Show Job Controls
Bid Cobra

EL PASO IH0010 (6392-91-001)

Items: 59

County: EL PASO
Length: N/A
Highway: IH0010
District: EL PASO
Control Number: 6392-91-001
DBE Goal: N/A
Project: RMC - 639291001
Guaranty: N/A
Time: 365 CALENDAR DAYS
Engineer's Estimate: $718,525.00
Date: 12/01/2021 (4 years ago)
Contract Number: N/A
Type: METAL BEAM GUARD FENCE & CHAIN LINK FENCE REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$718,525.00
$894,440.75
Over/Under Est: 24.48% $175,915.75
Over/Under Est: 25.4% $182,504.00
Amt Left: 0.74% $6,588.25
Over/Under Est: 88.54% $636,162.00
Amt Left: 51.46% $460,246.25
Delta: -50.35% -$453,658.00
$1,496,732.00
Over/Under Est: 108.31% $778,207.00
Amt Left: 67.34% $602,291.25
Delta: -10.49% -$142,045.00

Bid Items & Bid Tabulations

59 Total 0 of 59
EL PASO  |  IH0010  |  EL PASO  |  6392-91-001  |  12/01/2021  |  $718,525.00  |  RMC - 639291001  |  METAL BEAM GUARD FENCE & CHAIN LINK...  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
E. G. L. CONSTRUCTION, INC.
BK FIELD OPERATIONS LLC
SYNERGY PROJECT CONTRACTORS, INC.
DIGG COMMERCIAL, LLC
RAIL (HANDRAIL)(TY A)
LF 25.000 $95.000 $255.560 $100.000 $399.000 $180.000
RAIL (HANDRAIL)(TY B)
LF 25.000 $120.000 $153.850 $100.000 $404.700 $190.000
RAIL (HANDRAIL)(TY C)
LF 25.000 $150.000 $165.450 $100.000 $404.700 $200.000
RAIL (HANDRAIL)(TY D)
LF 25.000 $160.000 $168.300 $100.000 $410.400 $220.000
RAIL (HANDRAIL)(TY E)
LF 25.000 $170.000 $182.850 $100.000 $456.000 $250.000
RAIL (HANDRAIL)(TY F)
LF 25.000 $180.000 $203.200 $100.000 $461.700 $300.000
MOBILIZATION
LS 1.000 $15,000.000 $15,000.000 $35,000.000 $22,800.000 $80,000.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 10.000 $1,100.000 $1,200.000 $1,700.000 $2,590.080 $3,000.000
DOWNSTREAM ANCHOR TERMINAL ADJUSTMENT
EA 5.000 $120.000 $90.830 $1,000.000 $114.000 $450.000
CHAIN LINK FENCE (INSTALL) (6')
LF 250.000 $30.000 $28.000 $15.000 $44.460 $35.000
CHAIN LINK FENCE (REPAIR) (6')
LF 1,000.000 $18.000 $28.000 $14.000 $38.760 $15.000
CHAIN LINK FENCE (REMOVE)
LF 250.000 $4.000 $2.500 $3.000 $2.280 $10.000
GATE (INSTALL) (DOUBLE) (6' X 14')
EA 2.000 $1,800.000 $1,740.000 $650.000 $2,850.000 $2,400.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 4,500.000 $15.000 $21.000 $33.000 $26.220 $40.000
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 100.000 $30.000 $29.210 $80.000 $50.160 $54.000
REPAIR RAIL ELEMENT (CURVED RAIL)
LF 100.000 $30.000 $33.050 $30.000 $63.840 $58.000
REM / REPL TIMBER/STL POST W/O CONC FND
EA 400.000 $45.000 $75.000 $1.000 $53.580 $100.000
REALIGN POSTS
EA 300.000 $10.000 $15.000 $1.000 $10.260 $50.000
INSTALL BLOCKOUT (TYPE SPECIFIED)
EA 20.000 $20.000 $21.830 $100.000 $19.380 $80.000
REMOVE & REPLACE BLOCKOUT
EA 150.000 $15.000 $29.250 $1.000 $26.220 $80.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 3,500.000 $16.000 $22.000 $22.000 $51.300 $42.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 450.000 $50.000 $60.000 $80.000 $62.700 $100.000
REPLACE TERMINAL ANCHOR POSTS
EA 150.000 $150.000 $325.000 $120.000 $385.320 $190.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 60.000 $1,000.000 $1,100.000 $2,000.000 $2,679.000 $1,700.000
REPAIR STEEL POST WITH BASE PLATE
EA 10.000 $200.000 $240.940 $100.000 $199.500 $200.000
REPLACE POSTS (TL-3)
EA 100.000 $125.000 $215.000 $100.000 $212.040 $210.000
REPLACE POSTS (TL-4)
EA 500.000 $150.000 $171.000 $160.000 $303.240 $300.000
CABLE SPLICE / TURNBUCKLE (TL-3)
EA 2.000 $175.000 $224.000 $100.000 $323.760 $500.000
CABLE SPLICE / TURNBUCKLE (TL-4)
EA 2.000 $175.000 $284.000 $150.000 $323.760 $516.000
REPAIR CONCRETE FOUNDATION (TL-3)
EA 4.000 $250.000 $200.000 $1.000 $228.000 $500.000
REPAIR CONCRETE FOUNDATION (TL-4)
EA 4.000 $300.000 $325.000 $500.000 $256.500 $500.000
REPR OR REPLC CABLE BARR TERM SEC(TL-3)
EA 5.000 $725.000 $1,159.000 $500.000 $684.000 $2,600.000
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
EA 20.000 $1,000.000 $704.000 $800.000 $1,311.000 $2,700.000
REPLACE CABLE (TL-3)
LF 250.000 $6.000 $5.620 $0.100 $6.270 $10.000
REPLACE CABLE (TL-4)
LF 250.000 $8.000 $7.630 $1.000 $6.560 $11.000
CHECK / RE-TENSION CABLE
EA 5.000 $500.000 $464.000 $40.000 $399.000 $1,000.000
POST AND CABLE FENCE (REMOVAL)
LF 250.000 $10.000 $4.690 $2.000 $3.420 $10.000
POST AND CABLE FENCE (REMV CONC ANCHOR)
EA 6.000 $175.000 $123.000 $100.000 $142.500 $250.000
POST AND CABLE FENCE (NEW INSTALLATION)
LF 250.000 $50.000 $140.000 $20.000 $114.000 $180.000
POST AND CABLE FENCE (NEW CONC ANCHOR)
EA 6.000 $300.000 $383.000 $100.000 $307.800 $400.000
POST AND CABLE FENCE(REMV / REPL POSTS)
EA 100.000 $100.000 $109.000 $50.000 $96.900 $200.000
POST AND CABLE FENCE (REMV/ REPL CABLE)
LF 200.000 $100.000 $108.000 $10.000 $108.300 $15.000
REMOVE AND REPLACE (WIDE QUAD)
EA 1.000 $24,000.000 $19,000.000 $40,000.000 $24,852.000 $30,000.000
REPAIR REACT (N) (MISC HARDWARE)
EA 5.000 $300.000 $152.000 $1,000.000 $609.900 $3,200.000
REPAIR REACT (N) (CYLINDERS)
EA 2.000 $3,200.000 $4,524.000 $2,000.000 $5,586.000 $4,200.000
REPAIR (QUAD) (W) (BAY)
EA 2.000 $1,000.000 $741.000 $2,000.000 $10,260.000 $1,600.000
REMOVE AND REPLACE (FASTRACC)
EA 2.000 $24,000.000 $19,000.000 $25,000.000 $29,640.000 $28,000.000
REPAIR TAU II (W)
LF 20.000 $325.000 $329.000 $500.000 $1,368.000 $1,500.000
REPAIR (QUAD) (W) (NOSE)
EA 5.000 $900.000 $1,250.000 $500.000 $2,451.000 $1,200.000
REPAIR QUAD (W) (MISC HARDWARE)
EA 5.000 $900.000 $684.000 $250.000 $798.000 $1,150.000
REMOVE AND REPLACE TAU II (W)
EA 1.000 $25,000.000 $16,000.000 $40,000.000 $42,180.000 $36,000.000
REPAIR REACT CABLE 350
LF 50.000 $30.000 $37.800 $400.000 $37.800 $80.000
REMOVE AND REPLACE (QUADGUARD)(MASH)(N)
EA 1.000 $21,000.000 $20,000.000 $28,000.000 $24,025.500 $25,000.000
REPAIR (QUADGUARD)(MASH)(N)
LF 20.000 $100.000 $54.000 $400.000 $572.400 $225.000
REPAIR (TAU)(MASH)(N)
LF 20.000 $250.000 $341.000 $400.000 $393.300 $230.000
REMOVE AND REPLACE (REACT)(M)(NARROW)
EA 1.000 $22,000.000 $15,000.000 $30,000.000 $28,291.760 $40,000.000
STONE MASONRY (ROCK WALL)
SF 600.000 $12.000 $20.000 $30.000 $18.240 $50.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 15.000 $55.000 $251.990 $50.000 $114.000 $500.000
TMA (STATIONARY)
DAY 200.000 $150.000 $350.000 $1.000 $171.000 $500.000
Totals: $718,525.000 $894,440.750 $901,029.000 $1,354,687.000 $1,496,732.000