Job Info for 0266-01-083

County: FAYETTE Highway: SH 71 Date: 11/06/2019 (5 years ago) Engineer's Estimate: $16,067,131 Control Number: 0266-01-083
Project: NH 2020(197) District: YOAKUM Time: 195 WORKING DAYS Type: OVERLAY
HCS
Pay Estimates: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $16,067,131.05
HUNTER INDUSTRIES, LTD.   $15,790,738.49 1
-1.72% | -$276,392.56
ANGEL BROTHERS HOLDINGS CORP.   $15,929,013.23 2
-0.86% | -$138,117.82
0.88% | $138,274.74
JAMES CONSTRUCTION GROUP, L.L.C.   $16,572,739.78 3
3.15% | $505,608.73
4.95% | $782,001.29
4.04% | $643,726.55
Subcontractor Percentage Amount
TRP CONSTRUCTION GROUP, LLC 3.43% $541,622.33
A BROTHERS MILLING, LLC 1.14% $180,014.42
DIIBS SPECIALISTS, LLC 0.55% $86,849.06
WEST TEXAS ROCK RESOURCES, LLC 0.30% $47,372.22
CPAVE, INC. 0.21% $33,160.55
BATTERSON, LLP 0.20% $31,581.48
BEAVER BOYS SERVICES LLC 0.03% $4,737.22
Total: 5.86% $925,337.28

Bid Items

Items: 63, 0 filtered
FAYETTE SH 71  |  YOAKUM  |  0266-01-083  |  11/06/2019  |  $16,067,131  |  NH 2020(197)  |  OVERLAY  |  195 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate HUNTER INDUSTRIES, LTD. ANGEL BROTHERS HOLDINGS CORP. JAMES CONSTRUCTION GROUP, L.L.C.
132 6021 EMBANKMENT (VEHICLE)(ORD COMP)(TY C) CY 316.000 $40.000 $39.420 $27.000 $31.000
134 6004 BACKFILL (TY A OR B) STA 2,705.250 $80.000 $168.150 $100.000 $82.000
150 6002 BLADING HR 70.000 $100.000 $91.200 $82.000 $93.000
247 6057 FL BS (CMP IN PLC)(TYE GR1-2)(FNAL POS) CY 276.000 $80.000 $96.860 $150.000 $93.000
316 6224 AGGR(TY-PB GR-4 SAC-B) CY 4,109.000 $70.000 $81.200 $65.000 $122.000
316 6400 ASPH (AC-15P OR AC-10-2TR OR CRS-2P) GAL 181,594.000 $3.500 $3.370 $2.750 $2.900
341 6008 D-GR HMA TY-B PG64-22 TON 172.000 $80.000 $94.380 $144.000 $137.000
341 6042 D-GR HMA TY-D SAC-B PG70-22 TON 85,092.000 $75.000 $80.570 $82.400 $93.500
341 6281 TACK COAT GAL 43,346.000 $2.000 $2.930 $2.950 $2.300
347 6002 TOM-C (AGGREGATE) SAC-A TON 36,887.000 $100.000 $95.740 $110.000 $97.000
347 6003 TOM (ASPHALT) PG 70-22 TON 2,369.000 $150.000 $95.740 $110.000 $97.000
351 6002 FLEXIBLE PAVEMENT STRUCTURE REPAIR(6") SY 1,000.000 $50.000 $41.370 $43.000 $84.000
351 6004 FLEXIBLE PAVEMENT STRUCTURE REPAIR(8") SY 1,050.000 $60.000 $53.470 $58.000 $91.000
351 6013 FLEXIBLE PAVEMENT STRUCTURE REPAIR(4") SY 2,119.000 $40.000 $28.380 $29.000 $45.000
354 6021 PLANE ASPH CONC PAV(0" TO 2") SY 376,350.000 $1.750 $1.640 $1.150 $2.500
354 6082 PLANE ASPH CONC PAV (10") SY 392.000 $6.000 $17.160 $30.000 $19.000
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 7.800 $525.000 $700.000 $1,350.000 $715.000
438 6001 CLEANING AND SEALING EXISTING JOINTS LF 4,078.390 $25.000 $8.250 $21.000 $25.500
500 6001 MOBILIZATION LS 1.000 $1,500,000.000 $1,301,781.250 $1,115,000.000 $435,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 16.000 $3,500.000 $2,775.290 $3,000.000 $9,200.000
533 6001 RUMBLE STRIPS (SHOULDER) LF 500,218.000 $0.200 $0.110 $0.270 $0.160
533 6002 RUMBLE STRIPS (CENTERLINE) LF 101,121.000 $0.200 $0.110 $0.380 $0.160
540 6001 MTL W-BEAM GD FEN (TIM POST) LF 1,900.000 $25.000 $22.600 $30.000 $19.000
540 6006 MTL BEAM GD FEN TRANS (THRIE-BEAM) EA 8.000 $1,800.000 $1,796.770 $2,035.000 $1,600.000
542 6001 REMOVE METAL BEAM GUARD FENCE LF 700.000 $2.000 $2.030 $15.000 $2.000
542 6002 REMOVE TERMINAL ANCHOR SECTION EA 8.000 $175.000 $173.880 $250.000 $200.000
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 14.000 $2,500.000 $2,840.060 $3,000.000 $2,350.000
658 6062 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) EA 80.000 $30.000 $25.500 $25.000 $20.000
662 6001 WK ZN PAV MRK NON-REMOV (W)4"(BRK) LF 100,352.000 $0.200 $0.150 $0.150 $0.150
662 6004 WK ZN PAV MRK NON-REMOV (W)4"(SLD) LF 989,610.000 $0.200 $0.150 $0.150 $0.150
662 6012 WK ZN PAV MRK NON-REMOV (W)8"(SLD) LF 28,030.000 $0.750 $0.280 $0.280 $0.280
662 6015 WK ZN PAV MRK NON-REMOV (W)18"(SLD) LF 90.000 $2.200 $2.000 $2.000 $2.000
662 6016 WK ZN PAV MRK NON-REMOV (W)24"(SLD) LF 190.000 $3.150 $3.000 $3.000 $3.000
662 6032 WK ZN PAV MRK NON-REMOV (Y)4"(BRK) LF 67,811.000 $0.250 $0.150 $0.150 $0.150
662 6034 WK ZN PAV MRK NON-REMOV (Y)4"(SLD) LF 554,057.000 $0.200 $0.150 $0.150 $0.150
662 6111 WK ZN PAV MRK SHT TERM (TAB)TY Y-2 EA 18,282.000 $1.250 $1.780 $0.700 $1.000
666 6035 REFL PAV MRK TY I (W)8"(SLD)(090MIL) LF 18,050.000 $0.700 $0.700 $0.700 $0.700
666 6224 PAVEMENT SEALER 4" LF 95,724.000 $0.250 $0.200 $0.200 $0.200
666 6231 PAVEMENT SEALER (ARROW) EA 6.000 $45.000 $45.000 $45.000 $45.000
666 6283 REF PROF PAV MRK TY I(W)4"(SLD)(090MIL) LF 95,724.000 $0.650 $0.600 $0.600 $0.600
666 6302 RE PM W/RET REQ TY I (W)4"(SLD)(090MIL) LF 244,656.000 $0.600 $0.300 $0.300 $0.300
666 6311 RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL) LF 27,643.000 $0.550 $0.300 $0.300 $0.300
666 6314 RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL) LF 58,310.000 $0.550 $0.300 $0.300 $0.300
668 6075 PREFAB PAV MRK TY C (W) (18") (SLD) LF 90.000 $12.000 $11.000 $11.000 $11.000
668 6076 PREFAB PAV MRK TY C (W) (24") (SLD) LF 422.000 $15.000 $13.000 $13.000 $13.000
668 6077 PREFAB PAV MRK TY C (W) (ARROW) EA 21.000 $200.000 $225.000 $225.000 $225.000
668 6085 PREFAB PAV MRK TY C (W) (WORD) EA 4.000 $250.000 $275.000 $275.000 $275.000
668 6089 PREFAB PAV MRK TY C (W) (RR XING) EA 2.000 $600.000 $650.000 $650.000 $650.000
668 6091 PREFAB PAV MRK TY C (W) (18")(YLD TRI) EA 92.000 $35.000 $25.000 $25.000 $25.000
668 6092 PREFAB PAV MRK TY C (W) (36")(YLD TRI) EA 690.000 $45.000 $45.000 $45.000 $45.000
672 6007 REFL PAV MRKR TY I-C EA 858.000 $3.000 $3.000 $3.000 $3.000
672 6009 REFL PAV MRKR TY II-A-A EA 2,405.000 $3.000 $3.000 $3.000 $3.000
672 6010 REFL PAV MRKR TY II-C-R EA 3,089.000 $3.000 $3.000 $3.000 $3.000
677 6028 ELIM EXT PV MRK & MRKS (RUMBLE STRIP) LF 140,702.000 $0.500 $0.250 $0.550 $1.000
3041 6001 UNDERSEAL COURSE GAL 135,635.000 $3.200 $2.900 $2.500 $2.600
6001 6002 PORTABLE CHANGEABLE MESSAGE SIGN EA 2.000 $10,000.000 $7,500.000 $10,000.000 $7,100.000
6024 6003 HPPM W/RET REQ TY I(W)4"(BRK)(100MIL) LF 61,556.000 $0.600 $0.360 $0.360 $0.360
6024 6006 HPPM W/RET REQ TY I(W)4"(SLD)(100MIL) LF 214,766.000 $0.600 $0.330 $0.330 $0.330
6024 6015 HPPM W/RET REQ TY I(Y)4"(BRK)(100MIL) LF 1,000.000 $0.550 $0.340 $0.340 $0.340
6024 6018 HPPM W/RET REQ TY I(Y)4"(SLD)(100MIL) LF 253,824.000 $0.550 $0.340 $0.340 $0.340
6024 6025 PAVEMENT SEALER 4" LF 2,413.000 $0.400 $0.600 $0.600 $0.600
6185 6002 TMA (STATIONARY) DAY 40.000 $200.000 $300.000 $215.000 $260.000
6185 6005 TMA (MOBILE OPERATION) DAY 105.000 $250.000 $600.000 $215.000 $560.000
Totals: $16,067,131.05 $15,790,738.51 $15,929,013.23 $16,572,739.79