FAYETTE CR (0913-28-070)

Items: 49

County: FAYETTE
Length: N/A
Highway: CR
District: YOAKUM
Control Number: 0913-28-070
DBE Goal: N/A
Project: BR 2018(330)
Guaranty: N/A
Time: 124 WORKING DAYS
Engineer's Estimate: $1,125,822.80
Date: 08/04/2022 (3 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
CLAYTON HARRIS
COVEY MORROW
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$1,125,822.80
$1,089,896.94
Over/Under Est: -3.19% -$35,925.86
Over/Under Est: 1.83% $20,569.79
Amt Left: 5.18% $56,495.65
Over/Under Est: 11.65% $131,106.94
Amt Left: 15.33% $167,032.80
Delta: -9.64% -$110,537.15
Over/Under Est: 85.41% $961,573.70
Amt Left: 91.52% $997,499.56
Delta: -66.07% -$830,466.76
Subcontractor Percentage Amount
JH CONTRACT FIELD SERVICES, LLC 8.32% $90,679.43
1 PRIORITY ENVIRONMENTAL SERVICES, LLC 6.67% $72,696.13
LONE STAR EROSION CONTROL 3.62% $39,454.27
SYLVA CONSTRUCTION, LLC 2.84% $30,953.07
B-N-B MAINTENANCE SERVICES LLC 1.36% $14,822.60
LONESTAR TRAFFIC SAFETY, LLC 0.41% $4,468.58
TRAFFIC SIGNS & LINES, LLC 0.38% $4,141.61
Total: 23.60% $257,215.69

Bid Items & Bid Tabulations

49 Total 0 of 49
FAYETTE  |  CR  |  YOAKUM  |  0913-28-070  |  08/04/2022  |  $1,125,822.80  |  BR 2018(330)  |  BRIDGE REPL  |  124 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
FUQUA CONSTRUCTION CO., INC.
ACME BRIDGE COMPANY, INC.
MB WESTERN INDUSTRIAL CONTRACTING COMPANY
GIBSON & ASSOCIATES, INC.
PREPARING ROW
STA 4.500 $5,000.000 $6,250.000 $13,300.000 $15,775.160 $22,000.000
EXCAVATION (ROADWAY)
CY 15.000 $13.000 $50.000 $270.000 $77.350 $93.500
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 237.000 $25.500 $50.000 $78.900 $63.100 $93.500
BROADCAST SEED (PERM) (RURAL) (SANDY)
SY 835.000 $0.600 $2.813 $1.550 $2.590 $1.600
BROADCAST SEED (TEMP) (WARM)
SY 209.000 $0.600 $6.250 $6.400 $9.550 $6.600
BROADCAST SEED (TEMP) (COOL)
SY 209.000 $0.600 $6.250 $6.400 $9.550 $6.600
VEGETATIVE WATERING
MG 16.200 $85.000 $100.000 $76.700 $99.470 $250.000
FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS)
CY 624.000 $95.000 $125.000 $70.200 $133.530 $105.600
ASPH (RC-250)
GAL 107.000 $15.000 $50.000 $171.000 $33.160 $104.500
AGGR(TY-E GR-5 SAC-B)
CY 3.800 $500.000 $2,500.000 $4,640.000 $331.560 $990.000
AGGR(TY-PE GR-4 SAC-B)
CY 4.100 $500.000 $2,500.000 $3,730.000 $431.020 $990.000
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
GAL 198.000 $6.750 $50.000 $101.000 $33.160 $104.500
CEM STABIL BKFL
CY 27.000 $150.000 $250.000 $299.000 $165.000 $800.000
TEMPORARY SPL SHORING
SF 1,384.000 $22.000 $50.000 $7.700 $71.380 $10.000
DRILL SHAFT (18 IN)
LF 70.000 $130.000 $312.500 $228.000 $288.740 $310.000
DRILL SHAFT (24 IN)
LF 406.000 $325.000 $417.038 $278.000 $295.000 $320.000
CL C CONC (ABUT)
CY 22.000 $1,200.000 $2,500.000 $1,700.000 $1,547.640 $5,200.000
CL C CONC (CAP)
CY 18.000 $1,200.000 $2,500.000 $3,650.000 $1,788.280 $9,500.000
CL C CONC (COLUMN)
CY 8.000 $1,200.000 $2,500.000 $3,060.000 $2,987.890 $7,700.000
REINF CONC SLAB (SLAB BEAM)
SF 770.000 $22.000 $50.000 $44.700 $59.940 $92.000
PRESTR CONC SLAB BEAM (4SB12)
LF 189.000 $175.000 $279.988 $403.000 $239.950 $400.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 71.000 $160.000 $312.500 $291.000 $699.870 $291.500
ELASTOMERIC BEARING (LAMINATED)
EA 18.000 $1,500.000 $1,875.000 $1,100.000 $3,681.940 $1,000.000
CLEAN & PAINT EXIST STR (SYSTEM II)
LS 1.000 $200,000.000 $90,870.000 $56,300.000 $83,669.000 $55,000.000
RAIL (TY T223)
LF 143.000 $105.000 $137.500 $189.000 $212.260 $850.000
TYPE A JOINT
LF 100.000 $60.000 $81.250 $35.100 $43.700 $50.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 1.000 $75,000.000 $50,000.000 $15,600.000 $11,733.510 $105,000.000
REMOV STR (SMALL FENCE)
LF 20.000 $4.000 $50.000 $22.500 $17.030 $50.000
MOBILIZATION
LS 1.000 $100,000.000 $137,000.000 $120,000.000 $121,175.620 $210,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $3,000.000 $1,059.625 $2,720.000 $1,989.350 $4,300.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 730.000 $4.000 $5.625 $5.300 $7.690 $5.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 730.000 $1.200 $3.125 $2.150 $1.990 $2.200
DRIVEWAYS (SURF TREAT)
SY 250.000 $35.000 $37.500 $79.800 $61.490 $71.500
MTL W-BEAM GD FEN (TIM POST)
LF 100.000 $30.000 $38.538 $35.900 $46.420 $53.460
MTL BEAM GD FEN TRANS (TL2)
EA 4.000 $1,900.000 $1,437.388 $1,230.000 $1,724.100 $1,760.000
SHORT RADIUS
LF 50.000 $45.000 $52.975 $57.600 $165.780 $59.840
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $3,150.000 $4,157.988 $3,260.000 $4,641.810 $3,850.000
WIRE FENCE (TY A)
LF 20.000 $30.000 $50.000 $48.000 $165.780 $150.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 3.000 $500.000 $668.750 $1,070.000 $663.120 $250.000
REMOVE SM RD SN SUP&AM
EA 3.000 $120.000 $93.750 $107.000 $198.930 $100.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 3.000 $25.000 $50.000 $25.600 $66.310 $26.400
INSTL OM ASSM (OM-2Y)(WC)GND
EA 4.000 $70.000 $100.000 $78.400 $165.780 $80.850
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 3.000 $30.000 $75.000 $41.600 $86.200 $42.900
REP STL BRIDGE MEMBER (TOP CHORD)
EA 1.000 $3,000.000 $3,750.000 $8,900.000 $29,017.020 $36,000.000
REP STL BRIDGE MEMBER (TIGHTEN MEMBER)
EA 1.000 $565.000 $3,750.000 $1,410.000 $1,116.220 $500.000
REP STL BRIDGE MEMBER(STRAIGHTEN MEMB)
EA 3.000 $10,000.000 $1,250.000 $2,350.000 $1,520.590 $2,500.000
REP STL BRIDGE MEMBER(REPL RIVET/BOLT)
EA 100.000 $500.000 $12.500 $48.800 $171.950 $145.000
RELOCATE EXIST TRUSS BRIDGE
LS 1.000 $160,000.000 $25,000.000 $161,000.000 $139,413.520 $466,000.000
SURFACE TREATMENT OF WROUGHT IRON
LS 1.000 $12,000.000 $3,125.000 $43,900.000 $9,316.780 $28,600.000
Totals: $1,125,822.800 $1,089,896.968 $1,146,392.590 $1,256,929.754 $2,087,396.500