FOARD SH 6 (0098-02-028)

Items: 30

County: FOARD
Length: N/A
Highway: SH 6
District: CHILDRESS
Control Number: 0098-02-028
DBE Goal: N/A
Project: F 2022(099)
Guaranty: N/A
Time: 74 WORKING DAYS
Engineer's Estimate: $4,802,115.50
Date: 11/04/2021 (4 years ago)
Contract Number: N/A
Type: REHABILITATION OF EXISTING ROADWAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (4)
E
Engineer's Estimate
$4,802,115.50
$3,874,626.92
Over/Under Est: -19.31% -$927,488.58
$4,042,430.20
Over/Under Est: -15.82% -$759,685.30
Amt Left: 4.33% $167,803.28
$4,507,807.78
Over/Under Est: -6.13% -$294,307.72
Amt Left: 16.34% $633,180.86
Delta: -11.51% -$465,377.58
$5,121,138.70
Over/Under Est: 6.64% $319,023.20
Amt Left: 32.17% $1,246,511.78
Delta: -13.61% -$613,330.92

Bid Items & Bid Tabulations

30 Total 0 of 30
FOARD  |  SH 6  |  CHILDRESS  |  0098-02-028  |  11/04/2021  |  $4,802,115.50  |  F 2022(099)  |  REHAB OF EXIST ROADWAY  |  74 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
A. L. HELMCAMP, INC.
DUININCK, INC.
ZACK BURKETT CO.
GILVIN-TERRILL, LTD.
BACKFILL (TY A OR B)
STA 362.000 $140.000 $100.000 $390.000 $300.000 $150.000
DRILL SEEDING (PERM) (RURAL) (SANDY)
AC 17.000 $500.000 $300.000 $315.000 $680.000 $605.000
VEGETATIVE WATERING
MG 1,352.000 $25.000 $5.000 $23.000 $10.000 $21.500
EMULS ASPH (EROSN CONT)(CSS-1H)
GAL 16,062.000 $3.400 $3.000 $3.350 $4.500 $3.500
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")
SY 4,267.000 $25.000 $35.000 $39.500 $37.500 $40.000
PLANE ASPH CONC PAV(0" TO 2")
SY 16,622.000 $2.750 $1.900 $2.100 $4.500 $3.000
RIPRAP (MOW STRIP)(4 IN)
CY 85.000 $600.000 $600.000 $790.000 $1,200.000 $800.000
MOBILIZATION
LS 1.000 $475,885.300 $240,000.000 $360,000.000 $315,000.000 $500,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 5.000 $21,000.000 $8,700.000 $13,500.000 $5,000.000 $20,000.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 370.000 $6.000 $6.300 $6.300 $7.500 $10.000
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 71,724.000 $0.200 $0.110 $0.070 $0.130 $0.200
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 36,139.000 $0.200 $0.110 $0.120 $0.130 $0.250
MTL W-BEAM GD FEN (STEEL POST)
LF 1,050.000 $30.000 $32.000 $32.500 $47.500 $31.000
REMOVE METAL BEAM GUARD FENCE
LF 1,050.000 $3.000 $3.200 $3.150 $2.000 $3.000
GUARDRAIL END TREATMENT (INSTALL)
EA 18.000 $2,400.000 $3,500.000 $3,600.000 $3,945.000 $3,375.000
GUARDRAIL END TREATMENT (REMOVE)
EA 18.000 $300.000 $365.000 $370.000 $242.000 $350.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 36.000 $35.000 $48.000 $48.500 $19.200 $46.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 2,986.000 $0.850 $0.500 $1.050 $1.000 $1.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 2,986.000 $0.500 $0.500 $1.050 $1.000 $1.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 70.000 $12.000 $8.300 $16.000 $9.500 $20.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 78,632.000 $0.350 $0.370 $0.320 $0.420 $0.450
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 8,220.000 $0.350 $0.420 $0.320 $0.470 $0.450
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 35,305.000 $0.350 $0.370 $0.320 $0.420 $0.450
REFL PAV MRKR TY II-A-A
EA 995.000 $2.250 $3.800 $3.400 $4.310 $3.500
D-GR HMA TY-D SAC-A PG70-28
TON 22,097.000 $130.000 $104.000 $99.000 $115.000 $130.000
D-GR HMA TY-D PG70-28 (LEVEL-UP)
TON 6,345.000 $110.000 $108.000 $100.000 $115.000 $135.000
TACK COAT
GAL 28,119.000 $3.500 $2.900 $2.900 $4.500 $3.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $15,000.000 $5,000.000 $7,900.000 $2,500.000 $15,500.000
TMA (STATIONARY)
DAY 58.000 $220.000 $200.000 $265.000 $250.000 $590.000
TMA (MOBILE OPERATION)
DAY 7.000 $50.000 $150.000 $840.000 $100.000 $950.000
Totals: $4,802,115.500 $3,874,626.920 $4,042,430.200 $4,507,807.780 $5,121,138.700