County: FAYETTE Highway: IH0010 Date: 02/02/2023 (1 year ago) Engineer's Estimate: $1,961,050 Control Number: 6429-12-001
Project: RMC - 642912001 District: YOAKUM Time: 730 CALENDAR DAYS Type: METAL BEAM GUARD FENCE REPAIR
HCS
Pay Estimates: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10
Proposal

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $1,961,050.00
GARRET SHIELDS INFRASTRUCTURE   $1,382,686.88 1
-29.49% | -$578,363.12
JCW CONSTRUCTION, LLC   $1,496,865.10 2
-23.67% | -$464,184.90
8.26% | $114,178.22
BK FIELD OPERATIONS LLC   $1,621,154.00 3
-17.33% | -$339,896.00
17.25% | $238,467.12
8.30% | $124,288.90
DIGG COMMERCIAL, LLC   $1,750,299.00 4
-10.75% | -$210,751.00
26.59% | $367,612.12
7.97% | $129,145.00
ABOVE ALL CONSTRUCTION   $1,946,024.00 5
-0.77% | -$15,026.00
40.74% | $563,337.12
11.18% | $195,725.00
Subcontractor Percentage Amount
ELITE CASTLE RESOURCES LLC 99.99% $1,382,548.61
Total: 99.99% $1,382,548.61

Bid Items

Items: 39, 0 filtered
FAYETTE IH0010  |  YOAKUM  |  6429-12-001  |  02/02/2023  |  $1,961,050  |  RMC - 642912001  |  METAL BEAM GUARD FENCE REPAIR  |  730 CALENDAR DAYS
Item code Description Unit Quantity Engineer's Estimate GARRET SHIELDS INFRASTRUCTURE JCW CONSTRUCTION, LLC BK FIELD OPERATIONS LLC DIGG COMMERCIAL, LLC ABOVE ALL CONSTRUCTION
500 6033 MOBILIZATION (CALLOUT) EA 24.000 $1,000.000 $9,863.120 $1.000 $1.000 $1.000 $1.000
540 6037 MTL BM GD FEN TRANS (ANCHOR PLATE) EA 5.000 $750.000 $250.000 $1.000 $200.000 $1.000 $500.000
658 6061 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2 EA 100.000 $30.000 $300.000 $60.000 $100.000 $1.000 $50.000
658 6062 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) EA 100.000 $35.000 $25.000 $20.000 $12.000 $1.000 $20.000
770 6001 REPAIR RAIL ELEMENT (W - BEAM) LF 10,000.000 $27.000 $2.000 $17.000 $25.000 $1.000 $25.000
770 6002 REPAIR RAIL ELEMENT (THRIE - BEAM) LF 100.000 $50.000 $15.000 $50.000 $20.000 $1.000 $50.000
770 6003 REP RAIL ELMNT(THRIE-BM TRANS TO W -BM) LF 40.000 $35.000 $10.000 $50.000 $30.000 $1.000 $75.000
770 6004 REPAIR RAIL ELEMENT (CURVED RAIL) LF 750.000 $25.000 $1.000 $1.000 $5.000 $1.000 $15.000
770 6010 REM / REPL TIMBER/STL POST W/O CONC FND EA 750.000 $50.000 $1.000 $30.000 $10.000 $1.000 $50.000
770 6011 REM / REPL TIMBER / STL POST W/CONC FND EA 150.000 $55.000 $384.000 $60.000 $20.000 $1.000 $75.000
770 6017 REALIGN POSTS EA 500.000 $35.000 $1.500 $10.000 $1.000 $1.000 $5.000
770 6019 REMOVE & REPLACE BLOCKOUT EA 700.000 $37.000 $284.000 $80.000 $120.000 $1.000 $100.000
770 6021 REPLACE SINGLE GDRAIL TERMINAL RAIL LF 1,500.000 $30.000 $30.000 $22.000 $10.000 $1.000 $25.000
770 6022 REPLACE SINGLE GDRAIL TERMINAL POST EA 250.000 $65.000 $100.000 $70.000 $40.000 $1.000 $70.000
770 6027 REMOVE GDRAIL END TRT / REPL WITH SGT EA 100.000 $3,000.000 $1,025.570 $2,500.000 $3,000.000 $1.000 $3,100.000
770 6028 REPL SINGLE GDRAIL TERM IMPACT HEAD EA 50.000 $1,200.000 $1.000 $650.000 $575.000 $1.000 $900.000
770 6029 REM & RESET SGT IMPACT HEAD EA 40.000 $200.000 $1.000 $100.000 $50.000 $1.000 $50.000
770 6030 REPLACE SGT CABLE ASSEMBLY EA 50.000 $30.000 $1.000 $1.000 $1.000 $1.000 $50.000
770 6031 REPLACE SGT CABLE ANCHOR EA 40.000 $30.000 $1.000 $1.000 $1.000 $1.000 $50.000
770 6032 REPLACE SGT STRUT EA 50.000 $35.000 $1.000 $1.000 $1.000 $1.000 $50.000
770 6033 REPLACE SGT OBJECT MARKER EA 100.000 $35.000 $1.000 $1.000 $1.000 $1.000 $20.000
771 6001 REPLACE POSTS (TL-3) EA 5,000.000 $135.000 $1.000 $1.000 $155.000 $1.000 $150.000
771 6002 REPLACE POSTS (TL-4) EA 500.000 $140.000 $1.000 $1.000 $10.000 $1.000 $150.000
771 6003 CABLE SPLICE / TURNBUCKLE (TL-3) EA 15.000 $100.000 $650.000 $1.000 $100.000 $1.000 $300.000
771 6004 CABLE SPLICE / TURNBUCKLE (TL-4) EA 10.000 $100.000 $1.000 $1.000 $1.000 $1.000 $10.000
771 6005 REPAIR CONCRETE FOUNDATION (TL-3) EA 10.000 $100.000 $1.000 $100.000 $10.000 $1.000 $10.000
771 6006 REPAIR CONCRETE FOUNDATION (TL-4) EA 10.000 $100.000 $1.000 $1.000 $1.000 $1.000 $10.000
771 6007 REPR OR REPLC CABLE BARR TERM SEC(TL-3) EA 30.000 $1,500.000 $350.000 $500.000 $2,500.000 $1.000 $1,300.000
771 6008 REPR OR REPLC CABLE BARR TERM SEC(TL-4) EA 30.000 $2,000.000 $1.000 $1.000 $50.000 $1.000 $500.000
771 6009 REPLACE CABLE (TL-3) LF 1,000.000 $5.000 $3.000 $0.001 $1.000 $1.000 $3.000
771 6010 REPLACE CABLE (TL-4) LF 1,000.000 $5.000 $1.000 $0.010 $1.000 $1.000 $3.000
771 6011 CHECK / RE-TENSION CABLE EA 75.000 $300.000 $1.000 $100.000 $50.000 $1.000 $100.000
771 6012 REPLACE POST HARDWARE (TL-4) EA 2,000.000 $11.000 $0.100 $0.010 $0.100 $1.000 $0.100
771 6018 REPLACE POST HARDWARE (TL-3) EA 5,000.000 $10.000 $0.100 $0.010 $0.100 $1.000 $0.100
771 6020 REPLACE CCT POST (5 FT 3 IN) EA 10.000 $165.000 $200.000 $400.000 $1.000 $1.000 $150.000
771 6021 REPLACE CCT POST (5 FT 11 IN) EA 10.000 $165.000 $200.000 $0.010 $1.000 $1.000 $150.000
774 6005 RMV/REPL(VIA-SAND FILL PLASTIC BARRELS) EA 200.000 $325.000 $1.000 $1.000 $1.000 $1.000 $500.000
6185 6002 TMA (STATIONARY) DAY 200.000 $150.000 $3,000.000 $4,000.000 $1.000 $8,000.000 $500.000
7022 6003 1 LANE CLOSURE-4 LANE ROAD EA 12.000 $4,000.000 $2,000.000 $4,000.000 $3,000.000 $10,000.000 $2,000.000
Totals: $1,961,050.00 $1,382,686.88 $1,496,865.10 $1,621,154.00 $1,750,299.00 $1,946,024.00