ERATH SH 108 (0343-03-028)

Items: 125

County: ERATH
Length: N/A
Highway: SH 108
District: FORT WORTH
Control Number: 0343-03-028
DBE Goal: N/A
Project: STP 2018(571)
Guaranty: N/A
Time: 320 WORKING DAYS
Engineer's Estimate: $8,994,686.75
Date: 03/06/2018 (8 years ago)
Contract Number: N/A
Type: GR, BS, DR, SC, PAVMT MARK
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$8,994,686.75
Over/Under Est: -33.99% -$3,057,472.05
Over/Under Est: -8.91% -$801,698.90
Amt Left: 37.99% $2,255,773.15
Over/Under Est: -7.79% -$700,957.63
Amt Left: 39.69% $2,356,514.42
Delta: -1.23% -$100,741.27
Over/Under Est: -3.97% -$357,277.51
Amt Left: 45.48% $2,700,194.54
Delta: -4.14% -$343,680.12

Bid Items & Bid Tabulations

125 Total 0 of 125
ERATH  |  SH 108  |  FORT WORTH  |  0343-03-028  |  03/06/2018  |  $8,994,686.75  |  STP 2018(571)  |  GR, BS, DR, SC, PAVMT MARK  |  320 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
JAY MILLS CONTRACTING, INCORPORATED
NOBLES ROAD CONSTRUCTION, INC.
KNIFE RIVER CORPORATION - SOUTH
JOHNSON BROS. CORPORATION, A SOUTHLAND COMPANY
PREPARING ROW
STA 667.300 $1,000.000 $180.000 $138.500 $400.000 $700.000
REMOVING STAB BASE & ASPH PAV (8"-14")
SY 2,237.000 $4.000 $1.500 $7.210 $2.000 $4.450
REMOVING STAB BASE & ASPH PAV (0-6")
SY 7,073.000 $7.000 $0.400 $9.360 $4.950 $2.000
EXCAVATION (ROADWAY)
CY 879.000 $12.000 $11.500 $24.700 $10.000 $5.000
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 40,596.000 $9.000 $6.350 $4.300 $7.500 $5.000
COMPOST MANUF TOPSOIL (4")
SY 141,466.000 $1.150 $0.820 $0.830 $0.810 $1.100
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
SY 141,466.000 $0.350 $0.260 $0.240 $0.230 $0.250
CELL FBR MLCH SEED(TEMP)(WARM)
SY 70,733.000 $0.300 $0.220 $0.290 $0.280 $0.300
CELL FBR MLCH SEED(TEMP)(COOL)
SY 70,733.000 $0.300 $0.220 $0.300 $0.290 $0.300
VEGETATIVE WATERING
MG 11,691.000 $15.000 $0.010 $19.570 $1.000 $25.000
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 595.000 $55.000 $32.500 $70.200 $55.000 $44.000
CEMENT
TON 16.000 $200.000 $137.500 $267.000 $300.000 $125.000
CEMENT TREAT (NEW BASE)(36")
SY 320.000 $5.000 $35.850 $35.350 $27.000 $130.000
ASPH (AC-20XP)
GAL 70,511.000 $3.500 $3.000 $2.800 $2.700 $3.000
AGGR(TY-PB GR-4 SAC-B)
CY 1,885.000 $75.000 $75.750 $76.270 $95.000 $80.000
D-GR HMA(SQ) TY-D PG64-22
TON 80.000 $150.000 $142.000 $197.000 $200.000 $90.000
D-GR HMA TY-B PG64-22
TON 25,158.000 $80.000 $66.000 $87.000 $76.500 $70.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 3,000.000 $50.000 $40.800 $36.500 $49.000 $40.000
CUT & RESTORE ASPH PAVING
SY 196.000 $75.000 $23.000 $56.100 $100.000 $65.000
CUT AND RESTORE PAV (FLEX BASE)
SY 481.000 $103.000 $7.000 $28.330 $16.000 $35.000
TRENCH EXCAVATION PROTECTION
LF 76.000 $5.000 $2.000 $25.750 $7.500 $1.000
TEMPORARY SPL SHORING
SF 18,908.000 $20.000 $0.010 $13.550 $13.000 $15.000
DRILL SHAFT (30 IN)
LF 219.000 $250.000 $130.000 $199.820 $140.000 $150.000
DRILL SHAFT (36 IN)
LF 440.000 $250.000 $180.000 $175.100 $200.000 $155.000
CL C CONC (ABUT)(HPC)
CY 68.000 $1,500.000 $725.000 $1,596.500 $1,500.000 $850.000
CL C CONC (CAP)(HPC)
CY 32.000 $1,800.000 $800.000 $2,111.500 $2,500.000 $1,500.000
CL C CONC (COLUMN)
CY 8.300 $860.000 $800.000 $1,236.000 $2,000.000 $1,400.000
APPROACH SLAB
CY 68.000 $700.000 $400.000 $566.000 $480.000 $400.000
PRESTR CONC DECK SLAB BEAM (6DS23)
LF 458.720 $350.000 $345.000 $718.810 $400.000 $300.000
PRESTR CONC DECK SLAB BEAM (8DS23)
LF 229.360 $350.000 $345.000 $974.190 $400.000 $260.000
RIPRAP (CONC)(5 IN)
CY 24.000 $450.000 $375.000 $463.500 $375.000 $550.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 79.000 $150.000 $75.000 $87.550 $125.000 $100.000
RIPRAP (MOW STRIP)(4 IN)
CY 257.000 $450.000 $400.000 $463.550 $400.000 $500.000
RAIL (TY T631)
LF 230.000 $100.000 $82.500 $87.550 $75.000 $92.000
CMP (GAL STL 18 IN)
LF 523.000 $56.000 $32.000 $46.350 $28.000 $59.000
CMP (GAL STL 24 IN)
LF 61.000 $66.000 $36.000 $61.800 $68.000 $73.000
CMP (GAL STL 30 IN)
LF 42.000 $75.000 $44.000 $82.400 $98.000 $97.000
CMP (GAL STL 36 IN)
LF 22.000 $110.000 $50.500 $133.900 $133.000 $120.000
CONC BOX CULV (4 FT X 2 FT)
LF 34.000 $250.000 $185.000 $257.500 $430.000 $300.000
CONC BOX CULV (10 FT X 8 FT)
LF 114.000 $1,000.000 $605.000 $566.500 $1,080.000 $440.000
CONC BOX CULV (12 FT X 10 FT)
LF 76.000 $1,100.000 $740.000 $1,545.000 $1,500.000 $2,600.000
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
LF 8.000 $850.000 $330.000 $412.000 $430.000 $590.000
CONC BOX CULV (3 FT X 3 FT)(EXTEND)
LF 17.000 $500.000 $330.000 $463.500 $570.000 $560.000
CONC BOX CULV (4 FT X 2 FT)(EXTEND)
LF 8.000 $900.000 $396.000 $577.500 $500.000 $720.000
CONC BOX CULV (4 FT X 3 FT)(EXTEND)
LF 35.000 $500.000 $522.500 $557.500 $630.000 $620.000
CONC BOX CULV (5 FT X 3 FT)(EXTEND)
LF 65.000 $635.000 $528.000 $618.000 $530.000 $710.000
CONC BOX CULV (5 FT X 5 FT)(EXTEND)
LF 22.000 $550.000 $385.000 $515.000 $540.000 $769.000
CONC BOX CULV (6 FT X 3 FT)(EXTEND)
LF 18.000 $630.000 $357.500 $618.000 $560.000 $828.000
CONC BOX CULV (6 FT X 5 FT)(EXTEND)
LF 24.000 $640.000 $685.000 $700.400 $590.000 $562.000
CONC BOX CULV (6 FT X 6 FT)(EXTEND)
LF 17.000 $650.000 $440.000 $721.000 $650.000 $836.000
CONC BOX CULV (7 FT X 3 FT)(EXTEND)
LF 10.000 $560.000 $390.500 $824.000 $650.000 $892.000
CONC BOX CULV (7 FT X 7 FT)(EXTEND)
LF 11.000 $805.000 $533.500 $978.000 $700.000 $948.000
CONC BOX CULV (8 FT X 8 FT)(EXTEND)
LF 12.000 $970.000 $605.000 $1,030.000 $940.000 $1,000.000
CONC BOX CULV (9 FT X 9 FT)(EXTEND)
LF 10.000 $1,000.000 $682.000 $1,339.000 $910.000 $1,059.000
CONC BOX CULV (5 FT X 6 FT) (EXTEND)
LF 37.000 $700.000 $440.000 $618.000 $540.000 $753.000
RC PIPE (CL III)(18 IN)
LF 22.000 $52.000 $60.000 $72.100 $90.000 $73.000
WINGWALL (FW - S) (HW=5 FT)
EA 1.000 $10,700.000 $5,500.000 $11,383.500 $6,900.000 $6,500.000
WINGWALL (FW - S) (HW=6 FT)
EA 2.000 $11,000.000 $8,607.500 $11,330.000 $7,900.000 $9,000.000
WINGWALL (PW - 1) (HW=10 FT)
EA 1.000 $27,000.000 $44,000.000 $30,900.000 $25,000.000 $43,000.000
WINGWALL (PW - 1) (HW=11 FT)
EA 6.000 $33,000.000 $45,100.000 $32,960.000 $30,000.000 $43,000.000
WINGWALL (PW - 1) (HW=12 FT)
EA 1.000 $36,000.000 $55,000.000 $39,140.000 $39,000.000 $53,000.000
WINGWALL (PW - 1) (HW=5 FT)
EA 1.000 $11,000.000 $11,687.500 $10,300.000 $9,700.000 $11,700.000
WINGWALL (PW - 1) (HW=7 FT)
EA 4.000 $18,500.000 $19,937.500 $18,540.000 $15,000.000 $19,000.000
WINGWALL (PW - 1) (HW=8 FT)
EA 6.000 $22,000.000 $21,450.000 $20,600.000 $16,000.000 $21,000.000
WINGWALL (PW - 1) (HW=9 FT)
EA 1.000 $33,500.000 $28,875.000 $25,750.000 $18,000.000 $28,000.000
SET (TY I)(S=3 FT)(HW=3FT)(4:1)(C)
EA 2.000 $4,700.000 $1,430.000 $5,307.000 $7,300.000 $1,500.000
SET (TY I)(S=3 FT)(HW= 4 FT)(4:1)(C)
EA 2.000 $5,600.000 $5,005.000 $5,411.000 $7,700.000 $5,300.000
SET (TY I)(S= 4 FT)(HW= 3 FT)(4:1) (C)
EA 4.000 $5,360.000 $1,622.500 $5,522.000 $8,200.000 $2,500.000
SET (TY I)(S= 4 FT)(HW= 4 FT)(4:1) (C)
EA 8.000 $5,500.000 $4,180.000 $5,738.000 $9,400.000 $5,000.000
SET (TY I)(S= 5 FT)(HW= 4 FT)(4:1) (C)
EA 3.000 $5,650.000 $6,875.000 $6,576.000 $13,000.000 $6,470.000
SET (TY I)(S= 5 FT)(HW= 5 FT)(4:1) (C)
EA 3.000 $4,300.000 $6,875.000 $7,006.000 $11,000.000 $6,600.000
SET (TY I)(S= 5 FT)(HW= 6 FT)(4:1) (C)
EA 2.000 $6,800.000 $7,810.000 $8,277.000 $12,000.000 $7,800.000
SET (TY I)(S= 5 FT)(HW= 7 FT)(4:1) (C)
EA 2.000 $8,500.000 $5,830.000 $8,288.000 $10,900.000 $8,300.000
SET (TY I)(S= 6 FT)(HW= 4 FT)(4:1) (C)
EA 4.000 $5,700.000 $3,630.000 $7,723.000 $8,700.000 $5,000.000
SET (TY I)(S= 7 FT)(HW= 4 FT)(4:1) (C)
EA 1.000 $5,000.000 $3,575.000 $6,116.000 $8,600.000 $5,000.000
SET (TY I)(S= 7 FT)(HW= 5 FT)(4:1) (C)
EA 1.000 $5,100.000 $4,290.000 $7,824.000 $9,100.000 $5,500.000
SET (TY II) (18 IN) (CMP) (4: 1) (C)
EA 2.000 $950.000 $735.000 $824.000 $1,000.000 $1,000.000
SET (TY II) (18 IN) (CMP) (4: 1) (P)
EA 32.000 $800.000 $735.000 $824.000 $1,000.000 $1,000.000
SET (TY II) (18 IN) (RCP) (4: 1) (P)
EA 2.000 $950.000 $675.000 $824.000 $925.000 $1,000.000
SET (TY II) (24 IN) (CMP) (3: 1) (C)
EA 1.000 $1,000.000 $700.000 $1,236.000 $950.000 $1,100.000
SET (TY II) (24 IN) (CMP) (4: 1) (C)
EA 13.000 $1,300.000 $730.000 $1,236.000 $1,000.000 $1,100.000
SET (TY II) (30 IN) (CMP) (4: 1) (C)
EA 6.000 $1,500.000 $1,030.000 $1,442.000 $1,575.000 $1,500.000
SET (TY II) (36 IN) (CMP) (4: 1) (C)
EA 6.000 $2,400.000 $1,130.000 $2,369.000 $1,650.000 $2,300.000
REMOV STR (HEADWALL)
EA 81.000 $2,000.000 $610.000 $824.000 $640.000 $1,325.000
REMOV STR (PIPE)
LF 537.000 $14.000 $13.000 $10.300 $10.000 $18.000
REMOV STR (BOX CULVERT)
LF 198.000 $70.000 $55.500 $51.500 $64.000 $60.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 1.000 $46,000.000 $27,500.000 $82,400.000 $75,000.000 $29,000.000
MOBILIZATION
LS 1.000 $800,000.000 $350,000.000 $640,000.000 $825,000.000 $750,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 20.000 $5,000.000 $2,150.000 $7,725.000 $3,200.000 $8,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 3,310.000 $25.000 $25.850 $30.900 $33.000 $35.000
ROCK FILTER DAMS (REMOVE)
LF 3,310.000 $10.000 $5.500 $8.250 $9.000 $10.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 1,776.000 $25.000 $24.000 $15.450 $15.000 $32.000
CONSTRUCTION EXITS (REMOVE)
SY 1,776.000 $8.000 $8.600 $4.150 $5.000 $11.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,798.000 $3.000 $3.200 $3.500 $8.000 $6.300
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,798.000 $1.000 $0.580 $0.500 $1.450 $1.590
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 2,000.000 $7.000 $5.000 $5.150 $15.000 $14.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 2,000.000 $1.000 $0.800 $1.000 $1.450 $1.600
CONSTRUCTING DETOURS
SY 235.000 $80.000 $40.000 $32.000 $70.000 $60.000
ONE-WAY TRAF CONT (PILOT CAR)
HR 1,600.000 $65.000 $75.000 $95.000 $150.000 $150.000
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 75.000 $4,000.000 $0.010 $2,000.000 $3,500.000 $3,250.000
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 1,840.000 $72.000 $57.000 $35.140 $83.000 $52.000
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 240.000 $70.000 $57.000 $45.000 $76.000 $59.000
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 1,012.000 $8.000 $9.250 $10.100 $25.000 $12.000
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 188.000 $8.000 $9.250 $10.100 $25.000 $9.500
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 1,840.000 $10.000 $6.000 $14.000 $25.000 $9.100
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 240.000 $5.000 $6.000 $14.000 $25.000 $15.000
DRIVEWAYS (ACP)
SY 437.000 $40.000 $33.000 $30.250 $40.000 $55.000
DRIVEWAYS (SURF TREAT)
SY 8,979.000 $20.000 $13.000 $18.050 $20.000 $37.000
TURNOUTS (SURF TREAT)
SY 712.000 $20.000 $13.000 $18.050 $40.000 $40.000
MTL W-BEAM GD FEN (TIM POST)
LF 3,275.000 $20.000 $19.800 $20.000 $22.000 $22.200
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 6.000 $1,000.000 $1,045.000 $1,000.000 $1,000.000 $1,170.000
REMOVE METAL BEAM GUARD FENCE
LF 870.000 $4.000 $3.030 $2.000 $3.000 $3.400
GUARDRAIL END TREATMENT (INSTALL)
EA 40.000 $2,200.000 $2,447.500 $2,050.000 $2,350.000 $2,745.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $250.000 $220.000 $180.000 $220.000 $247.000
MAILBOX INSTALL-S (RR-POST) TY 4
EA 27.000 $250.000 $247.500 $350.000 $235.000 $278.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 84.000 $200.000 $412.500 $246.000 $400.000 $462.000
REMOVE SM RD SN SUP&AM
EA 1.000 $100.000 $140.880 $82.000 $100.000 $93.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
EA 133.000 $18.000 $22.000 $25.000 $22.000 $25.000
INSTL OM ASSM (OM-2Z)(FLX)GND(BI)
EA 60.000 $72.000 $44.000 $40.000 $44.000 $50.000
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 2,690.000 $0.400 $0.360 $0.260 $0.350 $0.410
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 39,548.000 $0.300 $0.360 $0.260 $0.350 $0.410
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 77,174.000 $0.150 $0.330 $0.330 $0.330 $0.380
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
LF 133,453.000 $0.150 $0.610 $0.750 $0.600 $0.690
REFL PAV MRKR TY II-A-A
EA 1,332.000 $5.000 $3.080 $5.200 $3.000 $3.550
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,000.000 $10,450.000 $10,300.000 $25,000.000 $16,100.000
Totals: $8,994,686.750 $5,937,214.700 $8,192,987.862 $8,293,729.120 $8,637,409.240