,919,532.360 $3,391,867.676