Job Info for 0027-12-152

County: FORT BEND Highway: IH 69 Date: 12/03/2020 (3 years ago) Engineer's Estimate: $4,613,352 Control Number: 0027-12-152
Project: C 27-12-152 District: HOUSTON Time: 450 WORKING DAYS Type: INSTALL NEW ITS EQUIPMENT AND INFRASTRUCTURE
HCS
Pay Estimates: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $4,613,351.83
TRAF-TEX, INC.   $3,151,614.40 1
-31.68% | -$1,461,737.43
THIRD COAST SERVICES LLC   $3,899,725.10 2
-15.47% | -$713,626.73
23.74% | $748,110.70
SICE, INC.   $4,054,179.52 3
-12.12% | -$559,172.31
28.64% | $902,565.12
3.96% | $154,454.42
HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, INC.   $4,390,986.25 4
-4.82% | -$222,365.58
39.32% | $1,239,371.85
8.31% | $336,806.73
FLORIDA TRAFFIC CONTROL DEVICES, INC.   $4,395,673.12 5
-4.72% | -$217,678.71
39.47% | $1,244,058.72
0.11% | $4,686.87

Bid Items

Items: 52, 0 filtered
FORT BEND IH 69  |  HOUSTON  |  0027-12-152  |  12/03/2020  |  $4,613,352  |  C 27-12-152  |  INSTL NEW ITS EQUIPMENT AND INFRASTRUCT  |  450 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate TRAF-TEX, INC. THIRD COAST SERVICES LLC SICE, INC. HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, INC. FLORIDA TRAFFIC CONTROL DEVICES, INC.
416 6005 DRILL SHAFT (42 IN) LF 627.000 $200.000 $205.000 $300.000 $341.857 $245.130 $494.160
416 6023 DRILL SHAFT (SIGN MTS) (54 IN) LF 224.000 $330.000 $544.000 $675.000 $595.223 $413.360 $612.780
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 295.000 $465.000 $336.000 $364.000 $442.966 $567.560 $760.220
500 6001 MOBILIZATION LS 1.000 $250,000.000 $31,948.000 $388,545.000 $345,405.380 $338,279.540 $272,673.210
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 30.000 $6,000.000 $1,160.000 $1,700.000 $3,870.163 $2,631.830 $1,403.480
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 2,000.000 $2.400 $3.750 $3.050 $1.721 $1.380 $4.090
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 2,000.000 $0.800 $0.550 $1.000 $0.479 $0.520 $2.050
540 6001 MTL W-BEAM GD FEN (TIM POST) LF 6,375.000 $21.000 $19.250 $18.000 $20.201 $21.850 $21.640
540 6016 DOWNSTREAM ANCHOR TERMINAL SECTION EA 33.000 $1,200.000 $984.500 $1,100.000 $1,213.714 $1,088.420 $1,286.530
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 33.000 $2,600.000 $2,200.000 $2,650.000 $2,952.593 $2,303.920 $2,806.960
618 6031 CONDT (PVC) (SCH 40) (3") (CONC ENCSE) LF 1,240.000 $6.980 $10.880 $8.500 $7.625 $11.890 $11.430
618 6046 CONDT (PVC) (SCH 80) (2") LF 8,855.000 $8.160 $9.550 $7.200 $5.587 $10.750 $8.120
618 6047 CONDT (PVC) (SCH 80) (2") (BORE) LF 5,245.000 $16.000 $16.800 $21.000 $9.658 $19.560 $23.030
618 6053 CONDT (PVC) (SCH 80) (3") LF 1,945.000 $11.600 $18.100 $11.000 $5.771 $12.580 $11.230
618 6054 CONDT (PVC) (SCH 80) (3") (BORE) LF 110.000 $21.000 $19.250 $30.000 $13.172 $23.420 $22.020
618 6058 CONDT (PVC) (SCH 80) (4") LF 310.000 $13.900 $22.250 $18.000 $9.694 $15.630 $14.310
620 6002 ELEC CONDR (NO.14) INSULATED LF 66,810.000 $0.670 $0.640 $0.960 $0.381 $0.460 $0.550
620 6007 ELEC CONDR (NO.8) BARE LF 4,530.000 $1.100 $0.970 $1.250 $0.562 $0.900 $0.840
620 6008 ELEC CONDR (NO.8) INSULATED LF 8,200.000 $1.190 $1.050 $1.300 $0.698 $1.080 $0.930
620 6009 ELEC CONDR (NO.6) BARE LF 715.000 $1.300 $1.100 $1.350 $0.987 $1.180 $1.080
620 6010 ELEC CONDR (NO.6) INSULATED LF 1,540.000 $1.400 $1.250 $1.400 $1.047 $1.290 $1.120
620 6011 ELEC CONDR (NO.4) BARE LF 845.000 $1.700 $1.400 $1.500 $1.053 $1.520 $1.520
620 6012 ELEC CONDR (NO.4) INSULATED LF 1,935.000 $1.960 $1.500 $1.600 $1.390 $1.680 $1.560
620 6015 ELEC CONDR (NO.2) BARE LF 1,500.000 $2.100 $2.000 $2.150 $1.710 $2.290 $2.000
620 6016 ELEC CONDR (NO.2) INSULATED LF 3,800.000 $2.300 $2.200 $2.250 $1.906 $2.400 $2.000
621 6003 TRAY CABLE (3 CONDR) (10 AWG) LF 385.000 $2.190 $1.850 $2.700 $1.279 $2.840 $1.510
624 6001 GROUND BOX TY A (122311) EA 80.000 $750.000 $547.000 $750.000 $502.688 $612.560 $721.550
628 6250 ELC SRV TY D 120/240 100(NS)SS(N)SP(O) EA 38.000 $4,000.000 $2,811.000 $3,200.000 $3,807.876 $3,768.380 $3,778.890
650 6035 INS OH SN SUP(35 FT BAL TEE) EA 8.000 $30,000.000 $24,693.000 $22,250.000 $24,633.714 $23,351.100 $25,104.990
654 6004 SIGN WALKWAY (36 IN) WITH HNDRL LF 248.000 $296.000 $245.000 $195.000 $223.654 $278.300 $331.110
687 6001 PED POLE ASSEMBLY EA 3.000 $1,630.810 $2,036.000 $1,600.000 $2,253.190 $3,454.430 $2,774.710
6007 6010 FIBER OPTIC CBL (SNGLE-MODE)(6 FIBER) LF 122,185.000 $1.220 $1.030 $1.050 $1.289 $1.640 $1.080
6007 6011 FIBER OPTIC CBL (SNGLE-MODE)(12 FIBER) LF 107,785.000 $1.800 $1.220 $1.100 $1.290 $1.750 $1.330
6007 6017 FIBER OPTIC CBL (SNGLE-MODE)(144 FIBER) LF 113,165.000 $3.450 $1.700 $2.400 $2.310 $3.620 $2.630
6007 6023 FIBER OPTIC PATCH PANEL (12 POSITION) EA 50.000 $1,500.000 $754.000 $1,185.000 $963.047 $1,230.480 $589.740
6007 6027 FIBER OPTIC PATCH PANEL (144 POSITION) EA 9.000 $4,000.000 $3,864.000 $2,200.000 $4,334.489 $2,775.980 $4,452.130
6007 6094 FIBER OPTIC FUSION SPLICE EA 1,812.000 $62.000 $12.000 $48.000 $25.919 $24.080 $25.480
6010 6001 CCTV FIELD EQUIPMENT (ANALOG) EA 31.000 $7,500.000 $4,585.000 $6,900.000 $7,258.128 $7,493.180 $7,028.830
6016 6006 ITS MULTI-DUCT CND (PVC-40) LF 680.000 $16.000 $10.440 $6.900 $7.988 $15.660 $12.270
6016 6008 ITS MULTI-DUCT CND (PVC-40)(CONC ENCSE) LF 1,240.000 $9.900 $13.300 $10.950 $10.991 $16.870 $15.510
6016 6010 ITS MULTI-DUCT CND (PVC-80) LF 120.000 $15.600 $13.300 $9.000 $8.949 $19.970 $19.180
6016 6011 ITS MULTI-DUCT CND (PVC-80)(BORE) LF 110.000 $24.200 $21.850 $50.000 $16.617 $32.410 $22.320
6017 6001 COMMUNICATION HUB BUILDING EA 5.000 $25,400.000 $18,447.000 $24,000.000 $33,752.125 $29,327.250 $24,764.200
6027 6003 CONDUIT (PREPARE) LF 334,790.000 $1.500 $0.400 $0.500 $0.935 $0.870 $1.450
6028 6002 INSTALL DMS (FOUNDATION MTD CABINET) EA 8.000 $10,000.000 $8,668.000 $6,950.000 $7,987.506 $8,711.400 $7,591.900
6035 6001 FIBER OPTIC VIDEO DATA TRANSMITTER EA 31.000 $1,250.000 $947.000 $1,095.000 $1,202.950 $1,605.230 $976.320
6035 6002 FIBER OPTIC VIDEO DATA RECEIVER EA 31.000 $1,250.000 $947.000 $1,095.000 $1,202.950 $1,605.230 $976.320
6064 6047 ITS POLE (55 FT)(110 MPH) EA 31.000 $12,500.000 $11,130.000 $11,250.000 $11,251.785 $13,048.280 $11,752.980
6064 6080 ITS POLE MNT CAB (TY 2)(CONF 1) EA 31.000 $4,900.000 $4,706.000 $5,200.000 $2,736.645 $4,386.080 $3,426.250
6185 6002 TMA (STATIONARY) DAY 450.000 $194.000 $150.000 $130.000 $302.594 $134.460 $210.050
6186 6002 ITS GND BOX(PCAST) TY 1 (243636)W/APRN EA 8.000 $2,800.000 $2,870.000 $2,225.000 $2,623.622 $3,841.580 $2,555.270
6304 6001 ITS RVSD (DATA COLLECT ONLY) SYS EA 13.000 $9,500.000 $9,975.000 $9,100.000 $5,703.367 $7,696.530 $5,764.370
Totals: $4,613,351.83 $3,151,614.40 $3,899,725.10 $4,054,179.64 $4,390,986.25 $4,395,673.12