|
|
PREPARING ROW
|
STA
|
51.000
|
$12,400.000
|
$42,750.000
|
$91,000.000
|
$41,817.000
|
$40,000.000
|
$87,647.060
|
$156,900.000
|
|
|
REMOVING CONC (PAV)
|
SY
|
42,838.000
|
$6.500
|
$10.600
|
$2.800
|
$7.040
|
$5.000
|
$2.620
|
$26.800
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
1,236.000
|
$9.000
|
$6.700
|
$5.250
|
$9.290
|
$5.000
|
$5.200
|
$55.750
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
652.000
|
$12.000
|
$9.800
|
$7.000
|
$11.160
|
$5.000
|
$5.640
|
$27.800
|
|
|
REMOVING STAB BASE AND ASPH PAV (7")
|
SY
|
42,838.000
|
$9.000
|
$12.900
|
$1.500
|
$5.240
|
$4.000
|
$6.100
|
$6.000
|
|
|
REMOVING STAB BASE & ASPH PAV (18")
|
SY
|
15,108.000
|
$9.000
|
$22.100
|
$5.000
|
$12.230
|
$8.000
|
$13.840
|
$10.900
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
75,559.000
|
$10.000
|
$19.100
|
$8.450
|
$14.550
|
$14.000
|
$5.290
|
$12.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
32,848.000
|
$13.600
|
$41.500
|
$11.500
|
$44.160
|
$35.000
|
$9.260
|
$44.500
|
|
|
EMBANK(FINAL)(DC)(TY E)(CSBE)
|
CY
|
3,830.000
|
$63.000
|
$57.200
|
$50.000
|
$54.680
|
$55.000
|
$51.510
|
$66.750
|
|
|
EMB(FNL)(DC)(TYE)(CSBE)(RWALL FND IMPR
|
CY
|
4,584.000
|
$57.000
|
$57.200
|
$50.000
|
$52.620
|
$55.000
|
$55.220
|
$61.000
|
|
|
BLOCK SODDING
|
SY
|
44,352.000
|
$3.250
|
$5.100
|
$3.830
|
$4.870
|
$4.200
|
$3.650
|
$8.750
|
|
|
STRAW OR HAY MULCH
|
SY
|
22,176.000
|
$0.200
|
$0.600
|
$0.160
|
$0.720
|
$0.200
|
$0.150
|
$0.750
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
11,088.000
|
$0.380
|
$0.600
|
$0.140
|
$0.150
|
$0.200
|
$0.130
|
$1.150
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
11,088.000
|
$0.250
|
$0.400
|
$0.210
|
$0.150
|
$0.250
|
$0.200
|
$0.450
|
|
|
FERTILIZER
|
AC
|
13.740
|
$588.000
|
$1,040.000
|
$471.990
|
$958.490
|
$525.000
|
$450.000
|
$1,510.000
|
|
|
VEGETATIVE WATERING
|
MG
|
1,648.800
|
$28.000
|
$36.400
|
$19.000
|
$34.970
|
$18.000
|
$26.000
|
$231.000
|
|
|
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
|
TON
|
2,473.000
|
$280.000
|
$350.000
|
$234.000
|
$357.920
|
$325.000
|
$304.500
|
$295.000
|
|
|
LIME TRT (EXIST MATL)(18")
|
SY
|
49,138.000
|
$12.000
|
$6.100
|
$13.000
|
$11.080
|
$8.000
|
$11.500
|
$8.250
|
|
|
LIME TRT (EXST MATL)(8")
|
SY
|
26,724.000
|
$6.000
|
$4.100
|
$5.700
|
$4.890
|
$4.000
|
$5.000
|
$10.700
|
|
|
CEM TRT(PLNT MX) (CL N)(TY E)(GR 4)(6")
|
SY
|
75,862.000
|
$16.500
|
$17.300
|
$8.750
|
$14.460
|
$14.000
|
$15.000
|
$13.300
|
|
|
ASPHALT STAB BASE (GR 4)(PG 64)
|
TON
|
7,552.000
|
$115.000
|
$95.700
|
$105.000
|
$106.840
|
$112.000
|
$97.150
|
$123.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
1,280.000
|
$6.300
|
$3.800
|
$7.000
|
$4.110
|
$4.000
|
$5.810
|
$4.650
|
|
|
CONC PVMT (CONT REINF - CRCP) (10")
|
SY
|
66,124.000
|
$82.000
|
$84.400
|
$82.100
|
$83.530
|
$91.000
|
$87.930
|
$102.000
|
|
|
CONC PVMT (CONT REINF)(FAST TRK)(13")
|
SY
|
9,438.000
|
$120.000
|
$142.200
|
$143.500
|
$130.520
|
$120.000
|
$150.000
|
$124.000
|
|
|
STRUCT EXCAV
|
CY
|
4,584.000
|
$6.250
|
$16.600
|
$10.400
|
$16.590
|
$15.000
|
$13.040
|
$28.400
|
|
|
CEM STABIL BKFL
|
CY
|
8,588.000
|
$89.300
|
$52.600
|
$50.000
|
$58.410
|
$50.000
|
$56.750
|
$255.000
|
|
|
CUT & RESTORE CONC PAVING
|
SY
|
499.000
|
$226.000
|
$203.400
|
$150.000
|
$217.750
|
$100.000
|
$228.570
|
$93.250
|
|
|
CEMENT STAB BACKFILL (INLET OR MH)
|
CY
|
1,226.600
|
$60.620
|
$52.600
|
$50.000
|
$58.410
|
$50.000
|
$55.110
|
$121.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
11,637.000
|
$6.900
|
$0.100
|
$6.200
|
$1.520
|
$1.000
|
$4.590
|
$64.500
|
|
|
TEMPORARY SPL SHORING
|
SF
|
464.000
|
$25.000
|
$27.000
|
$5.000
|
$26.110
|
$12.000
|
$30.000
|
$47.500
|
|
|
DRILL SHAFT (30 IN)
|
LF
|
3,564.000
|
$204.000
|
$160.200
|
$148.000
|
$148.220
|
$153.000
|
$132.700
|
$312.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
6,358.000
|
$235.000
|
$212.800
|
$185.000
|
$213.240
|
$230.000
|
$205.240
|
$349.000
|
|
|
DRILL SHAFT (48 IN)
|
LF
|
4,440.000
|
$400.000
|
$321.100
|
$325.000
|
$375.600
|
$425.000
|
$344.080
|
$480.000
|
|
|
DRILL SHAFT (66 IN)
|
LF
|
5,681.000
|
$925.000
|
$608.900
|
$585.000
|
$726.710
|
$755.000
|
$750.000
|
$1,320.000
|
|
|
DRILL SHAFT (SIGN MTS) (54 IN)
|
LF
|
300.000
|
$646.000
|
$511.800
|
$516.160
|
$492.110
|
$515.000
|
$492.110
|
$617.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (36 IN)
|
LF
|
28.000
|
$360.000
|
$238.000
|
$240.000
|
$228.820
|
$240.000
|
$228.820
|
$331.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (42 IN)
|
LF
|
34.000
|
$340.000
|
$257.200
|
$259.420
|
$247.330
|
$260.000
|
$247.330
|
$348.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (48 IN)
|
LF
|
66.000
|
$500.000
|
$302.600
|
$305.150
|
$290.930
|
$305.000
|
$290.930
|
$396.000
|
|
|
CL C CONC (ABUT)
|
CY
|
94.600
|
$1,392.000
|
$1,130.100
|
$1,000.000
|
$1,197.180
|
$1,200.000
|
$1,176.060
|
$1,700.000
|
|
|
CL C CONC (COLUMN)
|
CY
|
192.000
|
$1,555.000
|
$1,138.800
|
$1,225.000
|
$1,238.020
|
$1,200.000
|
$1,351.550
|
$2,270.000
|
|
|
CL F CONC (CAP)
|
CY
|
220.000
|
$1,307.000
|
$1,049.800
|
$1,125.000
|
$1,513.480
|
$1,300.000
|
$1,912.260
|
$1,650.000
|
|
|
REINF CONC SLAB
|
SF
|
41,948.000
|
$22.000
|
$24.600
|
$20.000
|
$19.710
|
$20.000
|
$24.380
|
$60.000
|
|
|
RETAINING WALL (MSE)
|
SF
|
35,133.000
|
$93.000
|
$41.200
|
$66.000
|
$32.150
|
$45.000
|
$79.260
|
$90.500
|
|
|
RETAINING WALL (DRILL SHAFT) (FACIA)
|
SF
|
14,658.000
|
$84.000
|
$97.300
|
$100.000
|
$66.590
|
$80.000
|
$75.000
|
$81.000
|
|
|
PRESTR CONC GIRDER (TX54)
|
LF
|
5,434.800
|
$214.000
|
$185.000
|
$174.000
|
$201.480
|
$200.000
|
$172.240
|
$255.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
760.000
|
$360.000
|
$460.500
|
$640.000
|
$460.130
|
$523.000
|
$700.000
|
$1,560.000
|
|
|
RIPRAP (CONC) (CL B) (4")
|
CY
|
98.000
|
$735.000
|
$550.400
|
$640.000
|
$651.980
|
$800.000
|
$1,200.000
|
$881.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
49.000
|
$410.000
|
$599.000
|
$650.000
|
$634.060
|
$800.000
|
$625.000
|
$705.000
|
|
|
RAIL (TY SSTR)
|
LF
|
4,217.000
|
$68.000
|
$50.900
|
$43.000
|
$57.400
|
$60.000
|
$52.000
|
$121.000
|
|
|
RAIL (TY PR11)
|
LF
|
33.000
|
$130.000
|
$222.200
|
$265.000
|
$283.570
|
$250.000
|
$368.680
|
$162.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
240.800
|
$220.000
|
$173.800
|
$180.000
|
$187.220
|
$200.000
|
$208.700
|
$220.000
|
|
|
CONC BOX CULV (10 FT X 7 FT)
|
LF
|
2,851.000
|
$1,464.000
|
$1,258.800
|
$1,400.000
|
$1,392.270
|
$1,750.000
|
$1,500.000
|
$418.000
|
|
|
CONC BOX CULV (7 FT X 3 FT)(EXTEND)
|
LF
|
17.000
|
$1,150.000
|
$774.400
|
$900.000
|
$1,138.020
|
$1,100.000
|
$1,107.810
|
$1,160.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
6,949.000
|
$104.000
|
$82.800
|
$85.000
|
$108.830
|
$113.000
|
$105.430
|
$138.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
1,047.000
|
$110.000
|
$103.900
|
$110.000
|
$138.140
|
$125.000
|
$118.910
|
$192.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
790.000
|
$143.000
|
$142.000
|
$145.000
|
$155.940
|
$175.000
|
$165.680
|
$242.000
|
|
|
INLET (COMPL)(TY AD)
|
EA
|
13.000
|
$4,530.000
|
$6,019.700
|
$4,500.000
|
$5,738.630
|
$5,500.000
|
$6,838.550
|
$7,640.000
|
|
|
INLET (COMPL)(TY AZ)
|
EA
|
3.000
|
$5,515.000
|
$7,522.700
|
$6,500.000
|
$7,371.260
|
$7,000.000
|
$8,291.910
|
$9,110.000
|
|
|
INLET (COMPL)(TY AZR)
|
EA
|
19.000
|
$7,600.000
|
$7,504.900
|
$7,200.000
|
$7,075.200
|
$7,500.000
|
$9,539.270
|
$8,920.000
|
|
|
INLET (COMPL)(CURB)(TY C1)
|
EA
|
68.000
|
$8,170.000
|
$9,185.400
|
$6,400.000
|
$8,749.520
|
$9,000.000
|
$9,877.570
|
$11,520.000
|
|
|
MANH (COMPL) (JUNCT BOX)(SPL W/RISER)
|
EA
|
2.000
|
$7,000.000
|
$18,872.700
|
$91,000.000
|
$24,824.060
|
$120,000.000
|
$128,093.670
|
$25,930.000
|
|
|
INLET (COMPL)(TY C1)(STAGE II)
|
EA
|
14.000
|
$3,200.000
|
$6,991.000
|
$5,200.000
|
$6,697.050
|
$7,200.000
|
$9,609.450
|
$5,410.000
|
|
|
INLET (COMPL)(EXT TY C)
|
EA
|
105.000
|
$3,800.000
|
$2,566.600
|
$1,100.000
|
$1,454.110
|
$1,280.000
|
$1,621.360
|
$3,340.000
|
|
|
MANH (BOX CULV)
|
EA
|
8.000
|
$7,000.000
|
$5,664.300
|
$3,500.000
|
$6,320.990
|
$3,500.000
|
$5,420.630
|
$6,470.000
|
|
|
WINGWALL (PW - 1) (HW=6 FT)
|
EA
|
1.000
|
$30,050.000
|
$32,860.000
|
$28,000.000
|
$26,969.580
|
$19,400.000
|
$29,884.850
|
$29,710.000
|
|
|
SET (TY I) (24 IN) (4: 1) (C)
|
EA
|
1.000
|
$6,300.000
|
$2,576.300
|
$1,200.000
|
$2,904.480
|
$1,692.050
|
$4,097.020
|
$8,510.000
|
|
|
REMOV STR (INLET)
|
EA
|
52.000
|
$621.000
|
$577.200
|
$720.000
|
$880.860
|
$650.000
|
$1,913.160
|
$1,360.000
|
|
|
REMOV STR (MANHOLE)
|
EA
|
9.000
|
$616.000
|
$956.800
|
$720.000
|
$880.910
|
$700.000
|
$1,920.490
|
$1,290.000
|
|
|
REMOV STR (SET)
|
EA
|
4.000
|
$312.000
|
$577.200
|
$320.000
|
$914.750
|
$1,000.000
|
$1,433.220
|
$706.000
|
|
|
REMOV STR (PIPE)
|
LF
|
6,510.000
|
$25.000
|
$21.100
|
$23.000
|
$31.150
|
$21.000
|
$15.850
|
$31.750
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$4,408,598.000
|
$4,400,000.000
|
$4,650,000.000
|
$4,500,000.000
|
$4,820,000.000
|
$5,000,000.000
|
$8,000,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
29.000
|
$15,000.000
|
$4,832.400
|
$14,500.000
|
$5,464.150
|
$10,500.000
|
$14,875.300
|
$291,400.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
120.000
|
$42.000
|
$88.400
|
$40.000
|
$42.330
|
$34.000
|
$32.000
|
$49.500
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
120.000
|
$11.000
|
$10.400
|
$16.000
|
$14.070
|
$15.000
|
$15.000
|
$17.300
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
444.000
|
$58.000
|
$31.200
|
$50.000
|
$42.030
|
$34.000
|
$32.000
|
$40.250
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
444.000
|
$12.000
|
$5.200
|
$14.000
|
$10.990
|
$15.000
|
$15.000
|
$15.200
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
8,039.000
|
$3.720
|
$2.100
|
$4.500
|
$3.710
|
$3.500
|
$3.500
|
$5.350
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
8,039.000
|
$0.910
|
$0.500
|
$1.000
|
$0.880
|
$1.000
|
$1.000
|
$1.900
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
1,860.000
|
$7.620
|
$8.300
|
$4.500
|
$5.670
|
$6.000
|
$5.500
|
$8.150
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,860.000
|
$1.420
|
$3.100
|
$0.900
|
$1.090
|
$2.000
|
$1.500
|
$2.600
|
|
|
CONSTRUCTING DETOURS
|
SY
|
6,030.000
|
$103.000
|
$105.100
|
$130.000
|
$142.280
|
$125.000
|
$120.000
|
$140.000
|
|
|
PORT CTB (DES SOURCE)(LOW PROF)(TY 1)
|
LF
|
6,260.000
|
$7.000
|
$12.400
|
$7.000
|
$15.580
|
$12.000
|
$16.250
|
$73.500
|
|
|
PORT CTB (DES SOURCE)(LOW PROF)(TY 2)
|
LF
|
140.000
|
$7.000
|
$12.400
|
$8.000
|
$26.550
|
$12.000
|
$32.550
|
$83.250
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
10,820.000
|
$5.000
|
$9.400
|
$7.000
|
$6.220
|
$6.000
|
$8.530
|
$15.600
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
320.000
|
$5.000
|
$9.400
|
$8.000
|
$6.160
|
$9.000
|
$17.890
|
$25.900
|
|
|
PORT CTB (STKPL)(LOW PROF)(TY 1)
|
LF
|
6,260.000
|
$7.000
|
$12.100
|
$7.000
|
$14.650
|
$10.000
|
$16.460
|
$21.700
|
|
|
PORT CTB (STKPL)(LOW PROF)(TY 2)
|
LF
|
140.000
|
$7.000
|
$12.100
|
$8.000
|
$26.170
|
$10.000
|
$19.500
|
$25.000
|
|
|
PORT CTB CONNECT HARDWARE
|
EA
|
314.000
|
$83.000
|
$99.800
|
$100.000
|
$92.950
|
$90.000
|
$87.000
|
$56.500
|
|
|
CONC CURB (MONO) (TY II)
|
LF
|
29,614.000
|
$5.000
|
$3.700
|
$4.500
|
$3.970
|
$4.000
|
$3.260
|
$18.300
|
|
|
CONC CURB (U-TURN)
|
LF
|
714.000
|
$31.700
|
$28.300
|
$15.000
|
$40.610
|
$46.000
|
$49.690
|
$57.000
|
|
|
CONC CURB (DOWEL)
|
LF
|
422.000
|
$7.500
|
$5.300
|
$8.000
|
$9.800
|
$9.000
|
$17.810
|
$19.100
|
|
|
DRIVEWAYS (CONC) (HES)
|
SY
|
147.000
|
$75.000
|
$113.000
|
$105.000
|
$103.070
|
$100.000
|
$110.000
|
$137.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
5,986.000
|
$64.000
|
$62.400
|
$68.000
|
$58.760
|
$62.500
|
$60.000
|
$83.500
|
|
|
CURB RAMPS (TY 2)
|
EA
|
1.000
|
$2,560.000
|
$1,778.600
|
$3,000.000
|
$2,019.220
|
$2,000.000
|
$2,500.000
|
$2,940.000
|
|
|
CURB RAMPS (TY 5)
|
EA
|
1.000
|
$3,480.000
|
$4,330.500
|
$3,200.000
|
$4,016.380
|
$2,200.000
|
$3,650.000
|
$3,800.000
|
|
|
CURB RAMPS (TY 6)
|
EA
|
5.000
|
$2,000.000
|
$3,027.900
|
$3,200.000
|
$2,803.800
|
$2,000.000
|
$2,200.000
|
$3,250.000
|
|
|
CURB RAMPS (TY 7)
|
EA
|
1.000
|
$2,296.000
|
$1,725.900
|
$2,700.000
|
$2,070.510
|
$2,000.000
|
$2,150.000
|
$2,730.000
|
|
|
CURB RAMPS (TY 20)
|
EA
|
8.000
|
$2,663.000
|
$1,565.400
|
$2,700.000
|
$2,468.240
|
$2,000.000
|
$3,500.000
|
$2,510.000
|
|
|
CURB RAMPS (TY 21)
|
EA
|
1.000
|
$2,247.000
|
$2,503.300
|
$3,300.000
|
$2,284.190
|
$3,000.000
|
$3,000.000
|
$3,220.000
|
|
|
CURB RAMPS (TY 22)
|
EA
|
1.000
|
$3,000.000
|
$1,814.100
|
$3,800.000
|
$4,200.450
|
$2,100.000
|
$4,400.000
|
$3,430.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$2,000.000
|
$2,241.200
|
$2,260.330
|
$2,155.000
|
$2,400.000
|
$2,155.000
|
$2,360.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$3,162.000
|
$3,068.000
|
$3,094.180
|
$2,950.000
|
$3,200.000
|
$2,950.000
|
$3,380.000
|
|
|
PIPE UNDERDRAINS (TY 6) (6")
|
LF
|
2,682.000
|
$21.000
|
$47.900
|
$30.000
|
$37.000
|
$39.000
|
$19.480
|
$68.500
|
|
|
IN RD IL (U/P) (TY 1) (150W EQ) LED
|
EA
|
10.000
|
$1,700.000
|
$1,348.100
|
$1,359.580
|
$1,296.230
|
$1,350.000
|
$1,296.230
|
$1,390.000
|
|
|
IN RD IL (U/P) (TY 2) (150W EQ) LED
|
EA
|
2.000
|
$1,455.000
|
$1,661.400
|
$1,675.550
|
$1,597.470
|
$1,700.000
|
$1,597.470
|
$1,550.000
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
3,651.000
|
$13.500
|
$8.900
|
$8.980
|
$8.560
|
$9.000
|
$8.560
|
$10.100
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
610.000
|
$28.300
|
$10.500
|
$10.560
|
$10.070
|
$10.500
|
$10.070
|
$19.300
|
|
|
CONDT (PVC) (SCH 80) (3")
|
LF
|
1,582.000
|
$22.300
|
$14.800
|
$14.940
|
$14.240
|
$15.000
|
$14.240
|
$21.300
|
|
|
CONDT (PVC) (SCH 80) (3") (BORE)
|
LF
|
1,288.000
|
$32.650
|
$14.700
|
$14.780
|
$14.090
|
$15.000
|
$14.090
|
$27.200
|
|
|
CONDT (PVC) (SCH 80) (4")
|
LF
|
391.000
|
$34.200
|
$20.700
|
$20.880
|
$19.910
|
$20.000
|
$19.910
|
$27.200
|
|
|
CONDT (PVC) (SCH 80) (4") (BORE)
|
LF
|
153.000
|
$40.700
|
$19.500
|
$19.690
|
$18.770
|
$20.000
|
$18.770
|
$33.500
|
|
|
CONDT (RM) (2")
|
LF
|
815.000
|
$71.500
|
$20.800
|
$20.990
|
$20.010
|
$21.000
|
$20.010
|
$33.500
|
|
|
ELEC CONDR (NO.12) BARE
|
LF
|
475.000
|
$1.050
|
$0.800
|
$0.800
|
$0.760
|
$0.800
|
$0.760
|
$1.350
|
|
|
ELEC CONDR (NO.12) INSULATED
|
LF
|
950.000
|
$1.400
|
$0.800
|
$0.840
|
$0.800
|
$0.900
|
$0.800
|
$1.350
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
6,929.000
|
$1.450
|
$0.900
|
$0.910
|
$0.870
|
$1.000
|
$0.870
|
$1.700
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
2,560.000
|
$1.700
|
$1.100
|
$1.090
|
$1.040
|
$1.100
|
$1.040
|
$1.750
|
|
|
ELEC CONDR (NO.4) BARE
|
LF
|
200.000
|
$2.800
|
$1.500
|
$1.550
|
$1.480
|
$1.500
|
$1.480
|
$2.450
|
|
|
ELEC CONDR (NO.4) INSULATED
|
LF
|
3,466.000
|
$3.500
|
$2.200
|
$2.170
|
$2.070
|
$2.200
|
$2.070
|
$2.600
|
|
|
TRAY CABLE (4 CONDR) (12 AWG)
|
LF
|
7,629.000
|
$2.450
|
$2.200
|
$2.180
|
$2.080
|
$2.300
|
$2.080
|
$2.600
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
30.000
|
$1,500.000
|
$1,108.800
|
$1,118.270
|
$1,066.160
|
$1,100.000
|
$1,066.160
|
$1,170.000
|
|
|
REMOVE GROUND BOX
|
EA
|
14.000
|
$295.000
|
$365.800
|
$368.940
|
$351.750
|
$375.000
|
$351.750
|
$148.000
|
|
|
ELC SRV TY A 240/480 060(SS)SS(E)GC(U)
|
EA
|
1.000
|
$6,360.000
|
$8,345.900
|
$8,417.160
|
$8,024.940
|
$8,400.000
|
$8,024.940
|
$6,240.000
|
|
|
ELC SRV TY D 120/240 060(NS)SS(E)SP(O)
|
EA
|
1.000
|
$6,963.000
|
$7,070.000
|
$7,130.290
|
$6,798.040
|
$7,200.000
|
$6,798.040
|
$5,710.000
|
|
|
ELC SRV TY D 120/240 060(NS)SS(E)SP(U)
|
EA
|
1.000
|
$8,500.000
|
$5,932.600
|
$5,983.220
|
$5,704.420
|
$6,000.000
|
$5,704.420
|
$4,840.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
64.000
|
$33.500
|
$25.000
|
$27.260
|
$25.990
|
$32.000
|
$25.000
|
$26.000
|
|
|
ALUMINUM SIGNS (TY O)
|
SF
|
1,303.000
|
$33.000
|
$23.600
|
$23.770
|
$22.660
|
$25.000
|
$22.660
|
$29.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
44.000
|
$581.000
|
$468.000
|
$471.990
|
$450.000
|
$500.000
|
$450.000
|
$817.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
22.000
|
$704.000
|
$639.600
|
$645.060
|
$615.000
|
$700.000
|
$615.000
|
$937.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
2.000
|
$883.000
|
$722.800
|
$728.970
|
$695.000
|
$750.000
|
$695.000
|
$1,150.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(2)SA(P)
|
EA
|
2.000
|
$1,078.000
|
$1,383.200
|
$1,395.010
|
$1,330.000
|
$1,400.000
|
$1,330.000
|
$1,160.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(2)SA(T-2EXT)
|
EA
|
5.000
|
$1,800.000
|
$1,367.600
|
$1,379.270
|
$1,315.000
|
$1,500.000
|
$1,315.000
|
$1,350.000
|
|
|
IN SM RD SN SUP&AM TYFRP(1)UA(P)
|
EA
|
7.000
|
$650.000
|
$410.800
|
$414.310
|
$395.000
|
$450.000
|
$395.000
|
$678.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T-2EXT)
|
EA
|
1.000
|
$1,200.000
|
$993.200
|
$1,001.670
|
$955.000
|
$1,000.000
|
$955.000
|
$1,220.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
|
EA
|
1.000
|
$962.000
|
$956.800
|
$964.970
|
$920.000
|
$1,000.000
|
$920.000
|
$1,260.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
|
EA
|
6.000
|
$1,770.000
|
$2,210.000
|
$2,228.860
|
$2,125.000
|
$2,200.000
|
$2,125.000
|
$2,640.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
52.000
|
$70.000
|
$72.800
|
$73.420
|
$70.000
|
$75.000
|
$70.000
|
$147.000
|
|
|
INS OH SN SUP(40 FT CANT)
|
EA
|
6.000
|
$46,539.000
|
$56,032.500
|
$56,510.690
|
$53,877.450
|
$57,000.000
|
$53,877.450
|
$2,040.000
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
4.000
|
$64.000
|
$67.600
|
$68.180
|
$65.000
|
$75.000
|
$65.000
|
$89.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BR)
|
EA
|
42.000
|
$24.000
|
$25.000
|
$25.170
|
$24.000
|
$25.000
|
$24.000
|
$46.500
|
|
|
WK ZN PAV MRK REMOV (W)4"(BRK)
|
LF
|
9,823.000
|
$0.760
|
$1.700
|
$1.310
|
$1.250
|
$1.300
|
$1.250
|
$2.500
|
|
|
WK ZN PAV MRK REMOV (W)4"(DOT)
|
LF
|
1,858.000
|
$3.500
|
$2.100
|
$3.150
|
$3.000
|
$3.150
|
$3.000
|
$3.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
31,857.000
|
$1.010
|
$1.500
|
$1.260
|
$1.200
|
$1.250
|
$1.200
|
$2.000
|
|
|
WK ZN PAV MRK REMOV (W)8"(SLD)
|
LF
|
2,304.000
|
$1.910
|
$2.100
|
$2.520
|
$2.400
|
$2.500
|
$2.400
|
$2.000
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
239.000
|
$6.580
|
$12.500
|
$8.390
|
$8.000
|
$8.500
|
$8.000
|
$10.000
|
|
|
WK ZN PAV MRK REMOV (W)(ARROW)
|
EA
|
24.000
|
$157.300
|
$156.000
|
$246.490
|
$235.000
|
$250.000
|
$235.000
|
$175.000
|
|
|
WK ZN PAV MRK REMOV (W)(DBL ARROW)
|
EA
|
15.000
|
$227.000
|
$234.000
|
$419.550
|
$400.000
|
$425.000
|
$400.000
|
$200.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(DOT)
|
LF
|
505.000
|
$4.000
|
$1.000
|
$3.150
|
$3.000
|
$3.150
|
$3.000
|
$3.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
35,514.000
|
$0.950
|
$1.500
|
$1.260
|
$1.200
|
$1.250
|
$1.200
|
$3.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
642.000
|
$5.000
|
$7.500
|
$6.290
|
$6.000
|
$6.500
|
$6.000
|
$6.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
13,123.000
|
$0.480
|
$1.700
|
$0.420
|
$0.400
|
$0.400
|
$0.400
|
$0.650
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
4,397.000
|
$1.330
|
$2.600
|
$0.840
|
$0.800
|
$0.800
|
$0.800
|
$1.200
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
786.000
|
$4.000
|
$8.100
|
$3.670
|
$3.500
|
$4.000
|
$3.500
|
$3.000
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
19.000
|
$59.000
|
$104.000
|
$47.200
|
$45.000
|
$50.000
|
$45.000
|
$75.000
|
|
|
ELIM EXT PAV MRK & MRKS (DBL ARROW)
|
EA
|
5.000
|
$90.000
|
$187.200
|
$89.150
|
$85.000
|
$100.000
|
$85.000
|
$97.000
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
19.000
|
$51.000
|
$124.800
|
$62.930
|
$60.000
|
$70.000
|
$60.000
|
$75.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
21,973.000
|
$0.040
|
$0.300
|
$0.010
|
$0.010
|
$0.050
|
$0.010
|
$0.050
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
5,166.000
|
$0.070
|
$0.300
|
$0.010
|
$0.010
|
$0.050
|
$0.010
|
$0.200
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
5,359.000
|
$0.190
|
$0.800
|
$0.010
|
$0.010
|
$0.050
|
$0.010
|
$0.500
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
1,113.000
|
$0.290
|
$3.700
|
$0.010
|
$0.010
|
$0.100
|
$0.010
|
$1.000
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
30.000
|
$7.700
|
$36.400
|
$26.220
|
$25.000
|
$30.000
|
$25.000
|
$10.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
17.000
|
$10.800
|
$41.600
|
$36.710
|
$35.000
|
$40.000
|
$35.000
|
$10.000
|
|
|
PAV SURF PREP FOR MRK (36")(YLD TRI)
|
EA
|
25.000
|
$3.700
|
$5.000
|
$10.490
|
$10.000
|
$10.000
|
$10.000
|
$10.000
|
|
|
INSTALL HWY TRF SIG (SYSTEM)
|
EA
|
2.000
|
$36,270.000
|
$31,594.100
|
$31,863.690
|
$30,378.930
|
$32,000.000
|
$30,378.930
|
$36,570.000
|
|
|
REMOVING TRAFFIC SIGNALS
|
EA
|
2.000
|
$6,270.000
|
$8,984.900
|
$9,061.570
|
$8,639.320
|
$9,000.000
|
$8,639.320
|
$2,460.000
|
|
|
TEMP TRAF SIGNALS
|
EA
|
2.000
|
$69,350.000
|
$87,901.300
|
$88,651.390
|
$84,520.490
|
$90,000.000
|
$84,520.490
|
$158,700.000
|
|
|
VEH SIG SEC (12")LED(GRN)
|
EA
|
32.000
|
$289.000
|
$266.100
|
$268.390
|
$255.880
|
$270.000
|
$255.880
|
$223.000
|
|
|
VEH SIG SEC (12")LED(GRN ARW)
|
EA
|
5.000
|
$288.000
|
$266.100
|
$268.390
|
$255.880
|
$270.000
|
$255.880
|
$223.000
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
40.000
|
$287.000
|
$266.100
|
$268.390
|
$255.880
|
$270.000
|
$255.880
|
$223.000
|
|
|
VEH SIG SEC (12")LED(YEL ARW)
|
EA
|
5.000
|
$282.000
|
$266.100
|
$268.390
|
$255.880
|
$270.000
|
$255.880
|
$223.000
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
32.000
|
$283.000
|
$266.100
|
$268.390
|
$255.880
|
$270.000
|
$255.880
|
$223.000
|
|
|
VEH SIG SEC (12")LED(RED ARW)
|
EA
|
10.000
|
$293.000
|
$266.100
|
$268.390
|
$255.880
|
$270.000
|
$255.880
|
$223.000
|
|
|
PED SIG SEC (LED)(COUNTDOWN)
|
EA
|
22.000
|
$704.000
|
$761.200
|
$767.660
|
$731.890
|
$770.000
|
$731.890
|
$671.000
|
|
|
BACK PLATE (12")(1 SEC)
|
EA
|
8.000
|
$94.620
|
$148.700
|
$149.960
|
$142.970
|
$150.000
|
$142.970
|
$89.000
|
|
|
BACKPLATE W/REFL BRDR(4 SEC)
|
EA
|
5.000
|
$189.000
|
$210.000
|
$211.770
|
$201.900
|
$210.000
|
$201.900
|
$180.000
|
|
|
BACKPLATE W/REFL BRDR(3 SEC)
|
EA
|
32.000
|
$166.000
|
$196.400
|
$198.030
|
$188.800
|
$200.000
|
$188.800
|
$147.000
|
|
|
TRF SIG CBL (TY A)(12 AWG)(2 CONDR)
|
LF
|
8,216.000
|
$1.800
|
$0.900
|
$0.900
|
$0.860
|
$0.900
|
$0.860
|
$1.700
|
|
|
TRF SIG CBL (TY A)(12 AWG)(4 CONDR)
|
LF
|
8,343.000
|
$2.430
|
$1.200
|
$1.220
|
$1.160
|
$1.250
|
$1.160
|
$2.300
|
|
|
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
|
LF
|
9,831.000
|
$3.150
|
$2.200
|
$2.170
|
$2.070
|
$2.200
|
$2.070
|
$2.950
|
|
|
RELOCATE RDSD FLASH BEACON ASSEMBLY
|
EA
|
4.000
|
$2,500.000
|
$1,450.000
|
$1,462.370
|
$1,394.230
|
$1,500.000
|
$1,394.230
|
$1,650.000
|
|
|
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
|
EA
|
4.000
|
$7,420.000
|
$6,551.500
|
$6,607.400
|
$6,299.510
|
$6,600.000
|
$6,299.510
|
$5,190.000
|
|
|
REMOV RDSD FLSH BCN AM (SOLAR PWRD)
|
EA
|
2.000
|
$800.000
|
$629.700
|
$635.030
|
$605.440
|
$650.000
|
$605.440
|
$197.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(36')LUM
|
EA
|
1.000
|
$11,700.000
|
$15,178.900
|
$15,308.440
|
$14,595.110
|
$15,500.000
|
$14,595.110
|
$13,510.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(44')LUM
|
EA
|
1.000
|
$12,750.000
|
$16,981.000
|
$17,125.900
|
$16,327.890
|
$17,500.000
|
$16,327.890
|
$15,250.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(60')LUM
|
EA
|
1.000
|
$27,300.000
|
$44,685.600
|
$45,066.870
|
$42,966.890
|
$45,000.000
|
$42,966.890
|
$39,940.000
|
|
|
INS TRF SIG PL AM(S)2 ARM(44-28')LUM
|
EA
|
1.000
|
$18,350.000
|
$22,116.600
|
$22,305.340
|
$21,265.980
|
$23,000.000
|
$21,265.980
|
$19,820.000
|
|
|
INS TRF SIG PL AM(S)2 ARM(44-36')LUM
|
EA
|
1.000
|
$16,217.000
|
$23,873.800
|
$24,077.470
|
$22,955.530
|
$24,000.000
|
$22,955.530
|
$21,520.000
|
|
|
INS TRF SIG PL AM(S)2 ARM(50-28')LUM
|
EA
|
1.000
|
$33,000.000
|
$47,694.500
|
$48,101.460
|
$45,860.070
|
$48,000.000
|
$45,860.070
|
$42,750.000
|
|
|
INS TRF SIG PL AM(S)2 ARM(55-36')LUM
|
EA
|
1.000
|
$33,200.000
|
$50,658.500
|
$51,090.730
|
$48,710.050
|
$52,000.000
|
$48,710.050
|
$45,450.000
|
|
|
PED POLE ASSEMBLY
|
EA
|
16.000
|
$2,360.000
|
$1,928.100
|
$1,944.550
|
$1,853.940
|
$2,000.000
|
$1,853.940
|
$2,220.000
|
|
|
PED DETECT PUSH BUTTON (APS)
|
EA
|
22.000
|
$920.500
|
$972.300
|
$980.590
|
$934.900
|
$1,000.000
|
$934.900
|
$985.000
|
|
|
PED DETECTOR CONTROLLER UNIT
|
EA
|
2.000
|
$3,250.000
|
$3,396.900
|
$3,425.930
|
$3,266.290
|
$3,500.000
|
$3,266.290
|
$2,040.000
|
|
|
FULL - WIDTH MOWING
|
CYC
|
29.000
|
$3,000.000
|
$1,248.000
|
$2,000.000
|
$2,226.350
|
$500.000
|
$1,200.000
|
$4,050.000
|
|
|
LITTER REMOVAL
|
CYC
|
58.000
|
$1,400.000
|
$1,404.000
|
$2,000.000
|
$1,277.320
|
$500.000
|
$1,350.000
|
$2,210.000
|
|
|
DEBRIS REMOVAL (FRONTAGE ROADS)
|
CYC
|
58.000
|
$1,850.000
|
$832.000
|
$1,000.000
|
$1,549.770
|
$500.000
|
$800.000
|
$3,500.000
|
|
|
CLEANING / SWEEPING (FRONTAGE ROAD)
|
CYC
|
58.000
|
$2,700.000
|
$1,040.000
|
$2,500.000
|
$1,746.970
|
$500.000
|
$1,000.000
|
$2,750.000
|
|
|
WIDE FLANGE PAVEMENT TERMINALS
|
LF
|
154.000
|
$565.000
|
$653.800
|
$640.000
|
$568.740
|
$750.000
|
$741.670
|
$38.750
|
|
|
D-GR HMA TY-C SAC-B PG70-22
|
TON
|
564.000
|
$140.000
|
$135.200
|
$155.000
|
$197.660
|
$170.000
|
$137.280
|
$230.000
|
|
|
SOUND WALL (14 FT)
|
LF
|
1,960.000
|
$480.000
|
$462.700
|
$452.000
|
$523.350
|
$500.000
|
$412.900
|
$765.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
6.000
|
$11,474.000
|
$19,251.400
|
$18,000.000
|
$7,550.500
|
$18,000.000
|
$18,510.750
|
$15,980.000
|
|
MULTIPOLYMER PAV MRK (W)(6")(SLD)
|
LF
|
7,997.000
|
$0.750
|
$1.800
|
$1.000
|
$0.950
|
$1.100
|
$0.950
|
$1.250
|
|
MULTIPOLYMER PAV MRK (W)(6")(BRK)
|
LF
|
4,708.000
|
$0.750
|
$1.800
|
$1.050
|
$1.000
|
$1.100
|
$1.000
|
$1.250
|
|
MULTIPOLYMER PAV MRK (W)(6")(DOT)
|
LF
|
610.000
|
$1.500
|
$2.700
|
$3.150
|
$3.000
|
$3.250
|
$3.000
|
$3.500
|
|
MULTIPOLYMER PAV MRK (W)(8")(SLD)
|
LF
|
5,166.000
|
$1.300
|
$2.100
|
$1.990
|
$1.900
|
$2.000
|
$1.900
|
$1.250
|
|
MULTIPOLYMER PAV MRK (W)(12")(SLD)
|
LF
|
3,798.000
|
$3.000
|
$5.700
|
$4.200
|
$4.000
|
$4.400
|
$4.000
|
$6.500
|
|
MULTIPOLYMER PAV MRK (W)(12")(LNDP)
|
LF
|
1,561.000
|
$3.000
|
$5.200
|
$4.200
|
$4.000
|
$4.400
|
$4.000
|
$6.500
|
|
MULTIPOLYMER PAV MRK (W)(24")(SLD)
|
LF
|
1,113.000
|
$6.000
|
$12.800
|
$8.390
|
$8.000
|
$8.500
|
$8.000
|
$13.000
|
|
MULTIPOLYMER PAV MRK (Y)(6")(SLD)
|
LF
|
8,658.000
|
$0.750
|
$1.500
|
$1.000
|
$0.950
|
$1.000
|
$0.950
|
$1.250
|
|
MULTIPOLYMER PAV MRK (BLK)(6")(BRK)
|
LF
|
4,708.000
|
$0.850
|
$1.700
|
$1.050
|
$1.000
|
$1.100
|
$1.000
|
$1.250
|
|
MULTIYPOLYMER PAV MRK (W) (ARROW)
|
EA
|
22.000
|
$160.000
|
$312.000
|
$262.220
|
$250.000
|
$275.000
|
$250.000
|
$300.000
|
|
MULTIPOLYMER PAV MRK (W) (DBL ARROW)
|
EA
|
8.000
|
$210.500
|
$364.000
|
$419.550
|
$400.000
|
$425.000
|
$400.000
|
$350.000
|
|
MULTIPOLYMER PAV MRK (W) (WORD)
|
EA
|
17.000
|
$190.000
|
$312.000
|
$314.660
|
$300.000
|
$325.000
|
$300.000
|
$300.000
|
|
MULTIPOLYMER PAV MRK (W) 36" YLD TRI
|
EA
|
25.000
|
$51.000
|
$208.000
|
$89.150
|
$85.000
|
$100.000
|
$85.000
|
$10.000
|
|
|
BBU SYSTEM (EXTERNAL BATT CABINET)
|
EA
|
2.000
|
$8,315.000
|
$9,060.400
|
$9,137.750
|
$8,711.960
|
$9,200.000
|
$8,711.960
|
$9,070.000
|
|
|
TMA (STATIONARY)
|
DAY
|
250.000
|
$225.000
|
$186.200
|
$175.000
|
$236.200
|
$250.000
|
$200.000
|
$397.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
400.000
|
$90.000
|
$93.600
|
$65.000
|
$56.200
|
$70.000
|
$54.270
|
$113.000
|
|
|
RVDS(PRESENCE DET ONLY)(INSTALL ONLY)
|
EA
|
6.000
|
$672.000
|
$1,827.300
|
$1,842.860
|
$1,756.990
|
$1,850.000
|
$1,756.990
|
$394.000
|
|
|
RVDS(PRES AND ADV DET)(INSTALL ONLY)
|
EA
|
2.000
|
$672.000
|
$1,677.400
|
$1,691.760
|
$1,612.920
|
$1,700.000
|
$1,612.920
|
$394.000
|
|
|
VIVDS TEMPORARY
|
EA
|
2.000
|
$14,100.000
|
$32,224.800
|
$32,499.780
|
$30,985.380
|
$32,500.000
|
$30,985.380
|
$28,500.000
|
|
|
VIVDS PROSR SYS (INSTALL ONLY)
|
EA
|
1.000
|
$1,670.000
|
$306.800
|
$309.390
|
$294.970
|
$325.000
|
$294.970
|
$555.000
|
|
|
VIVDS CAM ASSY (INSTALL ONLY)
|
EA
|
3.000
|
$978.000
|
$429.500
|
$433.170
|
$412.990
|
$450.000
|
$412.990
|
$425.000
|
|
|
VIVDS CABLING (INSTALL ONLY)
|
LF
|
883.000
|
$2.040
|
$2.100
|
$2.160
|
$2.060
|
$2.200
|
$2.060
|
$1.000
|
|
Totals: |
$48,470,546.822
|
$46,697,178.980
|
$46,757,338.803
|
$46,822,326.533
|
$48,660,000.000
|
$50,454,265.984
|
$80,476,224.550
|