|
|
PREPARING ROW
|
STA
|
121.000
|
$1,666.160
|
$188.560
|
$8,200.000
|
$6,950.000
|
$16,500.000
|
|
|
REMOVING CONC (PAV)
|
SY
|
9,273.000
|
$10.000
|
$9.900
|
$25.000
|
$15.000
|
$45.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
10,835.000
|
$8.500
|
$7.700
|
$20.000
|
$10.000
|
$10.000
|
|
|
REMOVING CONC (FOUNDATIONS)
|
SY
|
9.000
|
$500.000
|
$34.000
|
$80.000
|
$60.000
|
$15.000
|
|
|
REMOVING CONC (CURB)
|
LF
|
15,497.000
|
$3.500
|
$3.130
|
$2.000
|
$2.750
|
$1.000
|
|
|
REMOVING CONC (CTB)
|
LF
|
5,146.000
|
$10.000
|
$11.170
|
$19.500
|
$12.000
|
$15.000
|
|
|
REMOVING CONC (RETAINING WALLS)
|
SY
|
5,838.000
|
$35.000
|
$6.600
|
$23.000
|
$12.000
|
$25.000
|
|
|
REMOVING CONC (FLUME)
|
SY
|
43.000
|
$32.000
|
$23.580
|
$36.000
|
$17.000
|
$10.000
|
|
|
REMOVING STAB BASE AND ASPH PAV(0"-16")
|
SY
|
15,904.000
|
$14.000
|
$3.860
|
$4.000
|
$2.000
|
$5.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
47,552.000
|
$6.510
|
$4.600
|
$1.000
|
$11.000
|
$6.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY A)
|
CY
|
72,875.000
|
$16.500
|
$8.800
|
$1.000
|
$6.500
|
$13.500
|
|
|
EMB(FNL)(DC)(TYE)(CSBE)(RWALL FND IMPR
|
CY
|
7,582.000
|
$33.500
|
$39.610
|
$91.000
|
$65.000
|
$50.000
|
|
|
PRIME COAT (CSS-1H)
|
GAL
|
7,420.000
|
$3.050
|
$4.350
|
$2.700
|
$5.000
|
$4.730
|
|
|
D-GR HMA TY-D PG64-22
|
TON
|
7,054.000
|
$72.000
|
$73.500
|
$62.000
|
$85.000
|
$66.910
|
|
|
SUPERPAVE MIXTURES SP-B PG64-22
|
TON
|
5,901.000
|
$65.000
|
$73.060
|
$68.000
|
$80.000
|
$69.600
|
|
|
SUPERPAVE MIXTURES SP-C SAC-A PG64-22
|
TON
|
706.000
|
$55.000
|
$75.410
|
$98.000
|
$125.000
|
$119.150
|
|
|
CONC PVMT (CONT REINF - CRCP) (12")
|
SY
|
28,004.000
|
$55.000
|
$70.200
|
$65.000
|
$62.000
|
$75.000
|
|
|
STRUCT EXCAV (PIPE)
|
CY
|
5,971.000
|
$5.000
|
$7.780
|
$3.000
|
$1.000
|
$7.000
|
|
|
CEM STABIL BKFL
|
CY
|
4,586.860
|
$65.000
|
$88.020
|
$120.000
|
$125.000
|
$60.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
2,103.000
|
$120.000
|
$83.620
|
$120.000
|
$125.000
|
$100.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
13,394.000
|
$3.000
|
$2.630
|
$2.500
|
$10.000
|
$1.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
73,060.000
|
$10.000
|
$8.800
|
$20.000
|
$12.000
|
$20.000
|
|
|
SOIL NAIL ANCHORS
|
LF
|
7,363.000
|
$17.000
|
$16.500
|
$35.000
|
$14.000
|
$28.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
1,540.000
|
$156.530
|
$188.700
|
$261.000
|
$200.000
|
$220.000
|
|
|
DRILL SHAFT (42 IN)
|
LF
|
1,139.000
|
$204.700
|
$273.790
|
$402.000
|
$375.000
|
$250.000
|
|
|
DRILL SHAFT (48 IN)
|
LF
|
457.000
|
$270.960
|
$253.060
|
$391.000
|
$400.000
|
$350.000
|
|
|
DRILL SHAFT (54 IN)
|
LF
|
98.000
|
$282.210
|
$566.640
|
$645.000
|
$520.000
|
$650.000
|
|
|
DRILL SHAFT (60 IN)
|
LF
|
200.000
|
$380.000
|
$461.900
|
$770.000
|
$600.000
|
$500.000
|
|
|
DRILL SHAFT (NON - REINFORCED) (12 IN)
|
LF
|
32.000
|
$250.000
|
$225.560
|
$210.000
|
$210.000
|
$205.000
|
|
|
DRILL SHAFT (SIGN MTS) (24 IN)
|
LF
|
131.000
|
$315.000
|
$275.070
|
$255.000
|
$255.000
|
$250.000
|
|
|
DRILL SHAFT (SIGN MTS) (48 IN)
|
LF
|
161.000
|
$500.000
|
$544.640
|
$500.000
|
$500.000
|
$495.000
|
|
|
DRILL SHAFT (96 IN)
|
LF
|
672.000
|
$748.970
|
$1,045.270
|
$1,670.000
|
$1,250.000
|
$1,413.320
|
|
|
DRILL SHAFT (SIGN MTS) (60 IN)
|
LF
|
390.000
|
$700.000
|
$593.050
|
$540.000
|
$515.000
|
$539.000
|
|
|
CL A CONC (FLUME)
|
CY
|
255.400
|
$380.000
|
$385.100
|
$575.000
|
$600.000
|
$418.000
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
86.400
|
$828.660
|
$770.200
|
$750.000
|
$700.000
|
$800.000
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
512.700
|
$1,057.450
|
$990.250
|
$850.000
|
$1,000.000
|
$1,100.000
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
240.000
|
$838.330
|
$874.720
|
$975.000
|
$1,000.000
|
$1,700.000
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
319.500
|
$340.000
|
$357.590
|
$400.000
|
$350.000
|
$500.000
|
|
|
CL F CONC (CAP)(HPC)
|
CY
|
112.200
|
$1,250.000
|
$797.700
|
$850.000
|
$1,000.000
|
$1,200.000
|
|
|
CL F CONC (COLUMN)(HPC)
|
CY
|
57.200
|
$1,250.000
|
$896.730
|
$1,050.000
|
$1,300.000
|
$2,000.000
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
83,608.000
|
$15.010
|
$15.400
|
$17.000
|
$17.000
|
$19.000
|
|
|
APPROACH SLAB (HPC)
|
CY
|
137.600
|
$482.620
|
$467.620
|
$420.000
|
$450.000
|
$450.000
|
|
|
RETAINING WALL (MSE)
|
SF
|
48,305.000
|
$36.000
|
$40.710
|
$44.000
|
$46.000
|
$55.000
|
|
|
RETAINING WALL (CONC BLOCK)
|
SF
|
42,550.000
|
$25.000
|
$45.660
|
$30.000
|
$40.000
|
$40.000
|
|
|
RETAINING WALL (CAST - IN - PLACE)
|
SF
|
1,219.000
|
$53.000
|
$57.210
|
$94.000
|
$80.000
|
$60.000
|
|
|
RETAINING WALL (SOIL NAIL)(FACIA)
|
SF
|
6,881.000
|
$47.900
|
$51.710
|
$45.000
|
$50.000
|
$40.000
|
|
|
PRESTR CONC GIRDER (TX54)
|
LF
|
11,449.920
|
$123.050
|
$143.040
|
$185.000
|
$165.000
|
$170.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
759.800
|
$265.000
|
$275.070
|
$375.000
|
$350.000
|
$300.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
1.000
|
$382.000
|
$550.140
|
$890.000
|
$375.000
|
$600.000
|
|
|
RIPRAP (CONC)(6 IN)
|
CY
|
3.000
|
$310.000
|
$550.140
|
$500.000
|
$600.000
|
$600.000
|
|
|
STR STEEL (MISC NON - BRIDGE)
|
LB
|
280.000
|
$7.190
|
$9.900
|
$27.500
|
$20.000
|
$5.000
|
|
|
RAIL (TY T551)
|
LF
|
19,987.000
|
$48.000
|
$44.010
|
$49.000
|
$42.000
|
$43.000
|
|
|
RAIL (TY T551)(HPC)
|
LF
|
3,410.700
|
$50.720
|
$47.310
|
$54.000
|
$50.000
|
$48.000
|
|
|
RAIL (TY C221)
|
LF
|
3,674.000
|
$67.000
|
$49.510
|
$55.000
|
$80.000
|
$105.000
|
|
|
RAIL (TY C221)(HPC)
|
LF
|
1,675.400
|
$99.220
|
$52.810
|
$75.000
|
$85.000
|
$150.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - A)
|
LF
|
440.000
|
$84.230
|
$104.530
|
$99.000
|
$70.000
|
$110.000
|
|
|
CONC BOX CULV (4 FT X 3 FT)
|
LF
|
270.000
|
$203.000
|
$233.530
|
$250.000
|
$220.000
|
$350.000
|
|
|
CONC BOX CULV (6 FT X 3 FT)
|
LF
|
1,780.000
|
$285.000
|
$339.260
|
$391.000
|
$325.000
|
$550.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
260.000
|
$50.000
|
$63.750
|
$55.000
|
$85.000
|
$260.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
5,717.000
|
$68.000
|
$71.800
|
$75.000
|
$95.000
|
$110.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
710.000
|
$86.000
|
$112.440
|
$125.000
|
$125.000
|
$172.620
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
1,269.000
|
$110.000
|
$142.850
|
$155.000
|
$155.000
|
$209.700
|
|
|
RC PIPE (CL III)(42 IN)
|
LF
|
2,346.000
|
$138.000
|
$174.920
|
$200.000
|
$185.000
|
$267.690
|
|
|
RC PIPE (CL III)(48 IN)
|
LF
|
1,794.000
|
$200.000
|
$226.550
|
$250.000
|
$215.000
|
$299.580
|
|
|
RC PIPE (CL IV)(24 IN)
|
LF
|
1,647.000
|
$87.000
|
$76.880
|
$115.000
|
$120.000
|
$137.260
|
|
|
RC PIPE (CL IV)(30 IN)
|
LF
|
33.000
|
$130.000
|
$124.590
|
$330.000
|
$220.000
|
$187.940
|
|
|
RC PIPE (CL IV)(36 IN)
|
LF
|
524.000
|
$121.000
|
$148.360
|
$185.000
|
$210.000
|
$230.680
|
|
|
RC PIPE (CL V)(24 IN)
|
LF
|
117.000
|
$164.000
|
$96.230
|
$310.000
|
$235.000
|
$169.840
|
|
|
RC PIPE (CL V)(36 IN)
|
LF
|
764.000
|
$171.000
|
$154.960
|
$210.000
|
$185.000
|
$256.280
|
|
|
RC PIPE (CL V)(30 IN)
|
LF
|
39.000
|
$153.000
|
$129.060
|
$270.000
|
$375.000
|
$231.430
|
|
|
MANH (COMPL)(PRM)(72IN)
|
EA
|
4.000
|
$5,200.000
|
$8,959.230
|
$9,600.000
|
$8,500.000
|
$14,727.520
|
|
|
JCTBOX(COMPL)(PJB)(3FTX3FT)
|
EA
|
13.000
|
$2,273.000
|
$4,069.750
|
$4,900.000
|
$2,900.000
|
$5,000.000
|
|
|
JCTBOX(COMPL)(PJB)(4FTX4FT)
|
EA
|
1.000
|
$2,948.000
|
$5,019.850
|
$6,000.000
|
$3,500.000
|
$6,000.000
|
|
|
INLET (COMPL)(PCO)(6FT)(RIGHT)
|
EA
|
1.000
|
$3,894.000
|
$7,057.690
|
$6,700.000
|
$7,200.000
|
$8,000.000
|
|
|
INLET (COMPL)(PCO)(6FT)(BOTH)
|
EA
|
3.000
|
$4,470.000
|
$6,871.020
|
$7,100.000
|
$7,500.000
|
$9,000.000
|
|
|
INLET (COMPL)(PMBD)(4FT)
|
EA
|
16.000
|
$4,091.000
|
$6,930.470
|
$7,200.000
|
$6,500.000
|
$9,000.000
|
|
|
INLET (COMPL)(PMBD)(5FT)
|
EA
|
1.000
|
$4,158.000
|
$6,799.000
|
$7,000.000
|
$6,500.000
|
$9,100.000
|
|
|
INLET (COMPL)(POD)(FG)(3FTX5FT)
|
EA
|
4.000
|
$3,400.000
|
$4,911.570
|
$4,900.000
|
$3,600.000
|
$9,000.000
|
|
|
INLET (COMPL)(POD)(SFG)(4FTX4FT)
|
EA
|
1.000
|
$3,500.000
|
$5,361.660
|
$5,100.000
|
$3,600.000
|
$9,000.000
|
|
|
INLET (COMPL)(PSL)(RC)(3FTX3FT)
|
EA
|
5.000
|
$5,716.000
|
$4,049.780
|
$3,900.000
|
$4,800.000
|
$8,000.000
|
|
|
INLET (COMPL)(PSL)(RC)(4FTX4FT)
|
EA
|
11.000
|
$3,721.000
|
$5,674.960
|
$5,700.000
|
$5,900.000
|
$10,500.000
|
|
|
INLET (COMPL)(PSL)(RC)(3FTX5FT)
|
EA
|
4.000
|
$3,620.000
|
$4,873.060
|
$4,800.000
|
$5,800.000
|
$8,500.000
|
|
|
INLET (COMPL)(PSL)(RC)(4FTX5FT)
|
EA
|
2.000
|
$4,300.000
|
$5,432.650
|
$5,500.000
|
$6,500.000
|
$9,000.000
|
|
|
INLET (COMPL)(PSL)(RC)(5FTX5FT)
|
EA
|
2.000
|
$4,377.000
|
$5,896.970
|
$6,000.000
|
$7,500.000
|
$10,000.000
|
|
|
INLET (COMPL)(PSL)(RC)(5FTX6FT)
|
EA
|
3.000
|
$5,043.000
|
$5,802.640
|
$5,900.000
|
$8,600.000
|
$10,000.000
|
|
|
INLET (COMPL)(PSL)(RC)(6FTX6FT)
|
EA
|
1.000
|
$4,720.000
|
$6,189.450
|
$6,300.000
|
$8,500.000
|
$12,000.000
|
|
|
INLET (COMPL)(PSL)(RC)(8FTX8FT)
|
EA
|
6.000
|
$9,789.000
|
$13,593.610
|
$5,000.000
|
$13,000.000
|
$20,000.000
|
|
|
INLET (COMPL)(PSL)(FG)(3FTX5FT-3FTX3FT)
|
EA
|
1.000
|
$6,312.000
|
$5,103.130
|
$4,900.000
|
$5,000.000
|
$9,000.000
|
|
|
INLET (COMPL)(PSL)(FG)(5FTX5FT-4FTX4FT)
|
EA
|
4.000
|
$4,612.000
|
$6,635.800
|
$6,600.000
|
$7,500.000
|
$14,000.000
|
|
|
INLET (COMPL)(PSL)(FG)(6FTX6FT-4FTX4FT)
|
EA
|
1.000
|
$7,408.000
|
$6,421.270
|
$6,400.000
|
$8,500.000
|
$12,000.000
|
|
|
INLET (COMPL)(PSL)(FG)(6FTX6FT-3FTX5FT)
|
EA
|
3.000
|
$6,641.000
|
$5,706.070
|
$5,500.000
|
$6,800.000
|
$15,958.240
|
|
|
INLET(COMPL)(PSL)(SFG)(3FTX3FT-3FTX3FT)
|
EA
|
1.000
|
$3,155.000
|
$3,844.750
|
$3,500.000
|
$4,200.000
|
$11,094.270
|
|
|
INLET(COMPL)(PSL)(SFG)(4FTX4FT-4FTX4FT)
|
EA
|
52.000
|
$4,345.000
|
$5,199.930
|
$3,900.000
|
$5,500.000
|
$15,074.670
|
|
|
INLET(COMPL)(PSL)(SFG)(3FTX5FT-3FTX5FT)
|
EA
|
3.000
|
$4,750.000
|
$4,141.220
|
$4,000.000
|
$5,000.000
|
$13,648.260
|
|
|
INLET (COMPL)(TY MSE2)
|
EA
|
8.000
|
$5,100.000
|
$4,961.950
|
$4,900.000
|
$4,000.000
|
$8,676.250
|
|
|
MANH (COMPL)(JUNCT BOX)
|
EA
|
1.000
|
$8,225.000
|
$22,938.670
|
$25,000.000
|
$25,000.000
|
$36,710.110
|
|
|
SET (TY II) (36 IN) (RCP) (3: 1) (P)
|
EA
|
2.000
|
$2,256.000
|
$3,513.760
|
$4,700.000
|
$1,800.000
|
$4,816.150
|
|
|
GRATE AND FRAME (BRIDGE DRAIN)
|
EA
|
5.000
|
$2,954.080
|
$2,260.420
|
$1,650.000
|
$2,350.000
|
$2,185.200
|
|
|
JACK BOR OR TUN PIPE(24 IN)(RC)(CL III)
|
LF
|
55.000
|
$678.000
|
$527.720
|
$650.000
|
$450.000
|
$632.170
|
|
|
JACK BOR OR TUN PIPE(30 IN)(STL CASING)
|
LF
|
295.000
|
$50.000
|
$324.580
|
$325.000
|
$295.000
|
$346.190
|
|
|
JACK BOR OR TUN PIPE(48 IN)(RC)(CL III)
|
LF
|
44.000
|
$770.000
|
$857.800
|
$1,050.000
|
$775.000
|
$1,181.250
|
|
|
JACK BOR OR TUN PIPE(48 IN)(STL CASING)
|
LF
|
300.000
|
$725.000
|
$675.360
|
$600.000
|
$650.000
|
$570.560
|
|
|
JACK BOR TUN BOX CULV (6 FT X 3 FT)
|
LF
|
50.000
|
$1,314.000
|
$437.220
|
$600.000
|
$1.000
|
$2,278.150
|
|
|
PIPE (PVC) (SCH 40) (6 IN)
|
LF
|
260.000
|
$54.460
|
$37.290
|
$28.500
|
$16.000
|
$54.730
|
|
|
REMOV STR (INLET)
|
EA
|
14.000
|
$1,500.000
|
$660.170
|
$670.000
|
$1,250.000
|
$572.540
|
|
|
REMOV STR (MANHOLE)
|
EA
|
10.000
|
$427.000
|
$990.250
|
$820.000
|
$1,200.000
|
$615.490
|
|
|
REMOV STR (PIPE)
|
LF
|
3,859.000
|
$13.000
|
$29.670
|
$15.000
|
$21.000
|
$31.470
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$2,250,000.000
|
$2,070,083.870
|
$1,390,000.000
|
$2,870,660.000
|
$4,300,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
18.000
|
$8,100.000
|
$14,933.800
|
$11,700.000
|
$12,000.000
|
$15,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
20.000
|
$4.750
|
$31.830
|
$123.000
|
$35.000
|
$29.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
20.000
|
$8.500
|
$8.480
|
$36.000
|
$15.000
|
$9.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
900.000
|
$20.000
|
$16.280
|
$46.500
|
$18.000
|
$19.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
900.000
|
$6.000
|
$6.580
|
$9.600
|
$8.000
|
$7.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
14,897.000
|
$2.500
|
$2.610
|
$2.200
|
$2.500
|
$2.400
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
14,897.000
|
$0.750
|
$0.660
|
$0.570
|
$0.750
|
$0.750
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
1,234.000
|
$5.000
|
$4.100
|
$15.500
|
$6.000
|
$4.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
523.000
|
$4.500
|
$4.540
|
$18.500
|
$6.000
|
$3.750
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
575.000
|
$5.000
|
$5.800
|
$18.500
|
$8.500
|
$4.750
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
2,332.000
|
$1.250
|
$1.230
|
$1.750
|
$1.500
|
$1.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
1,127.000
|
$25.000
|
$27.230
|
$72.000
|
$95.000
|
$101.160
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
15,090.000
|
$25.000
|
$46.930
|
$40.000
|
$62.500
|
$104.530
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
6,960.000
|
$45.000
|
$42.540
|
$27.000
|
$62.000
|
$102.950
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
120.000
|
$45.000
|
$45.790
|
$80.000
|
$70.000
|
$118.970
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
17,730.000
|
$5.000
|
$4.870
|
$3.000
|
$3.000
|
$6.460
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
5,860.000
|
$5.050
|
$4.870
|
$5.600
|
$3.500
|
$6.790
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
160.000
|
$7.000
|
$4.930
|
$12.000
|
$7.000
|
$7.940
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
15,090.000
|
$7.000
|
$7.870
|
$5.400
|
$4.000
|
$6.460
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
6,960.000
|
$10.390
|
$7.870
|
$5.600
|
$5.000
|
$6.790
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
120.000
|
$15.000
|
$7.870
|
$25.000
|
$8.500
|
$6.790
|
|
|
CONC CURB (MONO) (TY II)
|
LF
|
9,166.000
|
$7.000
|
$6.420
|
$6.600
|
$6.500
|
$6.500
|
|
|
CONC SIDEWALKS (4")
|
SY
|
1,367.000
|
$33.000
|
$44.320
|
$40.000
|
$42.000
|
$36.000
|
|
|
CURB RAMPS (TY 1)
|
EA
|
1.000
|
$1,100.000
|
$1,117.520
|
$1,000.000
|
$950.000
|
$900.000
|
|
|
CURB RAMPS (TY 2)
|
EA
|
2.000
|
$1,100.000
|
$1,540.590
|
$1,130.000
|
$1,050.000
|
$1,000.000
|
|
|
CURB RAMPS (TY 3)
|
EA
|
1.000
|
$1,400.000
|
$1,047.500
|
$1,320.000
|
$1,250.000
|
$1,200.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
8.000
|
$1,750.000
|
$2,145.550
|
$3,100.000
|
$2,100.000
|
$2,800.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
471.000
|
$3.000
|
$4.130
|
$21.000
|
$4.500
|
$19.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
7.000
|
$210.000
|
$291.570
|
$390.000
|
$300.000
|
$350.000
|
|
|
REMOVE DOWNSTREAM ANCHOR TERMINAL
|
EA
|
2.000
|
$95.000
|
$220.060
|
$280.000
|
$300.000
|
$250.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
7.000
|
$170.000
|
$275.070
|
$330.000
|
$300.000
|
$300.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
8.000
|
$2,250.000
|
$3,520.900
|
$4,300.000
|
$3,750.000
|
$3,850.000
|
|
|
CRASH CUSH ATTEN (INSTL)
|
EA
|
14.000
|
$10,750.000
|
$9,902.530
|
$13,500.000
|
$11,000.000
|
$12,200.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
14.000
|
$1,420.000
|
$1,760.450
|
$970.000
|
$600.000
|
$875.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
9.000
|
$812.000
|
$440.110
|
$830.000
|
$600.000
|
$750.000
|
|
|
PIPE UNDERDRAINS (TY 6) (6")
|
LF
|
5,324.000
|
$18.000
|
$18.220
|
$23.000
|
$14.000
|
$51.950
|
|
|
PIPE UNDERDRAINS (TY 9)(4")
|
LF
|
2,641.000
|
$18.000
|
$18.220
|
$16.500
|
$14.000
|
$80.630
|
|
|
REPLACE LUMINAIRE W/LED (150W EQ)
|
EA
|
2.000
|
$1,500.000
|
$1,705.440
|
$1,600.000
|
$1,560.000
|
$1,550.000
|
|
|
IN RD IL (U/P) (TY 1) (150W EQ) LED
|
EA
|
3.000
|
$1,350.000
|
$3,288.740
|
$3,000.000
|
$3,000.000
|
$2,989.000
|
|
|
IN RD IL (U/P) (TY 2) (150W EQ) LED
|
EA
|
10.000
|
$1,020.000
|
$3,446.080
|
$3,150.000
|
$3,150.000
|
$3,132.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
1,826.000
|
$9.500
|
$21.460
|
$20.000
|
$20.000
|
$19.500
|
|
|
CONDT (PVC) (SCH 40) (2") (BORE)
|
LF
|
457.000
|
$25.000
|
$36.310
|
$33.500
|
$35.000
|
$33.000
|
|
|
CONDT (PVC) (SCH 40) (3")
|
LF
|
10,447.000
|
$20.000
|
$23.350
|
$21.500
|
$22.000
|
$21.220
|
|
|
CONDT (PVC) (SCH 40) (3") (BORE)
|
LF
|
3,296.000
|
$35.000
|
$46.210
|
$43.000
|
$42.500
|
$42.000
|
|
|
CONDT (RM) (3/4")
|
LF
|
885.000
|
$24.000
|
$30.140
|
$28.000
|
$28.000
|
$27.390
|
|
|
CONDT (RM) (2")
|
LF
|
1,150.000
|
$29.000
|
$65.990
|
$60.000
|
$60.000
|
$59.980
|
|
|
CONDT (RM) (3")
|
LF
|
290.000
|
$50.000
|
$74.470
|
$68.000
|
$68.000
|
$67.680
|
|
|
ELEC CONDR (NO.14) INSULATED
|
LF
|
19,725.000
|
$0.900
|
$1.600
|
$1.500
|
$1.500
|
$1.450
|
|
|
ELEC CONDR (NO.12) BARE
|
LF
|
1,520.000
|
$1.500
|
$3.260
|
$3.000
|
$3.000
|
$2.960
|
|
|
ELEC CONDR (NO.12) INSULATED
|
LF
|
3,040.000
|
$1.500
|
$3.260
|
$3.000
|
$3.000
|
$2.960
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
5,797.000
|
$1.500
|
$4.060
|
$3.700
|
$3.750
|
$3.690
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
1,635.000
|
$1.500
|
$4.530
|
$4.150
|
$4.250
|
$4.120
|
|
|
GROUND BOX TY A (122311)
|
EA
|
1.000
|
$325.000
|
$1,160.800
|
$1,100.000
|
$1,060.000
|
$1,055.000
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
21.000
|
$1,000.000
|
$1,375.350
|
$1,300.000
|
$1,300.000
|
$1,250.000
|
|
|
GROUND BOX TY 1 (122422)
|
EA
|
2.000
|
$1,000.000
|
$3,687.040
|
$3,400.000
|
$3,500.000
|
$3,351.000
|
|
|
GROUND BOX TY 1 (122422)W/APRON
|
EA
|
59.000
|
$4,500.000
|
$4,375.820
|
$4,000.000
|
$4,000.000
|
$3,977.000
|
|
|
REMOVE GROUND BOX
|
EA
|
58.000
|
$340.000
|
$137.540
|
$127.000
|
$130.000
|
$125.000
|
|
|
REMOVE ELECTRICAL SERVICES
|
EA
|
1.000
|
$825.000
|
$1,375.350
|
$1,300.000
|
$1,275.000
|
$1,250.000
|
|
|
ELC SRV TY A 240/480 060(NS)SS(E)GC(O)
|
EA
|
1.000
|
$7,750.000
|
$7,542.430
|
$6,900.000
|
$6,900.000
|
$6,855.000
|
|
|
ELC SRV TY D 120/240 060(NS)GS(N)GC(O)
|
EA
|
1.000
|
$7,500.000
|
$8,573.390
|
$7,800.000
|
$8,000.000
|
$7,792.000
|
|
|
ELC SRV TY D 120/240 100(NS)GS(N)EX(O)
|
EA
|
1.000
|
$6,000.000
|
$4,363.710
|
$4,000.000
|
$4,000.000
|
$3,966.000
|
|
|
ELC SRV TY D 120/240 100(NS)GS(N)GC(O)
|
EA
|
2.000
|
$7,000.000
|
$6,332.120
|
$5,800.000
|
$5,800.000
|
$5,755.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
45.000
|
$40.000
|
$40.040
|
$37.000
|
$37.000
|
$36.390
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
1,942.750
|
$40.000
|
$43.540
|
$40.000
|
$40.000
|
$39.570
|
|
|
ALUMINUM SIGNS (TY O)
|
SF
|
2,402.000
|
$45.000
|
$45.230
|
$41.500
|
$41.250
|
$41.110
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY O)
|
SF
|
717.750
|
$40.000
|
$45.230
|
$41.500
|
$41.250
|
$41.110
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
19.000
|
$500.000
|
$878.020
|
$800.000
|
$800.000
|
$798.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
35.000
|
$600.000
|
$961.650
|
$875.000
|
$900.000
|
$874.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
9.000
|
$500.000
|
$1,026.560
|
$935.000
|
$950.000
|
$933.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
16.000
|
$650.000
|
$1,159.700
|
$1,060.000
|
$1,075.000
|
$1,054.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
11.000
|
$800.000
|
$1,138.790
|
$1,040.000
|
$1,050.000
|
$1,035.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-2EXT)
|
EA
|
2.000
|
$925.000
|
$1,126.690
|
$1,025.000
|
$1,050.000
|
$1,024.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
|
EA
|
1.000
|
$800.000
|
$1,270.820
|
$1,200.000
|
$1,200.000
|
$1,155.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
|
EA
|
1.000
|
$2,500.000
|
$3,286.540
|
$3,000.000
|
$3,000.000
|
$2,987.000
|
|
|
IN SM RD SN SUP&AM (RAIL MOUNT)
|
EA
|
11.000
|
$4,500.000
|
$3,914.800
|
$3,600.000
|
$3,600.000
|
$3,558.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
89.000
|
$150.000
|
$137.540
|
$127.000
|
$130.000
|
$125.000
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
9,782.000
|
$7.000
|
$8.050
|
$7.350
|
$7.350
|
$7.320
|
|
|
REMOVE LRSA
|
EA
|
13.000
|
$1,000.000
|
$1,708.740
|
$1,600.000
|
$1,600.000
|
$1,553.000
|
|
|
INS OH SN SUP(30 FT BAL TEE)
|
EA
|
3.000
|
$40,000.000
|
$36,304.870
|
$33,000.000
|
$33,000.000
|
$32,996.000
|
|
|
INS OH SN SUP(35 FT CANT)(CIRC TUBE)
|
EA
|
4.000
|
$90,000.000
|
$112,665.000
|
$113,000.000
|
$115,000.000
|
$112,665.000
|
|
|
INS OH SN SUP(155 FT BRDG)(CIRC TUBE)
|
EA
|
4.000
|
$330,000.000
|
$369,446.000
|
$370,000.000
|
$370,000.000
|
$369,446.000
|
|
|
REMOVE OVERHD SIGN SUP
|
EA
|
7.000
|
$12,000.000
|
$13,812.930
|
$12,600.000
|
$13,000.000
|
$12,554.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
172.000
|
$20.000
|
$22.010
|
$71.000
|
$30.000
|
$19.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
|
EA
|
90.000
|
$20.000
|
$27.510
|
$56.000
|
$30.000
|
$18.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
21.000
|
$25.000
|
$27.510
|
$56.000
|
$35.000
|
$27.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
50,490.000
|
$1.240
|
$1.270
|
$1.600
|
$1.300
|
$1.250
|
|
|
WK ZN PAV MRK REMOV (W)8"(DOT)
|
LF
|
243.000
|
$2.500
|
$2.810
|
$3.500
|
$2.850
|
$2.810
|
|
|
WK ZN PAV MRK REMOV (W)4"(BKN W/MRKR)
|
LF
|
9,000.000
|
$0.720
|
$1.270
|
$2.000
|
$1.650
|
$1.600
|
|
|
WK ZN PAV MRK REMOV (W)(ARROW)
|
EA
|
16.000
|
$100.000
|
$165.040
|
$220.000
|
$180.000
|
$175.470
|
|
|
WK ZN PAV MRK REMOV (W)(WORD)
|
EA
|
7.000
|
$170.000
|
$165.040
|
$320.000
|
$260.000
|
$255.680
|
|
|
WK ZN PAV MRK REMOV (W)36"(YLD TRI)
|
EA
|
43.000
|
$70.000
|
$34.110
|
$7.700
|
$6.100
|
$6.070
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
38,930.000
|
$1.380
|
$1.270
|
$1.600
|
$1.300
|
$1.250
|
|
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
|
LF
|
270.000
|
$0.500
|
$0.610
|
$0.480
|
$0.500
|
$0.450
|
|
REFL PAV MRK TY I (W)4"(SLD)(100MIL)
|
LF
|
22,106.000
|
$0.500
|
$0.610
|
$0.480
|
$0.500
|
$0.450
|
|
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
|
LF
|
38,442.000
|
$0.750
|
$0.530
|
$0.680
|
$0.700
|
$0.650
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
3,851.000
|
$1.000
|
$1.010
|
$0.950
|
$0.950
|
$0.900
|
|
REFL PAV MRK TY I (W)12"(LNDP)(100MIL)
|
LF
|
281.000
|
$2.000
|
$1.520
|
$1.700
|
$1.700
|
$1.650
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
1,074.000
|
$2.000
|
$2.090
|
$2.150
|
$2.150
|
$2.110
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
193.000
|
$5.250
|
$4.360
|
$4.200
|
$4.200
|
$4.160
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
27.000
|
$90.000
|
$60.520
|
$72.000
|
$75.000
|
$70.190
|
|
REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)
|
EA
|
4.000
|
$125.000
|
$121.030
|
$87.000
|
$90.000
|
$85.230
|
|
REFL PAV MRK TY I(W)(UTURN ARW)(100MIL)
|
EA
|
6.000
|
$125.000
|
$64.640
|
$117.000
|
$120.000
|
$115.310
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
17.000
|
$125.000
|
$60.520
|
$71.000
|
$75.000
|
$70.190
|
|
REFL PAV MRK TY I(W)(ENTR GORE)(100MIL)
|
EA
|
8.000
|
$875.000
|
$1,353.350
|
$1,210.000
|
$1,200.000
|
$1,203.190
|
|
REFL PAV MRK TY I(W)(EXIT GORE)(100MIL)
|
EA
|
6.000
|
$650.000
|
$854.920
|
$920.000
|
$920.000
|
$917.430
|
|
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
|
EA
|
54.000
|
$27.000
|
$15.330
|
$9.400
|
$9.400
|
$9.370
|
|
REFL PAV MRK TY I (Y)4"(SLD)(100MIL)
|
LF
|
20,824.000
|
$0.300
|
$0.830
|
$0.460
|
$0.500
|
$0.450
|
|
REFL PAV MRK TY II (W) 4" (DOT)
|
LF
|
270.000
|
$0.250
|
$0.120
|
$0.110
|
$0.150
|
$0.100
|
|
REFL PAV MRK TY II (W) 4" (SLD)
|
LF
|
22,106.000
|
$0.150
|
$0.120
|
$0.120
|
$0.150
|
$0.100
|
|
REFL PAV MRK TY II (W) 6" (BRK)
|
LF
|
38,442.000
|
$0.250
|
$0.110
|
$0.160
|
$0.150
|
$0.150
|
|
REFL PAV MRK TY II (W) 8" (SLD)
|
LF
|
3,851.000
|
$0.350
|
$0.240
|
$0.210
|
$0.250
|
$0.200
|
|
REFL PAV MRK TY II (W) 12" (LNDP)
|
LF
|
281.000
|
$0.750
|
$0.360
|
$0.310
|
$0.350
|
$0.300
|
|
REFL PAV MRK TY II (W) 12" (SLD)
|
LF
|
1,074.000
|
$1.000
|
$0.360
|
$1.400
|
$1.350
|
$1.350
|
|
REFL PAV MRK TY II (W) 24" (SLD)
|
LF
|
193.000
|
$2.750
|
$2.200
|
$2.500
|
$2.500
|
$2.460
|
|
REFL PAV MRK TY II (W) (ARROW)
|
EA
|
27.000
|
$58.000
|
$27.510
|
$46.000
|
$50.000
|
$45.120
|
|
REFL PAV MRK TY II (W) (DBL ARROW)
|
EA
|
4.000
|
$65.000
|
$55.020
|
$66.000
|
$70.000
|
$65.170
|
|
REFL PAV MRK TY II (W) (UTURN ARROW)
|
EA
|
6.000
|
$65.000
|
$35.510
|
$87.000
|
$90.000
|
$85.230
|
|
REFL PAV MRK TY II (W) (WORD)
|
EA
|
17.000
|
$65.000
|
$27.510
|
$46.000
|
$50.000
|
$45.120
|
|
REFL PAV MRK TY II (W) (ENTR GORE)
|
EA
|
8.000
|
$325.000
|
$273.200
|
$287.000
|
$290.000
|
$285.760
|
|
REFL PAV MRK TY II (W) (EXIT GORE)
|
EA
|
6.000
|
$275.000
|
$169.000
|
$217.000
|
$220.000
|
$215.570
|
|
REFL PAV MRK TY II (W) 36" (YLD TRI)
|
EA
|
54.000
|
$17.000
|
$6.770
|
$452.000
|
$8.400
|
$8.370
|
|
REFL PAV MRK TY II (Y) 4" (SLD)
|
LF
|
20,824.000
|
$0.150
|
$0.120
|
$0.110
|
$0.150
|
$0.100
|
|
REFL PAV MRKR TY I-R
|
EA
|
56.000
|
$4.000
|
$3.270
|
$4.300
|
$4.300
|
$4.260
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
976.000
|
$3.000
|
$3.270
|
$3.600
|
$3.600
|
$3.560
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
22,509.000
|
$0.350
|
$0.680
|
$0.410
|
$0.450
|
$0.400
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
34,040.000
|
$0.700
|
$0.460
|
$0.610
|
$0.650
|
$0.600
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
3,860.000
|
$1.000
|
$1.380
|
$0.820
|
$0.850
|
$0.800
|
|
|
ELIM EXT PAV MRK & MRKS (12")
|
LF
|
480.000
|
$2.700
|
$3.740
|
$4.600
|
$4.600
|
$4.560
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
611.000
|
$3.500
|
$4.130
|
$9.200
|
$8.150
|
$8.120
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
25.000
|
$60.000
|
$137.540
|
$141.000
|
$140.000
|
$140.370
|
|
|
ELIM EXT PAV MRK & MRKS (DBL ARROW)
|
EA
|
3.000
|
$70.000
|
$203.550
|
$212.000
|
$210.000
|
$210.560
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
16.000
|
$70.000
|
$137.540
|
$141.000
|
$140.000
|
$140.370
|
|
|
ELIM EXT PAV MRK & MRKS (ENTR GORE)
|
EA
|
5.000
|
$190.000
|
$1,966.200
|
$730.000
|
$730.000
|
$726.930
|
|
|
ELIM EXT PAV MRK & MRKS (EXIT GORE)
|
EA
|
6.000
|
$240.000
|
$110.030
|
$815.000
|
$815.000
|
$812.150
|
|
|
ELIM EXT PAV MRK & MRKS (UTURN ARROW)
|
EA
|
6.000
|
$60.000
|
$88.020
|
$280.000
|
$275.000
|
$275.730
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
43,200.000
|
$0.070
|
$0.070
|
$0.110
|
$0.150
|
$0.100
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
38,442.000
|
$0.250
|
$0.090
|
$0.160
|
$0.150
|
$0.150
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
3,851.000
|
$0.500
|
$0.130
|
$0.210
|
$0.200
|
$0.200
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
1,355.000
|
$0.500
|
$0.280
|
$0.570
|
$0.600
|
$0.550
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
193.000
|
$2.000
|
$0.550
|
$1.270
|
$1.250
|
$1.250
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
27.000
|
$30.000
|
$22.010
|
$41.000
|
$45.000
|
$40.110
|
|
|
PAV SURF PREP FOR MRK (DBL ARROW)
|
EA
|
4.000
|
$50.000
|
$88.020
|
$66.000
|
$65.000
|
$65.170
|
|
|
PAV SURF PREP FOR MRK (UTURN ARR)
|
EA
|
6.000
|
$15.000
|
$121.030
|
$80.000
|
$80.000
|
$79.710
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
17.000
|
$40.000
|
$22.010
|
$41.000
|
$40.000
|
$40.110
|
|
|
PAV SURF PREP FOR MRK (ENTR GORE)
|
EA
|
8.000
|
$40.000
|
$253.070
|
$345.000
|
$345.000
|
$340.900
|
|
|
PAV SURF PREP FOR MRK (EXIT GORE)
|
EA
|
6.000
|
$40.000
|
$187.050
|
$260.000
|
$255.000
|
$255.680
|
|
|
PAV SURF PREP FOR MRK (36")(YLD TRI)
|
EA
|
54.000
|
$9.000
|
$33.010
|
$5.250
|
$5.200
|
$5.160
|
|
|
LOOSE AGGR FOR GROUNDCOVER (TYPE II)
|
CY
|
7,532.000
|
$65.000
|
$48.270
|
$32.000
|
$65.000
|
$68.000
|
|
|
RMV, STCKPL, CLEAN, RELAY LOOSE AGGRGT
|
STA
|
69.200
|
$278.140
|
$361.020
|
$755.000
|
$1,150.000
|
$800.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
8.000
|
$6,500.000
|
$8,802.250
|
$6,300.000
|
$7,500.000
|
$18,000.000
|
|
|
ITS SYSTEM SUPPORT EQUIPMENT
|
LS
|
1.000
|
$95,810.000
|
$126,532.300
|
$120,000.000
|
$125,000.000
|
$115,000.000
|
|
|
ITS COM CBL (ETHERNET)
|
LF
|
100.000
|
$6.000
|
$20.910
|
$19.500
|
$20.000
|
$19.000
|
|
|
FIBER OPTIC CBL (SNGLE-MODE)(12 FIBER)
|
LF
|
2,943.000
|
$5.000
|
$6.730
|
$6.150
|
$6.150
|
$6.120
|
|
|
FIBER OPTIC CBL (SNGLE-MODE)(24 FIBER)
|
LF
|
83.000
|
$5.300
|
$16.830
|
$15.500
|
$16.000
|
$15.300
|
|
|
FIBER OPTIC CBL (SNGLE-MODE)(144 FIBER)
|
LF
|
15,670.000
|
$4.000
|
$10.970
|
$10.000
|
$10.000
|
$9.970
|
|
|
FIBER OPTIC PIGTAIL (12 FIBER)
|
LF
|
4,301.000
|
$12.500
|
$13.750
|
$13.000
|
$12.750
|
$12.500
|
|
|
FIBER OPTIC SPLICE ENCLOSURE
|
EA
|
5.000
|
$2,600.000
|
$4,571.670
|
$4,200.000
|
$4,160.000
|
$4,155.000
|
|
|
FIBER OPTIC PATCH PANEL (12 POSITION)
|
EA
|
11.000
|
$2,300.000
|
$2,750.700
|
$2,600.000
|
$2,550.000
|
$2,500.000
|
|
|
FIBER OPTIC CABLE ROAD MARKER
|
EA
|
14.000
|
$180.000
|
$495.130
|
$455.000
|
$450.000
|
$450.000
|
|
|
FIBER OPTIC PATCH PANEL (144 POSITION)
|
EA
|
5.000
|
$6,800.000
|
$2,860.730
|
$2,700.000
|
$2,650.000
|
$2,600.000
|
|
|
FIBER OPTIC FUSION SPLICE
|
EA
|
228.000
|
$80.000
|
$23.620
|
$21.500
|
$21.500
|
$21.470
|
|
|
REMOVE FIBER OPTIC CABLE
|
LF
|
18,196.000
|
$1.400
|
$2.750
|
$2.600
|
$2.550
|
$2.500
|
|
|
CCTV FIELD EQUIPMENT (ANALOG)
|
EA
|
6.000
|
$11,000.000
|
$13,959.260
|
$12,700.000
|
$12,700.000
|
$12,687.000
|
|
|
CCTV FIELD CONTROLLER
|
EA
|
6.000
|
$2,350.000
|
$2,858.530
|
$2,600.000
|
$2,600.000
|
$2,598.000
|
|
|
REMOVE CCTV FIELD EQUIPMENT
|
EA
|
3.000
|
$3,000.000
|
$1,650.420
|
$1,550.000
|
$1,550.000
|
$1,500.000
|
|
|
CONDUIT (PREPARE)
|
LF
|
4,651.000
|
$9.000
|
$5.630
|
$5.200
|
$5.250
|
$5.120
|
|
|
JUNCTION BOX (INSTALL)
|
EA
|
6.000
|
$830.000
|
$1,495.560
|
$1,400.000
|
$1,400.000
|
$1,359.250
|
|
|
GROUND BOX (PREPARE)
|
EA
|
25.000
|
$350.000
|
$1,712.040
|
$1,600.000
|
$1,600.000
|
$1,556.000
|
|
|
RADAR VEHICLE SENSING DEVICE
|
EA
|
6.000
|
$10,000.000
|
$9,792.500
|
$9,000.000
|
$9,000.000
|
$8,900.000
|
|
|
RELOCATE ITS RADIO
|
EA
|
4.000
|
$1,700.000
|
$2,921.250
|
$2,700.000
|
$2,700.000
|
$2,655.000
|
|
|
REMOVE ITS RADIO
|
EA
|
3.000
|
$1,000.000
|
$1,375.350
|
$1,300.000
|
$1,300.000
|
$1,250.000
|
|
|
ITS POLE (55 FT)(90 MPH)
|
EA
|
6.000
|
$15,000.000
|
$16,499.810
|
$15,000.000
|
$15,000.000
|
$14,996.000
|
|
|
ITS POLE (55 FT)(REM)
|
EA
|
3.000
|
$500.000
|
$1,853.970
|
$1,700.000
|
$1,700.000
|
$1,685.000
|
|
|
ITS POLE MNT CAB (TY 2)(CONF 2)(INS)
|
EA
|
6.000
|
$8,000.000
|
$7,821.900
|
$7,200.000
|
$7,200.000
|
$7,109.000
|
|
|
ITS POLE MNT CAB (TY 2)(CONF 2)(REM)
|
EA
|
3.000
|
$1,500.000
|
$2,570.260
|
$2,400.000
|
$2,400.000
|
$2,336.000
|
|
|
REMOVE DYNAMIC MESSAGE SIGN SYSTEM
|
EA
|
3.000
|
$22,000.000
|
$5,009.580
|
$4,600.000
|
$4,600.000
|
$4,553.000
|
|
|
SYSTEM INTEGRATION
|
LS
|
1.000
|
$82,000.000
|
$99,025.280
|
$91,000.000
|
$100,000.000
|
$90,000.000
|
|
|
INSTALLATION OF VE
|
EA
|
6.000
|
$1,300.000
|
$3,850.980
|
$3,600.000
|
$3,700.000
|
$3,500.000
|
|
|
INSTALLATION OF VD
|
EA
|
7.000
|
$1,300.000
|
$3,850.980
|
$3,600.000
|
$3,700.000
|
$3,500.000
|
|
|
INSTALLATION OF TS
|
EA
|
1.000
|
$1,300.000
|
$3,850.980
|
$3,600.000
|
$3,700.000
|
$3,500.000
|
|
|
INSTALLATION OF FES
|
EA
|
15.000
|
$1,300.000
|
$3,850.980
|
$3,600.000
|
$3,700.000
|
$3,500.000
|
|
|
TMA (STATIONARY)
|
EA
|
3.000
|
$5,000.000
|
$39,610.110
|
$40,000.000
|
$12,000.000
|
$6,500.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
25.000
|
$640.000
|
$66.020
|
$395.000
|
$400.000
|
$185.000
|
|
|
RMV DRUM SIGN ASSEMBLY
|
EA
|
4.000
|
$3,350.000
|
$2,035.520
|
$1,900.000
|
$1,900.000
|
$1,850.000
|
|
|
BLUETOOTH DETECTION SYSTEM (INSTALL)
|
EA
|
6.000
|
$9,000.000
|
$13,567.560
|
$12,400.000
|
$12,500.000
|
$12,331.000
|
|
|
ADD/DROP MULTIPLEXOR CHASSIS
|
EA
|
2.000
|
$8,700.000
|
$6,051.550
|
$5,600.000
|
$5,600.000
|
$5,500.000
|
|
|
ADD/DROP MULTIPLEXOR CHASSIS LICENSE
|
EA
|
2.000
|
$7,200.000
|
$8,252.110
|
$7,600.000
|
$7,600.000
|
$7,500.000
|
|
|
ADD/DROP MULTIPLEXOR CHASSIS POWER SUPP
|
EA
|
4.000
|
$5,600.000
|
$8,789.040
|
$8,000.000
|
$8,000.000
|
$7,988.000
|
|
|
BORA WITH ULM
|
EA
|
2.000
|
$46,000.000
|
$42,910.960
|
$40,000.000
|
$40,000.000
|
$39,000.000
|
|
|
H264 VIDEO CARD
|
EA
|
2.000
|
$4,500.000
|
$7,701.970
|
$7,100.000
|
$7,500.000
|
$7,000.000
|
|
|
CARD FANOUT CABLE
|
EA
|
2.000
|
$400.000
|
$550.140
|
$510.000
|
$550.000
|
$500.000
|
|
|
RS-232 INTERFACE CARD
|
EA
|
2.000
|
$2,600.000
|
$3,300.850
|
$3,200.000
|
$3,500.000
|
$3,000.000
|
|
|
ETHERNET INTERFACE CARD
|
EA
|
2.000
|
$6,200.000
|
$5,501.410
|
$5,100.000
|
$5,500.000
|
$5,000.000
|
|
|
COLOR DMS (POLE MNT CABINET)
|
EA
|
3.000
|
$168,000.000
|
$169,885.000
|
$170,000.000
|
$170,000.000
|
$169,885.000
|
|
Totals: |
$30,216,718.587
|
$32,640,631.250
|
$34,842,418.825
|
$36,546,864.688
|
$44,774,701.230
|