Show Job Controls
Bid Cobra

FORT BEND FM 361 (0838-03-024)

Items: 127

County: FORT BEND
Length: N/A
Highway: FM 361
District: HOUSTON
Control Number: 0838-03-024
DBE Goal: N/A
Project: STP 2019(918)
Guaranty: N/A
Time: 180 WORKING DAYS
Engineer's Estimate: $7,095,364.86
Date: 05/07/2019 (7 years ago)
Contract Number: N/A
Type: SHOULDERS, BASE REP, O/L, BRIDGE & PV MRKS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$7,095,364.86
$7,225,989.16
Over/Under Est: 1.84% $130,624.30
Over/Under Est: 7.92% $561,754.56
Amt Left: 5.97% $431,130.26
Over/Under Est: 10.27% $728,368.67
Amt Left: 8.27% $597,744.37
Delta: -2.18% -$166,614.11

Bid Items & Bid Tabulations

127 Total 0 of 127
FORT BEND  |  FM 361  |  HOUSTON  |  0838-03-024  |  05/07/2019  |  $7,095,364.86  |  STP 2019(918)  |  SHOULDERS, BASE REP, O/L, BRIDGE & P...  |  180 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
DURWOOD GREENE CONSTRUCTION CO.
ANGEL BROTHERS HOLDINGS CORP.
JAMES CONSTRUCTION GROUP, L.L.C.
PREPARING ROW
STA 376.110 $500.000 $700.000 $220.000 $330.000
REMOVING CONC (RIPRAP)
SY 1,340.000 $15.100 $11.000 $14.000 $5.500
REMOVE CONC (RAIL)
LF 262.000 $9.000 $11.000 $17.000 $12.750
REMOVING STAB BASE AND ASPH PAV (3")
SY 513.000 $3.050 $8.000 $8.000 $14.750
EXCAVATION (ROADWAY)
CY 10,774.000 $9.450 $10.000 $12.500 $9.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 19,318.000 $3.000 $8.000 $12.000 $12.000
BLOCK SODDING
SY 143,865.000 $2.460 $1.300 $3.500 $2.720
STRAW OR HAY MULCH
SY 35,978.000 $0.250 $0.150 $0.280 $0.210
BROADCAST SEED (TEMP) (WARM)
SY 35,978.000 $0.110 $0.300 $0.220 $0.080
FERTILIZER
AC 37.290 $315.000 $500.000 $825.000 $630.890
VEGETATIVE WATERING
MG 4,474.800 $5.570 $7.000 $15.000 $4.000
FL BS (CMP IN PLC)(TY D GR 4)(FNAL POS)
CY 15.000 $25.000 $130.000 $200.000 $460.000
ASPHALT STAB BASE (GR 2)(PG 64)
TON 26,211.350 $63.000 $69.000 $72.000 $68.520
D-GR HMA TY-D SAC-A PG70-22
TON 15,310.240 $77.000 $87.000 $83.000 $84.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 9,237.000 $33.000 $12.000 $21.000 $41.000
PLANE ASPH CONC PAV (2")
SY 94,259.000 $1.260 $2.500 $1.900 $1.560
PLANE ASPH CONC PAV (5")
SY 243.000 $5.000 $10.000 $20.000 $30.000
STRUCT EXCAV (BOX)
CY 2,458.000 $7.000 $25.000 $5.000 $1.080
STRUCT EXCAV (PIPE)
CY 1,836.000 $7.000 $25.000 $8.000 $1.080
CEM STABIL BKFL
CY 2,389.000 $50.000 $60.000 $57.500 $43.140
CUT & RESTORE ASPH PAVING
SY 353.000 $172.000 $250.000 $62.000 $161.780
CEMENT STAB BACKFILL (INLET OR MH)
CY 40.250 $47.000 $60.000 $42.000 $43.140
TRENCH EXCAVATION PROTECTION
LF 648.000 $2.110 $20.000 $5.000 $1.080
PRESTR CONC PIL (18 IN SQ)
LF 1,059.000 $110.000 $155.000 $137.000 $104.000
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 30.400 $400.000 $350.000 $360.000 $325.810
CL C CONC (ABUT)
CY 27.000 $816.000 $1,450.000 $1,900.000 $1,100.000
CL C CONC (CAP)
CY 22.800 $864.000 $1,450.000 $1,700.000 $1,300.000
REINF CONC SLAB (SLAB BEAM)
SF 4,642.000 $12.250 $13.000 $17.250 $14.000
APPROACH SLAB
CY 68.800 $420.000 $880.000 $555.000 $550.000
PRESTR CONC SLAB BEAM (5SB12)
LF 886.500 $180.000 $231.000 $193.000 $150.000
RIPRAP (CONC)(5 IN)
CY 346.000 $375.000 $550.000 $350.000 $377.490
RIPRAP (STONE COMMON)(DRY)(18 IN)
CY 366.000 $225.000 $187.000 $145.000 $172.570
RIPRAP (MOW STRIP)(4 IN)
CY 63.000 $412.000 $700.000 $600.000 $647.120
RAIL (TY SSTR) (W/DRAIN SLOTS)
LF 224.000 $30.000 $88.000 $205.000 $70.000
CONC BOX CULV (6 FT X 3 FT)
LF 1,712.000 $270.000 $345.000 $262.000 $388.270
RC PIPE (CL III)(18 IN)
LF 86.000 $65.000 $60.000 $77.000 $248.060
RC PIPE (CL III)(24 IN)
LF 72.000 $80.000 $65.000 $164.000 $124.030
RC PIPE (CL III)(30 IN)
LF 476.000 $83.000 $90.000 $88.000 $129.420
RC PIPE (CL III)(36 IN)
LF 456.000 $109.000 $112.000 $98.000 $172.570
RC PIPE (CL III)(48 IN)
LF 192.000 $206.000 $167.000 $117.000 $215.710
MANH (COMPL)(PRM)(48IN)
EA 7.000 $3,000.000 $1,500.000 $1,500.000 $5,392.690
SET (TY II) (18 IN) (RCP) (6: 1) (C)
EA 11.000 $900.000 $1,050.000 $700.000 $1,617.810
SET (TY II) (24 IN) (RCP) (6: 1) (C)
EA 1.000 $2,200.000 $1,500.000 $950.000 $1,617.810
SET (TY II) (30 IN) (RCP) (6: 1) (C)
EA 2.000 $1,500.000 $2,200.000 $1,100.000 $2,696.350
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 2.000 $2,320.000 $2,200.000 $1,100.000 $2,696.350
REMOV STR (PIPE)
LF 1,244.000 $22.150 $20.000 $15.000 $21.570
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 1.000 $26,000.000 $120,000.000 $44,000.000 $20,000.000
MOBILIZATION
LS 1.000 $650,000.000 $300,000.000 $506,000.000 $600,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 12.000 $10,000.000 $2,700.000 $5,750.000 $1,687.170
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 230.000 $35.000 $30.000 $26.000 $25.550
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 180.000 $45.000 $45.000 $32.500 $30.490
ROCK FILTER DAMS (REMOVE)
LF 410.000 $12.560 $12.000 $9.000 $10.060
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,649.000 $1.570 $3.000 $3.500 $4.940
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,649.000 $0.710 $1.000 $0.750 $0.890
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 2,340.000 $12.330 $10.000 $4.000 $3.010
BIODEG EROSN CONT LOGS (REMOVE)
LF 2,340.000 $2.430 $3.000 $0.900 $0.540
RUMBLE STRIPS (SHOULDER)
LF 57,354.000 $0.230 $0.220 $0.350 $0.210
RUMBLE STRIPS (CENTERLINE)
LF 31,138.000 $0.270 $0.260 $0.400 $0.340
MTL W-BEAM GD FEN (TIM POST)
LF 1,075.000 $19.520 $22.000 $21.500 $22.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $1,890.000 $2,100.000 $1,900.000 $1,730.000
REMOVE METAL BEAM GUARD FENCE
LF 837.500 $5.580 $3.300 $3.500 $3.000
RM MTL BM GD FEN TRANS (T101)
EA 4.000 $100.000 $770.000 $800.000 $250.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $2,715.000 $3,100.000 $3,300.000 $2,645.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $265.000 $350.000 $330.000 $250.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 32.000 $272.000 $210.000 $440.000 $194.260
MAILBOX INSTALL-D (TWW-POST) TY 4
EA 1.000 $355.000 $240.000 $500.000 $211.050
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 3.000 $660.000 $475.000 $660.000 $510.240
CONDT (PVC) (SCH 80) (2")
LF 65.000 $12.140 $7.000 $6.000 $5.450
CONDT (PVC) (SCH 80) (3")
LF 55.000 $13.660 $8.000 $7.250 $6.560
CONDT (PVC) (SCH 80) (3") (BORE)
LF 20.000 $19.640 $15.000 $13.000 $11.630
ELEC CONDR (NO.6) BARE
LF 65.000 $1.120 $2.000 $1.600 $1.420
ELEC CONDR (NO.4) BARE
LF 70.000 $1.580 $2.500 $2.000 $1.740
ELEC CONDR (NO.4) INSULATED
LF 140.000 $1.900 $2.600 $2.000 $1.850
TRAY CABLE (4 CONDR) (12 AWG)
LF 540.000 $1.680 $2.500 $2.000 $1.700
GROUND BOX TY D (162922)W/APRON
EA 2.000 $2,980.000 $1,250.000 $1,300.000 $1,210.500
REMOVE GROUND BOX
EA 1.000 $266.000 $400.000 $400.000 $369.030
ZINC-COAT STL WIRE STRAND (1/4")
LF 305.000 $2.870 $1.500 $1.500 $1.390
ZINC-COAT STL WIRE STRAND (3/8")
LF 305.000 $2.500 $1.500 $1.500 $1.390
ELC SRV TY D 120/240 060(NS)SS(E)SP(O)
EA 1.000 $4,200.000 $4,500.000 $4,800.000 $4,308.230
REPLACE EXISTING ALUMINUM SIGNS(TY A)
SF 9.000 $22.500 $24.000 $27.500 $39.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 57.000 $475.000 $380.000 $450.000 $370.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 13.000 $547.000 $450.000 $490.000 $441.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 1.000 $770.000 $550.000 $620.000 $554.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 10.000 $620.000 $630.000 $690.000 $631.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 9.000 $746.000 $680.000 $850.000 $697.000
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 2.000 $760.000 $770.000 $1,000.000 $847.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 12.000 $20.000 $22.000 $80.000 $20.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 21.000 $32.150 $60.000 $80.000 $48.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 39.000 $23.850 $32.000 $16.500 $30.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 149,759.000 $0.130 $0.180 $0.200 $0.160
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 75,849.000 $0.230 $0.200 $0.250 $0.200
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 700.000 $0.220 $0.250 $0.500 $0.400
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 344.000 $1.110 $1.000 $2.000 $1.500
WK ZN PAV MRK NON-REMOV (W)(ARROW)
EA 4.000 $60.630 $35.000 $65.000 $60.000
WK ZN PAV MRK NON-REMOV(W)(WORD)
EA 4.000 $69.330 $35.000 $65.000 $60.000
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 7,850.000 $0.130 $0.180 $0.200 $0.170
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 18,513.000 $0.130 $0.180 $0.200 $0.170
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
LF 7,850.000 $0.220 $0.200 $0.250 $0.200
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 18,513.000 $0.250 $0.200 $0.250 $0.200
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 350.000 $0.960 $1.000 $1.100 $0.990
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 172.000 $5.410 $5.000 $7.000 $6.000
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 75,849.000 $0.410 $0.380 $0.500 $0.420
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
LF 7,850.000 $0.410 $0.380 $0.500 $0.420
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 18,513.000 $0.430 $0.380 $0.500 $0.420
PREFAB PAV MRK TY C (W) (ARROW)
EA 2.000 $361.000 $210.000 $300.000 $265.000
PREFAB PAV MRK TY C (W) (WORD)
EA 2.000 $388.000 $310.000 $360.000 $325.000
REFL PAV MRKR TY I-C
EA 18.000 $3.180 $10.000 $11.000 $10.000
REFL PAV MRKR TY II-A-A
EA 844.000 $3.080 $4.000 $5.000 $4.250
INSTALL HWY TRF SIG (FLASH BEACON)
EA 1.000 $26,500.000 $27,000.000 $28,500.000 $25,987.660
REMOVING TRAFFIC SIGNALS
EA 1.000 $3,380.000 $7,400.000 $7,600.000 $6,919.200
VEH SIG SEC (12")LED(YEL)
EA 4.000 $400.000 $190.000 $200.000 $179.310
VEH SIG SEC (12")LED(RED)
EA 4.000 $400.000 $190.000 $200.000 $179.310
BACK PLATE (12")(1 SEC)
EA 8.000 $81.520 $50.000 $55.000 $47.870
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
LF 790.000 $1.780 $2.500 $2.500 $2.270
INS TRF SIG PL AM (S)STR(TY D)
EA 1.000 $5,080.000 $6,400.000 $6,700.000 $6,106.250
INS TRF SIG PL AM (S)STR(TY D)LUM
EA 1.000 $5,555.000 $8,300.000 $8,800.000 $7,990.310
FULL - WIDTH MOWING
CYC 3.000 $1,910.000 $2,000.000 $2,400.000 $1,129.440
LITTER REMOVAL
CYC 3.000 $1,250.000 $500.000 $825.000 $514.430
DITCH CLEANING AND RESHAPING (FOOT)
LF 68,587.000 $2.480 $0.500 $3.000 $2.000
STORM SEWER CLEANING (PIPE)(12"-18"DIA)
LF 344.000 $4.000 $2.000 $16.500 $20.000
STORM SEWER CLEANING (PIPE)(19"-24"DIA)
LF 1,167.000 $6.000 $2.000 $16.500 $20.000
STORM SEWER CLEANING (PIPE)(25"-30"DIA)
LF 2,267.000 $7.000 $2.000 $16.500 $20.000
STORM SEWER CLEANING (PIPE)(31"-36"DIA)
LF 6,923.000 $8.000 $2.000 $16.500 $20.000
STORM SEWER CLEANING (PIPE)(37"-42"DIA)
LF 63.000 $9.000 $2.000 $16.500 $20.000
BBU SYSTEM (EXTERNAL BATT CABINET)
EA 1.000 $6,590.000 $6,200.000 $6,600.000 $5,974.320
TMA (STATIONARY)
DAY 41.000 $122.000 $500.000 $350.000 $245.000
TMA (MOBILE OPERATION)
DAY 388.000 $275.000 $35.000 $30.000 $400.000
Totals: $7,095,364.856 $7,225,989.160 $7,657,119.420 $7,823,733.549