FORT BEND US0059 (6494-56-001)

Items: 44

County: FORT BEND
Length: 0.0100 MILES
Highway: US0059
District: HOUSTON
Control Number: 6494-56-001
DBE Goal: 0.0%
Project: RMC - A00218618
Guaranty: $10,000.00
Time: 365 CALENDAR DAYS
Engineer's Estimate: $303,181.00
Date: 04/14/2026 (8 weeks ago)
Contract Number: 4261204
Type: METAL BEAM GUARD FENCE REPAIR
Project ID: A00218618
Project Description: GUARDRAIL REPAIR
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: MAINTENANCE CONTRACT OFFICE
7600 WASHINGTON AVE, HOUSTON, TX 77007
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$303,181.00
$344,733.00
Over/Under Est: 13.71% $41,552.00
Over/Under Est: 40.44% $122,619.00
Amt Left: 23.52% $81,067.00
Over/Under Est: 69.74% $211,442.00
Amt Left: 49.28% $169,890.00
Delta: -20.86% -$88,823.00

Bid Items & Bid Tabulations

44 Total 0 of 44
FORT BEND  |  US0059  |  HOUSTON  |  6494-56-001  |  04/14/2026  |  $303,181.00  |  RMC - A00218618  |  METAL BEAM GUARD FENCE REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ROSS SA ENTERPRISE LLC
ROY JORGENSEN ASSOCIATES, INC.
HAZMAT INTERNATIONAL, INC.
RIPRAP (MOW STRIP)(4 IN)
CY 20.000 $434.000 $1.000 $800.000 $50.000
MOBILIZATION (CALLOUT)
EA 20.000 $300.000 $1.000 $100.000 $1.000
MOBILIZATION (EMERGENCY)
EA 5.000 $600.000 $1.000 $2,000.000 $1.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 20.000 $150.000 $1.000 $100.000 $1.000
TMA (STATIONARY)
DAY 50.000 $500.000 $1.000 $100.000 $630.000
PORT CTB (MOVE)(SAFETY SH)(TY 2)
LF 120.000 $11.000 $8.000 $20.000 $25.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $1,320.000 $500.000 $1,750.000 $850.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 5.000 $871.000 $100.000 $1,250.000 $1,800.000
REMOVE METAL BEAM GUARD FENCE
LF 50.000 $2.000 $1.000 $25.000 $25.000
REMOVE TERMINAL ANCHOR SECTION
EA 2.000 $147.000 $1.000 $250.000 $250.000
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $2,157.000 $1.000 $2,450.000 $2,900.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $201.000 $1.000 $150.000 $250.000
REPLACE RAIL ELEMENT (W-BEAM)
LF 3,600.000 $15.000 $30.000 $15.000 $32.500
REPLACE RAIL ELEMENT (THRIE-BEAM)
LF 50.000 $83.000 $75.000 $25.000 $100.000
REPL RAIL ELMNT(THRIE-BM TRANS TO W-BM)
EA 20.000 $56.000 $1.000 $190.000 $200.000
REPLACE TIMBER POST W/O CONC FND
EA 100.000 $104.000 $50.000 $65.000 $150.000
REPLACE STEEL POST W/O CONC FND
EA 10.000 $18.000 $1.000 $65.000 $25.000
REPLACE TIMBER POST W/ CONC FND
EA 200.000 $60.000 $50.000 $90.000 $100.000
REPLACE STEEL POST W/ CONC FND
EA 50.000 $33.000 $1.000 $75.000 $25.000
REALIGN POSTS
EA 20.000 $22.000 $1.000 $100.000 $50.000
REPAIR OF TERMINAL ANCHORS POSTS
EA 4.000 $21.000 $1.000 $250.000 $1.000
REPLACE TERMINAL ANCHOR POSTS
EA 4.000 $5.000 $1.000 $500.000 $1.000
REM OBSOLETE GET & REPL W/ SGT
EA 20.000 $2,105.000 $4,000.000 $3,500.000 $5,000.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 30.000 $676.000 $1.000 $1,250.000 $1,100.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 1,500.000 $19.000 $5.000 $40.000 $40.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 150.000 $30.000 $100.000 $200.000 $125.000
REPLACE BLOCKOUT
EA 250.000 $81.000 $400.000 $50.000 $175.000
RESET SGT IMPACT HEAD
EA 10.000 $65.000 $1.000 $500.000 $100.000
REPLACE SGT OBJECT MARKER
EA 30.000 $29.000 $1.000 $100.000 $25.000
REPLACE SGT CABLE ANCHOR
EA 30.000 $49.000 $1.000 $125.000 $250.000
REPLACE SGT CABLE ASSEMBLY
EA 30.000 $55.000 $1.000 $125.000 $250.000
REPLACE SGT STRUT
EA 30.000 $66.000 $1.000 $125.000 $125.000
REPLACE POSTS (TL-4)(GIBRALTAR)
EA 60.000 $32.000 $80.000 $110.000 $100.000
CABLE SPLICE / TURNBUCKLE (TL-4)
EA 2.000 $94.000 $400.000 $500.000 $500.000
REPAIR CONCRETE FOUNDATION (TL-4)
EA 2.000 $81.000 $90.000 $500.000 $100.000
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
EA 2.000 $590.000 $2,000.000 $2,000.000 $2,500.000
REPLACE CABLE (TL-4)
LF 100.000 $3.000 $3.500 $20.000 $5.000
CHECK / RE-TENSION CABLE (TL-4)
EA 2.000 $80.000 $400.000 $750.000 $500.000
REPLACE POST HARDWARE (TL-4)
EA 2.000 $3.000 $90.000 $100.000 $100.000
REPAIR (STEEL PED. RAIL)
LF 100.000 $15.000 $1.000 $50.000 $10.000
REPAIR (T4(S))
LF 160.000 $168.000 $1.000 $50.000 $10.000
REPAIR (STL POST W/ BASE PLATE)(T4(S))
EA 80.000 $19.000 $1.000 $100.000 $10.000
REPAIR (T4 (A))
LF 120.000 $7.000 $1.000 $50.000 $10.000
REPAIR (ALUM POST W/ BASE PLATE)(T4(A))
EA 12.000 $7.000 $1.000 $200.000 $10.000
Totals: $303,181.000 $344,733.000 $425,800.000 $514,623.000