PREPARING ROW
|
STA
|
376.110
|
$500.000
|
$700.000
|
$220.000
|
$330.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
1,340.000
|
$15.100
|
$11.000
|
$14.000
|
$5.500
|
|
|
REMOVE CONC (RAIL)
|
LF
|
262.000
|
$9.000
|
$11.000
|
$17.000
|
$12.750
|
|
|
REMOVING STAB BASE AND ASPH PAV (3")
|
SY
|
513.000
|
$3.050
|
$8.000
|
$8.000
|
$14.750
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
10,774.000
|
$9.450
|
$10.000
|
$12.500
|
$9.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
19,318.000
|
$3.000
|
$8.000
|
$12.000
|
$12.000
|
|
|
BLOCK SODDING
|
SY
|
143,865.000
|
$2.460
|
$1.300
|
$3.500
|
$2.720
|
|
|
STRAW OR HAY MULCH
|
SY
|
35,978.000
|
$0.250
|
$0.150
|
$0.280
|
$0.210
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
35,978.000
|
$0.110
|
$0.300
|
$0.220
|
$0.080
|
|
|
FERTILIZER
|
AC
|
37.290
|
$315.000
|
$500.000
|
$825.000
|
$630.890
|
|
|
VEGETATIVE WATERING
|
MG
|
4,474.800
|
$5.570
|
$7.000
|
$15.000
|
$4.000
|
|
|
FL BS (CMP IN PLC)(TY D GR 4)(FNAL POS)
|
CY
|
15.000
|
$25.000
|
$130.000
|
$200.000
|
$460.000
|
|
|
ASPHALT STAB BASE (GR 2)(PG 64)
|
TON
|
26,211.350
|
$63.000
|
$69.000
|
$72.000
|
$68.520
|
|
|
D-GR HMA TY-D SAC-A PG70-22
|
TON
|
15,310.240
|
$77.000
|
$87.000
|
$83.000
|
$84.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
9,237.000
|
$33.000
|
$12.000
|
$21.000
|
$41.000
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
94,259.000
|
$1.260
|
$2.500
|
$1.900
|
$1.560
|
|
|
PLANE ASPH CONC PAV (5")
|
SY
|
243.000
|
$5.000
|
$10.000
|
$20.000
|
$30.000
|
|
|
STRUCT EXCAV (BOX)
|
CY
|
2,458.000
|
$7.000
|
$25.000
|
$5.000
|
$1.080
|
|
|
STRUCT EXCAV (PIPE)
|
CY
|
1,836.000
|
$7.000
|
$25.000
|
$8.000
|
$1.080
|
|
|
CEM STABIL BKFL
|
CY
|
2,389.000
|
$50.000
|
$60.000
|
$57.500
|
$43.140
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
353.000
|
$172.000
|
$250.000
|
$62.000
|
$161.780
|
|
|
CEMENT STAB BACKFILL (INLET OR MH)
|
CY
|
40.250
|
$47.000
|
$60.000
|
$42.000
|
$43.140
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
648.000
|
$2.110
|
$20.000
|
$5.000
|
$1.080
|
|
|
PRESTR CONC PIL (18 IN SQ)
|
LF
|
1,059.000
|
$110.000
|
$155.000
|
$137.000
|
$104.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (36 IN)
|
LF
|
30.400
|
$400.000
|
$350.000
|
$360.000
|
$325.810
|
|
|
CL C CONC (ABUT)
|
CY
|
27.000
|
$816.000
|
$1,450.000
|
$1,900.000
|
$1,100.000
|
|
|
CL C CONC (CAP)
|
CY
|
22.800
|
$864.000
|
$1,450.000
|
$1,700.000
|
$1,300.000
|
|
|
REINF CONC SLAB (SLAB BEAM)
|
SF
|
4,642.000
|
$12.250
|
$13.000
|
$17.250
|
$14.000
|
|
|
APPROACH SLAB
|
CY
|
68.800
|
$420.000
|
$880.000
|
$555.000
|
$550.000
|
|
|
PRESTR CONC SLAB BEAM (5SB12)
|
LF
|
886.500
|
$180.000
|
$231.000
|
$193.000
|
$150.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
346.000
|
$375.000
|
$550.000
|
$350.000
|
$377.490
|
|
|
RIPRAP (STONE COMMON)(DRY)(18 IN)
|
CY
|
366.000
|
$225.000
|
$187.000
|
$145.000
|
$172.570
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
63.000
|
$412.000
|
$700.000
|
$600.000
|
$647.120
|
|
|
RAIL (TY SSTR) (W/DRAIN SLOTS)
|
LF
|
224.000
|
$30.000
|
$88.000
|
$205.000
|
$70.000
|
|
|
CONC BOX CULV (6 FT X 3 FT)
|
LF
|
1,712.000
|
$270.000
|
$345.000
|
$262.000
|
$388.270
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
86.000
|
$65.000
|
$60.000
|
$77.000
|
$248.060
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
72.000
|
$80.000
|
$65.000
|
$164.000
|
$124.030
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
476.000
|
$83.000
|
$90.000
|
$88.000
|
$129.420
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
456.000
|
$109.000
|
$112.000
|
$98.000
|
$172.570
|
|
|
RC PIPE (CL III)(48 IN)
|
LF
|
192.000
|
$206.000
|
$167.000
|
$117.000
|
$215.710
|
|
|
MANH (COMPL)(PRM)(48IN)
|
EA
|
7.000
|
$3,000.000
|
$1,500.000
|
$1,500.000
|
$5,392.690
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (C)
|
EA
|
11.000
|
$900.000
|
$1,050.000
|
$700.000
|
$1,617.810
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
1.000
|
$2,200.000
|
$1,500.000
|
$950.000
|
$1,617.810
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (C)
|
EA
|
2.000
|
$1,500.000
|
$2,200.000
|
$1,100.000
|
$2,696.350
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$2,320.000
|
$2,200.000
|
$1,100.000
|
$2,696.350
|
|
|
REMOV STR (PIPE)
|
LF
|
1,244.000
|
$22.150
|
$20.000
|
$15.000
|
$21.570
|
|
|
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
|
EA
|
1.000
|
$26,000.000
|
$120,000.000
|
$44,000.000
|
$20,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$650,000.000
|
$300,000.000
|
$506,000.000
|
$600,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
12.000
|
$10,000.000
|
$2,700.000
|
$5,750.000
|
$1,687.170
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
230.000
|
$35.000
|
$30.000
|
$26.000
|
$25.550
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
180.000
|
$45.000
|
$45.000
|
$32.500
|
$30.490
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
410.000
|
$12.560
|
$12.000
|
$9.000
|
$10.060
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,649.000
|
$1.570
|
$3.000
|
$3.500
|
$4.940
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,649.000
|
$0.710
|
$1.000
|
$0.750
|
$0.890
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
2,340.000
|
$12.330
|
$10.000
|
$4.000
|
$3.010
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
2,340.000
|
$2.430
|
$3.000
|
$0.900
|
$0.540
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
57,354.000
|
$0.230
|
$0.220
|
$0.350
|
$0.210
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
31,138.000
|
$0.270
|
$0.260
|
$0.400
|
$0.340
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,075.000
|
$19.520
|
$22.000
|
$21.500
|
$22.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$1,890.000
|
$2,100.000
|
$1,900.000
|
$1,730.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
837.500
|
$5.580
|
$3.300
|
$3.500
|
$3.000
|
|
|
RM MTL BM GD FEN TRANS (T101)
|
EA
|
4.000
|
$100.000
|
$770.000
|
$800.000
|
$250.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$2,715.000
|
$3,100.000
|
$3,300.000
|
$2,645.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$265.000
|
$350.000
|
$330.000
|
$250.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
32.000
|
$272.000
|
$210.000
|
$440.000
|
$194.260
|
|
|
MAILBOX INSTALL-D (TWW-POST) TY 4
|
EA
|
1.000
|
$355.000
|
$240.000
|
$500.000
|
$211.050
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
3.000
|
$660.000
|
$475.000
|
$660.000
|
$510.240
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
65.000
|
$12.140
|
$7.000
|
$6.000
|
$5.450
|
|
|
CONDT (PVC) (SCH 80) (3")
|
LF
|
55.000
|
$13.660
|
$8.000
|
$7.250
|
$6.560
|
|
|
CONDT (PVC) (SCH 80) (3") (BORE)
|
LF
|
20.000
|
$19.640
|
$15.000
|
$13.000
|
$11.630
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
65.000
|
$1.120
|
$2.000
|
$1.600
|
$1.420
|
|
|
ELEC CONDR (NO.4) BARE
|
LF
|
70.000
|
$1.580
|
$2.500
|
$2.000
|
$1.740
|
|
|
ELEC CONDR (NO.4) INSULATED
|
LF
|
140.000
|
$1.900
|
$2.600
|
$2.000
|
$1.850
|
|
|
TRAY CABLE (4 CONDR) (12 AWG)
|
LF
|
540.000
|
$1.680
|
$2.500
|
$2.000
|
$1.700
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
2.000
|
$2,980.000
|
$1,250.000
|
$1,300.000
|
$1,210.500
|
|
|
REMOVE GROUND BOX
|
EA
|
1.000
|
$266.000
|
$400.000
|
$400.000
|
$369.030
|
|
|
ZINC-COAT STL WIRE STRAND (1/4")
|
LF
|
305.000
|
$2.870
|
$1.500
|
$1.500
|
$1.390
|
|
|
ZINC-COAT STL WIRE STRAND (3/8")
|
LF
|
305.000
|
$2.500
|
$1.500
|
$1.500
|
$1.390
|
|
|
ELC SRV TY D 120/240 060(NS)SS(E)SP(O)
|
EA
|
1.000
|
$4,200.000
|
$4,500.000
|
$4,800.000
|
$4,308.230
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY A)
|
SF
|
9.000
|
$22.500
|
$24.000
|
$27.500
|
$39.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
57.000
|
$475.000
|
$380.000
|
$450.000
|
$370.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
13.000
|
$547.000
|
$450.000
|
$490.000
|
$441.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
1.000
|
$770.000
|
$550.000
|
$620.000
|
$554.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
10.000
|
$620.000
|
$630.000
|
$690.000
|
$631.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
9.000
|
$746.000
|
$680.000
|
$850.000
|
$697.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
|
EA
|
2.000
|
$760.000
|
$770.000
|
$1,000.000
|
$847.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
12.000
|
$20.000
|
$22.000
|
$80.000
|
$20.000
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
21.000
|
$32.150
|
$60.000
|
$80.000
|
$48.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
39.000
|
$23.850
|
$32.000
|
$16.500
|
$30.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
149,759.000
|
$0.130
|
$0.180
|
$0.200
|
$0.160
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
75,849.000
|
$0.230
|
$0.200
|
$0.250
|
$0.200
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
700.000
|
$0.220
|
$0.250
|
$0.500
|
$0.400
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
344.000
|
$1.110
|
$1.000
|
$2.000
|
$1.500
|
|
|
WK ZN PAV MRK NON-REMOV (W)(ARROW)
|
EA
|
4.000
|
$60.630
|
$35.000
|
$65.000
|
$60.000
|
|
|
WK ZN PAV MRK NON-REMOV(W)(WORD)
|
EA
|
4.000
|
$69.330
|
$35.000
|
$65.000
|
$60.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
7,850.000
|
$0.130
|
$0.180
|
$0.200
|
$0.170
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
18,513.000
|
$0.130
|
$0.180
|
$0.200
|
$0.170
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
|
LF
|
7,850.000
|
$0.220
|
$0.200
|
$0.250
|
$0.200
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
18,513.000
|
$0.250
|
$0.200
|
$0.250
|
$0.200
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
350.000
|
$0.960
|
$1.000
|
$1.100
|
$0.990
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
172.000
|
$5.410
|
$5.000
|
$7.000
|
$6.000
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
75,849.000
|
$0.410
|
$0.380
|
$0.500
|
$0.420
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
|
LF
|
7,850.000
|
$0.410
|
$0.380
|
$0.500
|
$0.420
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
18,513.000
|
$0.430
|
$0.380
|
$0.500
|
$0.420
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
2.000
|
$361.000
|
$210.000
|
$300.000
|
$265.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
2.000
|
$388.000
|
$310.000
|
$360.000
|
$325.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
18.000
|
$3.180
|
$10.000
|
$11.000
|
$10.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
844.000
|
$3.080
|
$4.000
|
$5.000
|
$4.250
|
|
|
INSTALL HWY TRF SIG (FLASH BEACON)
|
EA
|
1.000
|
$26,500.000
|
$27,000.000
|
$28,500.000
|
$25,987.660
|
|
|
REMOVING TRAFFIC SIGNALS
|
EA
|
1.000
|
$3,380.000
|
$7,400.000
|
$7,600.000
|
$6,919.200
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
4.000
|
$400.000
|
$190.000
|
$200.000
|
$179.310
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
4.000
|
$400.000
|
$190.000
|
$200.000
|
$179.310
|
|
|
BACK PLATE (12")(1 SEC)
|
EA
|
8.000
|
$81.520
|
$50.000
|
$55.000
|
$47.870
|
|
|
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
|
LF
|
790.000
|
$1.780
|
$2.500
|
$2.500
|
$2.270
|
|
|
INS TRF SIG PL AM (S)STR(TY D)
|
EA
|
1.000
|
$5,080.000
|
$6,400.000
|
$6,700.000
|
$6,106.250
|
|
|
INS TRF SIG PL AM (S)STR(TY D)LUM
|
EA
|
1.000
|
$5,555.000
|
$8,300.000
|
$8,800.000
|
$7,990.310
|
|
|
FULL - WIDTH MOWING
|
CYC
|
3.000
|
$1,910.000
|
$2,000.000
|
$2,400.000
|
$1,129.440
|
|
|
LITTER REMOVAL
|
CYC
|
3.000
|
$1,250.000
|
$500.000
|
$825.000
|
$514.430
|
|
|
DITCH CLEANING AND RESHAPING (FOOT)
|
LF
|
68,587.000
|
$2.480
|
$0.500
|
$3.000
|
$2.000
|
|
|
STORM SEWER CLEANING (PIPE)(12"-18"DIA)
|
LF
|
344.000
|
$4.000
|
$2.000
|
$16.500
|
$20.000
|
|
|
STORM SEWER CLEANING (PIPE)(19"-24"DIA)
|
LF
|
1,167.000
|
$6.000
|
$2.000
|
$16.500
|
$20.000
|
|
|
STORM SEWER CLEANING (PIPE)(25"-30"DIA)
|
LF
|
2,267.000
|
$7.000
|
$2.000
|
$16.500
|
$20.000
|
|
|
STORM SEWER CLEANING (PIPE)(31"-36"DIA)
|
LF
|
6,923.000
|
$8.000
|
$2.000
|
$16.500
|
$20.000
|
|
|
STORM SEWER CLEANING (PIPE)(37"-42"DIA)
|
LF
|
63.000
|
$9.000
|
$2.000
|
$16.500
|
$20.000
|
|
|
BBU SYSTEM (EXTERNAL BATT CABINET)
|
EA
|
1.000
|
$6,590.000
|
$6,200.000
|
$6,600.000
|
$5,974.320
|
|
|
TMA (STATIONARY)
|
DAY
|
41.000
|
$122.000
|
$500.000
|
$350.000
|
$245.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
388.000
|
$275.000
|
$35.000
|
$30.000
|
$400.000
|
|
Totals: |
$7,095,364.856
|
$7,225,989.160
|
$7,657,119.420
|
$7,823,733.549
|