REMOVING CONC (CURB)
|
LF
|
379.000
|
$10.000
|
$84.000
|
$20.000
|
$50.000
|
$15.860
|
|
|
SUBGRADE WIDENING (ORD COMP)
|
STA
|
169.000
|
$225.000
|
$141.750
|
$500.000
|
$712.510
|
$505.860
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
20.000
|
$40.000
|
$53.500
|
$50.000
|
$90.000
|
$124.530
|
|
|
BACKFILL (TY A OR B)
|
STA
|
169.000
|
$160.000
|
$56.450
|
$225.000
|
$101.000
|
$234.030
|
|
|
BLADING
|
STA
|
5.000
|
$500.000
|
$120.000
|
$350.000
|
$120.000
|
$334.520
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
42,548.000
|
$0.900
|
$0.220
|
$1.000
|
$0.400
|
$0.690
|
|
|
DRILL SEEDING (PERM) (RURAL) (SANDY)
|
SY
|
42,548.000
|
$0.120
|
$0.150
|
$0.120
|
$0.120
|
$0.150
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
42,548.000
|
$0.090
|
$0.120
|
$0.080
|
$0.080
|
$0.130
|
|
|
VEGETATIVE WATERING
|
MG
|
461.000
|
$15.000
|
$10.400
|
$10.000
|
$37.000
|
$20.910
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY D)
|
SY
|
500.000
|
$1.000
|
$1.550
|
$1.900
|
$1.900
|
$1.650
|
|
|
PROOF ROLLING
|
HR
|
26.000
|
$100.000
|
$75.000
|
$150.000
|
$101.000
|
$84.230
|
|
|
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
|
CY
|
3,514.000
|
$40.000
|
$43.150
|
$65.000
|
$67.000
|
$59.480
|
|
|
PRIME COAT(MC-30 OR AE-P)
|
GAL
|
4,352.000
|
$3.500
|
$3.700
|
$4.500
|
$3.300
|
$4.170
|
|
|
ASPH (CRS-2)
|
GAL
|
5,527.000
|
$2.600
|
$3.550
|
$3.500
|
$2.700
|
$3.660
|
|
|
AGGR (TY-D GR-5 OR TY-L GR-5)
|
CY
|
151.000
|
$150.000
|
$188.000
|
$150.000
|
$124.000
|
$260.470
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
500.000
|
$35.000
|
$51.000
|
$40.000
|
$40.000
|
$50.780
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
440.000
|
$9.000
|
$11.250
|
$10.000
|
$8.000
|
$10.650
|
|
|
CUT & RESTORING PAV
|
SY
|
38.000
|
$150.000
|
$157.300
|
$300.000
|
$120.000
|
$77.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
5.200
|
$250.000
|
$139.600
|
$200.000
|
$225.000
|
$247.500
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
183.000
|
$2.000
|
$6.250
|
$15.000
|
$20.000
|
$22.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
690.000
|
$21.000
|
$31.250
|
$40.000
|
$50.000
|
$55.000
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
2.500
|
$500.000
|
$5,730.000
|
$2,000.000
|
$1,500.000
|
$1,650.000
|
|
|
CL C CONC (PILE ENCASEMENT)
|
CY
|
1.500
|
$4,000.000
|
$9,375.000
|
$3,500.000
|
$18,000.000
|
$19,800.000
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
3.000
|
$345.000
|
$469.000
|
$500.000
|
$450.000
|
$495.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(24 IN)
|
CY
|
106.000
|
$135.000
|
$166.000
|
$100.000
|
$160.000
|
$176.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
194.000
|
$450.000
|
$395.000
|
$450.000
|
$525.000
|
$577.500
|
|
|
RIPRAP (STONE COMMON)(GROUT)(18 IN)
|
CY
|
957.000
|
$175.000
|
$260.400
|
$150.000
|
$195.000
|
$214.500
|
|
|
CLEANING AND SEALING EXIST JOINTS(CL3)
|
LF
|
92.000
|
$55.000
|
$62.500
|
$80.000
|
$62.000
|
$77.000
|
|
|
CLEANING AND SEALING JOINTS (CL 3)
|
LF
|
69.000
|
$50.000
|
$62.500
|
$85.000
|
$62.000
|
$77.000
|
|
|
RETROFIT RAIL (TY T221)
|
LF
|
380.000
|
$200.000
|
$274.000
|
$175.000
|
$105.000
|
$218.950
|
|
|
CONC BOX CULV (3 FT X 3 FT)
|
LF
|
92.000
|
$335.000
|
$365.000
|
$350.000
|
$285.000
|
$313.500
|
|
|
CONC BOX CULV (6 FT X 4 FT)(EXTEND)
|
LF
|
15.000
|
$750.000
|
$3,481.000
|
$1,125.000
|
$860.000
|
$946.000
|
|
|
CONC BOX CULV (10 FT X 8 FT)(EXTEND)
|
LF
|
35.000
|
$1,250.000
|
$3,265.000
|
$1,500.000
|
$1,450.000
|
$1,595.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
144.000
|
$60.000
|
$60.000
|
$50.000
|
$56.000
|
$61.600
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
192.000
|
$80.000
|
$72.000
|
$60.000
|
$75.000
|
$82.500
|
|
|
WINGWALL (PW - 1) (HW=11 FT)
|
EA
|
2.000
|
$36,000.000
|
$29,165.000
|
$90,000.000
|
$69,000.000
|
$75,900.000
|
|
|
WINGWALL (PW - 1) (HW=6 FT)
|
EA
|
1.000
|
$23,000.000
|
$10,125.000
|
$35,000.000
|
$20,000.000
|
$22,000.000
|
|
|
WINGWALL (PW - 1) (HW=8 FT)
|
EA
|
1.000
|
$40,000.000
|
$14,600.000
|
$45,000.000
|
$32,000.000
|
$35,200.000
|
|
|
SET (TY I) (36 IN) (4: 1) (C)
|
EA
|
1.000
|
$5,500.000
|
$10,930.000
|
$13,000.000
|
$8,500.000
|
$13,313.700
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
8.000
|
$800.000
|
$1,091.000
|
$900.000
|
$990.000
|
$1,089.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
6.000
|
$1,200.000
|
$1,322.000
|
$1,200.000
|
$1,230.000
|
$1,353.000
|
|
|
SET (TY II) (36 IN) (RCP) (4: 1) (C)
|
EA
|
4.000
|
$2,500.000
|
$2,495.000
|
$2,300.000
|
$4,280.000
|
$4,708.000
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (C)
|
EA
|
2.000
|
$5,300.000
|
$3,250.000
|
$2,900.000
|
$4,960.000
|
$5,456.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
4.000
|
$2,000.000
|
$1,740.000
|
$3,500.000
|
$1,000.000
|
$1,100.000
|
|
|
REMOV STR (PIPE)
|
LF
|
197.000
|
$15.000
|
$8.350
|
$10.000
|
$15.000
|
$16.500
|
|
|
REMOVE STR (RAIL)
|
LF
|
204.000
|
$50.000
|
$0.010
|
$5.000
|
$0.010
|
$49.010
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$203,308.650
|
$200,656.000
|
$200,000.000
|
$249,325.000
|
$196,358.280
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
10.000
|
$5,000.000
|
$3,495.000
|
$2,500.000
|
$20,000.000
|
$5,477.270
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
248.000
|
$29.000
|
$28.000
|
$20.000
|
$40.000
|
$29.700
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
248.000
|
$8.800
|
$10.500
|
$5.000
|
$10.000
|
$11.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
3,430.000
|
$2.500
|
$5.000
|
$3.000
|
$2.700
|
$3.300
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
3,430.000
|
$1.000
|
$0.750
|
$1.000
|
$1.000
|
$0.830
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
4.000
|
$5,000.000
|
$6,500.000
|
$3,750.000
|
$3,100.000
|
$5,559.660
|
|
|
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
|
LF
|
210.000
|
$10.000
|
$35.650
|
$25.000
|
$30.000
|
$45.610
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
210.000
|
$10.000
|
$11.650
|
$15.000
|
$16.000
|
$22.350
|
|
|
PORT CTB (STKPL)(SGL SLP)(TY 1)
|
LF
|
210.000
|
$10.000
|
$37.350
|
$20.000
|
$30.000
|
$46.320
|
|
|
INTERSECTIONS (ACP)
|
SY
|
329.000
|
$50.000
|
$37.150
|
$30.000
|
$36.950
|
$77.360
|
|
|
DRIVEWAYS (ACP)
|
SY
|
2,628.000
|
$45.000
|
$32.300
|
$30.000
|
$34.100
|
$50.830
|
|
|
DRIVEWAYS AND TURNOUTS (ACP)
|
SY
|
172.000
|
$46.000
|
$44.200
|
$30.000
|
$33.850
|
$57.260
|
|
|
RUMBLE STRIPS (CENTERLINE) ASPHALT
|
LF
|
16,712.000
|
$0.180
|
$0.300
|
$0.350
|
$0.280
|
$0.660
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
2,000.000
|
$25.000
|
$31.000
|
$32.750
|
$29.750
|
$32.730
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$2,250.000
|
$2,005.000
|
$2,200.000
|
$1,925.000
|
$2,117.500
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,375.000
|
$3.000
|
$2.600
|
$1.750
|
$2.500
|
$2.750
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
5.000
|
$160.000
|
$130.200
|
$225.000
|
$125.000
|
$137.500
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
16.000
|
$2,500.000
|
$2,656.000
|
$3,100.000
|
$2,550.000
|
$2,805.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
5.000
|
$300.000
|
$260.400
|
$205.000
|
$250.000
|
$275.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$1,500.000
|
$1,925.000
|
$1,750.000
|
$1,200.000
|
$1,405.400
|
|
|
CRASH CUSH ATTEN (STKPL)
|
EA
|
2.000
|
$800.000
|
$885.000
|
$1,000.000
|
$800.000
|
$2,076.360
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
2.000
|
$8,000.000
|
$8,100.000
|
$12,500.000
|
$7,500.000
|
$9,904.220
|
|
|
WIRE FENCE (TY C)
|
LF
|
200.000
|
$20.000
|
$31.250
|
$20.000
|
$15.000
|
$23.050
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
2.000
|
$225.000
|
$250.000
|
$240.000
|
$225.000
|
$264.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
|
EA
|
1.000
|
$650.000
|
$865.000
|
$800.000
|
$450.000
|
$781.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(2)SB(P)
|
EA
|
1.000
|
$900.000
|
$1,125.000
|
$1,500.000
|
$700.000
|
$1,210.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
43.000
|
$300.000
|
$406.000
|
$475.000
|
$375.000
|
$462.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
35.000
|
$90.000
|
$105.000
|
$90.000
|
$100.000
|
$99.000
|
|
|
RELOCATE SM RD SN SUP & AM TY TEMP
|
EA
|
9.000
|
$200.000
|
$271.000
|
$250.000
|
$200.000
|
$286.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
4.000
|
$24.000
|
$21.000
|
$20.000
|
$18.000
|
$19.800
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
35.000
|
$30.000
|
$36.500
|
$35.000
|
$37.000
|
$40.700
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
|
EA
|
8.000
|
$135.000
|
$88.550
|
$100.000
|
$79.500
|
$121.000
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
210.000
|
$4.000
|
$5.200
|
$5.000
|
$5.000
|
$4.400
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
828.000
|
$0.500
|
$2.100
|
$2.000
|
$2.000
|
$1.320
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
20.000
|
$10.000
|
$14.600
|
$14.000
|
$14.000
|
$9.900
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
8,400.000
|
$0.500
|
$0.850
|
$0.820
|
$0.820
|
$1.320
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
1,835.000
|
$1.000
|
$1.000
|
$1.000
|
$1.130
|
$1.200
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
91.000
|
$7.000
|
$11.850
|
$11.350
|
$11.350
|
$11.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
32,024.000
|
$0.300
|
$0.360
|
$0.350
|
$0.350
|
$0.420
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
4,200.000
|
$0.240
|
$0.510
|
$0.490
|
$0.490
|
$0.420
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
11,496.000
|
$0.300
|
$0.460
|
$0.440
|
$0.440
|
$0.420
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
353.000
|
$3.500
|
$5.200
|
$5.000
|
$5.000
|
$4.400
|
|
|
FULL - WIDTH MOWING
|
CYC
|
2.000
|
$3,000.000
|
$2,750.000
|
$3,500.000
|
$3,800.000
|
$3,675.150
|
|
|
D-GR HMA TY-C SAC-B PG64-22
|
TON
|
7,245.000
|
$70.000
|
$75.300
|
$70.000
|
$96.000
|
$94.890
|
|
|
UNDERSEAL COURSE
|
GAL
|
13,173.000
|
$3.000
|
$3.800
|
$3.500
|
$0.010
|
$4.330
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$8,500.000
|
$2,600.000
|
$10,000.000
|
$2,200.000
|
$11,172.110
|
|
|
TMA (STATIONARY)
|
DAY
|
300.000
|
$150.000
|
$1.000
|
$165.000
|
$0.010
|
$168.810
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
450.000
|
$50.000
|
$68.600
|
$80.000
|
$25.000
|
$6.700
|
|
Totals: |
$2,292,395.190
|
$2,480,709.530
|
$2,587,648.540
|
$2,830,753.710
|
$2,983,547.960
|