Show Job Controls
Bid Cobra

EL PASO IH0010 (6429-14-001)

Items: 86

County: EL PASO
Length: N/A
Highway: IH0010
District: EL PASO
Control Number: 6429-14-001
DBE Goal: N/A
Project: RMC - 642914001
Guaranty: N/A
Time: 365 CALENDAR DAYS
Engineer's Estimate: $1,221,390.00
Date: 02/01/2023 (3 years ago)
Contract Number: N/A
Type: METAL BEAM GUARD FENCE REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$1,221,390.00
$1,096,192.78
Over/Under Est: -10.25% -$125,197.22
$1,200,890.00
Over/Under Est: -1.68% -$20,500.00
Amt Left: 9.55% $104,697.22
Over/Under Est: 13.8% $168,590.00
Amt Left: 26.8% $293,787.22
Delta: -15.75% -$189,090.00
Over/Under Est: 66.34% $810,212.20
Amt Left: 85.33% $935,409.42
Delta: -46.16% -$641,622.20

Bid Items & Bid Tabulations

86 Total 0 of 86
EL PASO  |  IH0010  |  EL PASO  |  6429-14-001  |  02/01/2023  |  $1,221,390.00  |  RMC - 642914001  |  METAL BEAM GUARD FENCE REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
E. G. L. CONSTRUCTION, INC.
MIJELUM, L.L.C.
APACHE BARRICADE & SIGN
SYNERGY PROJECT CONTRACTORS, INC.
RAIL (HANDRAIL)(TY A)
LF 10.000 $150.000 $153.000 $100.000 $110.000 $390.000
RAIL (HANDRAIL)(TY B)
LF 10.000 $140.000 $124.000 $100.000 $165.000 $390.000
RAIL (HANDRAIL)(TY C)
LF 10.000 $150.000 $130.000 $100.000 $110.000 $390.000
RAIL (HANDRAIL)(TY D)
LF 10.000 $150.000 $123.880 $100.000 $110.000 $390.000
RAIL (HANDRAIL)(TY E)
LF 10.000 $140.000 $135.560 $100.000 $165.000 $390.000
RAIL (HANDRAIL)(TY F)
LF 10.000 $150.000 $170.400 $100.000 $110.000 $390.000
MOBILIZATION
LS 1.000 $45,000.000 $15,000.000 $10.000 $1,000.000 $80,000.000
MTL W-BEAM GD FEN (TIM POST)
LF 15.000 $60.000 $50.000 $50.000 $60.000 $35.400
MTL W-BEAM GD FEN (STEEL POST)
LF 15.000 $60.000 $50.000 $100.000 $60.000 $41.300
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 5.000 $1,300.000 $1,360.000 $800.000 $1,800.000 $3,186.000
DOWNSTREAM ANCHOR TERMINAL ADJUSTMENT
EA 5.000 $50.000 $233.000 $250.000 $45.000 $236.000
REMOVE METAL BEAM GUARD FENCE
LF 25.000 $30.000 $7.540 $50.000 $25.000 $9.440
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 5.000 $200.000 $314.840 $250.000 $200.000 $236.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 1.000 $1,000.000 $1,829.530 $1,500.000 $900.000 $2,360.000
CRASH CUSHION ATTEN (INSTALL) (TRACC)
EA 1.000 $20,000.000 $25,332.780 $23,000.000 $28,000.000 $34,810.000
CHAIN LINK FENCE (INSTALL) (6')
LF 25.000 $60.000 $40.000 $100.000 $63.000 $31.860
CHAIN LINK FENCE (REPAIR) (6')
LF 500.000 $25.000 $40.000 $20.000 $63.000 $41.300
CHAIN LINK FENCE (REMOVE)
LF 100.000 $15.000 $40.000 $10.000 $20.000 $11.800
GATE (INSTALL) (DOUBLE) (6' X 14')
EA 2.000 $500.000 $1,768.000 $600.000 $2,300.000 $3,540.000
CHAIN LINK FENCE (REPAIR) (4')
LF 100.000 $25.000 $16.500 $15.000 $25.000 $35.400
CHAIN LINK FENCE (INSTALL) (8')
LF 100.000 $75.000 $34.830 $120.000 $125.000 $70.800
CHAIN LINK FENCE (INSTALL) (4')
LF 100.000 $50.000 $35.000 $90.000 $25.000 $41.300
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 50.000 $20.000 $30.000 $20.000 $22.000 $37.760
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BR)
EA 50.000 $20.000 $31.820 $20.000 $22.000 $41.300
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 25.000 $15.000 $28.300 $20.000 $22.000 $36.580
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2(BR)
EA 25.000 $20.000 $30.240 $20.000 $22.000 $41.300
REPAIR RAIL ELEMENT (W - BEAM)
LF 3,000.000 $30.000 $35.000 $21.000 $29.000 $36.580
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 100.000 $125.000 $39.550 $40.000 $130.000 $61.360
REPAIR RAIL ELEMENT (CURVED RAIL)
LF 100.000 $50.000 $45.360 $50.000 $45.000 $69.620
RAISE RAIL ELEMENT
LF 100.000 $25.000 $22.500 $20.000 $25.000 $23.600
REM / REPL TIMBER/STL POST W/O CONC FND
EA 400.000 $65.000 $120.000 $150.000 $110.000 $74.340
REALIGN POSTS
EA 500.000 $10.000 $36.000 $38.000 $9.000 $41.300
INSTALL BLOCKOUT (TYPE SPECIFIED)
EA 20.000 $12.000 $38.400 $50.000 $25.000 $37.760
REMOVE & REPLACE BLOCKOUT
EA 100.000 $30.000 $46.630 $70.000 $25.000 $46.020
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 2,000.000 $50.000 $30.000 $27.000 $28.000 $47.200
REPLACE SINGLE GDRAIL TERMINAL POST
EA 450.000 $100.000 $50.000 $170.000 $95.000 $236.000
REPLACE TERMINAL ANCHOR POSTS
EA 200.000 $150.000 $268.000 $170.000 $310.000 $472.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 20.000 $3,400.000 $2,100.000 $3,400.000 $3,600.000 $4,956.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 50.000 $1,000.000 $2,500.000 $900.000 $1,200.000 $2,065.000
REPLACE SGT OBJECT MARKER
EA 25.000 $20.000 $86.000 $30.000 $32.000 $76.700
REPAIR STEEL POST WITH BASE PLATE
EA 10.000 $350.000 $196.000 $300.000 $375.000 $430.700
REPLACE POSTS (TL-3)
EA 15.000 $130.000 $111.000 $150.000 $195.000 $147.500
REPLACE POSTS (TL-4)
EA 300.000 $300.000 $167.500 $250.000 $320.000 $230.100
CABLE SPLICE / TURNBUCKLE (TL-3)
EA 2.000 $200.000 $275.630 $90.000 $375.000 $413.000
CABLE SPLICE / TURNBUCKLE (TL-4)
EA 8.000 $200.000 $343.130 $200.000 $375.000 $413.000
REPAIR CONCRETE FOUNDATION (TL-3)
EA 5.000 $300.000 $330.000 $90.000 $450.000 $354.000
REPAIR CONCRETE FOUNDATION (TL-4)
EA 8.000 $300.000 $302.500 $200.000 $450.000 $354.000
REPR OR REPLC CABLE BARR TERM SEC(TL-3)
EA 3.000 $1,000.000 $1,359.290 $500.000 $3,500.000 $4,720.000
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
EA 5.000 $1,750.000 $1,275.000 $2,000.000 $3,500.000 $4,366.000
REPLACE CABLE (TL-3)
LF 50.000 $6.000 $5.000 $6.000 $15.000 $17.700
REPLACE CABLE (TL-4)
LF 200.000 $7.000 $6.750 $8.000 $15.000 $17.700
CHECK / RE-TENSION CABLE
EA 10.000 $600.000 $516.670 $300.000 $495.000 $306.800
POST AND CABLE FENCE (REMOVAL)
LF 100.000 $2.000 $5.600 $50.000 $4.950 $9.440
POST AND CABLE FENCE (REMV CONC ANCHOR)
EA 6.000 $100.000 $147.000 $500.000 $135.000 $55.000
POST AND CABLE FENCE (NEW INSTALLATION)
LF 100.000 $50.000 $66.800 $100.000 $90.000 $23.600
POST AND CABLE FENCE (NEW CONC ANCHOR)
EA 6.000 $200.000 $231.000 $700.000 $250.000 $2,065.000
POST AND CABLE FENCE(REMV / REPL POSTS)
EA 100.000 $65.000 $78.600 $200.000 $99.000 $472.000
POST AND CABLE FENCE (REMV/ REPL CABLE)
LF 100.000 $20.000 $46.400 $50.000 $115.000 $9.440
POST AND CABLE FENCE (REPAIR)
LF 500.000 $20.000 $10.600 $30.000 $20.000 $9.440
REMOVE AND REPLACE (TRACC)
EA 2.000 $30,000.000 $15,056.500 $28,000.000 $25,000.000 $34,810.000
REMOVE AND REPLACE (WIDE TRACC)
EA 1.000 $40,000.000 $28,060.000 $40,000.000 $45,000.000 $54,870.000
REMOVE AND REPLACE (NARROW REACT 350)
EA 1.000 $22,000.000 $22,172.500 $26,000.000 $35,000.000 $44,840.000
REMOVE AND REPLACE (WIDE REACT 350)
EA 1.000 $35,000.000 $31,156.250 $40,000.000 $57,000.000 $63,720.000
REPAIR (WIDE TRACC)
LF 25.000 $155.000 $150.000 $200.000 $160.000 $944.000
REMOVE AND REPLACE (WIDE QUAD)
EA 1.000 $5,000.000 $24,000.000 $35,000.000 $36,000.000 $46,020.000
REPAIR REACT (N) (MISC HARDWARE)
EA 5.000 $1,000.000 $338.000 $750.000 $1,100.000 $1,888.000
REPAIR REACT (N) (CYLINDERS)
EA 5.000 $3,500.000 $3,792.000 $4,000.000 $3,900.000 $4,720.000
REPAIR (QUAD) (W) (BAY)
EA 2.000 $1,150.000 $900.000 $1,000.000 $900.000 $15,340.000
REPAIR REACT (W) (MISC) (HARDWARE)
EA 2.000 $1,000.000 $486.250 $750.000 $900.000 $2,124.000
REPAIR REACT (W) (CYLINDERS)
EA 2.000 $3,500.000 $8,593.750 $4,000.000 $4,200.000 $7,670.000
REMOVE AND REPLACE (FASTRACC)
EA 2.000 $6,000.000 $24,000.000 $40,000.000 $29,500.000 $28,910.000
REMOVE AND REPLACE (TAU II) (N)
EA 1.000 $30,000.000 $26,067.000 $30,000.000 $29,000.000 $37,170.000
REPAIR TAU II (N)
LF 10.000 $2,000.000 $330.000 $2,000.000 $675.000 $2,360.000
REPAIR TAU II (W)
LF 20.000 $2,500.000 $329.000 $100.000 $900.000 $5,900.000
REPAIR (QUAD) (W) (NOSE)
EA 2.000 $1,250.000 $850.000 $1,000.000 $1,400.000 $3,540.000
REPAIR QUAD (W) (MISC HARDWARE)
EA 2.000 $2,000.000 $850.000 $2,000.000 $1,200.000 $2,360.000
REMOVE AND REPLACE TAU II (W)
EA 1.000 $30,000.000 $23,369.000 $25,000.000 $41,000.000 $38,940.000
REPAIR (NARROW REACT 350)
EA 2.000 $1,000.000 $1,333.000 $3,000.000 $900.000 $8,260.000
REPAIR REACT CABLE 350
LF 50.000 $100.000 $40.000 $50.000 $185.000 $82.600
REMOVE AND REPLACE (QUADGUARD)(MASH)(N)
EA 1.000 $13,000.000 $19,500.000 $25,000.000 $28,000.000 $40,120.000
REPAIR (QUADGUARD)(MASH)(N)
LF 20.000 $160.000 $183.000 $500.000 $1,800.000 $2,065.000
REMOVE AND REPLACE (TAU)(MASH)(N)
EA 1.000 $30,000.000 $22,017.500 $26,000.000 $29,000.000 $35,990.000
REPAIR (TAU)(MASH)(N)
LF 10.000 $2,000.000 $242.000 $200.000 $425.000 $1,770.000
STONE MASONRY (ROCK WALL)
SF 500.000 $50.000 $17.500 $10.000 $65.000 $25.960
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 15.000 $100.000 $195.250 $100.000 $85.000 $354.000
TMA (STATIONARY)
DAY 200.000 $350.000 $200.000 $200.000 $350.000 $483.800
Totals: $1,221,390.000 $1,096,192.780 $1,200,890.000 $1,389,980.000 $2,031,602.200