PREPARING ROW
|
STA
|
41.630
|
$5,000.000
|
$1,000.000
|
$1,500.000
|
$2,900.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
66.000
|
$12.000
|
$30.000
|
$50.000
|
$80.000
|
|
|
SUBGRADE WIDENING (ORD COMP)
|
STA
|
41.630
|
$265.000
|
$800.000
|
$1,150.000
|
$1,300.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY C)
|
CY
|
221.000
|
$8.500
|
$50.000
|
$50.000
|
$86.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
1,028.000
|
$8.500
|
$30.000
|
$50.000
|
$65.000
|
|
|
BACKFILL (TY A OR B)
|
STA
|
41.630
|
$150.000
|
$400.000
|
$600.000
|
$600.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
25,115.000
|
$1.000
|
$1.500
|
$1.000
|
$4.200
|
|
|
BLOCK SODDING
|
SY
|
40.000
|
$4.200
|
$7.000
|
$20.000
|
$7.000
|
|
|
BROADCAST SEED (PERM) (RURAL) (SANDY)
|
SY
|
4,891.000
|
$0.400
|
$0.350
|
$0.750
|
$0.330
|
|
|
BROADCAST SEED (PERM) (RURAL) (CLAY)
|
SY
|
20,224.000
|
$0.300
|
$0.200
|
$0.500
|
$0.210
|
|
|
BROADCAST SEED (TEMP)(WARM OR COOL)
|
SY
|
25,115.000
|
$0.280
|
$0.220
|
$0.500
|
$0.230
|
|
|
VEGETATIVE WATERING
|
MG
|
251.000
|
$20.000
|
$20.000
|
$20.000
|
$42.000
|
|
|
FL BS (CMP IN PLACE)(TY A GR 1-2)(11")
|
SY
|
996.000
|
$35.000
|
$40.000
|
$38.000
|
$120.000
|
|
|
LIME (HYDRATED LIME (SLURRY))
|
TON
|
86.000
|
$300.000
|
$350.000
|
$300.000
|
$350.000
|
|
|
LIME TRT (EXIST MATL) (7")
|
SY
|
1,174.000
|
$3.000
|
$6.000
|
$9.350
|
$12.000
|
|
|
LIME TRT (SUBGRADE)(8")
|
SY
|
4,705.000
|
$10.000
|
$7.000
|
$8.350
|
$10.000
|
|
|
CEM TRT(PLNT MX)(CL M)(TY A)(GR 4)(8")
|
SY
|
5,259.000
|
$27.100
|
$30.000
|
$40.000
|
$45.000
|
|
|
ASPH (RC-250)
|
GAL
|
1,646.000
|
$4.000
|
$5.500
|
$15.000
|
$10.000
|
|
|
AGGR (TY-B GR-5 OR TY-L GR-5)
|
CY
|
44.000
|
$150.000
|
$350.000
|
$350.000
|
$700.000
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
6,269.000
|
$1.500
|
$3.000
|
$2.400
|
$5.000
|
|
|
PLANE ASPH CONC PAV (2 1/2")
|
SY
|
8,284.000
|
$2.000
|
$3.000
|
$3.500
|
$4.000
|
|
|
CEM STABIL BKFL
|
CY
|
261.400
|
$85.000
|
$140.000
|
$125.000
|
$215.000
|
|
|
CUT & RESTORING PAV
|
SY
|
54.000
|
$115.000
|
$180.000
|
$250.000
|
$83.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
3.000
|
$200.000
|
$290.000
|
$250.000
|
$1,200.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
133.000
|
$6.000
|
$14.000
|
$12.000
|
$6.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
530.000
|
$19.000
|
$60.000
|
$40.000
|
$45.000
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
24.000
|
$235.000
|
$450.000
|
$325.000
|
$350.000
|
|
|
CL A CONC (COLLAR)
|
EA
|
2.000
|
$650.000
|
$2,300.000
|
$1,500.000
|
$2,000.000
|
|
|
RIPRAP (CONC) (CL B) (4")
|
CY
|
1.050
|
$55.000
|
$1,200.000
|
$1,000.000
|
$2,300.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
44.000
|
$480.000
|
$900.000
|
$600.000
|
$800.000
|
|
|
GABION MATTRESSES (GALV)(12 IN)
|
SY
|
19.000
|
$90.000
|
$250.000
|
$210.000
|
$250.000
|
|
|
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
|
LF
|
24.000
|
$500.000
|
$700.000
|
$500.000
|
$450.000
|
|
|
CONC BOX CULV (5 FT X 3 FT)(EXTEND)
|
LF
|
30.000
|
$650.000
|
$800.000
|
$600.000
|
$700.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
68.000
|
$65.000
|
$75.000
|
$56.000
|
$120.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
408.000
|
$80.000
|
$170.000
|
$130.000
|
$130.000
|
|
|
WINGWALL (PW - 1) (HW=3 FT)
|
EA
|
1.000
|
$8,500.000
|
$6,000.000
|
$5,000.000
|
$5,600.000
|
|
|
WINGWALL (PW - 2) (HW=6 FT)
|
EA
|
1.000
|
$12,850.000
|
$18,000.000
|
$14,000.000
|
$15,000.000
|
|
|
SET (TY I)(S=3 FT)(HW=3FT)(4:1)(C)
|
EA
|
1.000
|
$6,800.000
|
$8,700.000
|
$6,500.000
|
$8,500.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 4 FT)(3:1) (C)
|
EA
|
1.000
|
$9,000.000
|
$11,000.000
|
$8,500.000
|
$12,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
6.000
|
$950.000
|
$1,100.000
|
$850.000
|
$1,200.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
4.000
|
$1,200.000
|
$1,200.000
|
$900.000
|
$1,300.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
6.000
|
$1,150.000
|
$1,400.000
|
$950.000
|
$1,500.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
8.000
|
$2,500.000
|
$1,800.000
|
$1,000.000
|
$1,000.000
|
|
|
REMOV STR (PIPE)
|
LF
|
286.000
|
$20.000
|
$60.000
|
$30.000
|
$14.000
|
|
|
REMOV STR (PIPE)
|
EA
|
4.000
|
$500.000
|
$1,500.000
|
$750.000
|
$400.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$140,000.000
|
$205,000.000
|
$200,000.000
|
$280,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
10.000
|
$5,000.000
|
$10,000.000
|
$4,500.000
|
$12,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
200.000
|
$30.000
|
$32.000
|
$50.000
|
$55.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
200.000
|
$8.000
|
$7.500
|
$10.000
|
$17.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,840.000
|
$3.000
|
$4.000
|
$5.000
|
$5.500
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,840.000
|
$0.700
|
$1.000
|
$2.000
|
$1.600
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
112.000
|
$3.500
|
$5.000
|
$7.000
|
$8.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
112.000
|
$1.000
|
$1.000
|
$1.000
|
$1.200
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
0.250
|
$4,000.000
|
$7,500.000
|
$28,000.000
|
$20,000.000
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
60.000
|
$50.000
|
$30.000
|
$165.000
|
$120.000
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
60.000
|
$10.000
|
$20.000
|
$100.000
|
$85.000
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
60.000
|
$15.000
|
$25.000
|
$125.000
|
$85.000
|
|
|
CONCRETE GUTTER (MODIFIED)
|
LF
|
593.000
|
$33.000
|
$80.000
|
$50.000
|
$50.000
|
|
|
INTERSECTIONS (ACP)
|
SY
|
1,389.000
|
$45.000
|
$40.000
|
$45.000
|
$125.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
60.000
|
$90.000
|
$190.000
|
$130.000
|
$140.000
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
381.000
|
$20.000
|
$25.000
|
$40.000
|
$85.000
|
|
|
TURNOUTS (ACP)
|
SY
|
34.000
|
$35.000
|
$40.000
|
$40.000
|
$135.000
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
7,530.000
|
$1.000
|
$0.650
|
$1.000
|
$0.500
|
|
|
RUMBLE STRIPS (CENTERLINE) ASPHALT
|
LF
|
7,010.000
|
$1.000
|
$0.650
|
$1.000
|
$0.500
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
400.000
|
$25.000
|
$35.000
|
$29.000
|
$31.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$2,000.000
|
$2,500.000
|
$1,840.000
|
$2,300.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
678.000
|
$2.500
|
$1.500
|
$0.550
|
$2.500
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$225.000
|
$270.000
|
$180.000
|
$240.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$2,600.000
|
$3,700.000
|
$3,050.000
|
$3,500.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$325.000
|
$350.000
|
$250.000
|
$360.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$1,300.000
|
$1,300.000
|
$1,000.000
|
$900.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$900.000
|
$1,100.000
|
$800.000
|
$900.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
2.000
|
$8,000.000
|
$10,500.000
|
$9,000.000
|
$10,000.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 4
|
EA
|
1.000
|
$220.000
|
$275.000
|
$250.000
|
$320.000
|
|
|
MAILBOX INSTALL-D (TWG-POST) TY 4
|
EA
|
1.000
|
$280.000
|
$370.000
|
$335.000
|
$350.000
|
|
|
IN RD IL (TY ST) 40T-8 (250W EQ) LED
|
EA
|
3.000
|
$4,500.000
|
$6,000.000
|
$5,690.000
|
$6,100.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
210.000
|
$10.000
|
$15.000
|
$13.650
|
$15.000
|
|
|
CONDT (PVC) (SCH 40) (2") (BORE)
|
LF
|
120.000
|
$15.000
|
$25.000
|
$19.600
|
$21.000
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
990.000
|
$1.900
|
$3.000
|
$2.100
|
$2.500
|
|
|
GROUND BOX TY C (162911)W/APRON
|
EA
|
2.000
|
$1,140.000
|
$1,200.000
|
$1,220.000
|
$1,300.000
|
|
|
ELC SRV TY D 120/240 060(NS)SS(E)SP(O)
|
EA
|
1.000
|
$6,000.000
|
$7,500.000
|
$7,100.000
|
$8,000.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
18.000
|
$31.000
|
$30.000
|
$36.050
|
$40.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
16.000
|
$600.000
|
$650.000
|
$600.000
|
$700.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
1.000
|
$650.000
|
$750.000
|
$700.000
|
$950.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
1.000
|
$1,000.000
|
$950.000
|
$850.000
|
$1,200.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
5.000
|
$900.000
|
$1,000.000
|
$925.000
|
$1,200.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
|
EA
|
2.000
|
$1,000.000
|
$800.000
|
$715.000
|
$1,500.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
22.000
|
$100.000
|
$60.000
|
$55.000
|
$94.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
16.000
|
$25.000
|
$40.000
|
$35.000
|
$40.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)SRF)SRF
|
EA
|
8.000
|
$80.000
|
$110.000
|
$100.000
|
$90.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
4,960.000
|
$0.150
|
$2.200
|
$1.000
|
$1.100
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
616.000
|
$0.300
|
$2.200
|
$1.000
|
$2.200
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
2,385.000
|
$0.150
|
$2.200
|
$1.000
|
$1.100
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
1,080.000
|
$0.800
|
$1.000
|
$1.000
|
$3.300
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
735.000
|
$1.000
|
$1.500
|
$1.000
|
$0.750
|
|
REFL PAV MRK TY I (W)8"(DOT)(090MIL)
|
LF
|
25.000
|
$2.500
|
$2.200
|
$1.000
|
$5.500
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
1,080.000
|
$0.880
|
$2.200
|
$1.000
|
$1.900
|
|
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
|
LF
|
26.000
|
$7.000
|
$28.000
|
$25.000
|
$9.900
|
|
REFL PAV MRK TY II (W) 8" (DOT)
|
LF
|
150.000
|
$0.400
|
$2.200
|
$1.000
|
$3.300
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
8,081.000
|
$0.400
|
$1.100
|
$0.430
|
$0.830
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
11,698.000
|
$0.400
|
$1.100
|
$0.430
|
$0.830
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
5.000
|
$160.000
|
$300.000
|
$275.000
|
$320.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
5.000
|
$215.000
|
$320.000
|
$304.000
|
$420.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
56.000
|
$3.000
|
$5.500
|
$5.200
|
$6.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
674.000
|
$3.000
|
$5.500
|
$5.200
|
$6.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
2,160.000
|
$0.200
|
$1.100
|
$1.000
|
$3.300
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
4.000
|
$215.000
|
$600.000
|
$515.000
|
$600.000
|
|
|
TRF SIG CBL (TY A)(12 AWG)(5 CONDR)
|
LF
|
24.000
|
$2.000
|
$3.000
|
$2.600
|
$3.000
|
|
|
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
|
EA
|
2.000
|
$6,000.000
|
$7,000.000
|
$5,665.000
|
$6,100.000
|
|
|
SP MIXES SP-C PG64-22
|
TON
|
923.000
|
$100.000
|
$125.000
|
$150.000
|
$180.000
|
|
|
SP MIXES SP-C SAC-A PG70-22
|
TON
|
2,664.000
|
$100.000
|
$128.000
|
$155.000
|
$185.000
|
|
|
BONDING COURSE
|
GAL
|
2,193.000
|
$3.300
|
$6.000
|
$4.250
|
$6.200
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$8,000.000
|
$8,000.000
|
$10,000.000
|
$15,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
140.000
|
$160.000
|
$200.000
|
$150.000
|
$130.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
6.000
|
$250.000
|
$500.000
|
$200.000
|
$130.000
|
|
Totals: |
$1,670,488.850
|
$2,078,845.050
|
$2,140,930.420
|
$2,939,493.940
|