|
|
PREPARING ROW
|
STA
|
669.010
|
$313.300
|
$759.000
|
$760.000
|
$400.000
|
$830.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
291.000
|
$12.200
|
$15.000
|
$15.000
|
$18.000
|
$18.500
|
|
|
REMOVING CONC (MISC)
|
SY
|
132.000
|
$22.000
|
$15.000
|
$15.000
|
$24.000
|
$40.000
|
|
|
REMOVING STAB BASE & ASPH PAV (6" - 8")
|
SY
|
915.000
|
$5.200
|
$11.000
|
$5.010
|
$8.000
|
$6.500
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
106.000
|
$33.200
|
$25.000
|
$32.640
|
$18.000
|
$25.000
|
|
|
SUBGRADE WIDENING (ORD COMP)
|
STA
|
669.000
|
$173.800
|
$100.000
|
$163.130
|
$250.000
|
$235.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
1,304.000
|
$22.700
|
$17.500
|
$21.230
|
$21.000
|
$14.250
|
|
|
BACKFILL (TY A)
|
STA
|
669.010
|
$213.200
|
$300.000
|
$190.030
|
$350.000
|
$195.000
|
|
|
ROAD GRADER WORK (ORD COMP)
|
STA
|
669.000
|
$126.500
|
$125.000
|
$163.130
|
$150.000
|
$160.000
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
193,210.000
|
$0.100
|
$0.050
|
$0.050
|
$0.050
|
$0.090
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
193,210.000
|
$0.110
|
$0.060
|
$0.060
|
$0.050
|
$0.100
|
|
|
STRAW/HAY MLCH SEED(PERM)(RURAL)(CLAY)
|
SY
|
386,402.000
|
$0.200
|
$0.199
|
$0.200
|
$0.180
|
$0.400
|
|
|
VEGETATIVE WATERING
|
MG
|
2,160.000
|
$9.500
|
$15.000
|
$4.670
|
$16.000
|
$4.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY C)
|
SY
|
1,000.000
|
$1.500
|
$1.500
|
$1.150
|
$2.000
|
$3.850
|
|
|
PROOF ROLLING
|
HR
|
20.000
|
$74.300
|
$35.000
|
$114.100
|
$78.000
|
$120.000
|
|
|
FL BS (CMP IN PLC)(TY D GR 4) (6")
|
SY
|
192,553.000
|
$25.000
|
$9.380
|
$8.840
|
$11.260
|
$14.150
|
|
|
REWRK BS MTL (TY C)(5"-10")(ORD COMP)
|
SY
|
174,826.000
|
$1.500
|
$2.900
|
$1.860
|
$2.700
|
$1.650
|
|
|
CEMENT
|
TON
|
845.000
|
$134.800
|
$140.000
|
$133.000
|
$169.000
|
$185.000
|
|
|
CEMENT TREAT(EXIST MATL)(8")
|
SY
|
73,078.000
|
$2.000
|
$2.150
|
$1.950
|
$3.000
|
$1.550
|
|
|
PRIME COAT (RC-250)
|
GAL
|
52,873.000
|
$4.600
|
$5.150
|
$5.060
|
$4.000
|
$4.250
|
|
|
ASPH (AC-20-5TR)
|
GAL
|
154,845.000
|
$3.200
|
$4.780
|
$4.190
|
$3.500
|
$4.600
|
|
|
AGGR(TY-B GR-3 SAC-B)
|
CY
|
1,799.000
|
$71.100
|
$85.750
|
$122.170
|
$130.000
|
$120.000
|
|
|
AGGR(TY-B GR-5 SAC-B)
|
CY
|
1,350.000
|
$100.000
|
$81.000
|
$121.390
|
$150.000
|
$135.000
|
|
|
AGGR(TY-PB GR-4 SAC-B)
|
CY
|
1,573.000
|
$80.900
|
$121.120
|
$158.500
|
$120.000
|
$155.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
124.000
|
$246.200
|
$250.000
|
$250.000
|
$187.880
|
$350.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
289.000
|
$8.000
|
$20.000
|
$20.000
|
$15.770
|
$18.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
829.000
|
$26.900
|
$48.000
|
$75.000
|
$46.920
|
$42.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
4.000
|
$630.000
|
$450.000
|
$450.000
|
$1,013.000
|
$775.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
253.000
|
$160.100
|
$131.000
|
$112.700
|
$265.310
|
$160.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
746.000
|
$120.900
|
$126.000
|
$187.700
|
$257.800
|
$160.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
580.000
|
$396.900
|
$450.000
|
$450.000
|
$415.310
|
$475.000
|
|
|
CMP (GAL STL 24 IN)
|
LF
|
5.000
|
$37.000
|
$60.000
|
$60.000
|
$191.370
|
$200.000
|
|
|
CONC BOX CULV (8 FT X 8 FT)
|
LF
|
120.000
|
$13.100
|
$1,200.000
|
$1,200.000
|
$757.070
|
$980.000
|
|
|
CONC BOX CULV (7 FT X 5 FT)(EXTEND)
|
LF
|
20.000
|
$382.300
|
$750.000
|
$750.000
|
$1,519.910
|
$750.000
|
|
|
RC PIPE (CL III)(12 IN)
|
LF
|
90.000
|
$28.800
|
$30.000
|
$30.000
|
$50.710
|
$38.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
2,362.000
|
$39.600
|
$40.000
|
$40.000
|
$53.040
|
$42.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
194.000
|
$62.000
|
$55.000
|
$55.000
|
$80.960
|
$55.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
12.000
|
$76.200
|
$80.000
|
$80.000
|
$111.960
|
$84.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
142.000
|
$107.800
|
$100.000
|
$100.000
|
$107.980
|
$102.000
|
|
|
RC PIPE (CL III)(48 IN)
|
LF
|
104.000
|
$161.500
|
$150.000
|
$150.000
|
$166.490
|
$160.000
|
|
|
INLET (COMPL)(PSL)(SL)(6FTX6FT)
|
EA
|
1.000
|
$13.100
|
$6,000.000
|
$6,000.000
|
$4,407.510
|
$7,000.000
|
|
|
HEADWALL (CH - FW - 0) (DIA= 36 IN)
|
EA
|
1.000
|
$382.300
|
$4,800.000
|
$4,800.000
|
$15,600.190
|
$9,000.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 18 IN)
|
EA
|
1.000
|
$2,563.000
|
$2,500.000
|
$2,500.000
|
$3,917.340
|
$4,800.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 24 IN)
|
EA
|
1.000
|
$2,500.000
|
$2,800.000
|
$2,800.000
|
$4,101.780
|
$5,500.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 36 IN)
|
EA
|
2.000
|
$5,218.500
|
$5,000.000
|
$5,000.000
|
$11,636.760
|
$12,500.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 48 IN)
|
EA
|
8.000
|
$6,250.000
|
$6,500.000
|
$6,500.000
|
$12,501.300
|
$17,000.000
|
|
|
WINGWALL (PW - 2) (HW=10 FT)
|
EA
|
3.000
|
$20,000.000
|
$32,000.000
|
$32,000.000
|
$25,778.770
|
$23,500.000
|
|
|
WINGWALL (PW - 2) (HW=11 FT)
|
EA
|
1.000
|
$23,600.000
|
$38,000.000
|
$38,000.000
|
$34,750.790
|
$28,000.000
|
|
|
WINGWALL (PW - 2) (HW=6 FT)
|
EA
|
1.000
|
$8,402.500
|
$18,000.000
|
$18,000.000
|
$12,397.550
|
$12,000.000
|
|
|
WINGWALL (PW - 2) (HW=7 FT)
|
EA
|
1.000
|
$10,801.800
|
$20,000.000
|
$20,000.000
|
$12,904.760
|
$12,750.000
|
|
|
SET (TY I) (48 IN) (3: 1) (C)
|
EA
|
4.000
|
$13.100
|
$6,000.000
|
$6,000.000
|
$1,991.890
|
$10,000.000
|
|
|
SET (TY II) (12 IN) (CMP) (6: 1) (P)
|
EA
|
6.000
|
$494.000
|
$450.000
|
$450.000
|
$521.640
|
$525.000
|
|
|
SET (TY II) (12 IN) (RCP) (6: 1) (P)
|
EA
|
13.000
|
$465.600
|
$450.000
|
$450.000
|
$521.640
|
$525.000
|
|
|
SET (TY II) (18 IN) (CMP) (6: 1) (P)
|
EA
|
4.000
|
$571.000
|
$575.000
|
$575.000
|
$521.640
|
$630.000
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$539.600
|
$500.000
|
$500.000
|
$451.060
|
$560.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
185.000
|
$568.000
|
$575.000
|
$575.000
|
$508.400
|
$630.000
|
|
|
SET (TY II) (24 IN) (CMP) (6: 1) (P)
|
EA
|
6.000
|
$1,033.000
|
$950.000
|
$950.000
|
$797.400
|
$975.000
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (C)
|
EA
|
7.000
|
$768.300
|
$650.000
|
$650.000
|
$537.080
|
$665.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
3.000
|
$717.200
|
$750.000
|
$750.000
|
$623.120
|
$775.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
16.000
|
$964.200
|
$950.000
|
$950.000
|
$795.190
|
$950.000
|
|
|
SET (TY II) (30 IN) (RCP) (3: 1) (C)
|
EA
|
13.000
|
$1,033.900
|
$975.000
|
$975.000
|
$766.510
|
$1,000.000
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$1,300.400
|
$1,100.000
|
$1,100.000
|
$909.930
|
$1,200.000
|
|
|
SET (TY II) (36 IN) (CMP) (6: 1) (P)
|
EA
|
4.000
|
$2,827.200
|
$4,500.000
|
$4,500.000
|
$3,253.770
|
$985.000
|
|
|
SET (TY II) (36 IN) (RCP) (3: 1) (C)
|
EA
|
18.000
|
$1,751.600
|
$1,900.000
|
$1,900.000
|
$876.820
|
$1,000.000
|
|
|
SET (TY II) (36 IN) (RCP) (4: 1) (C)
|
EA
|
7.000
|
$2,592.500
|
$3,200.000
|
$3,200.000
|
$1,426.130
|
$1,800.000
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (P)
|
EA
|
1.000
|
$3,541.700
|
$4,500.000
|
$4,500.000
|
$3,253.750
|
$3,900.000
|
|
|
SET (TY II) (42 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$13.100
|
$4,200.000
|
$4,200.000
|
$2,479.430
|
$3,100.000
|
|
|
SET (TY II) (48 IN) (RCP) (3: 1) (C)
|
EA
|
2.000
|
$3,425.000
|
$3,200.000
|
$3,200.000
|
$1,991.890
|
$2,500.000
|
|
|
SET (TY II) (48 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$9,000.000
|
$7,000.000
|
$7,000.000
|
$5,261.300
|
$6,500.000
|
|
|
REMOV & RE - LAY PIPE (18 IN)
|
LF
|
4.000
|
$24.000
|
$24.000
|
$24.000
|
$135.570
|
$90.000
|
|
|
REMOV & RE - LAY PIPE (24 IN)
|
LF
|
34.000
|
$30.700
|
$28.000
|
$28.000
|
$47.850
|
$55.000
|
|
|
REMOV & RE - LAY PIPE (30 IN)
|
LF
|
20.000
|
$44.800
|
$38.000
|
$38.000
|
$54.230
|
$70.000
|
|
|
REMOV & RE - LAY PIPE (36 IN)
|
LF
|
56.000
|
$32.000
|
$50.000
|
$50.000
|
$48.420
|
$80.000
|
|
|
REMOV & RE - LAY PIPE (42 IN)
|
LF
|
6.000
|
$81.500
|
$60.000
|
$60.000
|
$90.380
|
$80.000
|
|
|
REMOV & RE - LAY PIPE (48 IN)
|
LF
|
70.000
|
$100.000
|
$75.000
|
$75.000
|
$69.720
|
$100.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
19.000
|
$941.200
|
$1,200.000
|
$1,200.000
|
$1,705.070
|
$950.000
|
|
|
REMOV STR (SET)
|
EA
|
71.000
|
$355.000
|
$150.000
|
$150.000
|
$674.990
|
$225.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
5.000
|
$624.600
|
$550.000
|
$550.000
|
$2,865.430
|
$1,350.000
|
|
|
REMOV STR (PIPE)
|
LF
|
66.000
|
$16.700
|
$10.000
|
$10.000
|
$81.820
|
$20.000
|
|
|
REMOV STR (PIPE)
|
EA
|
6.000
|
$272.300
|
$500.000
|
$500.000
|
$1,065.450
|
$675.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$800,000.000
|
$304,000.000
|
$827,155.000
|
$900,000.000
|
$1,000,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
14.000
|
$3,037.900
|
$5,750.000
|
$4,800.000
|
$8,800.000
|
$4,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
2,720.000
|
$34.700
|
$37.500
|
$38.000
|
$42.000
|
$83.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
2,720.000
|
$9.600
|
$7.000
|
$5.000
|
$4.000
|
$20.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,940.000
|
$2.700
|
$2.250
|
$2.500
|
$4.200
|
$6.600
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,940.000
|
$1.200
|
$0.750
|
$0.500
|
$1.000
|
$1.700
|
|
|
INTERSECTIONS (ACP)
|
SY
|
4,425.000
|
$14.600
|
$19.750
|
$23.200
|
$35.000
|
$38.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
308.000
|
$72.000
|
$98.000
|
$90.000
|
$137.860
|
$95.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
10,005.000
|
$20.400
|
$26.750
|
$23.200
|
$29.000
|
$40.000
|
|
|
TURNOUTS (ACP)
|
SY
|
2,605.000
|
$49.500
|
$41.000
|
$40.650
|
$38.000
|
$55.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
5,062.500
|
$21.100
|
$21.750
|
$21.750
|
$23.000
|
$25.850
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
12.000
|
$1,715.300
|
$2,250.000
|
$2,000.000
|
$2,200.000
|
$2,475.000
|
|
|
MTL BM GD FEN (LONG SPAN SYSTEM)
|
LF
|
300.000
|
$23.500
|
$21.000
|
$21.000
|
$24.000
|
$31.000
|
|
|
MTL W - BEAM GD FEN (LOW FILL CULVERT)
|
LF
|
125.000
|
$75.300
|
$65.000
|
$65.000
|
$70.000
|
$92.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
2,800.000
|
$2.300
|
$2.000
|
$2.000
|
$2.200
|
$3.300
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
40.000
|
$170.000
|
$175.000
|
$175.000
|
$200.000
|
$330.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
42.000
|
$2,127.200
|
$2,435.000
|
$2,435.000
|
$2,600.000
|
$2,855.000
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 1
|
EA
|
2.000
|
$169.500
|
$480.000
|
$339.000
|
$360.000
|
$375.000
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
87.000
|
$127.000
|
$133.000
|
$171.000
|
$180.000
|
$190.000
|
|
|
MAILBOX INSTALL-D (WC-POST) TY 3
|
EA
|
12.000
|
$116.100
|
$210.000
|
$208.000
|
$220.000
|
$225.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
288.000
|
$441.200
|
$490.000
|
$382.000
|
$460.000
|
$485.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
8.000
|
$542.100
|
$501.000
|
$495.000
|
$520.000
|
$545.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
1.000
|
$649.800
|
$763.000
|
$686.000
|
$720.000
|
$755.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(2)SA(P)
|
EA
|
2.000
|
$985.000
|
$1,292.000
|
$898.000
|
$850.000
|
$985.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
9.000
|
$945.700
|
$916.000
|
$741.000
|
$780.000
|
$815.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
|
EA
|
2.000
|
$876.800
|
$975.000
|
$779.000
|
$820.000
|
$855.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
250.000
|
$77.700
|
$75.000
|
$50.000
|
$65.000
|
$66.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
18.000
|
$33.000
|
$15.000
|
$18.000
|
$25.000
|
$20.000
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
114.000
|
$46.700
|
$35.000
|
$60.000
|
$65.000
|
$66.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
91.000
|
$25.700
|
$18.000
|
$18.000
|
$25.000
|
$48.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
18,060.000
|
$0.300
|
$0.120
|
$0.120
|
$0.130
|
$0.140
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
168,414.000
|
$0.200
|
$0.120
|
$0.120
|
$0.130
|
$0.140
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
26,918.000
|
$0.500
|
$1.000
|
$2.000
|
$0.600
|
$1.200
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
442.000
|
$5.300
|
$5.300
|
$5.300
|
$5.600
|
$5.850
|
|
|
REF PROF PAV MRK TY I(W)4"(SLD)(090MIL)
|
LF
|
133,146.000
|
$0.400
|
$0.600
|
$0.600
|
$0.640
|
$0.660
|
|
|
REF PROF PAV MRK TY I(Y)4"(SLD)(090MIL)
|
LF
|
84,207.000
|
$0.400
|
$0.600
|
$0.600
|
$0.640
|
$0.660
|
|
|
REF PROF PAV MRK TY I(Y)4"(BRK)(090MIL)
|
LF
|
9,030.000
|
$0.400
|
$1.000
|
$1.000
|
$1.100
|
$1.100
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
133,146.000
|
$0.300
|
$0.400
|
$0.400
|
$0.430
|
$0.440
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
9,030.000
|
$0.300
|
$0.500
|
$0.500
|
$0.550
|
$0.550
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
84,207.000
|
$0.300
|
$0.400
|
$0.400
|
$0.430
|
$0.440
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,503.000
|
$2.700
|
$3.300
|
$3.300
|
$3.500
|
$3.650
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
110.000
|
$0.200
|
$1.000
|
$1.000
|
$1.800
|
$1.100
|
|
|
GEOGRID BASE REINFORCEMENT (TY II)
|
SY
|
196,268.000
|
$2.000
|
$1.650
|
$2.810
|
$0.800
|
$1.750
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$7,523.800
|
$18,000.000
|
$12,000.000
|
$6,000.000
|
$20,000.000
|
|
|
TMA (STATIONARY)
|
EA
|
2.000
|
$7,392.000
|
$25,000.000
|
$6,000.000
|
$18,000.000
|
$24,000.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
200.000
|
$87.100
|
$185.000
|
$100.000
|
$50.000
|
$16.500
|
|
Totals: |
$10,731,066.815
|
$8,647,080.443
|
$9,094,007.245
|
$9,542,504.240
|
$10,880,027.985
|