FAYETTE BS 71-E (0265-14-012)

Items: 86

County: FAYETTE
Length: N/A
Highway: BS 71-E
District: YOAKUM
Control Number: 0265-14-012
DBE Goal: N/A
Project: BR 2024(013)
Guaranty: N/A
Time: 150 WORKING DAYS
Engineer's Estimate: $6,746,673.15
Date: 09/07/2023 (2 years ago)
Contract Number: N/A
Type: BRIDGE MAINTENANCE
Mail/Deliver Bids To: N/A
COVEY MORROW
CHASE HERMES
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$6,746,673.15
1
Awarded
$8,209,127.75
Over/Under Est: 21.68% $1,462,454.60
Over/Under Est: 99.22% $6,693,792.05
Amt Left: 63.73% $5,231,337.45
Over/Under Est: 124.01% $8,366,213.45
Amt Left: 84.1% $6,903,758.85
Delta: -12.44% -$1,672,421.40
Over/Under Est: 180.83% $12,199,934.85
Amt Left: 130.8% $10,737,480.25
Delta: -25.37% -$3,833,721.40
Subcontractor Percentage Amount
LONE STAR PAVING COMPANY 2.63% $262,161.66
Total: 2.63% $262,161.66

Bid Items & Bid Tabulations

86 Total 0 of 86
FAYETTE  |  BS 71-E  |  YOAKUM  |  0265-14-012  |  09/07/2023  |  $6,746,673.15  |  BR 2024(013)  |  BRIDGE MAINT  |  150 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
CEKRA INC.
BUILT RIGHT CONSTRUCTION OF OKLAHOMA, LLC
SOUTHERN ROAD & BRIDGE, LLC
RAGLE CONSTRUCTION, INC.
REMOVING CONC (RIPRAP)
CY 109.500 $150.000 $100.000 $350.000 $650.000 $140.000
EXCAVATION (ROADWAY)
CY 1,288.000 $10.000 $7.000 $25.000 $125.000 $54.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 11.000 $40.000 $16.000 $25.000 $150.000 $250.000
BLADING
HR 5.000 $175.000 $151.000 $150.000 $850.000 $150.000
FURNISHING AND PLACING TOPSOIL (4")
SY 613.000 $5.000 $1.000 $15.000 $10.000 $5.000
BLOCK SODDING
SY 613.000 $5.000 $3.000 $10.000 $18.000 $12.000
VEGETATIVE WATERING
MG 5.160 $45.000 $50.000 $50.000 $850.000 $200.000
AGGR(TY-PE GR-4 SAC-B)
CY 24.000 $175.000 $75.000 $700.000 $2,500.000 $250.000
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
GAL 1,057.000 $6.000 $3.500 $10.000 $11.000 $15.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 100.000 $75.000 $40.000 $200.000 $65.000 $150.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(14")
SY 78.000 $95.000 $100.000 $250.000 $95.000 $200.000
PLANE ASPH CONC PAV (2")
SY 800.000 $3.000 $2.000 $22.000 $25.000 $10.000
CEM STABIL BKFL
CY 194.000 $200.000 $70.000 $300.000 $125.000 $140.000
CL C CONC (RAIL FOUNDATION)
CY 74.400 $750.000 $750.000 $950.000 $650.000 $720.000
REINF CONC SLAB (LIGHTWEIGHT)
SF 33,312.000 $29.000 $32.000 $75.000 $75.000 $32.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 100.000 $200.000 $160.000 $250.000 $350.000 $275.000
RIPRAP (CONC)(5 IN)
CY 109.000 $550.000 $400.000 $700.000 $150.000 $530.000
RIPRAP (MOW STRIP)(5 IN)
CY 41.000 $575.000 $450.000 $600.000 $150.000 $670.000
ELASTOMERIC BEARING (SPECIAL)
EA 6.000 $1,200.000 $8,000.000 $5,000.000 $15,000.000 $40,000.000
CLEANING AND SEALING EXIST JOINTS(CL7)
LF 282.000 $100.000 $22.000 $50.000 $150.000 $30.000
STR STEEL (MISC NON - BRIDGE)
LB 113.000 $15.000 $6.000 $50.000 $150.000 $250.000
STR STEEL (SHEAR CONNECTOR)
LB 22,250.000 $12.000 $12.000 $25.000 $39.000 $6.500
STR STEEL (SHEAR ANCHOR)
LB 4,749.000 $10.000 $6.000 $20.000 $50.000 $50.000
CLEAN AND PAINT EXIST STR (REF NO. 1)
EA 5.000 $250,000.000 $220,000.000 $990,000.000 $550,000.000 $1,500,000.000
CLEAN AND PAINT EXIST STR (REF NO. 2)
EA 8.000 $100,000.000 $95,000.000 $180,000.000 $300,000.000 $200,000.000
ANCHOR BOLTS
EA 14.000 $200.000 $350.000 $500.000 $2,500.000 $1,500.000
RAIL (TY T223)
LF 262.000 $120.000 $98.000 $250.000 $1,150.000 $185.000
RAIL (HANDRAIL)(TY B)
LF 40.000 $200.000 $125.000 $350.000 $250.000 $300.000
RAIL (TY T2P)
LF 3,092.750 $135.000 $225.000 $250.000 $250.000 $320.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 140.000 $100.000 $300.000 $400.000 $985.000 $170.000
REMOV STR (BRIDGE SLAB)
EA 5.000 $100,000.000 $240,000.000 $140,000.000 $25,000.000 $650,000.000
ADJUST STL SHOES
EA 3.000 $1,500.000 $5,000.000 $10,000.000 $25,000.000 $45,000.000
MOBILIZATION
LS 1.000 $615,000.000 $820,000.000 $300,000.000 $1,000,000.000 $1,800,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 10.000 $4,000.000 $10,000.000 $2,500.000 $25,000.000 $12,000.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 200.000 $4.000 $5.000 $5.000 $15.000 $3.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 200.000 $1.000 $2.000 $2.000 $15.000 $1.000
DRIVEWAYS (ACP)
SY 123.000 $85.000 $32.000 $100.000 $150.000 $80.000
CONC SIDEWALKS (5")
SY 1,102.000 $165.000 $65.000 $100.000 $150.000 $70.000
CURB RAMPS
SY 42.000 $250.000 $600.000 $500.000 $150.000 $175.000
MTL W-BEAM GD FEN (TIM POST)
LF 325.000 $28.000 $25.000 $50.000 $50.000 $27.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 2.000 $2,700.000 $1,900.000 $1,850.000 $2,500.000 $950.000
REMOVE METAL BEAM GUARD FENCE
LF 450.000 $3.500 $3.000 $5.000 $3.000 $4.000
REMOVE TERMINAL ANCHOR SECTION
EA 2.000 $250.000 $250.000 $300.000 $250.000 $250.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 1.000 $300.000 $300.000 $300.000 $300.000 $250.000
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $3,250.000 $2,600.000 $3,500.000 $4,500.000 $2,900.000
GUARDRAIL END TREATMENT (REMOVE)
EA 1.000 $275.000 $250.000 $500.000 $1,500.000 $350.000
CRASH CUSH ATTEN (INSTL)(L)(W)(TL3)
EA 1.000 $35,000.000 $37,000.000 $60,000.000 $125,000.000 $32,000.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 1.000 $475.000 $630.000 $510.000 $685.000 $500.000
IN SM RD SN SUP&AM TYTWT(1)WS(T)
EA 1.000 $500.000 $670.000 $600.000 $1,150.000 $550.000
RELOCATE SM RD SN SUP&AM(SIGN ONLY)
EA 2.000 $400.000 $270.000 $300.000 $350.000 $450.000
REMOVE SM RD SN SUP&AM
EA 2.000 $85.000 $160.000 $150.000 $250.000 $220.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 12.000 $25.000 $100.000 $20.000 $65.000 $35.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 8.000 $35.000 $75.000 $50.000 $60.000 $40.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 8.000 $55.000 $75.000 $50.000 $60.000 $40.000
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 9,880.000 $1.000 $1.500 $1.250 $2.030 $1.500
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 140.000 $1.250 $2.750 $2.000 $3.750 $1.750
WK ZN PAV MRK REMOV (Y)6"(BRK)
LF 921.000 $1.000 $1.500 $2.000 $2.030 $1.500
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 11,221.000 $1.000 $1.500 $1.000 $2.030 $1.500
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 414.000 $1.000 $2.250 $2.000 $5.000 $2.000
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 140.000 $1.000 $0.750 $3.000 $3.000 $1.250
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
LF 9,880.000 $1.100 $0.750 $1.200 $0.980 $1.000
RE PM W/RET REQ TY I (Y)6"(BRK)(090MIL)
LF 921.000 $1.100 $0.750 $1.500 $0.980 $1.000
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
LF 11,221.000 $1.100 $0.750 $1.200 $0.980 $1.000
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 150.000 $14.000 $17.000 $20.000 $24.750 $12.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 8.000 $250.000 $300.000 $500.000 $427.500 $275.000
PREFAB PAV MRK TY C (Y) (24") (SLD)
LF 638.000 $14.500 $17.000 $20.000 $24.750 $12.000
REFL PAV MRKR TY II-A-A
EA 276.000 $4.100 $8.000 $10.000 $10.500 $6.000
REFL PAV MRKR TY II-C-R
EA 7.000 $4.500 $8.000 $15.000 $10.500 $6.000
ELIM EXT PAV MRK & MRKS (4")
LF 19,818.000 $0.300 $0.950 $1.000 $1.200 $0.500
ELIM EXT PAV MRK & MRKS (ARROW)
EA 8.000 $52.000 $80.000 $100.000 $120.000 $75.000
REP STL BRIDGE MEMBER (TRUSS VERTICAL)
EA 2.000 $2,800.000 $6,500.000 $3,500.000 $5,000.000 $3,800.000
REP STL BRIDGE MEMBER (BATTEN PLATES)
EA 20.000 $1,000.000 $2,200.000 $3,500.000 $5,000.000 $4,800.000
REP STL BRDG MEMB (TRUSS PORTAL BRACE)
EA 20.000 $2,500.000 $8,000.000 $5,000.000 $5,000.000 $4,800.000
REP STL BRIDGE MEMBER (STRINGER)
EA 11.000 $450.000 $12,500.000 $5,000.000 $25,000.000 $4,800.000
REP STL BRIDGE MEMBER(STRAIGHTEN MEMB)
EA 13.000 $1,250.000 $8,000.000 $3,500.000 $18,500.000 $1,750.000
REP STL BRIDGE MEMBER(REPL RIVET/BOLT)
EA 5,000.000 $125.000 $125.000 $15.000 $150.000 $20.000
REP STL BRIDGE MEMBER(LATERAL BRACING)
EA 16.000 $1,000.000 $700.000 $3,500.000 $1,850.000 $4,000.000
REP STL BRIDGE MEMBER (GUSSET PLATES)
EA 10.000 $5,500.000 $4,900.000 $5,000.000 $2,500.000 $6,850.000
REP STL BRDG MEMB (TRUSS SWAY FRAME)
EA 1.000 $250.000 $25,000.000 $5,000.000 $25,000.000 $13,500.000
D-GR HMA TY-B SAC-B PG64-22
TON 1,269.000 $125.000 $165.000 $250.000 $400.000 $250.000
D-GR HMA TY-D SAC-B PG70-22
TON 342.000 $125.000 $165.000 $260.000 $450.000 $300.000
TACK COAT
GAL 231.000 $4.000 $5.400 $13.000 $35.000 $10.000
POLYESTER POLYMER CONC OVERLAY (3/4")
SY 923.000 $140.000 $125.000 $235.000 $250.000 $150.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,000.000 $7,500.000 $7,500.000 $24,889.890 $25,000.000
TMA (STATIONARY)
DAY 10.000 $250.000 $650.000 $1,000.000 $1,000.000 $300.000
TMA (MOBILE OPERATION)
DAY 10.000 $250.000 $1,000.000 $400.000 $1,250.000 $325.000
Totals: $6,746,673.150 $8,209,127.750 $13,440,465.200 $15,112,886.600 $18,946,608.000