PREPARING ROW
|
STA
|
393.000
|
$1,000.000
|
$300.000
|
$450.000
|
$600.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
2,838.000
|
$17.070
|
$11.000
|
$12.000
|
$20.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (2"-6")
|
SY
|
106,432.000
|
$4.690
|
$1.790
|
$3.500
|
$5.900
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
2,911.000
|
$10.000
|
$10.000
|
$10.000
|
$9.500
|
|
|
SUBGRADE WIDENING (ORD COMP)
|
STA
|
393.000
|
$281.140
|
$300.000
|
$200.000
|
$200.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
1,667.000
|
$7.310
|
$15.000
|
$15.000
|
$25.000
|
|
|
BACKFILL (TY A OR B)
|
STA
|
393.000
|
$140.260
|
$80.000
|
$170.000
|
$200.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
266,332.000
|
$1.150
|
$0.650
|
$0.800
|
$0.940
|
|
|
BLOCK SODDING
|
SY
|
247.000
|
$2.960
|
$5.250
|
$6.000
|
$9.660
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
266,332.000
|
$0.150
|
$0.120
|
$0.110
|
$0.520
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
266,332.000
|
$0.130
|
$0.080
|
$0.110
|
$0.100
|
|
|
VEGETATIVE WATERING
|
MG
|
49,140.000
|
$6.340
|
$0.010
|
$1.000
|
$1.490
|
|
|
FL BS (CMP IN PLC)(TY D GR 1-2) (6")
|
SY
|
72,458.000
|
$7.000
|
$8.000
|
$9.000
|
$10.000
|
|
|
FL BS (RDWY DEL) (TY D GR 1-2)
|
TON
|
809.000
|
$23.910
|
$27.000
|
$39.000
|
$30.000
|
|
|
FL BS (CMP IN PLC)(TY D GR1-2)(12")
|
SY
|
54,671.000
|
$15.000
|
$15.000
|
$18.000
|
$20.000
|
|
|
REWORK BS MTL (TY B) (6") (ORD COMP)
|
SY
|
54,756.000
|
$1.370
|
$1.750
|
$3.000
|
$3.500
|
|
|
LIME (HYDRATED OR COMMERCIAL)(SLURRY)
|
TON
|
1,270.000
|
$150.000
|
$155.000
|
$182.000
|
$200.000
|
|
|
LIME TRT (SUBGRADE)(6")
|
SY
|
84,623.000
|
$3.500
|
$2.000
|
$4.000
|
$2.980
|
|
|
CEMENT
|
TON
|
437.000
|
$124.500
|
$135.000
|
$165.000
|
$230.000
|
|
|
CEMENT TREAT (MX EXST MTL & NW BS) (6")
|
SY
|
74,667.000
|
$2.010
|
$1.500
|
$3.000
|
$1.320
|
|
|
EMULS ASPH (PRIME)(MS-2 OR SS-1)
|
GAL
|
25,465.000
|
$3.920
|
$2.500
|
$2.500
|
$4.860
|
|
|
ASPH (MULTI OPTION)
|
GAL
|
56,022.000
|
$3.000
|
$3.600
|
$3.000
|
$4.200
|
|
|
AGGR(TY-B GR-4 SAC-B)
|
CY
|
1,062.000
|
$75.000
|
$115.000
|
$110.000
|
$131.250
|
|
|
SUPERPAVE MIXTURES SP-D SAC-B PG70-22
|
TON
|
14,010.000
|
$80.000
|
$72.000
|
$78.000
|
$86.000
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
52.000
|
$94.580
|
$750.000
|
$105.000
|
$267.860
|
|
|
FLOWABLE BACKFILL
|
CY
|
18.000
|
$107.410
|
$185.000
|
$300.000
|
$201.120
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
69.000
|
$10.000
|
$11.460
|
$20.000
|
$35.470
|
|
|
TEMPORARY SPL SHORING
|
SF
|
2,392.000
|
$20.000
|
$18.760
|
$35.000
|
$30.310
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
1.000
|
$350.580
|
$1,500.000
|
$1,200.000
|
$1,500.000
|
|
|
RIPRAP (STONE COMMON)(GROUT)(8 IN)
|
CY
|
390.000
|
$150.000
|
$257.000
|
$150.000
|
$250.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
40.000
|
$416.970
|
$437.000
|
$500.000
|
$725.000
|
|
|
CMP (GAL STL 12 IN)
|
LF
|
394.000
|
$35.340
|
$33.340
|
$41.000
|
$71.330
|
|
|
CMP (GAL STL 18 IN)
|
LF
|
1,094.000
|
$50.430
|
$39.600
|
$43.000
|
$77.940
|
|
|
CMP (GAL STL 24 IN)
|
LF
|
515.000
|
$59.740
|
$44.810
|
$50.000
|
$80.420
|
|
|
CMP (GAL STL 30 IN)
|
LF
|
62.000
|
$63.250
|
$50.020
|
$75.000
|
$90.820
|
|
|
CMP (GAL STL 48 IN)
|
LF
|
60.000
|
$102.210
|
$66.690
|
$95.000
|
$127.700
|
|
|
CMP (GAL STL 15 IN)
|
LF
|
187.000
|
$42.390
|
$36.470
|
$48.000
|
$72.900
|
|
|
CONC BOX CULV (5 FT X 3 FT)
|
LF
|
118.000
|
$500.000
|
$236.000
|
$330.000
|
$350.000
|
|
|
CONC BOX CULV (5 FT X 4 FT)
|
LF
|
120.000
|
$500.000
|
$263.000
|
$440.000
|
$375.000
|
|
|
CONC BOX CULV (10 FT X 6 FT)
|
LF
|
108.000
|
$814.910
|
$859.000
|
$1,300.000
|
$950.000
|
|
|
CONC BOX CULV (4 FT X 2 FT)(EXTEND)
|
LF
|
8.000
|
$438.520
|
$760.000
|
$1,700.000
|
$1,900.000
|
|
|
CONC BOX CULV (5 FT X 2 FT)(EXTEND)
|
LF
|
4.000
|
$439.440
|
$1,845.000
|
$3,400.000
|
$2,000.000
|
|
|
CONC BOX CULV (6 FT X 3 FT)(EXTEND)
|
LF
|
18.000
|
$400.000
|
$880.000
|
$1,300.000
|
$650.000
|
|
|
CONC BOX CULV (8 FT X 8 FT)(EXTEND)
|
LF
|
39.000
|
$972.800
|
$563.000
|
$1,600.000
|
$1,400.000
|
|
|
CONC BOX CULV (10 FT X 8 FT)(EXTEND)
|
LF
|
48.000
|
$1,600.000
|
$735.000
|
$1,500.000
|
$1,500.000
|
|
|
RC PIPE (CL III)(12 IN)
|
LF
|
626.000
|
$48.730
|
$42.720
|
$47.000
|
$71.000
|
|
|
RC PIPE (CL III)(15 IN)
|
LF
|
263.000
|
$47.070
|
$45.850
|
$57.000
|
$72.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
2,192.000
|
$55.000
|
$50.020
|
$54.000
|
$75.000
|
|
|
RC PIPE (CL III)(21 IN)
|
LF
|
99.000
|
$63.080
|
$57.310
|
$70.000
|
$80.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
454.000
|
$71.150
|
$65.650
|
$80.000
|
$85.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
166.000
|
$109.790
|
$105.240
|
$115.000
|
$130.000
|
|
|
RC PIPE (CL III)(48 IN)
|
LF
|
45.000
|
$2,997.480
|
$172.970
|
$195.000
|
$175.000
|
|
|
RC PIPE (CL III)(54 IN)
|
LF
|
72.000
|
$4,093.000
|
$218.820
|
$240.000
|
$250.000
|
|
|
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
|
EA
|
1.000
|
$6,000.000
|
$4,456.000
|
$4,000.000
|
$5,000.000
|
|
|
INLET (COMPL)(PSL)(FG)(4FTX4FT-4FTX4FT)
|
EA
|
3.000
|
$25,744.000
|
$5,628.000
|
$5,300.000
|
$6,250.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 36 IN)
|
EA
|
1.000
|
$14,023.000
|
$7,838.000
|
$7,600.000
|
$10,000.000
|
|
|
WINGWALL (PW - 1) (HW=10 FT)
|
EA
|
3.000
|
$2,000.000
|
$29,176.000
|
$35,000.000
|
$45,000.000
|
|
|
WINGWALL (PW - 1) (HW=12 FT)
|
EA
|
2.000
|
$6,897.610
|
$43,764.000
|
$46,000.000
|
$60,000.000
|
|
|
WINGWALL (PW - 1) (HW=5 FT)
|
EA
|
2.000
|
$3,334.500
|
$7,943.000
|
$12,000.000
|
$10,000.000
|
|
|
WINGWALL (PW - 1) (HW=8 FT)
|
EA
|
2.000
|
$14,250.000
|
$18,065.000
|
$24,000.000
|
$22,500.000
|
|
|
WINGWALL (PW - 1) (HW=9 FT)
|
EA
|
1.000
|
$25,333.000
|
$25,770.000
|
$33,000.000
|
$30,000.000
|
|
|
SET (TY I) (24 IN) (4: 1) (C)
|
EA
|
1.000
|
$2,000.000
|
$1,063.000
|
$2,000.000
|
$9,886.830
|
|
|
SET (TY I)(S= 4 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
2.000
|
$6,897.600
|
$7,797.000
|
$12,000.000
|
$10,741.770
|
|
|
SET (TY I)(S= 5 FT)(HW= 5 FT)(4:1) (C)
|
EA
|
2.000
|
$8,000.000
|
$7,067.000
|
$12,000.000
|
$10,739.300
|
|
|
SET (TY I)(S= 5 FT)(HW= 5 FT)(6:1) (P)
|
EA
|
12.000
|
$10,000.000
|
$9,176.000
|
$15,000.000
|
$11,130.260
|
|
|
SET (TY II) (12 IN) (CMP) (6: 1) (C)
|
EA
|
30.000
|
$400.000
|
$827.000
|
$600.000
|
$1,130.560
|
|
|
SET (TY II) (12 IN) (RCP) (6: 1) (P)
|
EA
|
40.000
|
$601.000
|
$785.000
|
$600.000
|
$1,108.820
|
|
|
SET (TY II) (15 IN) (CMP) (6: 1) (P)
|
EA
|
16.000
|
$717.000
|
$887.000
|
$600.000
|
$1,058.140
|
|
|
SET (TY II) (15 IN) (RCP) (6: 1) (P)
|
EA
|
20.000
|
$537.100
|
$821.000
|
$600.000
|
$1,058.140
|
|
|
SET (TY II) (18 IN) (CMP) (6: 1) (P)
|
EA
|
66.000
|
$981.000
|
$955.000
|
$700.000
|
$1,253.640
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
120.000
|
$523.210
|
$884.000
|
$700.000
|
$1,108.820
|
|
|
SET (TY II) (21 IN) (RCP) (6: 1) (P)
|
EA
|
6.000
|
$936.660
|
$1,063.000
|
$750.000
|
$1,518.710
|
|
|
SET (TY II) (24 IN) (CMP) (6: 1) (P)
|
EA
|
30.000
|
$1,000.000
|
$1,149.000
|
$800.000
|
$1,685.160
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
26.000
|
$976.670
|
$1,063.000
|
$800.000
|
$1,518.640
|
|
|
SET (TY II) (30 IN) (CMP) (6: 1) (P)
|
EA
|
2.000
|
$2,064.000
|
$1,745.000
|
$1,200.000
|
$2,680.070
|
|
|
SET (TY II) (36 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$2,859.000
|
$2,310.000
|
$1,500.000
|
$2,575.140
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (P)
|
EA
|
10.000
|
$4,000.000
|
$3,699.000
|
$2,200.000
|
$2,191.390
|
|
|
SET (TY II) (48 IN) (CMP) (6: 1) (P)
|
EA
|
2.000
|
$3,766.660
|
$4,297.000
|
$5,700.000
|
$4,031.930
|
|
|
SET (TY II) (48 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$6,172.040
|
$7,074.000
|
$5,700.000
|
$4,031.930
|
|
|
SET (TY II) (54 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$9,906.000
|
$8,804.000
|
$6,900.000
|
$5,063.790
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
7.000
|
$1,234.680
|
$2,193.000
|
$6,900.000
|
$3,000.000
|
|
|
REMOV STR (BOX CULVERT)
|
EA
|
2.000
|
$5,060.000
|
$2,312.000
|
$11,000.000
|
$4,000.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
5.000
|
$982.900
|
$1,027.000
|
$5,000.000
|
$2,000.000
|
|
|
REMOV STR (PIPE)
|
LF
|
39.000
|
$15.160
|
$9.380
|
$55.000
|
$20.000
|
|
|
REMOV STR (DRIVEWAY CULVERT)
|
EA
|
165.000
|
$1,000.000
|
$440.000
|
$650.000
|
$400.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$884,327.480
|
$800,000.000
|
$800,000.000
|
$700,700.120
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
16.000
|
$30,000.000
|
$10,000.000
|
$7,900.000
|
$22,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
3,200.000
|
$27.360
|
$25.000
|
$25.000
|
$21.200
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
3,200.000
|
$6.620
|
$8.000
|
$3.000
|
$5.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
312.000
|
$22.520
|
$20.000
|
$10.000
|
$25.310
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
312.000
|
$7.660
|
$8.000
|
$2.000
|
$7.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
14,000.000
|
$1.850
|
$2.650
|
$3.500
|
$2.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
14,000.000
|
$0.490
|
$0.450
|
$1.000
|
$0.400
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
320.000
|
$3.480
|
$5.000
|
$7.500
|
$6.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
320.000
|
$0.330
|
$1.000
|
$3.000
|
$1.000
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
2.000
|
$5,526.000
|
$7,500.000
|
$5,000.000
|
$3,500.000
|
|
|
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)
|
LF
|
360.000
|
$6.880
|
$22.000
|
$35.000
|
$15.220
|
|
|
PORT CTB (STKPL)(F-SHAPE)(TY 1)
|
LF
|
360.000
|
$8.180
|
$21.000
|
$23.000
|
$11.800
|
|
|
DRIVEWAYS (ACP)
|
SY
|
10,377.000
|
$25.000
|
$27.000
|
$32.000
|
$27.500
|
|
|
DRIVEWAYS (CONC) (HES)
|
SY
|
2,838.000
|
$90.000
|
$140.000
|
$110.000
|
$120.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
775.000
|
$23.030
|
$22.920
|
$22.000
|
$22.000
|
|
|
SHORT RADIUS
|
LF
|
25.000
|
$25.580
|
$26.050
|
$25.000
|
$23.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
12.000
|
$2,260.000
|
$2,605.000
|
$2,400.000
|
$2,300.000
|
|
|
CRASH CUSH ATTEN (DES SOURCE)
|
EA
|
8.000
|
$1,575.220
|
$9,200.000
|
$4,100.000
|
$1,318.760
|
|
|
CRASH CUSH ATTEN (STKPL)
|
EA
|
8.000
|
$940.000
|
$785.300
|
$4,100.000
|
$478.370
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
80.000
|
$237.080
|
$234.000
|
$220.000
|
$275.000
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
1.000
|
$663.360
|
$234.000
|
$610.000
|
$600.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
56.000
|
$537.240
|
$416.000
|
$490.000
|
$400.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
5.000
|
$629.370
|
$468.000
|
$610.000
|
$550.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
4.000
|
$745.000
|
$547.000
|
$750.000
|
$600.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
38.000
|
$371.920
|
$338.000
|
$420.000
|
$500.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
|
EA
|
12.000
|
$24.820
|
$26.000
|
$27.000
|
$21.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
8.000
|
$59.570
|
$47.000
|
$60.000
|
$69.240
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
11.000
|
$36.500
|
$26.000
|
$27.000
|
$33.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
14,264.000
|
$0.260
|
$0.780
|
$0.260
|
$0.270
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
70,365.000
|
$0.320
|
$0.530
|
$0.260
|
$0.270
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
2,434.000
|
$1.040
|
$1.180
|
$0.800
|
$1.780
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
120.000
|
$5.210
|
$6.100
|
$5.780
|
$5.950
|
|
REFL PAV MRK TY I (W)(RR XING)(100MIL)
|
EA
|
2.000
|
$537.700
|
$573.000
|
$682.500
|
$703.650
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
76,244.000
|
$0.350
|
$0.360
|
$0.420
|
$0.430
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
14,264.000
|
$0.420
|
$0.420
|
$0.420
|
$0.430
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
70,365.000
|
$0.370
|
$0.360
|
$0.420
|
$0.430
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,046.000
|
$3.410
|
$3.860
|
$3.410
|
$3.520
|
|
|
FULL - WIDTH MOWING
|
AC
|
128.000
|
$150.000
|
$145.000
|
$90.000
|
$250.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$12,671.730
|
$5,000.000
|
$5,000.000
|
$20,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
264.000
|
$200.000
|
$200.000
|
$300.000
|
$200.000
|
|
Totals: |
$9,904,052.360
|
$8,149,846.600
|
$9,421,579.000
|
$10,513,000.000
|