|
|
PREPARING ROW
|
STA
|
230.300
|
$1,000.000
|
$6,600.000
|
$10,000.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
3,292.000
|
$10.500
|
$11.000
|
$10.000
|
|
|
REMOVING CONC (CTB)
|
LF
|
1,868.000
|
$13.080
|
$17.000
|
$12.000
|
|
|
REMOVING CONC (DRAIN)
|
SY
|
165.000
|
$8.000
|
$10.000
|
$15.000
|
|
|
REMOVING CONC (FLUME)
|
SY
|
5,601.000
|
$20.000
|
$9.000
|
$7.000
|
|
|
REMOVING STB BASE AND ASPH PAV(10-14")
|
SY
|
142,836.000
|
$4.000
|
$4.800
|
$4.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
243,645.000
|
$10.000
|
$7.000
|
$11.500
|
|
|
EXCAVATION (SPECIAL)
|
CY
|
120,595.000
|
$10.000
|
$7.000
|
$9.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY A)
|
CY
|
321,372.000
|
$7.000
|
$11.000
|
$6.000
|
|
|
LANDSCAPE EDGE
|
LF
|
3,382.000
|
$4.650
|
$20.000
|
$18.000
|
|
|
PLANT MATERIAL (5 GAL) (SHRUB)
|
EA
|
908.000
|
$47.000
|
$40.000
|
$62.000
|
|
|
PLANT MATERIAL (MIN 6'HT) (BARE ROOT)
|
EA
|
118.000
|
$400.000
|
$125.000
|
$58.500
|
|
|
PLANT MAINTENANCE
|
MO
|
12.000
|
$850.000
|
$1,000.000
|
$2,400.000
|
|
|
PLANT REPLACEMENT (5-GAL)
|
EA
|
81.000
|
$34.000
|
$50.000
|
$69.750
|
|
|
FL BS (RDWY DEL)(TY A GR 1-2)(FNAL POS)
|
CY
|
2,167.000
|
$83.750
|
$40.000
|
$60.000
|
|
|
FL BS (CMP IN PLC)(TY A GR 5)(4")
|
SY
|
29,538.000
|
$8.000
|
$10.000
|
$7.500
|
|
|
CEMENT
|
TON
|
145.000
|
$212.190
|
$250.000
|
$250.000
|
|
|
CEMENT TREAT (NEW BASE) (6")
|
SY
|
12,824.000
|
$3.500
|
$2.000
|
$2.750
|
|
|
PRIME COAT (MULTI OPTION)
|
GAL
|
8,688.000
|
$3.970
|
$8.000
|
$9.000
|
|
|
EMULS ASPH (BS OR SUBGR TRT)(CSS-1H)
|
GAL
|
134,296.000
|
$5.000
|
$8.000
|
$10.500
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(10")
|
SY
|
14,286.000
|
$82.000
|
$65.000
|
$65.000
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
8,114.000
|
$1.680
|
$2.250
|
$2.500
|
|
|
CONC PVMT (CONT REINF - CRCP) (9")
|
SY
|
3,942.000
|
$39.860
|
$80.000
|
$85.000
|
|
|
STRUCT EXCAV (PIPE)
|
CY
|
6,482.000
|
$1.000
|
$5.000
|
$1.000
|
|
|
CEM STABIL BKFL
|
CY
|
7,014.000
|
$75.000
|
$140.000
|
$170.000
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
330.000
|
$60.000
|
$50.000
|
$150.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
213.000
|
$220.680
|
$165.000
|
$170.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
36,189.000
|
$2.860
|
$1.000
|
$4.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
73,877.000
|
$15.000
|
$22.000
|
$26.000
|
|
|
SOIL NAIL ANCHORS
|
LF
|
10,650.000
|
$36.000
|
$60.000
|
$18.500
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
216.000
|
$104.790
|
$140.000
|
$145.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
1,700.000
|
$430.000
|
$330.000
|
$325.000
|
|
|
DRILL SHAFT (42 IN)
|
LF
|
146.000
|
$469.880
|
$452.000
|
$500.000
|
|
|
DRILL SHAFT (48 IN)
|
LF
|
360.000
|
$425.370
|
$485.000
|
$550.000
|
|
|
DRILL SHAFT (60 IN)
|
LF
|
310.000
|
$728.170
|
$700.000
|
$710.000
|
|
|
DRILL SHAFT (SIGN MTS) (24 IN)
|
LF
|
46.000
|
$284.170
|
$300.000
|
$300.000
|
|
|
DRILL SHAFT (HIGH MAST POLE) (60 IN)
|
LF
|
769.000
|
$104.790
|
$693.000
|
$705.000
|
|
|
CL B CONC (FLUME)
|
CY
|
33.000
|
$450.000
|
$580.000
|
$1,400.000
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
10.400
|
$1,130.600
|
$1,500.000
|
$1,800.000
|
|
|
CL C CONC (ABUT)(HPC)(EXTEND)
|
CY
|
136.800
|
$1,589.170
|
$1,800.000
|
$1,400.000
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
173.900
|
$1,052.470
|
$1,400.000
|
$1,850.000
|
|
|
CL C CONC (COLUMN)
|
CY
|
46.500
|
$987.740
|
$3,100.000
|
$1,350.000
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
167.000
|
$1,030.620
|
$1,400.000
|
$1,050.000
|
|
|
CL C CONC (CRASHWALL)(HPC)
|
CY
|
247.200
|
$1,119.370
|
$920.000
|
$700.000
|
|
|
CL C CONC (COLLAR)
|
EA
|
18.000
|
$1,455.380
|
$2,200.000
|
$600.000
|
|
|
CL C CONC (MISC)
|
CY
|
34.000
|
$787.410
|
$750.000
|
$400.000
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
8,820.000
|
$17.880
|
$27.000
|
$30.000
|
|
|
REINF CONC SLAB (EXTEND SLAB)(HPC)
|
SF
|
25,692.000
|
$30.000
|
$25.000
|
$28.000
|
|
|
APPROACH SLAB (EXTEND) (HPC)
|
CY
|
558.100
|
$1,143.820
|
$540.000
|
$800.000
|
|
|
RETAINING WALL (MSE)
|
SF
|
120,031.000
|
$44.000
|
$69.000
|
$80.000
|
|
|
RETAINING WALL (CAST - IN - PLACE)
|
SF
|
25,503.000
|
$65.000
|
$49.000
|
$50.000
|
|
|
RETAINING WALL (SOIL NAIL)(FACIA)
|
SF
|
8,780.000
|
$36.000
|
$58.000
|
$65.000
|
|
|
PRESTR CONC GIRDER (TX34)
|
LF
|
4,249.210
|
$183.990
|
$265.000
|
$235.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
1,685.000
|
$309.650
|
$430.000
|
$430.000
|
|
|
RIPRAP (CONC)(CL B)(RR8&RR9)
|
CY
|
61.000
|
$476.730
|
$435.000
|
$600.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
239.000
|
$531.480
|
$450.000
|
$450.000
|
|
|
RAIL (TY T402)
|
LF
|
859.000
|
$135.000
|
$180.000
|
$265.000
|
|
|
RAIL (TY T402)(HPC)
|
LF
|
1,260.000
|
$130.000
|
$180.000
|
$275.000
|
|
|
RAIL (TY T551)
|
LF
|
20,854.000
|
$45.000
|
$60.000
|
$65.000
|
|
|
RAIL (TY T551)(HPC)
|
LF
|
336.000
|
$77.000
|
$79.000
|
$85.000
|
|
|
RAIL (TY PR1)
|
LF
|
773.000
|
$150.000
|
$160.000
|
$235.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
324.000
|
$146.730
|
$225.000
|
$230.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - B)
|
LF
|
56.000
|
$110.000
|
$220.000
|
$300.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
10,688.000
|
$100.000
|
$108.000
|
$110.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
5,118.000
|
$102.840
|
$146.000
|
$135.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
9,487.000
|
$170.000
|
$186.000
|
$185.000
|
|
|
RC PIPE (CL III)(42 IN)
|
LF
|
879.000
|
$167.650
|
$228.000
|
$250.000
|
|
|
RC PIPE (CL III)(48 IN)
|
LF
|
743.000
|
$184.340
|
$262.000
|
$300.000
|
|
|
RC PIPE (CL III)(54 IN)
|
LF
|
148.000
|
$250.090
|
$320.000
|
$325.000
|
|
|
RC PIPE (CL V)(30 IN)
|
LF
|
122.000
|
$193.150
|
$185.000
|
$250.000
|
|
|
MANH (COMPL)(PRM)(60IN)
|
EA
|
1.000
|
$5,705.000
|
$8,300.000
|
$8,000.000
|
|
|
MANH (COMPL)(PRM)(72IN)
|
EA
|
16.000
|
$9,400.000
|
$10,100.000
|
$10,000.000
|
|
|
INLET (COMPL)(PCO)(3FT)(LEFT)
|
EA
|
2.000
|
$5,419.200
|
$7,800.000
|
$7,000.000
|
|
|
INLET (COMPL)(PCO)(3FT)(BOTH)
|
EA
|
2.000
|
$6,243.770
|
$14,000.000
|
$12,500.000
|
|
|
INLET (COMPL)(PMBD)(5FT)
|
EA
|
30.000
|
$6,870.000
|
$10,000.000
|
$8,000.000
|
|
|
INLET (COMPL)(PSL)(FG)(4FTX4FT-4FTX4FT)
|
EA
|
24.000
|
$8,331.610
|
$7,000.000
|
$6,500.000
|
|
|
INLET (COMPL)(PSL)(FG)(5FTX6FT-4FTX4FT)
|
EA
|
8.000
|
$8,749.840
|
$10,000.000
|
$8,500.000
|
|
|
INLET (COMPL)(PSL)(FG)(6FTX6FT-4FTX4FT)
|
EA
|
1.000
|
$8,750.000
|
$11,000.000
|
$10,000.000
|
|
|
JCT BOX(COMPL)(CIP)(10FTX6FT)
|
EA
|
2.000
|
$16,185.000
|
$7,000.000
|
$12,000.000
|
|
|
HEADWALL (CH - FW - 0) (DIA= 24 IN)
|
EA
|
1.000
|
$14,000.000
|
$4,100.000
|
$8,000.000
|
|
|
HEADWALL (CH - FW - 0) (DIA= 36 IN)
|
EA
|
1.000
|
$7,500.000
|
$6,800.000
|
$8,500.000
|
|
|
HEADWALL (CH - FW - 0) (DIA= 48 IN)
|
EA
|
2.000
|
$13,000.000
|
$11,300.000
|
$9,500.000
|
|
|
HEADWALL (CH - FW - 0) (DIA= 54 IN)
|
EA
|
1.000
|
$12,000.000
|
$14,000.000
|
$12,000.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 24 IN)
|
EA
|
2.000
|
$5,927.930
|
$5,000.000
|
$4,100.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 30 IN)
|
EA
|
6.000
|
$8,826.670
|
$8,700.000
|
$3,000.000
|
|
|
HEADWALL (CH - PW - S) (DIA= 24 IN)
|
EA
|
2.000
|
$12,500.000
|
$7,700.000
|
$4,200.000
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (P)
|
EA
|
1.000
|
$1,240.000
|
$2,200.000
|
$1,650.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
17.000
|
$1,750.860
|
$2,600.000
|
$2,500.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (P)
|
EA
|
3.000
|
$1,600.000
|
$2,300.000
|
$1,700.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
2.000
|
$2,430.430
|
$2,400.000
|
$2,200.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$1,800.000
|
$2,400.000
|
$2,100.000
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
9.000
|
$2,799.020
|
$2,900.000
|
$3,400.000
|
|
|
SET (TY II) (36 IN) (RCP) (4: 1) (C)
|
EA
|
12.000
|
$4,587.730
|
$4,300.000
|
$4,400.000
|
|
|
REMOV STR (INLET)
|
EA
|
10.000
|
$1,000.000
|
$310.000
|
$1,400.000
|
|
|
REMOV STR (SET)
|
EA
|
4.000
|
$535.280
|
$189.000
|
$700.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
1.000
|
$1,141.340
|
$1,262.000
|
$1,500.000
|
|
|
REMOV STR (PIPE)
|
EA
|
22.000
|
$357.140
|
$182.000
|
$2,500.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$5,000,000.000
|
$13,500,000.000
|
$11,125,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
42.000
|
$25,000.000
|
$19,000.000
|
$32,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
1,155.000
|
$40.000
|
$50.000
|
$55.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
260.000
|
$70.000
|
$35.000
|
$80.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
285.000
|
$42.000
|
$85.000
|
$185.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
1,700.000
|
$13.430
|
$5.000
|
$15.000
|
|
|
SANDBAGS FOR EROSION CONTROL (12")
|
LF
|
435.000
|
$5.580
|
$10.000
|
$10.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
39,303.000
|
$3.360
|
$3.350
|
$3.500
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
39,303.000
|
$0.930
|
$1.000
|
$1.250
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
1,425.000
|
$5.940
|
$5.000
|
$9.250
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,425.000
|
$2.020
|
$1.000
|
$2.900
|
|
|
CONSTRUCTING DETOURS
|
SY
|
21,504.000
|
$45.000
|
$53.000
|
$60.000
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
24,060.000
|
$28.390
|
$94.000
|
$92.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
660.000
|
$13.290
|
$88.000
|
$85.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
20.000
|
$13.290
|
$107.000
|
$95.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
50,170.000
|
$6.690
|
$4.000
|
$4.750
|
|
|
PORT CTB (STKPL)(SGL SLP)(TY 1)
|
LF
|
24,060.000
|
$13.280
|
$6.000
|
$7.400
|
|
|
PERM CTB (F-SHAPE) (TY 1)
|
LF
|
7,961.000
|
$69.560
|
$61.000
|
$75.000
|
|
|
PERM CTB (F-SHAPE) (TY 4)
|
LF
|
11,677.000
|
$120.000
|
$85.000
|
$135.000
|
|
|
CONC CURB (TY II)
|
LF
|
45,385.000
|
$11.500
|
$10.000
|
$10.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
579.000
|
$49.380
|
$63.000
|
$90.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
1,443.000
|
$39.640
|
$36.000
|
$75.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
72,080.000
|
$0.140
|
$0.350
|
$0.110
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
7,487.500
|
$22.360
|
$28.000
|
$28.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
6.000
|
$2,107.930
|
$2,200.000
|
$2,800.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
20.000
|
$1,092.000
|
$1,200.000
|
$1,800.000
|
|
|
MTL BM GD FEN TRANS (NON - SYM)
|
EA
|
1.000
|
$1,371.320
|
$1,160.000
|
$950.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
13,237.000
|
$2.380
|
$2.250
|
$4.000
|
|
|
REMOVE DOWNSTREAM ANCHOR TERMINAL
|
EA
|
1.000
|
$300.000
|
$169.000
|
$375.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
10.000
|
$201.380
|
$350.000
|
$375.000
|
|
|
CABLE BARRIER TERMINAL SECTION (TL-3)
|
EA
|
1.000
|
$1,500.000
|
$2,800.000
|
$5,500.000
|
|
|
REMOVE CABLE BARRIER
|
LF
|
16,424.000
|
$3.500
|
$2.250
|
$2.500
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
31.000
|
$2,785.140
|
$3,200.000
|
$3,000.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
12.000
|
$362.760
|
$300.000
|
$550.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
78.000
|
$1,090.170
|
$820.000
|
$1,200.000
|
|
|
CRASH CUSH ATTEN (STKPL)
|
EA
|
19.000
|
$650.110
|
$1,300.000
|
$1,000.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
1.000
|
$900.000
|
$1,065.000
|
$1,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
1.000
|
$22,641.330
|
$73,100.000
|
$35,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
19.000
|
$11,694.010
|
$15,230.000
|
$10,000.000
|
|
|
CHAIN LINK FENCE (REMOVE)
|
LF
|
7,778.000
|
$2.500
|
$7.000
|
$9.000
|
|
|
CHAIN LINK FENCE (INSTALL) (8')
|
LF
|
6,222.000
|
$60.000
|
$28.000
|
$33.000
|
|
|
CHAIN LINK FENCE GATE (INSTALL)(6'X16')
|
EA
|
2.000
|
$3,500.000
|
$2,300.000
|
$2,900.000
|
|
|
GATE (INSTALL)(DOUBLE)(6' X 16')
|
EA
|
6.000
|
$3,000.000
|
$4,200.000
|
$4,900.000
|
|
|
REMOVE RD IL ASM (TRANS-BASE)
|
EA
|
50.000
|
$1,057.720
|
$1,300.000
|
$1,255.000
|
|
|
REMOVE RD IL ASM (U/P)
|
EA
|
8.000
|
$400.000
|
$1,055.000
|
$1,055.000
|
|
|
IN RD IL (U/P) (TY 2) (150W EQ) LED
|
EA
|
13.000
|
$1,423.610
|
$2,622.000
|
$2,625.000
|
|
|
HI MST IL POLE (150 FT)( 80 MPH)
|
EA
|
29.000
|
$47,000.000
|
$47,102.000
|
$47,500.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
30,945.000
|
$18.060
|
$33.000
|
$32.350
|
|
|
CONDT (PVC) (SCH 40) (2") (BORE)
|
LF
|
2,994.000
|
$27.750
|
$39.000
|
$39.000
|
|
|
CONDT (PVC) (SCH 40) (3")
|
LF
|
2,451.000
|
$23.590
|
$42.000
|
$41.350
|
|
|
CONDT (PVC) (SCH 40) (3") (BORE)
|
LF
|
790.000
|
$37.130
|
$46.000
|
$45.750
|
|
|
CONDT (PVC) (SCH 40) (4")
|
LF
|
22,690.000
|
$20.500
|
$43.000
|
$42.250
|
|
|
CONDT (PVC) (SCH 40) (4") (BORE)
|
LF
|
601.000
|
$42.000
|
$60.000
|
$59.600
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
105.000
|
$13.130
|
$33.000
|
$32.750
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
1,405.000
|
$32.170
|
$41.000
|
$40.550
|
|
|
CONDT (RM) (3/4")
|
LF
|
610.000
|
$18.070
|
$29.000
|
$29.000
|
|
|
ELEC CONDR (NO.14) INSULATED
|
LF
|
25,766.000
|
$5.430
|
$1.600
|
$1.600
|
|
|
ELEC CONDR (NO.10) INSULATED
|
LF
|
1,800.000
|
$1.750
|
$1.850
|
$1.850
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
15,195.000
|
$2.970
|
$3.750
|
$3.750
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
5,612.000
|
$3.000
|
$4.000
|
$4.000
|
|
|
ELEC CONDR (NO.4) INSULATED
|
LF
|
10,903.000
|
$4.920
|
$4.200
|
$4.200
|
|
|
ELEC CONDR (NO.2) INSULATED
|
LF
|
44,232.000
|
$3.560
|
$5.250
|
$5.250
|
|
|
ELEC CONDR (NO.1/0) INSULATED
|
LF
|
50,944.000
|
$4.880
|
$5.900
|
$5.900
|
|
|
ELEC CONDR (NO.2/0) INSULATED
|
LF
|
10,512.000
|
$5.430
|
$6.250
|
$6.250
|
|
|
ELEC CONDR (NO.3/0) INSULATED
|
LF
|
10,455.000
|
$15.810
|
$11.600
|
$11.550
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
115.000
|
$1,292.840
|
$1,525.000
|
$1,525.000
|
|
|
REMOVE GROUND BOX
|
EA
|
44.000
|
$224.870
|
$221.000
|
$225.000
|
|
|
REMOVE ELECTRICAL SERVICES
|
EA
|
6.000
|
$1,134.210
|
$1,121.000
|
$1,125.000
|
|
|
ELC SRV TY A 240/480 060(NS)SS(E)GC(O)
|
EA
|
1.000
|
$9,147.280
|
$7,852.000
|
$7,900.000
|
|
|
ELC SRV TY A 240/480 060(NS)SS(E)GC(U)
|
EA
|
1.000
|
$8,100.000
|
$9,000.000
|
$9,000.000
|
|
|
ELC SRV TY A 240/480 100(NS)SS(E)GC(O)
|
EA
|
2.000
|
$10,000.000
|
$7,002.000
|
$7,500.000
|
|
|
ELC SRV TY D 120/240 060(NS)GS(N)GC(O)
|
EA
|
3.000
|
$7,964.410
|
$7,965.000
|
$8,000.000
|
|
|
ELC SRV TY D 120/240 100(NS)GS(N)GC(O)
|
EA
|
1.000
|
$5,500.000
|
$7,900.000
|
$8,000.000
|
|
|
ELC SRV TY D 120/240 125(NS)GS(N)GC(O)
|
EA
|
1.000
|
$5,888.000
|
$6,888.000
|
$7,000.000
|
|
|
ELC SRV TY D 120/240 125(NS)GS(N)GC(U)
|
EA
|
1.000
|
$10,000.000
|
$8,330.000
|
$8,500.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
160.000
|
$49.830
|
$36.000
|
$35.750
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
450.000
|
$26.690
|
$36.000
|
$36.000
|
|
|
ALUMINUM SIGNS (TY O)
|
SF
|
3,047.750
|
$40.000
|
$37.000
|
$36.750
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY A)
|
SF
|
32.000
|
$58.540
|
$62.000
|
$61.755
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY O)
|
SF
|
335.000
|
$47.450
|
$87.000
|
$87.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
91.000
|
$672.190
|
$840.000
|
$850.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
50.000
|
$718.410
|
$905.000
|
$910.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
1.000
|
$750.810
|
$915.000
|
$915.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
11.000
|
$743.330
|
$1,178.000
|
$1,180.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
|
EA
|
1.000
|
$1,017.590
|
$1,208.000
|
$1,210.000
|
|
|
IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL)
|
EA
|
9.000
|
$1,479.000
|
$1,693.000
|
$1,700.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
|
EA
|
8.000
|
$3,400.000
|
$2,955.000
|
$3,000.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
104.000
|
$115.470
|
$125.000
|
$125.000
|
|
|
REMOVE BRDG MNT CLEARANCE SIGN ASSM
|
EA
|
2.000
|
$301.090
|
$1,154.000
|
$1,200.000
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
2,117.200
|
$4.100
|
$6.750
|
$6.750
|
|
|
REMOVE LRSA
|
EA
|
13.000
|
$928.910
|
$2,322.000
|
$2,325.000
|
|
|
INS OH SN SUP(30 FT BAL TEE)
|
EA
|
3.000
|
$34,287.500
|
$40,229.000
|
$40,500.000
|
|
|
INS OH SN SUP(35 FT CANT)(CIRC TUBE)
|
EA
|
1.000
|
$135,000.000
|
$140,000.000
|
$140,000.000
|
|
|
INS OH SN SUP(75 FT COMB)(CIRC TUBE)
|
EA
|
1.000
|
$160,000.000
|
$251,000.000
|
$250,150.000
|
|
|
INS OH SN SUP(135 FT BRDG)(CIRC TUBE)
|
EA
|
2.000
|
$200,000.000
|
$328,000.000
|
$327,250.000
|
|
|
INS OH SN SUP(150 FT BRDG)(CIRC TUBE)
|
EA
|
1.000
|
$220,000.000
|
$358,000.000
|
$357,500.000
|
|
|
INS OH SN SUP(155 FT COMB)(CIRC TUBE)
|
EA
|
1.000
|
$225,000.000
|
$375,000.000
|
$375,000.000
|
|
|
REMOVE OVERHD SIGN SUP
|
EA
|
1.000
|
$16,000.000
|
$19,000.000
|
$19,000.000
|
|
|
REMOVE OVERHD SIGN SUP (SIGN ONLY)
|
EA
|
1.000
|
$1,152.700
|
$24,000.000
|
$24,000.000
|
|
|
INS OH SN SUP(165 FT COMB)(CIRC TUBE)
|
EA
|
1.000
|
$235,000.000
|
$401,000.000
|
$400,600.000
|
|
|
INS OH SN SUP(180 FT COMB)(CIRC TUBE)
|
EA
|
1.000
|
$270,000.000
|
$432,000.000
|
$432,000.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
66.000
|
$8.190
|
$25.000
|
$50.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
|
EA
|
112.000
|
$8.140
|
$25.000
|
$50.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
|
EA
|
171.000
|
$16.440
|
$15.000
|
$50.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
60.000
|
$15.120
|
$20.000
|
$55.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
|
EA
|
6.000
|
$15.550
|
$20.000
|
$50.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
41.000
|
$85.130
|
$25.000
|
$100.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(BRK)
|
LF
|
18,107.000
|
$1.120
|
$1.350
|
$1.300
|
|
|
WK ZN PAV MRK REMOV (W)4"(DOT)
|
LF
|
211.000
|
$3.230
|
$1.700
|
$1.650
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
112,725.000
|
$1.020
|
$1.350
|
$1.300
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
101,464.000
|
$0.890
|
$1.350
|
$1.300
|
|
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
|
LF
|
324.000
|
$2.500
|
$2.300
|
$2.250
|
|
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
|
LF
|
42.000
|
$0.800
|
$11.000
|
$10.500
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
970.000
|
$1.460
|
$1.450
|
$1.400
|
|
REFL PAV MRK TY I (W)12"(LNDP)(100MIL)
|
LF
|
3,052.000
|
$2.750
|
$3.300
|
$3.250
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
5,340.000
|
$2.850
|
$3.300
|
$3.250
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
90.000
|
$6.540
|
$6.300
|
$6.250
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
20.000
|
$161.470
|
$126.000
|
$125.000
|
|
REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)
|
EA
|
5.000
|
$234.860
|
$152.000
|
$150.000
|
|
REFL PAV MRK TY I(W)(UTURN ARW)(100MIL)
|
EA
|
1.000
|
$180.830
|
$212.000
|
$210.000
|
|
REFL PAV MRK TY I(W)(LNDP ARW)(100MIL)
|
EA
|
7.000
|
$554.500
|
$255.000
|
$250.000
|
|
REFL PAV MRK TY I (W)(NUMBER)(100MIL)
|
EA
|
10.000
|
$218.300
|
$105.000
|
$100.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
21.000
|
$128.000
|
$140.000
|
$135.000
|
|
REFL PAV MRK TY I(W)(ENTR GORE)(100MIL)
|
EA
|
15.000
|
$1,000.000
|
$810.000
|
$800.000
|
|
REFL PAV MRK TY I(W)(EXIT GORE)(100MIL)
|
EA
|
15.000
|
$525.000
|
$910.000
|
$900.000
|
|
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
|
EA
|
8.000
|
$32.480
|
$46.000
|
$45.000
|
|
REFL PAV MRK TY II (W) 4" (SLD)
|
LF
|
108,178.000
|
$0.110
|
$0.200
|
$0.190
|
|
REFL PAV MRK TY II (W) 6" (BRK)
|
LF
|
37,856.000
|
$0.220
|
$0.260
|
$0.260
|
|
REFL PAV MRK TY II (W) 6" (DOT)
|
LF
|
324.000
|
$0.400
|
$0.500
|
$0.480
|
|
REFL PAV MRK TY II (W) 8" (DOT)
|
LF
|
42.000
|
$1.140
|
$2.700
|
$2.650
|
|
REFL PAV MRK TY II (W) 8" (SLD)
|
LF
|
970.000
|
$0.410
|
$0.400
|
$0.400
|
|
REFL PAV MRK TY II (W) 12" (LNDP)
|
LF
|
3,052.000
|
$1.000
|
$1.600
|
$1.550
|
|
REFL PAV MRK TY II (W) 12" (SLD)
|
LF
|
5,340.000
|
$1.150
|
$1.450
|
$1.400
|
|
REFL PAV MRK TY II (W) 24" (SLD)
|
LF
|
90.000
|
$2.330
|
$2.300
|
$2.250
|
|
REFL PAV MRK TY II (W) (ARROW)
|
EA
|
20.000
|
$62.990
|
$53.000
|
$52.000
|
|
REFL PAV MRK TY II (W) (DBL ARROW)
|
EA
|
5.000
|
$96.640
|
$66.000
|
$65.000
|
|
REFL PAV MRK TY II (W) (UTURN ARROW)
|
EA
|
1.000
|
$68.000
|
$118.000
|
$115.000
|
|
REFL PAV MRK TY II (W) (LNDP ARW)
|
EA
|
7.000
|
$303.330
|
$128.000
|
$125.000
|
|
REFL PAV MRK TY II (W) (NUMBER)
|
EA
|
10.000
|
$148.000
|
$56.000
|
$55.000
|
|
REFL PAV MRK TY II (W) (WORD)
|
EA
|
21.000
|
$64.040
|
$62.000
|
$60.000
|
|
REFL PAV MRK TY II (W) (ENTR GORE)
|
EA
|
15.000
|
$375.000
|
$405.000
|
$400.000
|
|
REFL PAV MRK TY II (W) (EXIT GORE)
|
EA
|
15.000
|
$285.000
|
$510.000
|
$500.000
|
|
REFL PAV MRK TY II (W) 36" (YLD TRI)
|
EA
|
8.000
|
$3.000
|
$36.000
|
$35.000
|
|
REFL PAV MRK TY II (Y) 4" (BRK)
|
LF
|
5,950.000
|
$0.120
|
$0.220
|
$0.210
|
|
REFL PAV MRK TY II (Y) 4" (SLD)
|
LF
|
106,426.000
|
$0.120
|
$0.200
|
$0.190
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
28,940.000
|
$0.720
|
$0.700
|
$0.690
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
37,856.000
|
$0.910
|
$0.980
|
$0.950
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
43,970.000
|
$0.860
|
$0.700
|
$0.690
|
|
|
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
|
LF
|
79,238.000
|
$0.800
|
$0.950
|
$0.920
|
|
|
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
|
LF
|
62,456.000
|
$0.800
|
$0.950
|
$0.920
|
|
PREFAB PAV MRK TY B (MULTI)(SHIELD)
|
EA
|
2.000
|
$1,650.000
|
$2,350.000
|
$2,300.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
1,843.000
|
$3.000
|
$3.500
|
$3.500
|
|
REFL PAV MRKR TY I-R
|
EA
|
168.000
|
$14.310
|
$3.500
|
$3.500
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
3,173.000
|
$4.090
|
$3.500
|
$3.500
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
5,344.000
|
$0.360
|
$1.100
|
$1.050
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
640.000
|
$0.720
|
$1.500
|
$1.450
|
|
|
ELIM EXT PAV MRK & MRKS (12")
|
LF
|
598.000
|
$1.330
|
$4.100
|
$4.000
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
3.000
|
$114.010
|
$145.000
|
$140.000
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
3.000
|
$104.800
|
$145.000
|
$140.000
|
|
|
REMOVE RDSD FLASH BEACON ASSEMBLY
|
EA
|
2.000
|
$1,060.000
|
$1,850.000
|
$1,850.000
|
|
|
ANTI - GRAFFITI COATNG(PERMNENT-TY III)
|
SF
|
70,558.000
|
$0.640
|
$1.100
|
$1.300
|
|
|
LOOSE AGGR FOR GROUNDCOVER (TYPE I)
|
CY
|
1,817.000
|
$83.380
|
$112.000
|
$130.000
|
|
|
LOOSE AGGR FOR GROUNDCOVER (TYPE II)
|
CY
|
7,900.000
|
$60.000
|
$112.000
|
$90.000
|
|
|
D-GR HMA TY-D PG64-22
|
TON
|
4,040.000
|
$65.210
|
$112.000
|
$115.000
|
|
|
SP MIXES SP-B PG64-22
|
TON
|
216,302.000
|
$97.000
|
$94.000
|
$115.000
|
|
|
SP MIXES SP-C SAC-A PG70-22
|
TON
|
22,957.000
|
$110.000
|
$115.000
|
$135.000
|
|
|
TACK COAT
|
GAL
|
170,361.000
|
$4.500
|
$9.000
|
$7.500
|
|
|
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
|
TON
|
31,993.000
|
$125.000
|
$141.000
|
$165.000
|
|
|
TACK COAT
|
GAL
|
2,143.000
|
$2.750
|
$7.500
|
$7.500
|
|
|
STONE MASONRY (ROCK WALL)
|
SF
|
49,558.000
|
$17.000
|
$11.000
|
$10.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$250.000
|
$9,000.000
|
$15,000.000
|
|
|
ITS SYSTEM SUPPORT EQUIPMENT
|
LS
|
1.000
|
$174,250.000
|
$175,000.000
|
$175,000.000
|
|
|
FIBER OPTIC CBL (SNGLE-MODE)(144 FIBER)
|
LF
|
29,088.000
|
$12.000
|
$14.000
|
$13.600
|
|
|
FIBER OPTIC PIGTAIL (12 FIBER)
|
LF
|
21,697.000
|
$13.240
|
$13.500
|
$13.150
|
|
|
FIBER OPTIC SPLICE ENCLOSURE
|
EA
|
3.000
|
$4,250.000
|
$4,300.000
|
$4,255.000
|
|
|
FIBER OPTIC PATCH PANEL (12 POSITION)
|
EA
|
18.000
|
$3,728.480
|
$3,800.000
|
$3,730.000
|
|
|
FIBER OPTIC CABLE ROAD MARKER
|
EA
|
64.000
|
$540.540
|
$750.000
|
$750.000
|
|
|
FIBER OPTIC PATCH PANEL (144 POSITION)
|
EA
|
5.000
|
$6,335.000
|
$6,500.000
|
$6,335.000
|
|
|
FIBER OPTIC FUSION SPLICE
|
EA
|
266.000
|
$111.750
|
$120.000
|
$116.250
|
|
|
REMOVE FIBER OPTIC CABLE
|
LF
|
24,145.000
|
$2.300
|
$2.500
|
$2.300
|
|
|
FO CBL (24 SMF)(PIGTAIL)
|
LF
|
260.000
|
$10.350
|
$11.000
|
$10.350
|
|
|
ITS GRND MNT CAB (TY 6) (CONF 2)
|
EA
|
2.000
|
$14,000.000
|
$14,000.000
|
$14,000.000
|
|
|
CCTV FIELD EQUIP (DIGITAL) (INSTL ONLY)
|
EA
|
6.000
|
$4,578.570
|
$963.000
|
$965.000
|
|
|
REMOVE CCTV FIELD EQUIPMENT
|
EA
|
2.000
|
$367.000
|
$1,250.000
|
$1,250.000
|
|
|
CONDUIT (PREPARE)
|
LF
|
946.000
|
$5.190
|
$2.500
|
$2.500
|
|
|
GROUND BOX (PREPARE)
|
EA
|
7.000
|
$422.520
|
$460.000
|
$460.000
|
|
|
ITS POLE (55 FT)(90 MPH)
|
EA
|
6.000
|
$21,850.000
|
$24,000.000
|
$24,000.000
|
|
|
ITS POLE (55 FT)(REM)
|
EA
|
2.000
|
$2,000.000
|
$2,000.000
|
$2,000.000
|
|
|
ITS POLE MNT CAB (TY 2)(CONF 2)
|
EA
|
6.000
|
$8,499.500
|
$8,500.000
|
$8,500.000
|
|
|
ITS POLE MNT CAB (TY 2)(CONF 2)(REM)
|
EA
|
2.000
|
$559.200
|
$560.000
|
$560.000
|
|
|
REMOVE DYNAMIC MESSAGE SIGN SYSTEM
|
EA
|
2.000
|
$2,550.000
|
$5,000.000
|
$4,930.000
|
|
|
INSTALLATION OF FES
|
EA
|
17.000
|
$1,300.000
|
$1,300.000
|
$1,300.000
|
|
|
REMOVE RVSD POLE STRUCTURE
|
EA
|
2.000
|
$2,000.000
|
$1,500.000
|
$1,500.000
|
|
|
REMOVE RADAR SENSING DEVICE UNIT
|
EA
|
2.000
|
$1,500.000
|
$1,000.000
|
$1,000.000
|
|
|
LED HI MST IL ASM (6 FIXT)(ASYM)(TY A)
|
EA
|
29.000
|
$33,000.000
|
$35,000.000
|
$34,600.000
|
|
|
REMOVE EXISTING CABLES (POWER)
|
LF
|
48,610.000
|
$3.500
|
$1.800
|
$1.800
|
|
|
TMA (STATIONARY)
|
DAY
|
60.000
|
$171.360
|
$160.000
|
$1,000.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
80.000
|
$71.480
|
$60.000
|
$250.000
|
|
|
ITS GND BOX (POLY) TY 1 (243648)W/APRN
|
EA
|
59.000
|
$4,600.000
|
$4,000.000
|
$4,000.000
|
|
|
ITS GND BOX (POLY) TY 2 (366048)W/APRN
|
EA
|
2.000
|
$5,000.000
|
$4,900.000
|
$4,900.000
|
|
|
ITS RVSD (DC ONLY) (INSTALL ONLY)
|
EA
|
6.000
|
$1,972.000
|
$980.000
|
$980.000
|
|
|
LCS SIGNAL UNIT (REMOVE)
|
EA
|
8.000
|
$532.760
|
$534.000
|
$535.000
|
|
|
COLOR DMS (POLE MNT CABINET)
|
EA
|
3.000
|
$194,783.330
|
$233,500.000
|
$233,500.000
|
|
|
ENVIRONMENTALLY CONTROLLED COMM BLDG
|
EA
|
1.000
|
$150,000.000
|
$188,000.000
|
$187,500.000
|
|
|
SYSTEM INTEGRATION
|
LS
|
1.000
|
$140,000.000
|
$290,000.000
|
$290,000.000
|
|
|
REMOVE ECUV
|
EA
|
1.000
|
$500.000
|
$115,000.000
|
$115,000.000
|
|
|
WATER MAIN (STEEL)(C-200)(48")
|
LF
|
21,988.000
|
$560.000
|
$680.000
|
$624.400
|
|
|
REMOVE EXIST WATER PIPE (36")
|
LF
|
355.000
|
$40.000
|
$50.000
|
$45.450
|
|
|
REMOVE EXIST WATER PIPE (48")
|
LF
|
22,318.000
|
$50.000
|
$42.000
|
$38.500
|
|
|
6" BLOW OFF VALVE IN MANHOLE
|
EA
|
6.000
|
$16,000.000
|
$22,300.000
|
$20,200.000
|
|
|
WATER MAIN (HDPE) (DR 9) (18")
|
LF
|
5.000
|
$25,000.000
|
$6,200.000
|
$5,600.000
|
|
|
WATER MAIN (SCCP)(DR 11)(36")
|
LF
|
583.000
|
$440.000
|
$2,100.000
|
$1,900.000
|
|
|
CASING (STEEL)(SPLT)(24")(OPEN TRENCH)
|
LF
|
81.000
|
$450.000
|
$1,500.000
|
$1,335.000
|
|
|
CASING (FRP)(54 IN)(BORED OR TUNNEL)
|
LF
|
485.000
|
$798.000
|
$2,200.000
|
$1,795.000
|
|
|
CASING (FRP)(66 IN)(BORED OR TUNNEL)
|
LF
|
2,836.000
|
$1,054.500
|
$2,600.000
|
$2,143.300
|
|
|
CASING (FRP)(66 IN)(OPEN TRENCH)
|
LF
|
234.000
|
$750.000
|
$2,400.000
|
$2,145.000
|
|
|
CATHODIC PROTECTION TEST STATION
|
LS
|
41.000
|
$1,000.000
|
$12,000.000
|
$10,750.000
|
|
|
48"X48"X16" TEE
|
EA
|
1.000
|
$35,000.000
|
$132,000.000
|
$125,000.000
|
|
|
48"X48"X36" WYE
|
EA
|
1.000
|
$45,000.000
|
$108,000.000
|
$100,000.000
|
|
|
3" COMBINATION VALVE
|
EA
|
1.000
|
$4,550.000
|
$32,000.000
|
$30,000.000
|
|
|
4" COMBINATION VALVE
|
EA
|
5.000
|
$7,000.000
|
$38,000.000
|
$35,000.000
|
|
|
6" COMBINATION VALVE
|
EA
|
14.000
|
$12,200.000
|
$41,000.000
|
$38,000.000
|
|
|
8" COMBINATION VALVE
|
EA
|
1.000
|
$5,250.000
|
$45,000.000
|
$45,000.000
|
|
|
48" ACCESS WAY
|
EA
|
4.000
|
$6,000.000
|
$137,000.000
|
$125,000.000
|
|
|
48" GATE VALVE
|
EA
|
22.000
|
$80,000.000
|
$243,000.000
|
$221,000.000
|
|
|
36" GATE VALVE
|
EA
|
1.000
|
$65,000.000
|
$237,000.000
|
$220,000.000
|
|
|
16" GATE VALVE
|
EA
|
1.000
|
$9,000.000
|
$28,000.000
|
$45,000.000
|
|
|
18" DUPLEX STAINLESS STEEL LINE STOP
|
EA
|
2.000
|
$48,000.000
|
$105,000.000
|
$100,000.000
|
|
Totals: |
$102,649,004.723
|
$137,955,531.390
|
$141,434,235.442
|