FORT BEND CS (0912-34-143)

Items: 94

County: FORT BEND
Length: N/A
Highway: CS
District: HOUSTON
Control Number: 0912-34-143
DBE Goal: N/A
Project: C 912-34-143
Guaranty: N/A
Time: 176 WORKING DAYS
Engineer's Estimate: $5,172,123.39
Date: 02/03/2017 (9 years ago)
Contract Number: N/A
Type: CONSTRUCT 4-LN DIVIDED ROADWAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (11)
E
Engineer's Estimate
$5,172,123.39
$3,825,527.24
Over/Under Est: -26.04% -$1,346,596.15
$3,926,895.22
Over/Under Est: -24.08% -$1,245,228.17
Amt Left: 2.65% $101,367.98
Over/Under Est: -20.97% -$1,084,716.41
Amt Left: 6.85% $261,879.74
Delta: -4.09% -$160,511.76
Over/Under Est: -18.19% -$940,596.14
Amt Left: 10.61% $406,000.01
Delta: -3.53% -$144,120.27
Over/Under Est: -17.3% -$894,774.01
Amt Left: 11.81% $451,822.14
Delta: -1.08% -$45,822.13
Over/Under Est: -15.65% -$809,385.09
Amt Left: 14.04% $537,211.06
Delta: -2.00% -$85,388.92
$4,420,534.97
Over/Under Est: -14.53% -$751,588.42
Amt Left: 15.55% $595,007.73
Delta: -1.32% -$57,796.67
Over/Under Est: -13.49% -$697,969.32
Amt Left: 16.96% $648,626.83
Delta: -1.21% -$53,619.10
Over/Under Est: -9.72% -$502,808.14
Amt Left: 22.06% $843,788.01
Delta: -4.36% -$195,161.18
$5,045,789.03
Over/Under Est: -2.44% -$126,334.36
Amt Left: 31.9% $1,220,261.79
Delta: -8.06% -$376,473.78
Over/Under Est: 13.48% $697,401.21
Amt Left: 53.43% $2,043,997.36
Delta: -16.33% -$823,735.57

Bid Items & Bid Tabulations

94 Total 0 of 94
FORT BEND  |  CS  |  HOUSTON  |  0912-34-143  |  02/03/2017  |  $5,172,123.39  |  C 912-34-143  |  CONSTRUCT 4-LN DIVIDED ROADWAY  |  176 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
SER CONSTRUCTION PARTNERS, LLC
TRIPLE B SERVICES LLP
DURWOOD GREENE CONSTRUCTION CO.
MAIN LANE INDUSTRIES LTD.
JAMES CONSTRUCTION GROUP, L.L.C.
HASSELL CONSTRUCTION COMPANY, INC.
J.D. ABRAMS, L.P.
STERLING DELAWARE HOLDING COMPANY, INC.
ANGEL BROTHERS HOLDINGS CORP.
ISI CONTRACTING, INC.
ARANDA BROTHERS CONSTRUCTION CO., INC.
PREPARING ROW
AC 5.380 $15,000.000 $21,000.000 $12,000.000 $40,000.000 $22,000.000 $14,500.000 $26,700.000 $46,500.000 $47,700.000 $42,000.000 $12,000.000 $6,500.000
REMOVING CONC (CURB AND GUTTER)
LF 706.000 $7.500 $3.200 $2.000 $7.000 $4.000 $4.180 $1.700 $1.250 $1.870 $7.000 $2.000 $2.000
REMOVING CONCRETE(MOW STRIP)
LF 800.000 $10.000 $0.650 $2.000 $10.000 $4.000 $2.070 $1.700 $1.250 $2.000 $7.000 $2.000 $10.000
REMOVING STAB BASE AND ASPH PAV (6")
SY 4,060.000 $3.500 $1.500 $2.000 $5.000 $2.000 $1.630 $2.000 $1.600 $1.660 $0.100 $5.000 $10.000
EXCAVATION (ROADWAY)
CY 9,574.000 $9.100 $7.500 $9.000 $9.000 $12.000 $7.680 $9.000 $7.000 $9.000 $12.000 $18.000 $7.000
EXCAVATION (SPECIAL)
CY 42,189.000 $11.750 $7.000 $8.650 $10.000 $8.000 $8.820 $10.000 $7.500 $9.000 $10.000 $8.000 $7.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 2,435.000 $12.000 $6.000 $8.000 $5.000 $6.000 $17.650 $6.500 $5.800 $15.000 $5.750 $21.000 $10.000
COMPOST MANUF TOPSOIL (4")
SY 38,067.000 $1.000 $0.850 $1.500 $1.000 $0.700 $1.230 $2.000 $0.700 $0.680 $1.000 $1.000 $2.000
BLOCK SODDING
SY 2,622.000 $3.000 $4.200 $3.150 $3.500 $3.000 $4.680 $3.350 $4.800 $4.680 $4.400 $5.000 $5.000
STRAW OR HAY MULCH
SY 18,834.000 $0.150 $0.200 $0.160 $0.190 $0.140 $0.320 $0.280 $0.330 $0.320 $0.250 $0.350 $0.250
BROADCAST SEED (TEMP) (WARM)
SY 9,417.000 $0.150 $0.250 $0.130 $0.190 $0.130 $0.190 $0.390 $0.200 $0.190 $0.250 $0.210 $0.250
DRILL SEED (TEMP)(WARM OR COOL)
SY 9,417.000 $0.150 $0.250 $0.150 $0.180 $0.140 $0.190 $0.390 $0.200 $0.190 $0.250 $0.210 $0.250
BROADCAST SEED (PERM)(SPECIAL MIX)
SY 38,067.000 $0.100 $0.250 $0.160 $0.200 $0.150 $0.160 $0.300 $0.170 $0.160 $0.250 $0.180 $0.300
DRILL SEEDING (PERM)(WARM OR COOL)
SY 9,417.000 $0.150 $0.250 $0.160 $0.180 $0.150 $0.160 $0.390 $0.170 $0.160 $0.250 $0.180 $0.300
FERTILIZER
AC 4.430 $700.000 $685.000 $727.000 $750.000 $650.000 $870.420 $675.000 $890.000 $870.420 $715.000 $965.000 $1,250.000
VEGETATIVE WATERING
MG 531.600 $17.000 $12.600 $16.000 $50.000 $10.000 $18.530 $27.000 $21.500 $18.530 $5.500 $21.000 $40.000
LIME TRT(MIX EXST MATL & NEW BASE)(6")
SY 24,142.000 $5.000 $2.000 $3.000 $2.000 $2.000 $2.670 $3.000 $8.000 $3.500 $2.900 $3.750 $5.000
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
TON 325.000 $160.000 $165.000 $176.000 $160.000 $180.000 $172.470 $150.000 $164.000 $160.000 $165.000 $170.000 $175.000
SALV, HAUL & STKPL RCL ASPH PV (10")
SY 10,567.000 $6.000 $1.500 $3.800 $4.000 $2.000 $1.000 $2.400 $0.500 $0.420 $6.500 $4.000 $5.000
CONC PAV (JOINT REINF) (10")
SY 21,500.000 $65.000 $51.600 $52.000 $52.000 $45.000 $57.000 $48.500 $53.800 $54.000 $58.500 $60.000 $63.000
CEM STABIL BKFL
CY 5,957.000 $40.000 $46.400 $38.000 $42.000 $37.000 $43.180 $39.000 $42.000 $48.000 $50.000 $40.000 $50.000
CEMENT STAB BACKFILL (INLET OR MH)
CY 373.000 $40.000 $50.500 $38.000 $42.000 $45.000 $43.180 $39.000 $42.000 $48.000 $50.000 $40.000 $50.000
TRENCH EXCAVATION PROTECTION
LF 7,168.000 $2.000 $0.100 $2.200 $1.000 $2.000 $1.160 $1.000 $0.650 $1.000 $3.000 $1.000 $1.000
RIPRAP (CONC)(5 IN)
CY 203.000 $450.000 $334.000 $335.000 $550.000 $350.000 $339.530 $410.000 $420.000 $350.000 $495.000 $400.000 $335.000
RIPRAP (MOW STRIP)(4 IN)
CY 60.000 $500.000 $425.000 $455.000 $625.000 $450.000 $469.240 $368.000 $475.000 $450.000 $550.000 $500.000 $305.000
CONC BOX CULV (3 FT X 3 FT)
LF 555.000 $150.000 $118.000 $125.000 $96.000 $150.000 $95.210 $105.000 $116.000 $110.000 $103.000 $145.000 $470.000
CONC BOX CULV (4 FT X 3 FT)
LF 1,705.000 $180.000 $137.000 $145.000 $120.000 $170.000 $127.180 $127.000 $137.000 $127.000 $124.000 $147.000 $570.000
CONC BOX CULV (5 FT X 3 FT)
LF 416.000 $220.000 $173.000 $180.000 $155.000 $190.000 $160.450 $163.000 $174.000 $167.000 $159.000 $185.000 $600.000
CONC BOX CULV (6 FT X 3 FT)
LF 70.000 $250.000 $191.000 $205.000 $175.000 $210.000 $181.090 $184.000 $206.000 $210.000 $172.000 $195.000 $625.000
CONC BOX CULV (6 FT X 4 FT)
LF 324.000 $300.000 $207.000 $225.000 $190.000 $220.000 $181.080 $211.000 $210.000 $210.000 $197.000 $210.000 $725.000
RC PIPE (CL III)(18 IN)
LF 294.000 $62.000 $68.000 $40.000 $37.000 $80.000 $34.980 $30.000 $36.000 $34.000 $35.000 $52.000 $50.000
RC PIPE (CL III)(21 IN)
LF 5.000 $80.000 $156.000 $45.000 $39.000 $300.000 $88.290 $35.000 $205.000 $50.000 $80.000 $55.000 $60.000
RC PIPE (CL III)(24 IN)
LF 960.000 $60.000 $37.000 $45.000 $33.000 $70.000 $40.570 $38.000 $41.500 $36.000 $36.000 $55.000 $60.000
RC PIPE (CL III)(30 IN)
LF 628.000 $85.000 $50.000 $60.000 $43.000 $80.000 $52.430 $53.000 $54.000 $50.000 $52.000 $95.000 $75.000
RC PIPE (CL III)(36 IN)
LF 832.000 $90.000 $63.000 $74.000 $57.000 $90.000 $63.330 $65.000 $55.000 $62.000 $69.000 $100.000 $95.000
RC PIPE (CL III)(48 IN)
LF 1,566.000 $145.000 $104.000 $110.000 $88.000 $200.000 $110.250 $91.000 $97.000 $115.000 $101.000 $160.000 $105.000
INLET (COMPL)(TY A)
EA 6.000 $2,300.000 $1,450.000 $2,400.000 $1,700.000 $2,500.000 $1,858.220 $2,300.000 $2,450.000 $2,900.000 $1,825.000 $3,000.000 $1,700.000
MANH (COMPL)(TY A)
EA 7.000 $4,000.000 $3,450.000 $5,300.000 $4,500.000 $5,000.000 $4,559.140 $4,500.000 $4,900.000 $4,900.000 $4,275.000 $6,300.000 $2,850.000
INLET (COMPL)(CURB)(TY C)
EA 32.000 $5,500.000 $2,700.000 $3,740.000 $4,100.000 $3,500.000 $3,627.450 $3,400.000 $3,400.000 $4,300.000 $3,350.000 $5,800.000 $1,750.000
INLET (COMPL)(CURB)(TY C1)
EA 4.000 $4,500.000 $3,550.000 $2,860.000 $5,000.000 $4,000.000 $4,049.760 $3,200.000 $3,700.000 $4,000.000 $4,100.000 $3,800.000 $1,750.000
JCT BOX (COMPL)(SPL)
EA 2.000 $10,000.000 $7,000.000 $21,150.000 $8,000.000 $10,000.000 $10,004.030 $13,000.000 $12,000.000 $12,000.000 $13,350.000 $15,000.000 $22,000.000
SET (TY II) (18 IN) (RCP) (4: 1) (C)
EA 6.000 $900.000 $965.000 $1,560.000 $600.000 $1,150.000 $1,595.980 $1,100.000 $1,250.000 $950.000 $675.000 $1,300.000 $2,500.000
SET (TY II) (36 IN) (RCP) (6: 1) (P)
EA 4.000 $4,000.000 $3,525.000 $4,000.000 $4,200.000 $4,000.000 $5,238.580 $3,500.000 $4,100.000 $3,950.000 $3,750.000 $3,800.000 $2,750.000
JACK BOR OR TUN PIPE(48 IN)(RC)(CL IV)
LF 328.000 $700.000 $500.000 $280.000 $610.000 $200.000 $700.360 $987.000 $730.000 $699.000 $870.000 $1,100.000 $300.000
REMOV STR (INLET)
EA 2.000 $700.000 $278.000 $520.000 $1,000.000 $400.000 $1,635.500 $1,100.000 $680.000 $550.000 $350.000 $600.000 $500.000
REMOV STR (SET)
EA 4.000 $300.000 $230.000 $520.000 $1,000.000 $400.000 $916.720 $1,100.000 $555.000 $300.000 $450.000 $530.000 $350.000
REMOV STR (PIPE)
LF 98.000 $30.000 $21.000 $36.000 $32.000 $20.000 $37.120 $19.000 $25.000 $15.000 $11.000 $46.000 $20.000
MOBILIZATION
LS 1.000 $409,955.420 $269,000.000 $100,000.000 $150,000.000 $380,000.000 $425,000.000 $430,000.000 $440,000.000 $430,000.000 $330,000.000 $470,000.000 $500,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 12.000 $2,500.000 $1,025.000 $1,740.000 $1,500.000 $10,000.000 $1,660.990 $2,400.000 $1,000.000 $900.000 $3,300.000 $2,000.000 $2,500.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 50.000 $35.000 $37.000 $65.000 $45.000 $35.000 $44.770 $38.000 $36.500 $44.770 $40.000 $50.000 $50.000
ROCK FILTER DAMS (REMOVE)
LF 50.000 $7.000 $11.000 $5.800 $25.000 $10.000 $11.020 $12.000 $20.500 $11.020 $16.500 $12.000 $25.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 312.000 $31.000 $21.000 $32.000 $15.000 $25.000 $63.410 $28.000 $26.000 $41.140 $26.000 $45.000 $20.000
CONSTRUCTION EXITS (REMOVE)
SY 312.000 $11.000 $6.000 $5.500 $8.000 $5.000 $8.500 $9.000 $5.100 $8.090 $5.000 $9.000 $10.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 3,110.000 $3.000 $1.850 $2.000 $2.500 $2.000 $2.000 $3.250 $2.900 $2.000 $2.200 $2.000 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 3,110.000 $1.100 $0.800 $0.350 $1.000 $1.000 $0.660 $1.100 $1.400 $0.660 $1.100 $0.750 $1.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 825.000 $5.000 $5.250 $9.000 $10.000 $5.000 $5.610 $4.500 $3.000 $5.610 $7.150 $5.000 $8.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 825.000 $1.200 $0.550 $1.150 $4.000 $1.000 $1.310 $1.250 $1.500 $1.310 $1.100 $1.500 $2.000
CONC CURB (MONO) (TY II)
LF 11,738.000 $5.000 $3.000 $3.400 $3.000 $3.000 $2.240 $3.100 $3.750 $2.500 $2.500 $4.000 $7.000
DRIVEWAYS (CONC)
SY 394.000 $70.000 $58.000 $226.000 $70.000 $60.000 $52.710 $61.000 $57.000 $40.000 $58.000 $85.000 $55.000
CONC SIDEWALKS (4")
SY 3,359.000 $60.000 $38.000 $50.000 $40.000 $40.000 $34.750 $49.000 $30.000 $42.000 $55.000 $50.000 $42.000
CONCRETE MEDIAN (NOSE)
SY 3.000 $100.000 $200.000 $600.000 $250.000 $60.000 $10.000 $79.000 $400.000 $500.000 $128.000 $100.000 $50.000
MTL W-BEAM GD FEN (TIM POST)
LF 600.000 $33.000 $23.500 $21.000 $22.500 $23.000 $19.730 $18.000 $21.000 $19.250 $20.000 $18.000 $25.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $1,770.000 $1,500.000 $1,550.000 $2,000.000 $1,500.000 $1,414.530 $1,600.000 $1,450.000 $1,380.000 $1,525.000 $1,900.000 $1,500.000
REMOVE METAL BEAM GUARD FENCE
LF 800.000 $4.000 $4.200 $1.100 $1.880 $4.000 $1.030 $1.500 $1.050 $1.000 $1.100 $3.000 $5.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $2,500.000 $2,240.000 $2,500.000 $2,937.500 $2,200.000 $2,255.040 $2,350.000 $2,310.000 $2,200.000 $2,425.000 $2,600.000 $2,150.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $260.000 $265.000 $300.000 $312.500 $260.000 $276.760 $250.000 $285.000 $270.000 $300.000 $200.000 $350.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 9.000 $450.000 $475.000 $380.000 $500.000 $400.000 $400.000 $400.000 $475.000 $445.000 $375.000 $500.000 $450.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 3.000 $475.000 $465.000 $170.000 $550.000 $450.000 $300.000 $300.000 $462.000 $520.000 $165.000 $500.000 $350.000
REMOVE SM RD SN SUP&AM
EA 10.000 $150.000 $62.000 $84.000 $70.000 $75.000 $100.000 $100.000 $62.000 $50.000 $83.000 $65.000 $250.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 12.000 $25.000 $27.000 $22.400 $40.000 $25.000 $19.480 $15.000 $35.000 $19.000 $21.000 $13.000 $100.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 146.000 $1.500 $2.500 $2.250 $2.300 $1.000 $1.000 $1.000 $2.400 $2.000 $1.100 $2.100 $1.250
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 15.000 $5.700 $8.300 $11.000 $7.900 $12.000 $6.000 $6.000 $8.000 $10.000 $6.000 $11.000 $5.500
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 1.000 $132.000 $190.000 $135.000 $180.000 $300.000 $150.000 $150.000 $182.000 $120.000 $110.000 $130.000 $125.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 1.000 $132.000 $190.000 $170.000 $180.000 $300.000 $150.000 $150.000 $182.000 $150.000 $132.000 $165.000 $125.000
PAVEMENT SEALER 4"
LF 7,637.000 $0.150 $0.200 $0.040 $0.180 $0.100 $0.200 $0.200 $0.190 $0.040 $0.150 $0.040 $0.750
PAVEMENT SEALER 8"
LF 146.000 $0.400 $0.400 $0.090 $0.360 $0.200 $0.400 $0.400 $0.370 $0.080 $0.250 $0.100 $0.250
PAVEMENT SEALER 24"
LF 15.000 $1.500 $2.500 $0.270 $2.400 $2.000 $1.500 $1.500 $2.500 $0.240 $0.750 $0.300 $1.000
PAVEMENT SEALER (ARROW)
EA 1.000 $15.000 $94.000 $5.600 $89.000 $60.000 $25.000 $25.000 $90.000 $5.000 $15.000 $5.500 $25.000
PAVEMENT SEALER (WORD)
EA 1.000 $12.000 $94.000 $5.600 $89.000 $60.000 $25.000 $25.000 $90.000 $5.000 $15.000 $5.500 $25.000
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 2,140.000 $1.000 $0.600 $0.670 $0.560 $0.600 $0.650 $0.650 $0.570 $0.600 $0.500 $0.650 $1.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 1,262.000 $0.600 $0.600 $0.670 $0.560 $0.600 $0.600 $0.600 $0.570 $0.600 $0.500 $0.650 $1.000
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 4,235.000 $0.600 $0.600 $0.670 $0.560 $0.600 $0.600 $0.600 $0.570 $0.600 $0.500 $0.650 $1.000
REFL PAV MRKR TY I-C
EA 7.000 $5.000 $9.250 $11.200 $8.800 $6.000 $4.000 $4.000 $8.900 $10.000 $3.300 $11.000 $10.000
REFL PAV MRKR TY II-A-A
EA 100.000 $4.500 $6.000 $7.500 $5.700 $6.000 $4.000 $4.000 $5.800 $7.000 $3.300 $8.000 $5.000
REFL PAV MRKR TY II-C-R
EA 107.000 $3.500 $6.000 $7.500 $5.700 $6.000 $4.000 $4.000 $5.800 $7.000 $3.300 $8.000 $5.000
ELIM EXT PAV MRK & MRKS (4")
LF 5,076.000 $0.400 $0.350 $0.400 $0.330 $1.000 $0.400 $0.400 $0.350 $0.350 $0.250 $0.400 $0.250
ELIM EXT PAV MRK & MRKS (8")
LF 140.000 $0.750 $1.150 $0.800 $1.100 $2.000 $1.000 $1.000 $1.200 $0.700 $0.500 $0.800 $0.500
ELIM EXT PAV MRK & MRKS (12")
LF 60.000 $1.250 $2.100 $1.100 $2.000 $4.000 $2.000 $2.000 $2.100 $1.000 $1.000 $1.100 $1.250
ELIM EXT PAV MRK & MRKS (WORD)
EA 2.000 $50.000 $105.000 $40.000 $98.000 $100.000 $25.000 $25.000 $99.000 $35.000 $35.000 $38.000 $50.000
PAV SURF PREP FOR MRK (4")
LF 7,637.000 $0.020 $0.040 $0.012 $0.040 $0.100 $0.010 $0.010 $0.050 $0.010 $0.100 $0.010 $0.100
PAV SURF PREP FOR MRK (8")
LF 146.000 $0.030 $0.150 $0.020 $0.120 $0.100 $0.020 $0.020 $0.130 $0.020 $0.100 $0.020 $0.200
PAV SURF PREP FOR MRK (24")
LF 15.000 $0.800 $0.350 $0.270 $0.310 $0.100 $0.060 $0.060 $0.320 $0.240 $0.100 $0.260 $0.250
PAV SURF PREP FOR MRK (ARROW)
EA 1.000 $8.000 $8.300 $5.600 $7.900 $25.000 $5.000 $5.000 $8.000 $5.000 $15.000 $5.500 $25.000
PAV SURF PREP FOR MRK (WORD)
EA 1.000 $10.000 $8.300 $5.600 $7.900 $25.000 $5.000 $5.000 $8.000 $5.000 $15.000 $5.500 $25.000
Totals: $5,172,123.390 $3,825,527.240 $3,926,895.224 $4,087,406.980 $4,231,527.250 $4,277,349.389 $4,362,738.300 $4,420,534.970 $4,474,154.079 $4,669,315.250 $5,045,789.030 $5,869,524.600