FORT BEND SH 36 (0188-01-039)

Items: 70

County: FORT BEND
Length: N/A
Highway: SH 36
District: HOUSTON
Control Number: 0188-01-039
DBE Goal: N/A
Project: NH 2019(911)
Guaranty: N/A
Time: 34 WORKING DAYS
Engineer's Estimate: $762,041.53
Date: 05/08/2019 (7 years ago)
Contract Number: N/A
Type: SPALL REP, SEAL COAT, 3/4" TOM, SIGN, PAV MRK
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$762,041.53
Over/Under Est: 24.56% $187,178.28
Over/Under Est: 25.8% $196,579.02
Amt Left: 0.99% $9,400.74
Over/Under Est: 55.89% $425,940.76
Amt Left: 25.15% $238,762.48
Delta: -23.93% -$229,361.74

Bid Items & Bid Tabulations

70 Total 0 of 70
FORT BEND  |  SH 36  |  HOUSTON  |  0188-01-039  |  05/08/2019  |  $762,041.53  |  NH 2019(911)  |  SPALL REP, SEAL COAT, 3/4" TOM, SIGN...  |  34 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
JAMES CONSTRUCTION GROUP, L.L.C.
ANGEL BROTHERS HOLDINGS CORP.
DURWOOD GREENE CONSTRUCTION CO.
REMOVING CONC (RIPRAP)
SY 31.000 $15.100 $100.000 $116.000 $55.000
REMOVING CONC (SIDEWALKS)
SY 102.400 $15.000 $77.000 $68.000 $60.000
REMOVING CONC (CURB)
LF 14.000 $14.310 $53.000 $35.000 $100.000
ASPH (AC-20-5TR)
GAL 10,884.000 $3.000 $3.750 $4.000 $5.000
AGGR (TY-PB OR PL GR 5 SAC-B)
CY 448.000 $135.000 $170.000 $135.000 $140.000
TOM (ASPHALT) PG 76-22
TON 180.000 $120.000 $134.000 $146.000 $150.000
TOM - F (AGGREGATE) SAC - A
TON 2,383.000 $120.000 $134.000 $146.000 $150.000
PLANE ASPH CONC PAV (0" TO 1 1/4")
SY 1,369.000 $4.500 $13.000 $16.000 $60.000
FULL - DEPTH REPAIR CRCP (9")
SY 223.000 $152.000 $257.000 $409.000 $300.000
RIPRAP (MOW STRIP)(4 IN)
CY 5.000 $412.000 $895.000 $870.000 $900.000
ADJUSTING MANHOLES
EA 20.000 $1,000.000 $545.000 $290.000 $900.000
MOBILIZATION
LS 1.000 $70,000.000 $120,000.000 $38,000.000 $80,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 3.000 $4,600.000 $2,800.000 $5,120.000 $6,000.000
CONC SIDEWALKS (4")
SY 22.000 $44.210 $452.000 $200.000 $600.000
CURB RAMPS (TY 7)
EA 11.000 $1,420.000 $1,235.000 $1,325.000 $6,000.000
MTL W-BEAM GD FEN (TIM POST)
LF 60.000 $19.520 $34.000 $36.000 $28.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 1.000 $1,890.000 $1,930.000 $3,500.000 $1,900.000
REMOVE METAL BEAM GUARD FENCE
LF 120.000 $5.580 $5.000 $6.000 $2.500
REMOVE TERMINAL ANCHOR SECTION
EA 2.000 $196.000 $450.000 $240.000 $200.000
GUARDRAIL END TREATMENT (INSTALL)
EA 1.000 $2,715.000 $2,845.000 $3,615.000 $3,000.000
GUARDRAIL END TREATMENT (REMOVE)
EA 1.000 $265.000 $250.000 $360.000 $300.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 7.000 $272.000 $191.000 $480.000 $300.000
MAILBOX INSTALL-D (TWW-POST) TY 4
EA 1.000 $355.000 $207.000 $540.000 $400.000
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 1.000 $660.000 $509.000 $725.000 $650.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 53.000 $475.000 $362.000 $550.000 $550.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 11.000 $547.000 $490.000 $675.000 $575.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 7.000 $770.000 $562.000 $780.000 $725.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 1.000 $725.000 $653.000 $800.000 $750.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 4.000 $746.000 $766.000 $1,035.000 $700.000
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
EA 2.000 $742.000 $773.000 $1,120.000 $800.000
IN SM RD SN SUP&AM TYS80(1)SA(U-2EXT)
EA 1.000 $855.000 $950.000 $1,350.000 $800.000
REMOVE SM RD SN SUP&AM
EA 79.000 $84.000 $75.000 $104.000 $200.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 11.000 $20.000 $25.000 $12.000 $30.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 3.000 $23.850 $35.000 $18.000 $30.000
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 4,023.000 $0.200 $0.250 $0.300 $0.450
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 510.000 $0.230 $0.250 $0.300 $0.450
WK ZN PAV MRK NON-REMOV (W)8"(DOT)
LF 36.000 $0.330 $1.000 $1.200 $2.000
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 927.000 $0.220 $0.500 $0.600 $1.000
WK ZN PAV MRK NON-REMOV (W)12"(SLD)
LF 2,948.000 $0.550 $2.000 $2.400 $4.000
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 889.000 $1.110 $3.000 $3.600 $7.000
WK ZN PAV MRK NON-REMOV (W)(ARROW)
EA 51.000 $60.630 $50.000 $60.000 $100.000
WK ZN PAV MRK NON-REMOV(W)(WORD)
EA 9.000 $69.330 $50.000 $60.000 $100.000
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
LF 2,180.000 $0.220 $0.250 $0.300 $0.450
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 16,706.000 $0.250 $0.250 $0.300 $0.450
WK ZN PAV MRK NON-REMOV (Y)24"(SLD)
LF 2,859.000 $1.360 $2.850 $3.500 $5.000
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 36.000 $2.000 $2.000 $2.500 $5.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 927.000 $0.960 $1.000 $1.200 $2.000
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 2,948.000 $2.660 $3.000 $3.500 $5.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 889.000 $5.410 $5.000 $6.000 $10.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 51.000 $109.000 $100.000 $120.000 $175.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 9.000 $156.000 $100.000 $120.000 $200.000
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
LF 2,859.000 $6.060 $5.000 $6.000 $10.000
RE PV MRK TY I(BLACK)6"(SHADOW)(100MIL)
LF 4,023.000 $0.470 $0.510 $0.600 $0.750
PAVEMENT SEALER 6"
LF 4,023.000 $0.070 $0.220 $0.250 $0.250
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 4,023.000 $0.480 $0.480 $0.600 $0.480
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 510.000 $0.410 $1.000 $1.200 $1.000
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
LF 2,180.000 $0.410 $0.480 $0.600 $0.700
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 16,706.000 $0.430 $0.480 $0.600 $0.700
REFL PAV MRKR TY I-C
EA 271.000 $3.180 $4.000 $5.000 $5.000
REFL PAV MRKR TY II-A-A
EA 495.000 $3.080 $4.000 $5.000 $5.000
ELIM EXT PAV MRK & MRKS (6")
LF 23,419.000 $0.260 $0.500 $0.600 $0.500
ELIM EXT PAV MRK & MRKS (8")
LF 963.000 $0.350 $1.000 $1.200 $1.000
ELIM EXT PAV MRK & MRKS (12")
LF 2,948.000 $1.040 $2.000 $2.500 $2.000
ELIM EXT PAV MRK & MRKS (24")
LF 3,748.000 $1.980 $3.000 $3.600 $3.000
ELIM EXT PAV MRK & MRKS (ARROW)
EA 51.000 $46.830 $50.000 $60.000 $50.000
ELIM EXT PAV MRK & MRKS (WORD)
EA 9.000 $46.440 $50.000 $60.000 $50.000
FIBER REINFORCED POLYMER PATCHING MATLS
LB 7,000.000 $4.750 $7.610 $7.250 $8.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 28.000 $52.610 $165.000 $420.000 $300.000
TMA (STATIONARY)
DAY 15.000 $122.000 $240.000 $48.000 $1,000.000
TMA (MOBILE OPERATION)
DAY 44.000 $275.000 $240.000 $48.000 $100.000
Totals: $762,041.530 $949,219.810 $958,620.550 $1,187,982.290