FAYETTE US 90 (0026-03-046)

Items: 90

County: FAYETTE
Length: N/A
Highway: US 90
District: YOAKUM
Control Number: 0026-03-046
DBE Goal: N/A
Project: BR 2023(623)
Guaranty: N/A
Time: 240 WORKING DAYS
Engineer's Estimate: $8,178,337.60
Date: 04/05/2023 (3 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
COVEY MORROW
CHASE HERMES
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$8,178,337.60
$7,055,348.46
Over/Under Est: -13.73% -$1,122,989.14
Over/Under Est: -3.63% -$297,208.19
Amt Left: 11.7% $825,780.95
Over/Under Est: -2.43% -$198,456.87
Amt Left: 13.1% $924,532.27
Delta: -1.25% -$98,751.32
Over/Under Est: -2.37% -$193,668.79
Amt Left: 13.17% $929,320.35
Delta: -0.06% -$4,788.08
Over/Under Est: -0.58% -$47,762.31
Amt Left: 15.24% $1,075,226.83
Delta: -1.83% -$145,906.48
Subcontractor Percentage Amount
TEXAS MATERIALS GROUP, INC. 17.01% $1,200,114.77
M & D FOUNDATION DRILLING INDUSTRIES, INC. 5.50% $388,044.17
LONE STAR EROSION CONTROL 1.65% $116,413.25
CND CONTRACTING 1.20% $84,664.18
AARON CONCRETE CONTRACTORS, LLC 1.13% $79,725.44
TRP CONSTRUCTION GROUP, LLC 0.75% $52,915.11
EGGEMEYER LAND CLEARING, LLC 0.58% $40,921.02
INTERSTATE BARRICADES & MARKINGS, INC. 0.24% $16,932.84
TORO BRAVO CONSTRUCTION, LLC 0.24% $16,932.84
HOUSTON SAWING & DRILLING 0.15% $10,583.02
TRAFFIC SIGNS & LINES, LLC 0.14% $9,877.49
Total: 28.59% $2,017,124.13

Bid Items & Bid Tabulations

90 Total 0 of 90
FAYETTE  |  US 90  |  YOAKUM  |  0026-03-046  |  04/05/2023  |  $8,178,337.60  |  BR 2023(623)  |  BRIDGE REPL  |  240 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ACME BRIDGE COMPANY, INC.
CAPITAL EXCAVATION COMPANY
E-Z BEL CONSTRUCTION, LLC
TEXAS MATERIALS GROUP, INC.
JOHN REED AND COMPANY, LLC
PREPARING ROW
STA 32.000 $5,000.000 $4,130.000 $2,500.000 $3,600.000 $5,520.000 $5,000.000
REMOVING CONC (PAV)
SY 3,742.000 $20.000 $9.400 $13.000 $18.000 $24.000 $3.000
REMOVING CONC (RIPRAP)
SY 26.000 $9.000 $18.100 $25.100 $18.000 $22.000 $8.000
REMOVING STAB BASE AND ASPH PAV (0-4")
SY 3,630.000 $5.000 $5.000 $7.200 $5.000 $13.000 $8.060
EXCAVATION (ROADWAY)
CY 6,899.000 $13.000 $13.800 $14.100 $12.000 $11.000 $30.000
EXCAVATION (CHANNEL)
CY 488.000 $13.000 $21.700 $42.650 $19.000 $32.000 $60.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 14,023.000 $18.000 $22.600 $26.000 $18.000 $21.000 $25.000
BLADING
HR 40.000 $120.000 $117.000 $168.000 $80.000 $100.000 $30.000
BROADCAST SEED (PERM) (RURAL) (CLAY)
SY 28,551.000 $0.500 $0.210 $0.250 $0.220 $0.270 $0.100
BROADCAST SEED (TEMP) (WARM)
SY 7,137.000 $0.500 $0.260 $0.200 $0.200 $0.240 $0.100
BROADCAST SEED (TEMP) (COOL)
SY 7,137.000 $0.500 $0.260 $0.200 $0.200 $0.240 $0.180
VEGETATIVE WATERING
MG 240.000 $45.000 $32.200 $36.700 $65.000 $15.000 $40.000
FL BS (CMP IN PLC)(TYE GR1-2)(FNAL POS)
CY 5,770.000 $110.000 $50.000 $90.000 $105.000 $107.000 $88.000
CEMENT
TON 274.000 $220.000 $265.000 $270.000 $265.000 $230.000 $250.000
CEMENT TREAT (SUBGRADE) (8")
SY 13,906.000 $3.500 $2.350 $4.750 $5.000 $4.000 $3.000
ASPH (RC-250)
GAL 16,674.000 $6.500 $1.000 $5.250 $3.000 $5.000 $4.950
AGGR(TY-E GR-5 SAC-B)
CY 99.000 $250.000 $238.000 $238.000 $700.000 $550.000 $225.000
AGGR(TY-PE GR-3 SAC-B)
CY 188.000 $250.000 $264.000 $260.000 $400.000 $370.000 $250.000
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
GAL 5,946.000 $6.000 $4.250 $4.250 $4.000 $6.000 $4.000
CEM STABIL BKFL
CY 291.000 $150.000 $177.000 $216.000 $175.000 $230.000 $100.000
TEMPORARY SPL SHORING
SF 218.000 $45.000 $42.300 $58.000 $25.000 $100.000 $50.000
DRILL SHAFT (36 IN)
LF 2,436.000 $325.000 $229.000 $270.000 $285.000 $247.000 $320.000
CL C CONC (ABUT)
CY 122.200 $1,200.000 $1,180.000 $1,310.000 $1,200.000 $1,600.000 $1,500.000
CL C CONC (CAP)
CY 197.000 $1,300.000 $1,240.000 $1,470.000 $1,650.000 $1,500.000 $1,500.000
CL C CONC (COLUMN)
CY 77.500 $1,300.000 $1,440.000 $1,350.000 $1,900.000 $1,400.000 $1,500.000
REINF CONC SLAB
SF 35,055.000 $23.000 $24.400 $26.000 $25.000 $30.000 $23.000
APPROACH SLAB
CY 204.400 $750.000 $848.000 $910.000 $1,100.000 $720.000 $600.000
PRESTR CONC GIRDER (TX28)
LF 1,074.500 $220.000 $225.000 $196.000 $275.000 $200.000 $280.000
PRESTR CONC GIRDER (TX40)
LF 3,398.520 $185.000 $200.000 $173.000 $275.000 $200.000 $280.000
RIPRAP (CONC)(5 IN)
CY 10.200 $550.000 $660.000 $750.000 $900.000 $630.000 $300.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 1,642.000 $175.000 $152.000 $208.000 $145.000 $190.000 $130.000
RAIL (TY SSTR) (W/DRAIN SLOTS)
LF 1,530.000 $120.000 $70.800 $73.900 $150.000 $108.000 $80.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 270.000 $150.000 $212.000 $237.000 $200.000 $200.000 $150.000
CONC BOX CULV (5 FT X 5 FT)(EXTEND)
LF 24.000 $950.000 $789.000 $1,370.000 $1,100.000 $800.000 $800.000
CONC BOX CULV (6 FT X 3 FT)(EXTEND)
LF 6.000 $1,100.000 $1,720.000 $2,190.000 $1,500.000 $1,500.000 $800.000
RC PIPE (CL III)(24 IN)
LF 188.000 $210.000 $130.000 $121.000 $300.000 $105.000 $100.000
SET (TY I)(S= 5 FT)(HW= 6 FT)(3:1) (C)
EA 2.000 $19,500.000 $17,600.000 $12,900.000 $17,500.000 $19,000.000 $15,000.000
SET (TY I)(S= 6 FT)(HW= 4 FT)(3:1) (C)
EA 2.000 $15,000.000 $14,000.000 $9,300.000 $12,500.000 $12,000.000 $15,000.000
SET (TY II) (24 IN) (CMP) (6: 1) (P)
EA 2.000 $2,000.000 $2,230.000 $2,940.000 $2,750.000 $2,200.000 $1,500.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 6.000 $2,500.000 $2,740.000 $3,540.000 $3,400.000 $2,200.000 $1,800.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 1.000 $130,180.000 $50,000.000 $44,500.000 $40,000.000 $31,000.000 $90,000.000
REMOV STR (BRIDGE 500 - 999 FT LENGTH)
EA 1.000 $250,000.000 $100,000.000 $88,000.000 $65,000.000 $62,000.000 $180,000.000
REMOV STR (SMALL)
EA 1.000 $850.000 $539.000 $2,430.000 $100.000 $1,200.000 $2,000.000
MOBILIZATION
LS 1.000 $740,000.000 $616,000.000 $700,000.000 $360,000.000 $570,000.000 $750,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 16.000 $3,500.000 $4,880.000 $5,300.000 $3,000.000 $2,700.000 $2,000.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,785.000 $4.000 $3.150 $4.050 $2.350 $4.500 $3.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,785.000 $1.000 $1.050 $1.100 $1.000 $1.000 $1.000
CONSTRUCTING DETOURS
SY 3,074.000 $75.000 $55.200 $68.900 $65.000 $72.000 $60.000
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 4.000 $6,000.000 $5,290.000 $3,820.000 $12,000.000 $4,000.000 $8,750.000
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
LF 1,140.000 $15.000 $12.700 $32.200 $17.500 $21.000 $10.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 810.000 $7.250 $14.100 $20.100 $4.500 $27.000 $5.000
PORT CTB (STKPL)(SGL SLP)(TY 1)
LF 1,140.000 $15.000 $12.700 $32.050 $16.000 $19.000 $10.000
DRIVEWAYS (SURF TREAT)
SY 746.000 $50.000 $69.000 $119.000 $68.000 $42.000 $50.000
MTL W-BEAM GD FEN (TIM POST)
LF 550.000 $28.000 $28.600 $25.450 $23.670 $30.000 $27.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 12.000 $2,500.000 $2,020.000 $2,080.000 $1,933.000 $2,500.000 $1,915.000
REMOVE METAL BEAM GUARD FENCE
LF 1,875.000 $3.000 $2.250 $2.150 $28.160 $2.000 $2.150
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 4.000 $300.000 $296.000 $300.000 $275.000 $300.000 $280.000
GUARDRAIL END TREATMENT (INSTALL)
EA 8.000 $3,300.000 $3,390.000 $3,090.000 $2,876.000 $3,500.000 $3,205.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 4.000 $1,500.000 $3,070.000 $700.000 $650.000 $1,000.000 $2,900.000
CRASH CUSH ATTEN (REMOVE)
EA 4.000 $500.000 $1,960.000 $380.000 $350.000 $600.000 $1,850.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 4.000 $9,000.000 $11,700.000 $8,500.000 $7,900.000 $8,000.000 $11,100.000
MAILBOX INSTALL-M (TWG-POST) TY 1
EA 1.000 $600.000 $370.000 $770.000 $350.000 $630.000 $350.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 1.000 $1,000.000 $899.000 $1,090.000 $1,700.000 $700.000 $850.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 3.000 $1,700.000 $996.000 $1,470.000 $1,884.000 $900.000 $942.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 4.000 $600.000 $504.000 $640.000 $954.000 $450.000 $477.000
REMOVE SM RD SN SUP&AM
EA 13.000 $100.000 $89.900 $156.000 $170.000 $100.000 $85.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 28.000 $25.000 $29.600 $16.200 $28.000 $36.000 $28.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 4.000 $30.000 $94.100 $50.300 $89.000 $75.000 $89.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 31.000 $25.000 $29.600 $38.900 $28.000 $35.000 $28.000
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
EA 4.000 $90.000 $94.100 $81.800 $89.000 $75.000 $89.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 7,910.000 $0.350 $0.480 $0.350 $0.450 $0.460 $0.450
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 6,680.000 $0.400 $0.480 $0.350 $0.450 $0.460 $0.450
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 11,842.000 $0.900 $0.690 $0.850 $0.640 $0.650 $0.650
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 40.000 $9.000 $4.250 $13.650 $4.000 $4.000 $4.000
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 11,968.000 $0.900 $0.690 $0.850 $0.650 $0.660 $0.650
REF PROF PAV MRK TY I(W)6"(SLD)(100MIL)
LF 12,350.000 $0.850 $1.050 $0.750 $1.000 $1.000 $1.000
REF PROF PAV MRK TY I(Y)6"(BRK)(100MIL)
LF 1,667.000 $0.850 $1.200 $0.850 $1.150 $1.200 $1.150
REF PROF PAV MRK TY I(Y)6"(SLD)(100MIL)
LF 4,060.000 $0.850 $1.150 $0.750 $1.100 $1.100 $1.100
REFL PAV MRKR TY II-A-A
EA 168.000 $6.500 $5.800 $7.550 $5.500 $5.500 $5.500
ELIM EXT PAV MRK & MRKS (4")
LF 14,997.000 $0.700 $0.370 $0.550 $0.350 $0.360 $0.350
ELIM EXT PAV MRK & MRKS (24")
LF 215.000 $3.650 $2.350 $2.700 $2.200 $2.200 $2.200
ELIM EXT PV MRK & MRKS (RUMBLE STRIP)
LF 5,150.000 $0.500 $3.000 $0.550 $0.750 $6.100 $1.000
PAV SURF PREP FOR MRK (6")
LF 2,174.000 $0.200 $0.130 $0.250 $0.120 $0.120 $0.120
D-GR HMA TY-B SAC-B PG64-22
TON 3,035.000 $150.000 $122.000 $122.000 $111.000 $130.000 $115.000
D-GR HMA TY-D SAC-B PG70-22
TON 2,768.000 $150.000 $159.000 $159.000 $145.000 $150.000 $150.000
D-GR HMA TY-D PG70-22 (LEVEL-UP)
TON 422.000 $120.000 $169.000 $169.000 $196.000 $185.000 $160.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $10,000.000 $38.800 $16,500.000 $20,000.000 $8,000.000 $4,000.000
TMSP RADAR SPEED CONTROL MONITOR
EA 3.000 $10,000.000 $9,090.000 $13,000.000 $7,500.000 $8,000.000 $5,000.000
TMA (STATIONARY)
DAY 40.000 $350.000 $142.000 $340.000 $350.000 $350.000 $400.000
TMA (MOBILE OPERATION)
DAY 40.000 $300.000 $450.000 $244.000 $350.000 $350.000 $500.000
Totals: $8,178,337.600 $7,055,348.460 $7,881,129.410 $7,979,880.730 $7,984,668.810 $8,130,575.290