FALLS FM 2027 (0833-06-019)

Items: 122

County: FALLS
Length: N/A
Highway: FM 2027
District: WACO
Control Number: 0833-06-019
DBE Goal: N/A
Project: STP 2020(942)HES
Guaranty: N/A
Time: 180 WORKING DAYS
Engineer's Estimate: $3,402,505.12
Date: 07/08/2020 (5 years ago)
Contract Number: N/A
Type: SAFETY TREAT FIXED OBJECTS, WIDEN PAVED SHOULDER T
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$3,402,505.12
$3,054,891.44
Over/Under Est: -10.22% -$347,613.68
Over/Under Est: -9.25% -$314,788.75
Amt Left: 1.07% $32,824.93
Over/Under Est: 14.76% $502,309.04
Amt Left: 27.82% $849,922.72
Delta: -26.46% -$817,097.79
$3,984,786.42
Over/Under Est: 17.11% $582,281.30
Amt Left: 30.44% $929,894.98
Delta: -2.05% -$79,972.26

Bid Items & Bid Tabulations

122 Total 0 of 122
FALLS  |  FM 2027  |  WACO  |  0833-06-019  |  07/08/2020  |  $3,402,505.12  |  STP 2020(942)HES  |  SAFETY TREAT FIXED OBJECTS, WIDEN PA...  |  180 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
KNIFE RIVER CORPORATION - SOUTH
BIG CREEK CONSTRUCTION, LTD.
TEXAS MATERIALS GROUP, INC.
A. L. HELMCAMP, INC.
PREPARING ROW
STA 7.000 $2,000.000 $3,500.000 $2,500.000 $6,200.000 $7,500.000
PREP ROW (TREE) (18"-36" DIA.)
EA 8.000 $1,500.000 $1,000.000 $2,500.000 $3,750.000 $2,500.000
REMOVING CONC (RIPRAP)
SY 522.500 $9.000 $18.000 $10.000 $12.350 $50.000
REMOVING CONC (DRIVEWAYS)
SY 86.000 $20.000 $18.000 $15.000 $18.750 $85.000
EXCAVATION (ROADWAY)
CY 6,250.000 $8.000 $10.000 $10.000 $10.000 $7.000
EXCAVATION (CHANNEL)
CY 100.000 $8.000 $20.000 $40.000 $40.000 $25.000
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 12,669.000 $12.000 $10.000 $10.000 $10.000 $13.000
FURNISHING AND PLACING TOPSOIL (4")
SY 116,793.000 $1.000 $0.050 $0.400 $0.300 $0.300
DRILL SEEDING (PERM) (RURAL) (SANDY)
SY 116,793.000 $0.120 $0.100 $0.140 $0.100 $0.100
DRILL SEEDING (TEMP) (WARM)
SY 58,397.000 $0.090 $0.060 $0.080 $0.060 $0.060
DRILL SEEDING (TEMP) (COOL)
SY 58,397.000 $0.090 $0.060 $0.090 $0.060 $0.060
VEGETATIVE WATERING
MG 1,896.700 $15.000 $1.000 $5.000 $1.000 $2.000
SOIL RETENTION BLANKETS (CL 1) (TY D)
SY 200.000 $1.000 $2.550 $5.000 $2.500 $2.600
SOIL RETENTION BLANKETS (CL 2) (TY E)
SY 771.000 $2.000 $3.050 $4.000 $3.000 $3.200
PROOF ROLLING
HR 25.900 $100.000 $60.000 $70.000 $98.000 $75.000
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
CY 10,215.000 $45.000 $34.000 $38.000 $40.000 $43.000
FL BS (RDWY DEL) (TY D GR 1-2)
TON 6,774.000 $30.000 $16.500 $19.000 $15.000 $22.000
REWORK BS MATL (TY C)(9")(ORD COMP)
SY 36,321.000 $2.200 $1.500 $1.000 $3.000 $3.300
CEMENT
TON 640.800 $150.000 $141.000 $150.000 $165.000 $150.000
CEMENT TREAT (MX EXST MATL & NW BS)(7")
SY 64,921.000 $1.500 $1.750 $1.580 $4.000 $3.000
EMULS ASPH (BS OR SUBGR TRT)(MS-2)
GAL 17,842.000 $2.600 $1.000 $3.000 $4.840 $3.250
ASPH (CRS-2)
GAL 26,912.000 $2.600 $2.400 $2.500 $2.350 $2.500
ASPH (RC-250)
GAL 8,921.000 $3.800 $3.000 $3.500 $4.650 $4.250
AGGR(TY-D GR-4 OR TY-L GR-4)
CY 443.000 $100.000 $103.000 $70.000 $110.000 $135.000
AGGR (TY-D GR-5 OR TY-L GR-5)
CY 198.000 $100.000 $115.000 $90.000 $164.000 $220.000
PLANE ASPH CONC PAV(0" TO 6")
SY 220.000 $2.000 $15.000 $15.000 $8.050 $18.000
CEM STABIL BKFL
CY 14.000 $150.000 $200.000 $150.000 $185.000 $132.000
TEMPORARY SPL SHORING
SF 1,206.000 $20.000 $17.500 $30.000 $28.000 $53.000
DRILL SHAFT (24 IN)
LF 208.000 $225.000 $348.000 $340.000 $275.000 $375.000
CL B CONC (FLUME)
CY 3.600 $750.000 $1,075.000 $750.000 $700.000 $690.000
CL C CONC (ABUT)(EXTEND)
CY 8.800 $1,300.000 $2,200.000 $2,500.000 $2,700.000 $3,875.000
CL C CONC (CAP)(EXTEND)
CY 4.000 $1,300.000 $5,100.000 $2,500.000 $5,300.000 $5,250.000
CL C CONC (COLUMN)
CY 7.000 $1,300.000 $2,000.000 $2,500.000 $2,800.000 $2,750.000
CONCRETE PAN GIRDER (EXTEND)
CY 36.600 $1,500.000 $2,400.000 $2,000.000 $4,000.000 $4,650.000
CONC STR REPAIR (STANDARD)
SF 36.600 $125.000 $100.000 $100.000 $250.000 $85.000
RIPRAP (CONC)(5 IN)
CY 101.500 $500.000 $395.000 $400.000 $525.000 $475.000
RIPRAP (CONC)(CL B)
CY 0.500 $750.000 $5,500.000 $1,500.000 $1,000.000 $1,050.000
RIPRAP (STONE COMMON)(DRY)(12 IN)
CY 19.500 $90.000 $138.000 $250.000 $190.000 $105.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 32.000 $150.000 $115.000 $250.000 $175.000 $210.000
RIPRAP (MOW STRIP)(4 IN)
CY 32.000 $450.000 $441.000 $450.000 $550.000 $630.000
CLEANING AND SEALING EXIST JOINTS(CL3)
LF 128.000 $55.000 $58.000 $75.000 $58.000 $61.000
RAIL (TY SSTR)
LF 208.000 $45.000 $120.000 $100.000 $175.000 $245.000
GABIONS (GALV)
CY 80.000 $400.000 $290.000 $450.000 $180.000 $400.000
CONC BOX CULV (7 FT X 7 FT)(EXTEND)
LF 11.000 $1,000.000 $1,036.000 $1,200.000 $780.000 $790.000
CONC BOX CULV (10 FT X 6 FT)(EXTEND)
LF 20.500 $1,000.000 $1,092.000 $1,400.000 $1,250.000 $1,050.000
CONC BOX CULV (9 FT X 4 FT)(EXTEND)
LF 18.500 $1,000.000 $1,026.000 $1,200.000 $720.000 $945.000
RC PIPE (CL III)(18 IN)
LF 764.000 $62.000 $52.000 $60.000 $48.750 $51.000
RC PIPE (CL III)(24 IN)
LF 372.000 $72.000 $69.000 $70.000 $65.000 $92.000
RC PIPE (CL III)(30 IN)
LF 48.000 $100.000 $95.000 $90.000 $87.000 $131.000
RC PIPE (CL III)(60 IN)
LF 20.000 $250.000 $346.000 $400.000 $350.000 $368.000
HEADWALL (CH - FW - 45) (DIA= 60 IN)
EA 2.000 $10,000.000 $8,100.000 $8,000.000 $12,350.000 $13,650.000
WINGWALL (FW - 0) (HW=5 FT)
EA 1.000 $11,000.000 $8,500.000 $5,000.000 $6,000.000 $4,725.000
WINGWALL (FW - 0) (HW=7 FT)
EA 2.000 $14,000.000 $9,500.000 $10,000.000 $8,550.000 $9,450.000
WINGWALL (FW - S) (HW=8 FT)
EA 1.000 $18,100.000 $12,300.000 $15,000.000 $13,000.000 $14,700.000
SET (TY I)(S= 9 FT)(HW= 5 FT)(4:1) (C)
EA 1.000 $11,000.000 $15,900.000 $17,000.000 $10,000.000 $15,750.000
SET (TY II) (18 IN) (RCP) (4: 1) (C)
EA 2.000 $900.000 $890.000 $800.000 $750.000 $788.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 48.000 $900.000 $1,000.000 $900.000 $900.000 $840.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 24.000 $1,100.000 $1,200.000 $1,000.000 $1,130.000 $998.000
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 4.000 $2,200.000 $1,870.000 $2,000.000 $2,100.000 $2,100.000
CLEAN EXIST CULVERTS
EA 5.000 $1,000.000 $2,562.000 $2,000.000 $1,200.000 $1,575.000
REMOV STR (PIPE)
LF 929.000 $15.000 $9.250 $12.000 $8.000 $26.000
MOBILIZATION
LS 1.000 $300,000.000 $305,000.000 $300,000.000 $382,320.000 $380,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 12.000 $5,000.000 $6,000.000 $2,000.000 $14,000.000 $5,900.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 373.000 $29.000 $28.000 $30.000 $24.000 $36.000
ROCK FILTER DAMS (REMOVE)
LF 373.000 $9.000 $9.000 $5.000 $10.000 $5.900
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,516.000 $2.500 $5.000 $3.000 $2.250 $3.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,516.000 $1.000 $1.000 $0.700 $1.100 $1.500
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 6.000 $5,000.000 $5,300.000 $5,000.000 $5,955.000 $4,150.000
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
LF 420.000 $10.000 $17.000 $20.000 $18.550 $10.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 420.000 $10.000 $10.000 $10.000 $4.200 $20.000
PORT CTB (STKPL)(SGL SLP)(TY 1)
LF 420.000 $10.000 $16.000 $15.000 $18.550 $10.000
INTERSECTIONS (ACP)
SY 597.000 $40.000 $34.000 $25.000 $38.550 $53.500
DRIVEWAYS (CONC)
SY 86.000 $85.000 $86.000 $87.000 $95.000 $110.000
DRIVEWAYS (SURF TREAT)
SY 3,696.000 $20.000 $16.000 $20.000 $32.150 $31.000
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 31,029.000 $0.200 $0.210 $0.300 $0.200 $0.250
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 15,805.000 $0.200 $0.310 $0.300 $0.300 $0.250
MTL W-BEAM GD FEN (STEEL POST)
LF 225.000 $26.000 $25.000 $25.000 $23.000 $21.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $1,825.000 $2,350.000 $2,000.000 $1,650.000 $1,750.000
REMOVE METAL BEAM GUARD FENCE
LF 400.000 $2.600 $10.300 $3.000 $2.200 $1.900
REMOVE TERMINAL ANCHOR SECTION
EA 4.000 $250.000 $155.000 $150.000 $125.000 $120.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $2,750.000 $2,625.000 $2,750.000 $2,500.000 $2,550.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000 $1,800.000 $2,200.000 $2,000.000 $3,600.000 $1,365.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $800.000 $800.000 $1,000.000 $750.000 $735.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 2.000 $25,000.000 $23,000.000 $27,500.000 $6,800.000 $26,400.000
WIRE FENCE (TY C)
LF 220.000 $20.000 $10.000 $20.000 $20.000 $16.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 14.000 $200.000 $190.000 $200.000 $180.000 $195.000
MAILBOX INSTALL-D (TWW-POST) TY 4
EA 2.000 $300.000 $257.000 $300.000 $200.000 $265.000
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 1.000 $500.000 $463.000 $500.000 $500.000 $475.000
IN SM RD SN SUP&AM TY10BWG(1)SB(T)
EA 2.000 $650.000 $618.000 $650.000 $500.000 $630.000
IN SM RD SN SUP&AM TY10BWG(1)SB(U)
EA 2.000 $575.000 $556.000 $600.000 $450.000 $567.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 38.000 $400.000 $293.000 $350.000 $370.000 $300.000
IN SM RD SN SUP&AM TYTWT(1)WS(T)
EA 8.000 $400.000 $355.000 $400.000 $360.000 $365.000
REMOVE SM RD SN SUP&AM
EA 17.000 $90.000 $77.000 $100.000 $85.000 $79.000
RELOCATE SM RD SN SUP & AM TY TEMP
EA 31.000 $200.000 $200.000 $250.000 $200.000 $235.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 4.000 $25.000 $31.000 $30.000 $18.000 $26.000
INSTL OM ASSM (OM-2X)(WC)GND
EA 16.000 $80.000 $57.000 $60.000 $70.000 $59.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 5.000 $30.000 $46.000 $40.000 $22.000 $48.000
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 913.000 $0.600 $0.720 $1.000 $0.290 $0.750
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 1,680.000 $0.200 $0.310 $0.500 $0.240 $0.320
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 24,357.000 $0.200 $0.210 $0.300 $0.240 $0.210
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 180.000 $4.000 $4.120 $7.000 $7.000 $4.200
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 1,260.000 $0.500 $0.620 $0.800 $0.700 $0.630
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 22.000 $10.000 $8.250 $10.000 $10.000 $8.400
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 7,200.000 $0.500 $0.590 $0.700 $0.700 $0.600
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 1,389.000 $0.600 $1.210 $1.000 $1.000 $0.460
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 8,823.000 $1.000 $1.210 $1.000 $1.000 $0.460
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 279.000 $1.300 $0.820 $1.000 $1.000 $0.840
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 913.000 $0.800 $0.820 $1.000 $1.000 $0.840
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 195.000 $6.000 $7.220 $10.000 $8.000 $7.350
PAVEMENT SEALER 4"
LF 290.000 $0.180 $0.520 $1.000 $0.550 $0.530
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 32,557.000 $0.350 $0.350 $0.370 $0.430 $0.360
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 1,680.000 $0.350 $0.410 $0.500 $0.430 $0.420
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 23,597.000 $0.350 $0.360 $0.370 $0.430 $0.370
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 28.000 $40.000 $38.000 $50.000 $45.000 $38.850
REFL PAV MRKR TY I-C
EA 57.000 $4.000 $5.160 $7.000 $4.000 $5.250
REFL PAV MRKR TY II-A-A
EA 518.000 $3.000 $5.160 $7.000 $4.000 $5.250
FULL - WIDTH MOWING
CYC 2.000 $3,000.000 $2,500.000 $3,000.000 $3,060.000 $2,000.000
D-GR HMA TY-C SAC-B PG76-22
TON 6,378.000 $75.000 $74.000 $60.000 $92.000 $85.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $7,000.000 $5,000.000 $5,000.000 $8,000.000 $5,600.000
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
LF 80.000 $20.000 $15.470 $20.000 $24.000 $15.750
TMA (STATIONARY)
DAY 172.000 $200.000 $75.000 $150.000 $225.000 $275.000
TMA (MOBILE OPERATION)
HR 60.000 $45.000 $60.000 $50.000 $45.000 $65.000
Totals: $3,402,505.120 $3,054,891.440 $3,087,716.370 $3,904,814.165 $3,984,786.420