Job Info for 1990-01-020

County: ERATH Highway: FM 205 Date: 08/06/2020 (4 years ago) Engineer's Estimate: $11,463,174 Control Number: 1990-01-020
Project: STP 2B20(093)HES District: FORT WORTH Time: 234 WORKING DAYS Type: HAZARD ELIMINATION & SAFETY

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $11,463,173.70
JAY MILLS CONTRACTING, INCORPORATED   $9,896,354.05 1
-13.67% | -$1,566,819.65
A. L. HELMCAMP, INC.   $11,121,873.89 2
-2.98% | -$341,299.81
12.38% | $1,225,519.84
SEMA CONSTRUCTION, INC.   $11,398,378.34 3
-0.57% | -$64,795.36
15.18% | $1,502,024.29
2.49% | $276,504.45
FLUOR HEAVY CIVIL, LLC   $12,099,484.47 4
5.55% | $636,310.77
22.26% | $2,203,130.42
6.15% | $701,106.13
ALTUS CONSTRUCTION LLC   $15,733,265.94 5
37.25% | $4,270,092.24
58.98% | $5,836,911.89
30.03% | $3,633,781.47

Bid Items

Items: 103, 0 filtered
ERATH FM 205  |  FORT WORTH  |  1990-01-020  |  08/06/2020  |  $11,463,174  |  STP 2B20(093)HES  |  HAZARD ELIM & SAFETY  |  234 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate JAY MILLS CONTRACTING, INCORPORATED A. L. HELMCAMP, INC. SEMA CONSTRUCTION, INC. FLUOR HEAVY CIVIL, LLC ALTUS CONSTRUCTION LLC
100 6002 PREPARING ROW STA 473.000 $618.000 $455.000 $510.000 $2,346.000 $2,010.000 $3,233.960
104 6017 REMOVING CONC (DRIVEWAYS) SY 113.000 $20.000 $15.000 $28.000 $12.000 $14.480 $20.360
110 6001 EXCAVATION (ROADWAY) CY 21,609.000 $10.000 $10.000 $10.000 $8.000 $9.260 $18.920
132 6004 EMBANKMENT (FINAL)(DENS CONT)(TY B) CY 31,561.000 $14.000 $10.000 $15.000 $12.400 $17.470 $39.720
134 6004 BACKFILL (TY A OR B) STA 473.000 $195.000 $220.000 $200.000 $360.000 $377.910 $244.550
161 6017 COMPOST MANUF TOPSOIL (4") SY 149,369.000 $0.900 $0.960 $1.600 $1.400 $1.390 $1.640
164 6004 BROADCAST SEED (PERM) (RURAL) (CLAY) AC 31.000 $583.000 $476.000 $510.000 $444.000 $432.640 $656.860
164 6010 BROADCAST SEED (TEMP) (WARM) AC 16.000 $350.000 $442.000 $270.000 $410.000 $401.400 $427.960
164 6012 BROADCAST SEED (TEMP) (COOL) AC 16.000 $350.000 $442.000 $300.000 $410.000 $401.400 $458.530
168 6001 VEGETATIVE WATERING MG 5,228.000 $26.000 $15.000 $10.000 $20.000 $27.160 $24.450
247 6041 FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS) CY 24,790.000 $60.000 $34.500 $63.000 $37.000 $44.710 $48.710
275 6001 CEMENT TON 2,333.000 $169.000 $151.500 $155.000 $125.000 $160.270 $220.090
275 6014 CEMENT TREAT (MX EXST MTL & NW BS)(8") SY 167,894.000 $2.000 $2.500 $3.800 $3.000 $8.870 $6.430
310 6009 PRIME COAT (MC-30) GAL 845.000 $5.000 $5.000 $10.000 $4.250 $4.000 $4.890
310 6012 PRIME COAT (RC-250) GAL 33,580.000 $5.000 $4.100 $4.200 $1.100 $1.000 $1.220
316 6016 ASPH (AC-20XP) GAL 1,606.000 $5.000 $5.000 $9.000 $4.250 $4.000 $4.890
316 6167 AGGR(TY-A GR-4 SAC-B) CY 41.000 $88.000 $115.000 $1,200.000 $130.000 $120.000 $146.730
316 6177 AGGR(TY-B GR-5 SAC-B) CY 1,400.000 $75.000 $82.000 $140.000 $98.000 $90.000 $110.050
354 6019 PLAN & TEXT CONC PAV(0" TO 4") SY 110,521.000 $6.000 $1.900 $2.500 $1.300 $0.010 $2.450
400 6008 CUT & RESTORE ASPH PAVING SY 661.000 $136.000 $75.000 $130.000 $102.000 $86.960 $97.820
403 6001 TEMPORARY SPL SHORING SF 8,128.000 $9.000 $24.000 $53.000 $48.000 $13.040 $51.190
432 6001 RIPRAP (CONC)(4 IN) CY 12.000 $558.000 $660.000 $480.000 $620.000 $451.620 $733.650
432 6016 RIPRAP (STONE TY R)(DRY)(12 IN) CY 11.000 $332.000 $150.000 $160.000 $250.000 $209.470 $427.960
432 6018 RIPRAP (STONE TYPE R)(DRY)(24") CY 9.000 $166.000 $150.000 $370.000 $230.000 $289.700 $427.960
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 167.000 $479.000 $580.000 $580.000 $620.000 $457.030 $489.100
450 6018 RAIL (TY T631) LF 75.000 $95.000 $88.000 $62.000 $64.000 $80.000 $244.550
462 6007 CONC BOX CULV (5 FT X 3 FT) LF 302.000 $315.000 $380.000 $530.000 $365.000 $357.590 $644.190
462 6012 CONC BOX CULV (6 FT X 5 FT) LF 60.000 $520.000 $595.000 $740.000 $475.000 $528.140 $1,000.460
462 6021 CONC BOX CULV (8 FT X 6 FT) LF 57.000 $692.000 $790.000 $900.000 $1,070.000 $726.470 $1,435.440
462 6056 CONC BOX CULV (6 FT X 5 FT)(EXTEND) LF 22.000 $725.000 $715.000 $800.000 $825.000 $860.310 $1,222.750
462 6065 CONC BOX CULV (8 FT X 6 FT)(EXTEND) LF 8.000 $1,016.000 $1,350.000 $900.000 $2,600.000 $1,482.440 $1,528.440
462 6093 CONC BOX CULV (5 FT X 6 FT) (EXTEND) LF 24.000 $752.000 $750.000 $800.000 $1,050.000 $583.610 $1,222.750
464 6003 RC PIPE (CL III)(18 IN) LF 680.000 $66.000 $65.000 $53.000 $67.000 $103.370 $89.070
464 6005 RC PIPE (CL III)(24 IN) LF 51.000 $85.000 $76.000 $130.000 $102.000 $142.760 $132.570
464 6007 RC PIPE (CL III)(30 IN) LF 253.000 $120.000 $100.000 $160.000 $145.000 $162.150 $180.210
464 6008 RC PIPE (CL III)(36 IN) LF 126.000 $121.000 $140.000 $180.000 $175.000 $229.270 $260.990
464 6009 RC PIPE (CL III)(42 IN) LF 164.000 $132.000 $200.000 $200.000 $230.000 $334.840 $362.480
464 6010 RC PIPE (CL III)(48 IN) LF 36.000 $165.000 $300.000 $240.000 $415.000 $458.900 $441.190
466 6095 HEADWALL (CH - PW - 0) (DIA= 18 IN) EA 6.000 $1,900.000 $3,575.000 $3,700.000 $4,000.000 $3,250.000 $3,876.110
466 6097 HEADWALL (CH - PW - 0) (DIA= 24 IN) EA 4.000 $3,200.000 $3,960.000 $4,800.000 $5,000.000 $4,200.000 $5,412.030
466 6101 HEADWALL (CH - PW - 0) (DIA= 36 IN) EA 8.000 $4,000.000 $8,250.000 $7,400.000 $8,500.000 $7,800.000 $7,248.020
466 6102 HEADWALL (CH - PW - 0) (DIA= 42 IN) EA 10.000 $9,041.000 $10,450.000 $9,000.000 $12,000.000 $9,800.000 $9,093.560
466 6103 HEADWALL (CH - PW - 0) (DIA= 48 IN) EA 8.000 $10,500.000 $13,200.000 $11,000.000 $15,000.000 $12,000.000 $11,554.970
466 6105 HEADWALL (CH - PW - 0) (DIA= 60 IN) EA 2.000 $16,000.000 $18,700.000 $16,000.000 $22,500.000 $16,500.000 $16,775.350
466 6179 WINGWALL (PW - 1) (HW=4 FT) EA 4.000 $6,000.000 $11,825.000 $13,000.000 $13,000.000 $11,000.000 $11,662.380
466 6181 WINGWALL (PW - 1) (HW=6 FT) EA 2.000 $12,000.000 $20,350.000 $20,000.000 $20,000.000 $19,000.000 $16,339.990
466 6182 WINGWALL (PW - 1) (HW=7 FT) EA 4.000 $17,000.000 $33,000.000 $22,000.000 $26,000.000 $30,500.000 $24,290.400
467 6358 SET (TY II) (18 IN) (RCP) (4: 1) (C) EA 2.000 $630.000 $750.000 $850.000 $1,000.000 $600.000 $1,224.280
467 6363 SET (TY II) (18 IN) (RCP) (6: 1) (P) EA 56.000 $857.000 $800.000 $900.000 $1,200.000 $700.000 $1,389.350
467 6390 SET (TY II) (24 IN) (RCP) (4: 1) (C) EA 4.000 $1,188.000 $900.000 $950.000 $1,300.000 $700.000 $1,691.980
467 6395 SET (TY II) (24 IN) (RCP) (6: 1) (P) EA 4.000 $1,840.000 $1,150.000 $1,000.000 $1,500.000 $1,000.000 $2,255.970
467 6419 SET (TY II) (30 IN) (RCP) (4: 1) (C) EA 8.000 $4,200.000 $1,400.000 $2,200.000 $2,300.000 $1,125.000 $2,696.160
467 6423 SET (TY II) (30 IN) (RCP) (6: 1) (P) EA 2.000 $2,175.000 $1,700.000 $2,600.000 $3,000.000 $1,800.000 $3,604.050
467 6450 SET (TY II) (36 IN) (RCP) (4: 1) (C) EA 2.000 $2,782.000 $2,000.000 $3,200.000 $3,200.000 $3,500.000 $3,521.520
467 6461 SET (TY II) (42 IN) (RCP) (3: 1) (C) EA 4.000 $3,294.000 $3,050.000 $4,300.000 $6,500.000 $4,100.000 $7,111.810
496 6004 REMOV STR (SET) EA 9.000 $470.000 $350.000 $580.000 $750.000 $913.850 $653.120
496 6005 REMOV STR (WINGWALL) EA 15.000 $1,685.000 $1,000.000 $1,300.000 $3,265.000 $1,061.120 $1,589.730
496 6006 REMOV STR (HEADWALL) EA 6.000 $1,120.000 $1,000.000 $1,300.000 $3,265.000 $658.680 $1,527.770
496 6007 REMOV STR (PIPE) LF 1,184.000 $26.000 $13.000 $26.000 $34.000 $19.030 $21.930
500 6001 MOBILIZATION LS 1.000 $1,136,000.000 $750,000.000 $930,000.000 $1,138,000.000 $1,200,000.000 $1,565,118.130
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 13.000 $6,000.000 $14,000.000 $10,000.000 $16,000.000 $8,085.330 $24,454.970
506 6002 ROCK FILTER DAMS (INSTALL) (TY 2) LF 2,720.000 $31.000 $32.200 $26.000 $31.000 $29.250 $37.660
506 6011 ROCK FILTER DAMS (REMOVE) LF 2,720.000 $11.000 $9.250 $5.000 $18.000 $8.370 $10.370
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 7,275.000 $3.000 $2.850 $2.400 $2.100 $2.550 $2.710
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 7,275.000 $0.600 $0.560 $0.650 $1.000 $0.510 $0.840
506 6042 BIODEG EROSN CONT LOGS (INSTL) (18") LF 520.000 $6.000 $6.700 $5.200 $4.600 $6.040 $6.210
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 520.000 $1.100 $0.560 $1.000 $2.000 $0.510 $1.670
510 6003 ONE-WAY TRAF CONT (PORT TRAF SIG) MO 2.000 $6,300.000 $6,500.000 $4,500.000 $15,000.000 $12,961.130 $12,227.490
512 6029 PORT CTB (MOVE)(F-SHAPE)(TY 1) LF 33,000.000 $8.000 $5.050 $1.300 $4.000 $6.480 $6.510
512 6067 PTB (FRN&INSTL)(F SHAPE)(TY 1) OR (STL) LF 660.000 $62.000 $65.000 $58.000 $48.000 $16.110 $36.680
530 6002 INTERSECTIONS (ACP) SY 1,706.000 $30.000 $31.000 $25.000 $15.000 $24.490 $41.570
530 6004 DRIVEWAYS (CONC) SY 113.000 $95.000 $85.000 $110.000 $72.000 $63.400 $85.920
530 6005 DRIVEWAYS (ACP) SY 646.000 $30.000 $38.000 $29.000 $18.000 $49.050 $40.350
530 6008 TURNOUTS (ACP) SY 487.000 $30.000 $27.500 $42.000 $22.000 $51.090 $42.800
530 6016 DRIVEWAYS (BASE) SY 4,225.000 $21.000 $14.600 $13.000 $8.800 $43.050 $23.130
533 6001 RUMBLE STRIPS (SHOULDER) LF 94,529.000 $0.200 $0.090 $0.150 $0.160 $0.080 $0.180
533 6002 RUMBLE STRIPS (CENTERLINE) LF 47,333.000 $0.200 $0.090 $0.150 $0.140 $0.080 $0.150
540 6001 MTL W-BEAM GD FEN (TIM POST) LF 1,645.000 $30.000 $21.450 $19.000 $18.250 $19.500 $23.740
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 20.000 $2,700.000 $2,530.000 $2,700.000 $2,625.000 $2,300.000 $3,008.700
545 6003 CRASH CUSH ATTEN (MOVE & RESET) EA 100.000 $1,790.000 $1,700.000 $750.000 $725.000 $1,255.000 $1,650.710
545 6005 CRASH CUSH ATTEN (REMOVE) EA 2.000 $2,036.000 $1,325.000 $1,500.000 $725.000 $1,920.000 $733.650
545 6019 CRASH CUSH ATTEN (INSTL)(S)(N)(TL3) EA 2.000 $10,000.000 $8,700.000 $16,000.000 $7,600.000 $6,775.000 $9,048.340
560 6011 MAILBOX INSTALL-S (TWW-POST) TY 4 EA 31.000 $289.000 $302.500 $370.000 $325.000 $225.000 $264.290
560 6012 MAILBOX INSTALL-D (TWW-POST) TY 4 EA 6.000 $374.000 $360.000 $410.000 $350.000 $235.000 $349.420
644 6001 IN SM RD SN SUP&AM TY10BWG(1)SA(P) EA 30.000 $465.000 $550.000 $840.000 $540.000 $475.000 $584.090
644 6004 IN SM RD SN SUP&AM TY10BWG(1)SA(T) EA 2.000 $588.000 $660.000 $1,000.000 $685.000 $575.000 $817.190
644 6030 IN SM RD SN SUP&AM TYS80(1)SA(T) EA 13.000 $575.000 $660.000 $1,100.000 $760.000 $800.000 $878.030
658 6048 INSTL OM ASSM (OM-2Z)(FLX)GND EA 66.000 $60.000 $77.000 $72.000 $67.000 $45.000 $94.050
662 6075 WK ZN PAV MRK REMOV (W)24"(SLD) LF 258.000 $9.000 $11.000 $28.000 $11.000 $10.000 $15.710
662 6095 WK ZN PAV MRK REMOV (Y)4"(SLD) LF 47,520.000 $0.800 $1.100 $0.900 $1.050 $1.000 $0.830
662 6110 WK ZN PAV MRK SHT TERM (TAB)TY Y EA 2,363.000 $2.000 $2.000 $0.500 $1.600 $1.180 $1.300
666 6009 REFL PAV MRK TY I (W)4"(LNDP)(100MIL) LF 94,342.000 $1.000 $0.170 $0.350 $0.170 $0.150 $1.080
666 6048 REFL PAV MRK TY I (W)24"(SLD)(100MIL) LF 57.000 $7.000 $6.600 $13.000 $6.250 $6.000 $7.070
666 6312 RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL) LF 6,786.000 $0.400 $0.500 $0.380 $0.500 $0.450 $0.340
666 6315 RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL) LF 62,847.000 $0.400 $0.500 $0.380 $0.500 $0.450 $0.340
672 6009 REFL PAV MRKR TY II-A-A EA 1,182.000 $4.000 $3.600 $5.000 $3.500 $3.250 $3.210
3076 6017 D-GR HMA TY-C SAC-B PG64-22 TON 19,308.000 $72.000 $86.500 $72.000 $78.000 $74.000 $90.480
3076 6066 TACK COAT GAL 24,908.000 $5.000 $0.010 $1.000 $0.010 $0.010 $0.010
3077 6027 SP MIXES SP-C SAC-A PG70-28 TON 14,482.000 $110.000 $111.000 $100.000 $108.000 $103.000 $125.940
3077 6075 TACK COAT GAL 42,251.000 $5.000 $0.010 $1.000 $0.010 $0.010 $0.010
6001 6002 PORTABLE CHANGEABLE MESSAGE SIGN EA 2.000 $10,000.000 $12,000.000 $7,500.000 $17,500.000 $10,774.190 $9,170.610
6185 6002 TMA (STATIONARY) DAY 220.000 $201.000 $205.000 $275.000 $225.000 $163.770 $305.690
6185 6003 TMA (MOBILE OPERATION) HR 152.000 $33.000 $22.000 $65.000 $128.000 $53.040 $427.960
Totals: $11,463,173.70 $9,896,354.05 $11,121,873.89 $11,398,378.34 $12,099,484.47 $15,733,265.94