FALLS FM 434 (1077-01-026)

Items: 95

County: FALLS
Length: N/A
Highway: FM 434
District: WACO
Control Number: 1077-01-026
DBE Goal: N/A
Project: STP 2021(788)HES
Guaranty: N/A
Time: 150 WORKING DAYS
Engineer's Estimate: $2,292,395.19
Date: 08/04/2021 (4 years ago)
Contract Number: N/A
Type: HAZARD ELIMINATION & SAFETY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (4)
E
Engineer's Estimate
$2,292,395.19
$2,480,709.53
Over/Under Est: 8.21% $188,314.34
Over/Under Est: 12.88% $295,253.35
Amt Left: 4.31% $106,939.01
Over/Under Est: 23.48% $538,358.52
Amt Left: 14.11% $350,044.18
Delta: -9.39% -$243,105.17
$2,983,547.96
Over/Under Est: 30.15% $691,152.77
Amt Left: 20.27% $502,838.43
Delta: -5.40% -$152,794.25

Bid Items & Bid Tabulations

95 Total 0 of 95
FALLS  |  FM 434  |  WACO  |  1077-01-026  |  08/04/2021  |  $2,292,395.19  |  STP 2021(788)HES  |  HAZARD ELIM & SAFETY  |  150 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
KNIFE RIVER CORPORATION - SOUTH
BIG CREEK CONSTRUCTION, LTD.
TEXAS MATERIALS GROUP, INC.
A. L. HELMCAMP, INC.
REMOVING CONC (CURB)
LF 379.000 $10.000 $84.000 $20.000 $50.000 $15.860
SUBGRADE WIDENING (ORD COMP)
STA 169.000 $225.000 $141.750 $500.000 $712.510 $505.860
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 20.000 $40.000 $53.500 $50.000 $90.000 $124.530
BACKFILL (TY A OR B)
STA 169.000 $160.000 $56.450 $225.000 $101.000 $234.030
BLADING
STA 5.000 $500.000 $120.000 $350.000 $120.000 $334.520
FURNISHING AND PLACING TOPSOIL (4")
SY 42,548.000 $0.900 $0.220 $1.000 $0.400 $0.690
DRILL SEEDING (PERM) (RURAL) (SANDY)
SY 42,548.000 $0.120 $0.150 $0.120 $0.120 $0.150
DRILL SEED (TEMP)(WARM OR COOL)
SY 42,548.000 $0.090 $0.120 $0.080 $0.080 $0.130
VEGETATIVE WATERING
MG 461.000 $15.000 $10.400 $10.000 $37.000 $20.910
SOIL RETENTION BLANKETS (CL 1) (TY D)
SY 500.000 $1.000 $1.550 $1.900 $1.900 $1.650
PROOF ROLLING
HR 26.000 $100.000 $75.000 $150.000 $101.000 $84.230
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
CY 3,514.000 $40.000 $43.150 $65.000 $67.000 $59.480
PRIME COAT(MC-30 OR AE-P)
GAL 4,352.000 $3.500 $3.700 $4.500 $3.300 $4.170
ASPH (CRS-2)
GAL 5,527.000 $2.600 $3.550 $3.500 $2.700 $3.660
AGGR (TY-D GR-5 OR TY-L GR-5)
CY 151.000 $150.000 $188.000 $150.000 $124.000 $260.470
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 500.000 $35.000 $51.000 $40.000 $40.000 $50.780
PLANE ASPH CONC PAV(0" TO 2")
SY 440.000 $9.000 $11.250 $10.000 $8.000 $10.650
CUT & RESTORING PAV
SY 38.000 $150.000 $157.300 $300.000 $120.000 $77.000
FLOWABLE BACKFILL
CY 5.200 $250.000 $139.600 $200.000 $225.000 $247.500
TRENCH EXCAVATION PROTECTION
LF 183.000 $2.000 $6.250 $15.000 $20.000 $22.000
TEMPORARY SPL SHORING
SF 690.000 $21.000 $31.250 $40.000 $50.000 $55.000
CL C CONC (RAIL FOUNDATION)
CY 2.500 $500.000 $5,730.000 $2,000.000 $1,500.000 $1,650.000
CL C CONC (PILE ENCASEMENT)
CY 1.500 $4,000.000 $9,375.000 $3,500.000 $18,000.000 $19,800.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 3.000 $345.000 $469.000 $500.000 $450.000 $495.000
RIPRAP (STONE COMMON)(DRY)(24 IN)
CY 106.000 $135.000 $166.000 $100.000 $160.000 $176.000
RIPRAP (MOW STRIP)(4 IN)
CY 194.000 $450.000 $395.000 $450.000 $525.000 $577.500
RIPRAP (STONE COMMON)(GROUT)(18 IN)
CY 957.000 $175.000 $260.400 $150.000 $195.000 $214.500
CLEANING AND SEALING EXIST JOINTS(CL3)
LF 92.000 $55.000 $62.500 $80.000 $62.000 $77.000
CLEANING AND SEALING JOINTS (CL 3)
LF 69.000 $50.000 $62.500 $85.000 $62.000 $77.000
RETROFIT RAIL (TY T221)
LF 380.000 $200.000 $274.000 $175.000 $105.000 $218.950
CONC BOX CULV (3 FT X 3 FT)
LF 92.000 $335.000 $365.000 $350.000 $285.000 $313.500
CONC BOX CULV (6 FT X 4 FT)(EXTEND)
LF 15.000 $750.000 $3,481.000 $1,125.000 $860.000 $946.000
CONC BOX CULV (10 FT X 8 FT)(EXTEND)
LF 35.000 $1,250.000 $3,265.000 $1,500.000 $1,450.000 $1,595.000
RC PIPE (CL III)(18 IN)
LF 144.000 $60.000 $60.000 $50.000 $56.000 $61.600
RC PIPE (CL III)(24 IN)
LF 192.000 $80.000 $72.000 $60.000 $75.000 $82.500
WINGWALL (PW - 1) (HW=11 FT)
EA 2.000 $36,000.000 $29,165.000 $90,000.000 $69,000.000 $75,900.000
WINGWALL (PW - 1) (HW=6 FT)
EA 1.000 $23,000.000 $10,125.000 $35,000.000 $20,000.000 $22,000.000
WINGWALL (PW - 1) (HW=8 FT)
EA 1.000 $40,000.000 $14,600.000 $45,000.000 $32,000.000 $35,200.000
SET (TY I) (36 IN) (4: 1) (C)
EA 1.000 $5,500.000 $10,930.000 $13,000.000 $8,500.000 $13,313.700
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 8.000 $800.000 $1,091.000 $900.000 $990.000 $1,089.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 6.000 $1,200.000 $1,322.000 $1,200.000 $1,230.000 $1,353.000
SET (TY II) (36 IN) (RCP) (4: 1) (C)
EA 4.000 $2,500.000 $2,495.000 $2,300.000 $4,280.000 $4,708.000
SET (TY II) (36 IN) (RCP) (6: 1) (C)
EA 2.000 $5,300.000 $3,250.000 $2,900.000 $4,960.000 $5,456.000
CLEAN EXIST CULVERTS
EA 4.000 $2,000.000 $1,740.000 $3,500.000 $1,000.000 $1,100.000
REMOV STR (PIPE)
LF 197.000 $15.000 $8.350 $10.000 $15.000 $16.500
REMOVE STR (RAIL)
LF 204.000 $50.000 $0.010 $5.000 $0.010 $49.010
MOBILIZATION
LS 1.000 $203,308.650 $200,656.000 $200,000.000 $249,325.000 $196,358.280
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 10.000 $5,000.000 $3,495.000 $2,500.000 $20,000.000 $5,477.270
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 248.000 $29.000 $28.000 $20.000 $40.000 $29.700
ROCK FILTER DAMS (REMOVE)
LF 248.000 $8.800 $10.500 $5.000 $10.000 $11.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 3,430.000 $2.500 $5.000 $3.000 $2.700 $3.300
TEMP SEDMT CONT FENCE (REMOVE)
LF 3,430.000 $1.000 $0.750 $1.000 $1.000 $0.830
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 4.000 $5,000.000 $6,500.000 $3,750.000 $3,100.000 $5,559.660
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
LF 210.000 $10.000 $35.650 $25.000 $30.000 $45.610
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 210.000 $10.000 $11.650 $15.000 $16.000 $22.350
PORT CTB (STKPL)(SGL SLP)(TY 1)
LF 210.000 $10.000 $37.350 $20.000 $30.000 $46.320
INTERSECTIONS (ACP)
SY 329.000 $50.000 $37.150 $30.000 $36.950 $77.360
DRIVEWAYS (ACP)
SY 2,628.000 $45.000 $32.300 $30.000 $34.100 $50.830
DRIVEWAYS AND TURNOUTS (ACP)
SY 172.000 $46.000 $44.200 $30.000 $33.850 $57.260
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 16,712.000 $0.180 $0.300 $0.350 $0.280 $0.660
MTL W-BEAM GD FEN (STEEL POST)
LF 2,000.000 $25.000 $31.000 $32.750 $29.750 $32.730
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,250.000 $2,005.000 $2,200.000 $1,925.000 $2,117.500
REMOVE METAL BEAM GUARD FENCE
LF 1,375.000 $3.000 $2.600 $1.750 $2.500 $2.750
REMOVE TERMINAL ANCHOR SECTION
EA 5.000 $160.000 $130.200 $225.000 $125.000 $137.500
GUARDRAIL END TREATMENT (INSTALL)
EA 16.000 $2,500.000 $2,656.000 $3,100.000 $2,550.000 $2,805.000
GUARDRAIL END TREATMENT (REMOVE)
EA 5.000 $300.000 $260.400 $205.000 $250.000 $275.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000 $1,500.000 $1,925.000 $1,750.000 $1,200.000 $1,405.400
CRASH CUSH ATTEN (STKPL)
EA 2.000 $800.000 $885.000 $1,000.000 $800.000 $2,076.360
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 2.000 $8,000.000 $8,100.000 $12,500.000 $7,500.000 $9,904.220
WIRE FENCE (TY C)
LF 200.000 $20.000 $31.250 $20.000 $15.000 $23.050
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 2.000 $225.000 $250.000 $240.000 $225.000 $264.000
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
EA 1.000 $650.000 $865.000 $800.000 $450.000 $781.000
IN SM RD SN SUP&AM TY10BWG(2)SB(P)
EA 1.000 $900.000 $1,125.000 $1,500.000 $700.000 $1,210.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 43.000 $300.000 $406.000 $475.000 $375.000 $462.000
REMOVE SM RD SN SUP&AM
EA 35.000 $90.000 $105.000 $90.000 $100.000 $99.000
RELOCATE SM RD SN SUP & AM TY TEMP
EA 9.000 $200.000 $271.000 $250.000 $200.000 $286.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 4.000 $24.000 $21.000 $20.000 $18.000 $19.800
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 35.000 $30.000 $36.500 $35.000 $37.000 $40.700
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
EA 8.000 $135.000 $88.550 $100.000 $79.500 $121.000
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 210.000 $4.000 $5.200 $5.000 $5.000 $4.400
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 828.000 $0.500 $2.100 $2.000 $2.000 $1.320
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 20.000 $10.000 $14.600 $14.000 $14.000 $9.900
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 8,400.000 $0.500 $0.850 $0.820 $0.820 $1.320
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 1,835.000 $1.000 $1.000 $1.000 $1.130 $1.200
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 91.000 $7.000 $11.850 $11.350 $11.350 $11.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 32,024.000 $0.300 $0.360 $0.350 $0.350 $0.420
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 4,200.000 $0.240 $0.510 $0.490 $0.490 $0.420
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 11,496.000 $0.300 $0.460 $0.440 $0.440 $0.420
REFL PAV MRKR TY II-A-A
EA 353.000 $3.500 $5.200 $5.000 $5.000 $4.400
FULL - WIDTH MOWING
CYC 2.000 $3,000.000 $2,750.000 $3,500.000 $3,800.000 $3,675.150
D-GR HMA TY-C SAC-B PG64-22
TON 7,245.000 $70.000 $75.300 $70.000 $96.000 $94.890
UNDERSEAL COURSE
GAL 13,173.000 $3.000 $3.800 $3.500 $0.010 $4.330
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $8,500.000 $2,600.000 $10,000.000 $2,200.000 $11,172.110
TMA (STATIONARY)
DAY 300.000 $150.000 $1.000 $165.000 $0.010 $168.810
TMA (MOBILE OPERATION)
HR 450.000 $50.000 $68.600 $80.000 $25.000 $6.700
Totals: $2,292,395.190 $2,480,709.530 $2,587,648.540 $2,830,753.710 $2,983,547.960