Show Job Controls
Bid Cobra

FANNIN VARIOUS (0901-32-083)

Items: 60

County: FANNIN
Length: 2.1100 MILES
Highway: VARIOUS
District: PARIS
Control Number: 0901-32-083
DBE Goal: 0.0%
Project: C 901-32-83
Guaranty: $36,000.00
Time: 57 WORKING DAYS
Engineer's Estimate: $1,804,723.16
Date: 09/06/2024 (1 year ago)
Contract Number: 9243228
Type: REHABILITATE EXISTING ROADWAY
Project ID: A00100070
Project Description: REHABILITATE PARK ROADS,PARKING LOTS AND CAMPSITE PULLOUTS
Mail/Deliver Bids To: N/A
AARON BLOOM
MELESE NORCHA
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$1,804,723.16
$1,835,767.08
Over/Under Est: 1.72% $31,043.92
$2,371,769.00
Over/Under Est: 31.42% $567,045.84
Amt Left: 29.2% $536,001.92
Subcontractor Percentage Amount
BLACKSMITH VENTURES LLC 41.28% $757,804.65
SOUTHERN CROSS CONTRACTORS, LLC 3.45% $63,333.96
SUPERIOR TRAFFIC CONTROL, LLC 1.90% $34,879.57
TRAFFIC HIGHWAY MAINTENANCE, LLC 1.76% $32,309.50
WOLFE CONSTRUCTION GROUP, INCORPORATED 0.81% $14,869.71
SEMARCK LANDSCAPE SERVICES, INC. 0.16% $2,937.23
Total: 49.36% $906,134.62

Bid Items & Bid Tabulations

60 Total 0 of 60
FANNIN  |  VARIOUS  |  PARIS  |  0901-32-083  |  09/06/2024  |  $1,804,723.16  |  C 901-32-83  |  REHAB EXIST ROADWAY  |  57 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
C. E. BARKER, LTD.
FNH CONSTRUCTION, LLC
PREPARING ROW
STA 9.000 $2,100.000 $20,000.000 $24,550.000
RMV (2"-6") TRT/UNTRT BASE & ASPH PAV
SY 132.000 $12.920 $8.600 $20.000
EXCAV (ROADWAY)
CY 637.000 $30.000 $33.070 $20.000
EMBANK (FNL)(OC)(TY B)
CY 314.000 $30.000 $47.540 $100.000
BACKFILL (TY A)
STA 174.000 $275.000 $286.590 $550.000
BROADCAST SEED (TEMP_COOL)
SY 12,648.000 $0.240 $0.340 $2.000
STRAW/HAY MLCH SEED(PERM_RURAL_CLAY)
SY 12,648.000 $1.000 $0.790 $3.000
VEGETATIVE WATERING
TGL 75.930 $70.000 $85.980 $50.000
SOIL RET BLKT(SL_MOD_CLAY_SHORT_ROLL)
SY 944.000 $2.500 $7.250 $20.000
PROOF ROLLING
HR 3.270 $200.000 $429.880 $150.000
FL BS (CMP IN PLC)(TY A GR 4) (6")
SY 4,858.000 $43.000 $23.990 $50.000
ASPH (RC-250)
GAL 1,364.000 $9.000 $11.460 $10.000
ASPH (AC-20-5TR OR AC-20XP)
GAL 2,239.000 $7.500 $27.510 $10.000
AGGR (TY-B, GR-3)(SAC-B)
CY 50.000 $550.000 $229.270 $500.000
AGGR (TY-B, GR-5)
CY 40.000 $450.000 $229.270 $500.000
D-GR HMA TY-D SAC-A PG64-22 (EXEMPT)
TON 3,624.000 $240.000 $208.640 $240.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 80.000 $92.000 $176.700 $100.000
PLANE ASPH CONC PAV(0" TO 2")
SY 297.000 $15.000 $30.950 $20.000
CL A CONC (COLLAR)
EA 1.000 $1,100.000 $2,006.110 $1,500.000
RIPRAP (CONC)(6 IN)
CY 26.000 $875.000 $594.070 $665.000
RIPRAP (SPECIAL)
CY 7.000 $560.000 $372.560 $1,000.000
RC PIPE (CL III)(18 IN)
LF 348.000 $100.000 $90.280 $150.000
RC PIPE (CL III)(24 IN)
LF 12.000 $175.000 $110.280 $200.000
HEADWALL (CH - PW - 0) (DIA= 24 IN)
EA 1.000 $11,500.000 $7,737.860 $4,500.000
HEADWALL (CH - PW - 0) (DIA= 36 IN)
EA 1.000 $14,000.000 $11,520.820 $6,500.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 5.000 $1,600.000 $2,286.970 $2,000.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 1.000 $2,550.000 $945.740 $2,500.000
REMOV STR (SET)
EA 1.000 $751.000 $716.470 $1,000.000
REMOV STR (HEADWALL)
EA 2.000 $1,500.000 $2,149.410 $2,500.000
MOBILIZATION
LS 1.000 $186,388.520 $180,000.000 $235,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 4.000 $5,200.000 $8,752.320 $1,500.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 1.000 $12,000.000 $17,847.840 $20,000.000
TMA (STATIONARY)
DAY 60.000 $220.000 $286.590 $250.000
TMA (MOBILE OPERATION)
HR 100.000 $75.000 $108.900 $55.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 700.000 $7.500 $7.980 $18.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 700.000 $2.000 $3.310 $9.000
CONC CURB & GUTTER (TY II)
LF 280.000 $75.000 $36.680 $85.000
CONC SIDEWALKS (5")
SY 3.000 $125.000 $94.570 $1,000.000
CURB RAMPS (TY 20)
EA 1.000 $4,700.000 $4,585.400 $5,000.000
MTL W-BEAM GD FEN (STEEL POST)
LF 1,400.000 $40.000 $28.660 $35.000
REMOVE METAL BEAM GUARD FENCE
LF 1,500.000 $4.000 $2.290 $5.000
REMOVE TERMINAL ANCHOR SECTION
EA 4.000 $215.000 $229.270 $500.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,500.000 $3,095.150 $3,250.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 16.000 $850.000 $716.470 $1,500.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 1.000 $900.000 $831.000 $1,500.000
REMOVE SM RD SN SUP&AM
EA 7.000 $125.000 $90.560 $100.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 16.000 $37.830 $28.660 $100.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 18.000 $90.000 $63.050 $100.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 47.000 $4.000 $2.290 $6.000
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
LF 50.000 $5.000 $28.660 $20.000
REFL PAV MRK TY I (W)4"(SLD)(100MIL)
LF 1,988.000 $1.200 $3.440 $2.000
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 134.000 $1.400 $5.730 $3.000
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 3,746.000 $1.600 $3.150 $3.000
PREFAB PM TY C (W)(WORD)
EA 3.000 $345.000 $521.590 $250.000
PREFAB PM TY C (W)(18")(YLD TRI)
EA 10.000 $52.300 $177.690 $250.000
PRE PM TY C (WHT)(ACC PRK)(SYMBL ONLY)
EA 4.000 $500.000 $1,690.870 $500.000
REFL PAV MRKR TY II-A-A
EA 94.000 $7.500 $36.680 $6.000
BONDING COURSE
GAL 1,650.000 $9.000 $11.460 $6.000
STONE MASONRY (FACADE MASONRY)
SF 227.000 $75.000 $171.950 $500.000
STONE MASONRY REPAIR
SF 50.000 $40.000 $171.950 $500.000
Totals: $1,804,723.160 $1,835,767.089 $2,371,769.000