EL PASO IH0010 (6336-67-001)

Items: 52

County: EL PASO
Length: N/A
Highway: IH0010
District: EL PASO
Control Number: 6336-67-001
DBE Goal: N/A
Project: RMC - 633667001
Guaranty: N/A
Time: 365 CALENDAR DAYS
Engineer's Estimate: $652,223.00
Date: 10/02/2018 (7 years ago)
Contract Number: N/A
Type: METAL BEAM GUARDRAIL FENCE REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$652,223.00
Over/Under Est: -1.67% -$10,887.30
Over/Under Est: 16.54% $107,867.00
Amt Left: 18.52% $118,754.30
Over/Under Est: 16.74% $109,177.00
Amt Left: 18.72% $120,064.30
Delta: -0.17% -$1,310.00

Bid Items & Bid Tabulations

52 Total 0 of 52
EL PASO  |  IH0010  |  EL PASO  |  6336-67-001  |  10/02/2018  |  $652,223.00  |  RMC - 633667001  |  METAL BEAM GUARDRAIL FENCE REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
SYNERGY PROJECT CONSULTANTS, INC.
BOWEN INDUSTRIAL CONTRACTORS, INC.
E. G. L. CONSTRUCTION, INC.
MOBILIZATION
LS 1.000 $5,000.000 $15,000.000 $15,000.000 $30,000.000
MOBILIZATION (CALLOUT 1)
EA 3.000 $1,500.000 $10,000.000 $1,750.000 $8,000.000
REMOVE METAL BEAM GUARD FENCE
LF 200.000 $2.820 $4.000 $2.000 $19.000
REMOVE TERMINAL ANCHOR SECTION
EA 10.000 $222.400 $124.000 $150.000 $200.000
CABLE BARRIER SYSTEM (TL-4)
LF 200.000 $8.800 $8.000 $8.000 $30.000
CABLE BARRIER TERMINAL SECTION (TL-4)
EA 1.000 $500.000 $3,000.000 $500.000 $1,000.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 1.000 $1,000.000 $20,000.000 $20,100.000 $21,000.000
CRASH CUSHION ATTEN (INSTALL) (QUAD)(N)
EA 2.000 $20,000.000 $20,000.000 $16,500.000 $17,000.000
CRASH CUSHION ATTEN (INSTALL) (QUAD)(W)
EA 2.000 $16,900.000 $20,000.000 $20,550.000 $21,000.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 5,000.000 $20.000 $12.000 $17.750 $16.000
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 80.000 $30.000 $25.000 $35.000 $75.000
REPAIR RAIL ELEMENT (CURVED RAIL)
LF 350.000 $30.000 $20.000 $30.000 $36.000
REM / REPL TIMBER/STL POST W/O CONC FND
EA 550.000 $50.000 $30.000 $48.000 $50.000
REM / REPL TIMBER / STL POST W/CONC FND
EA 80.000 $30.000 $39.940 $60.000 $60.000
REALIGN POSTS
EA 300.000 $40.000 $9.000 $15.000 $35.000
INSTALL BLOCKOUT (TYPE SPECIFIED)
EA 2.000 $10.000 $15.000 $20.000 $500.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 500.000 $11.750 $15.000 $28.000 $18.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 550.000 $30.000 $35.000 $97.000 $40.000
REPAIR OF TERMINAL ANCHORS POSTS
EA 3.000 $50.000 $50.000 $150.000 $500.000
REPLACE TERMINAL ANCHOR POSTS
EA 220.000 $100.000 $100.000 $200.000 $300.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 200.000 $900.000 $925.000 $1,100.000 $900.000
REPLACE SGT OBJECT MARKER
EA 10.000 $5.000 $30.000 $30.000 $50.000
REPLACE POSTS (TL-4)
EA 100.000 $80.000 $75.000 $77.000 $100.000
CABLE SPLICE / TURNBUCKLE (TL-3)
EA 2.000 $100.000 $150.000 $300.000 $500.000
CABLE SPLICE / TURNBUCKLE (TL-4)
EA 2.000 $150.000 $150.000 $300.000 $500.000
REPAIR CONCRETE FOUNDATION (TL-4)
EA 4.000 $50.000 $100.000 $100.000 $600.000
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
EA 30.000 $221.000 $250.000 $500.000 $90.000
REPLACE CABLE (TL-4)
LF 1,000.000 $4.000 $1.500 $6.750 $9.000
POST AND CABLE FENCE (REMOVAL)
LF 100.000 $4.400 $5.000 $2.000 $50.000
POST AND CABLE FENCE (REMV CONC ANCHOR)
EA 2.000 $50.000 $35.000 $50.000 $500.000
POST AND CABLE FENCE (NEW INSTALLATION)
LF 20.000 $19.250 $9.000 $15.000 $150.000
POST AND CABLE FENCE (NEW CONC ANCHOR)
EA 2.000 $4,200.000 $35.000 $50.000 $250.000
POST AND CABLE FENCE(REMV / REPL POSTS)
EA 20.000 $18.000 $23.000 $50.000 $150.000
POST AND CABLE FENCE (REMV/ REPL CABLE)
LF 20.000 $5.000 $2.500 $5.000 $150.000
REMOVE AND REPLACE (TRACC)
EA 1.000 $10,000.000 $13,000.000 $15,000.000 $17,000.000
REMOVE AND REPLACE (WIDE TRACC)
EA 1.000 $20,000.000 $10,000.000 $23,900.000 $23,500.000
REMOVE AND REPLACE (NARROW REACT 350)
EA 1.000 $16,000.000 $10,000.000 $20,100.000 $21,000.000
REPAIR (TRACC)
LF 20.000 $130.000 $75.000 $100.000 $150.000
REPAIR (WIDE TRACC)
LF 2.000 $200.000 $50.000 $200.000 $500.000
REMOVE AND REPLACE (FASTRACC)
EA 1.000 $20,000.000 $15,000.000 $17,500.000 $17,500.000
REMOVE AND REPLACE (TAU II) (N)
EA 1.000 $20,000.000 $20,090.500 $19,950.000 $25,000.000
REPAIR TAU II (N)
LF 2.000 $1,000.000 $300.000 $500.000 $500.000
TMA (STATIONARY)
EA 2.000 $1,500.000 $100.000 $600.000 $350.000
1 LN CLOSURE 2 LN RD NO SHOULDERS
HR 80.000 $150.000 $175.000 $70.000 $60.000
1 LN CLOSURE 2 LN RD PAVED SHOULDERS
HR 80.000 $65.000 $175.000 $70.000 $60.000
1 LN CLOSURE 4 LN RD
HR 25.000 $65.000 $180.000 $150.000 $60.000
FREEWAY 1 LANE CLOSURE
HR 80.000 $88.000 $200.000 $150.000 $60.000
EXIT OR ENTRANCE RAMP CLOSURE
HR 40.000 $525.000 $175.000 $70.000 $60.000
ONE LANE FRONTAGE ROAD CLOSURE
HR 5.000 $150.000 $175.000 $70.000 $60.000
ONE LANE CONNECTING RAMP CLOSURE
HR 5.000 $150.000 $175.000 $150.000 $60.000
WORK AREA ON SHOULDER
HR 60.000 $120.000 $175.000 $70.000 $60.000
TURN AROUND CLOSURE
HR 40.000 $120.000 $175.000 $70.000 $60.000
Totals: $652,223.000 $641,335.700 $760,090.000 $761,400.000