FORT BEND FM 1994 (1965-01-006)

Items: 46

County: FORT BEND
Length: N/A
Highway: FM 1994
District: HOUSTON
Control Number: 1965-01-006
DBE Goal: N/A
Project: STP 2017(640)
Guaranty: N/A
Time: 45 WORKING DAYS
Engineer's Estimate: $2,131,434.43
Date: 02/02/2017 (9 years ago)
Contract Number: N/A
Type: BASE REPAIR AND 1.5" OVERLAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$2,131,434.43
$1,774,560.91
Over/Under Est: -16.74% -$356,873.52
Over/Under Est: -16.73% -$356,564.41
Amt Left: 0.02% $309.11
Over/Under Est: -7.02% -$149,602.75
Amt Left: 11.68% $207,270.77
Delta: -11.66% -$206,961.66
Over/Under Est: 11.81% $251,779.77
Amt Left: 34.3% $608,653.29
Delta: -20.25% -$401,382.52

Bid Items & Bid Tabulations

46 Total 0 of 46
FORT BEND  |  FM 1994  |  HOUSTON  |  1965-01-006  |  02/02/2017  |  $2,131,434.43  |  STP 2017(640)  |  BASE REPAIR AND 1.5" OVERLAY  |  45 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
DURWOOD GREENE CONSTRUCTION CO.
JAMES CONSTRUCTION GROUP, L.L.C.
ANGEL BROTHERS HOLDINGS CORP.
FORDE CONSTRUCTION COMPANY, INC.
EXCAVATION (ROADWAY)
CY 234.000 $35.000 $25.000 $100.000 $100.000 $57.800
BACKFILL (TY A OR B)
STA 381.000 $150.000 $350.000 $110.000 $185.000 $525.000
ASPHALT STAB BASE (GR 2)(PG 64)
TON 428.000 $85.000 $85.000 $100.000 $104.000 $220.000
D-GR HMA(SQ) TY-D SAC-B PG76-22
TON 171.000 $90.000 $140.000 $150.000 $140.000 $260.000
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
TON 12,050.000 $120.000 $105.000 $110.000 $111.000 $126.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 6,500.000 $35.000 $15.000 $25.000 $44.000 $36.000
PLANE ASPH CONC PAV (1.5")
SY 5,784.000 $2.000 $2.000 $0.700 $3.800 $3.000
PLANE ASPH CONC PAV (0" TO 1 1/2")
SY 4,926.000 $3.000 $2.000 $0.850 $4.500 $4.500
MOBILIZATION
LS 1.000 $200,000.000 $70,000.000 $30,000.000 $20,000.000 $67,300.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 3.000 $2,500.000 $2,000.000 $2,100.000 $5,000.000 $19,000.000
RUMBLE STRIPS (SHOULDER)
LF 38,206.000 $0.200 $0.240 $0.170 $0.130 $0.180
MAILBOX INSTALL-M (TWG-POST) TY 1
EA 4.000 $450.000 $400.000 $550.000 $611.000 $403.600
MAILBOX INSTALL-S (WC-POST) TY 3
EA 26.000 $150.000 $150.000 $160.000 $178.000 $201.800
MAILBOX INSTALL-D (WC-POST) TY 3
EA 6.000 $200.000 $200.000 $180.000 $200.000 $221.980
REMOVE GROUND BOX
EA 1.000 $263.140 $350.000 $300.000 $330.000 $302.700
REMOVE ELECTRICAL SERVICES
EA 1.000 $607.770 $900.000 $800.000 $900.000 $807.190
ALUMINUM SIGNS (TY A)
SF 35.000 $44.670 $20.000 $39.000 $25.000 $29.260
REPLACE EXISTING ALUMINUM SIGNS(TY A)
SF 16.000 $21.190 $27.000 $39.000 $25.000 $32.290
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 30.000 $450.000 $475.000 $320.000 $342.000 $514.590
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 11.000 $500.000 $620.000 $520.000 $555.000 $635.660
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 3.000 $600.000 $775.000 $720.000 $775.000 $797.100
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 1.000 $650.000 $850.000 $700.000 $750.000 $827.370
REMOVE SM RD SN SUP&AM
EA 41.000 $100.000 $70.000 $75.000 $80.000 $59.530
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 5,304.000 $0.180 $0.400 $0.130 $0.300 $0.400
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 150.000 $1.000 $0.700 $0.250 $0.270 $0.710
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 23.000 $1.250 $3.900 $1.000 $3.500 $3.940
WK ZN PAV MRK NON-REMOV (W)(ARROW)
EA 1.000 $40.000 $110.000 $40.000 $43.000 $110.990
WK ZN PAV MRK NON-REMOV(W)(WORD)
EA 1.000 $45.000 $110.000 $60.000 $65.000 $110.990
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 550.000 $0.250 $0.400 $0.150 $0.160 $0.400
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 1,100.000 $0.250 $0.400 $0.150 $0.160 $0.400
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 400.000 $0.750 $1.300 $0.850 $0.910 $1.310
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 129.000 $5.500 $6.700 $4.500 $5.000 $6.760
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 3.000 $90.000 $120.000 $100.000 $110.000 $121.080
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 3.000 $120.000 $130.000 $130.000 $140.000 $131.170
PAVEMENT SEALER 6"
LF 101,614.000 $0.040 $0.120 $0.080 $0.090 $0.120
PAVEMENT SEALER 8"
LF 400.000 $0.120 $0.240 $0.150 $0.150 $0.240
PAVEMENT SEALER 24"
LF 129.000 $0.200 $0.590 $0.800 $0.860 $0.600
PAVEMENT SEALER (ARROW)
EA 3.000 $10.000 $47.000 $20.000 $22.000 $47.420
PAVEMENT SEALER (WORD)
EA 3.000 $10.000 $47.000 $20.000 $22.000 $47.420
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 80,986.000 $0.400 $0.320 $0.400 $0.450 $0.320
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
LF 9,430.000 $0.450 $0.320 $0.440 $0.450 $0.320
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 11,198.000 $0.450 $0.320 $0.420 $0.450 $0.320
REFL PAV MRKR TY I-C
EA 22.000 $3.000 $3.600 $3.000 $3.250 $3.630
REFL PAV MRKR TY II-A-A
EA 814.000 $3.000 $3.600 $3.000 $3.250 $3.630
REMOVE RDSD FLASH BEACON ASSEMBLY
EA 4.000 $878.000 $1,000.000 $905.000 $1,000.000 $913.130
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
EA 2.000 $4,474.000 $6,000.000 $5,900.000 $6,300.000 $5,953.040
Totals: $2,131,434.430 $1,774,560.910 $1,774,870.020 $1,981,831.680 $2,383,214.200