EL PASO FM 2529 (2326-01-029)

Items: 82

County: EL PASO
Length: N/A
Highway: FM 2529
District: EL PASO
Control Number: 2326-01-029
DBE Goal: N/A
Project: STP 2021(479)HES
Guaranty: N/A
Time: 190 WORKING DAYS
Engineer's Estimate: $1,619,625.65
Date: 04/08/2021 (5 years ago)
Contract Number: N/A
Type: HAZARD ELIMINATION & SAFETY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (6)
E
Engineer's Estimate
$1,619,625.65
Over/Under Est: -3.08% -$49,826.45
Over/Under Est: -3.04% -$49,273.06
Amt Left: 0.04% $553.39
$1,633,407.02
Over/Under Est: 0.85% $13,781.37
Amt Left: 4.05% $63,607.82
Delta: -4.02% -$63,054.43
Over/Under Est: 14.34% $232,335.03
Amt Left: 17.97% $282,161.48
Delta: -13.38% -$218,553.66
Over/Under Est: 29.88% $483,982.16
Amt Left: 34% $533,808.61
Delta: -13.59% -$251,647.13
$2,212,255.76
Over/Under Est: 36.59% $592,630.11
Amt Left: 40.93% $642,456.56
Delta: -5.16% -$108,647.95

Bid Items & Bid Tabulations

82 Total 0 of 82
EL PASO  |  FM 2529  |  EL PASO  |  2326-01-029  |  04/08/2021  |  $1,619,625.65  |  STP 2021(479)HES  |  HAZARD ELIM & SAFETY  |  190 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
INTERNATIONAL EAGLE ENTERPRISES, INC.
MARTINEZ BROS. CONTRACTORS, LLC
ALLIED PAVING CO.
LESNA CONSTRUCTION, INC.
DEL MAR CONTRACTING, INC.
BT CONSTRUCTORS, LLC
REMOVING CONC (MEDIANS)
SY 369.000 $20.500 $20.000 $15.680 $14.000 $16.000 $68.000 $12.960
REMOVING CONC (SIDEWALKS)
SY 792.000 $5.000 $20.000 $12.320 $10.330 $14.000 $14.000 $14.180
REMOVING CONC (DRIVEWAYS)
SY 425.000 $23.000 $20.000 $13.440 $15.000 $18.000 $17.000 $17.600
REMOVING CONC (CURB)
LF 1,373.000 $2.000 $5.000 $2.240 $4.610 $5.000 $5.000 $6.130
REMOVING CONC (MISC)
SY 630.000 $15.000 $22.000 $20.160 $18.740 $15.000 $15.000 $25.510
REMOVING CONC (CURB OR CURB & GUTTER)
LF 551.000 $4.000 $9.000 $3.360 $5.340 $10.000 $6.000 $8.050
REMOVING CONC (WHEELCHAIR RAMP)
SY 47.000 $11.000 $20.000 $20.160 $16.690 $30.000 $24.000 $36.430
REMOVING CONC (SIDEWALK OR RAMP)
SY 7.000 $27.000 $40.000 $22.400 $20.000 $50.000 $24.000 $99.450
REMOVE CONC (RAIL)
LF 22.000 $13.500 $40.000 $40.000 $10.800 $200.000 $15.000 $30.880
REMOVING CONC (FLUME)
SY 6.000 $115.000 $20.000 $30.240 $183.600 $200.000 $50.000 $77.440
REMOVING STAB BASE & ASPH PAV (0-2")
SY 9,789.000 $2.750 $2.300 $1.000 $3.260 $1.000 $7.500 $4.960
REMOVING STAB BASE & ASPH PAV (8"-12")
SY 238.000 $4.250 $6.000 $16.800 $21.440 $9.000 $26.000 $12.750
EMBANKMENT (FINAL)(ORD COMP)(TY A)
CY 941.000 $22.500 $18.000 $12.350 $48.600 $23.000 $38.000 $31.620
EMULS ASPH (BS OR SUBGR TRT)(CSS-1H)
GAL 980.000 $5.500 $6.000 $2.240 $10.800 $7.000 $10.000 $9.900
D-GR HMA(SQ) TY-C PG70-22
TON 479.000 $105.000 $200.000 $109.760 $98.350 $115.000 $125.000 $246.400
CL A CONC (MISC)
CY 7.200 $800.000 $1,000.000 $364.000 $480.600 $800.000 $750.000 $571.390
CL A CONC (FLUME)
CY 1.000 $375.000 $900.000 $622.700 $1,000.000 $1,200.000 $750.000 $1,855.700
STR STEEL (MISC NON - BRIDGE)
LB 11,089.000 $11.500 $4.000 $4.726 $1.250 $4.500 $4.000 $5.320
RAIL (HANDRAIL)(TY C)
LF 2,435.000 $100.000 $73.500 $100.000 $108.000 $157.000 $192.000 $90.730
RAIL (HANDRAIL)(TY E)
LF 625.000 $79.500 $95.000 $115.000 $75.600 $178.000 $192.000 $116.430
ADJUSTING MANHOLES
EA 3.000 $1,200.000 $500.000 $365.800 $1,500.000 $1,500.000 $450.000 $1,189.870
MOBILIZATION
LS 1.000 $100,000.000 $60,000.000 $80,000.000 $60,000.000 $100,000.000 $110,000.000 $370,453.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 10.000 $9,000.000 $20,000.000 $7,500.000 $14,300.000 $10,000.000 $13,000.000 $7,212.700
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 1,021.000 $5.500 $4.000 $3.540 $4.860 $7.000 $5.000 $5.500
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,021.000 $1.250 $1.000 $2.000 $1.080 $1.000 $3.000 $1.620
COLORED TEXTURED CONC (4")
SY 1,851.000 $55.000 $40.000 $67.000 $56.330 $52.000 $72.000 $78.420
COLORED TEXTURED CONC (6")
SY 105.000 $60.500 $60.000 $71.000 $62.060 $59.000 $88.000 $109.990
CONC CURB (TY II)
LF 24.000 $23.500 $50.000 $10.080 $10.180 $30.000 $15.000 $46.490
CONC CURB & GUTTER (TY II)
LF 2,054.000 $13.000 $15.000 $16.800 $13.890 $19.000 $18.000 $25.960
CONCRETE CURB (SPECIAL)
LF 18,387.000 $10.000 $9.000 $10.000 $15.490 $14.000 $13.500 $14.160
DRIVEWAYS (CONC)
SY 1,033.000 $40.500 $40.000 $47.000 $50.000 $50.000 $60.000 $104.930
CONC SIDEWALKS (5")
SY 3,557.000 $54.000 $32.000 $46.000 $42.000 $52.000 $49.000 $59.440
CURB RAMPS (TY 1)
EA 8.000 $1,100.000 $1,000.000 $840.000 $850.000 $1,250.000 $800.000 $1,741.570
CURB RAMPS (TY 7)
EA 6.000 $750.000 $1,000.000 $761.600 $965.500 $1,550.000 $950.000 $1,647.120
CURB RAMPS (TY 21)
EA 2.000 $1,035.000 $1,000.000 $1,120.000 $1,200.000 $2,300.000 $950.000 $1,239.510
CONC MEDIAN
SY 6.000 $50.000 $100.000 $100.800 $50.000 $175.000 $65.000 $201.820
CONCRETE MEDIAN (NOSE)
SY 2.000 $60.500 $500.000 $201.600 $550.000 $500.000 $66.000 $605.460
MTL W-BEAM GD FEN (TIM POST)
LF 5.000 $31.000 $250.000 $37.760 $51.500 $200.000 $75.000 $60.500
REMOVE METAL BEAM GUARD FENCE
LF 560.000 $4.000 $2.000 $9.440 $7.210 $5.000 $5.000 $2.480
RELOCATE RD IL ASM (TRANS-BASE)
EA 2.000 $450.000 $1,200.000 $566.400 $4,145.750 $4,425.000 $6,500.000 $2,994.200
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 48.000 $570.000 $790.000 $550.000 $693.640 $740.000 $700.000 $594.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 9.000 $695.000 $400.000 $483.800 $645.350 $400.000 $350.000 $502.700
REMOVE SM RD SN SUP&AM
EA 1.000 $117.750 $250.000 $483.800 $164.600 $160.000 $125.000 $96.800
REFL PAV MRK TY I (W)4"(DOT)(090MIL)
LF 78.000 $1.000 $1.500 $1.150 $0.770 $0.850 $1.000 $1.490
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 5,106.000 $0.500 $2.000 $1.900 $1.290 $1.400 $1.500 $1.870
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
LF 3,879.000 $5.500 $6.500 $5.500 $5.150 $5.500 $6.000 $5.560
REFL PAV MRK TY I (W)(ARROW)(090MIL)
EA 43.000 $120.000 $160.000 $151.200 $90.640 $97.000 $90.000 $148.500
REFL PAV MRK TY I (W)(WORD)(090MIL)
EA 43.000 $120.000 $160.000 $151.200 $90.640 $97.000 $90.000 $148.500
REF PAV MRK TY I(W)18"(YLD TRI)(090MIL)
EA 28.000 $46.500 $60.000 $12.320 $25.750 $27.500 $30.000 $12.100
REFL PAV MRK TY I(Y)(MED NOSE)(090MIL)
EA 52.000 $180.750 $200.000 $291.200 $154.500 $165.000 $175.000 $286.000
REFL PAV MRK TY II (W) 4" (DOT)
LF 78.000 $1.250 $1.000 $1.960 $0.240 $0.250 $0.300 $1.930
REFL PAV MRK TY II (W) 4" (SLD)
LF 15,671.000 $0.350 $0.750 $0.840 $0.240 $0.250 $0.300 $0.830
REFL PAV MRK TY II (W) 6" (BRK)
LF 6,830.000 $0.350 $0.700 $0.800 $0.360 $0.400 $0.400 $0.770
REFL PAV MRK TY II (W) 8" (SLD)
LF 5,106.000 $0.650 $0.900 $0.700 $0.490 $0.550 $0.550 $0.660
REFL PAV MRK TY II (W) 24" (SLD)
LF 3,879.000 $4.100 $3.000 $3.000 $2.060 $2.200 $2.500 $2.860
REFL PAV MRK TY II (W) (ARROW)
EA 43.000 $67.250 $100.000 $89.600 $49.440 $52.800 $55.000 $88.000
REFL PAV MRK TY II (W) (WORD)
EA 43.000 $80.750 $100.000 $89.600 $49.440 $52.800 $55.000 $88.000
REFL PAV MRK TY II (W) 18" (YLD TRI)
EA 28.000 $25.000 $40.000 $10.000 $17.510 $18.500 $20.000 $9.900
REFL PAV MRK TY II (Y) 4" (BRK)
LF 60.000 $0.100 $3.000 $1.960 $1.030 $1.100 $1.250 $1.930
REFL PAV MRK TY II (Y) 4" (SLD)
LF 524.000 $0.150 $3.000 $0.840 $1.030 $1.100 $1.250 $6.110
REFL PAV MRK TY II (Y) (MED NOSE)
EA 52.000 $280.000 $110.000 $190.400 $77.250 $82.500 $80.000 $187.000
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 15,673.000 $0.250 $1.000 $1.120 $0.550 $0.600 $0.600 $1.100
RE PM W/RET REQ TY I (W)6"(BRK)(090MIL)
LF 6,830.000 $0.250 $1.200 $1.400 $0.770 $0.800 $0.850 $1.380
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 528.000 $0.250 $3.200 $1.120 $2.580 $2.750 $3.000 $1.100
REFL PAV MRKR TY II-C-R
EA 442.000 $3.200 $8.000 $4.760 $4.380 $4.700 $4.500 $4.680
ELIM EXT PAV MRK & MRKS (4")
LF 27,525.000 $0.750 $1.000 $0.728 $0.530 $0.560 $0.550 $0.720
ELIM EXT PAV MRK & MRKS (8")
LF 1,481.000 $0.900 $1.500 $8.960 $0.880 $0.950 $1.000 $0.880
ELIM EXT PAV MRK & MRKS (12")
LF 2,125.000 $1.100 $2.000 $1.960 $1.440 $1.500 $1.600 $1.930
ELIM EXT PAV MRK & MRKS (24")
LF 2,012.000 $3.000 $3.500 $3.920 $2.830 $3.000 $3.000 $3.850
ELIM EXT PAV MRK & MRKS (ARROW)
EA 10.000 $105.000 $200.000 $123.200 $123.600 $132.000 $150.000 $121.000
ELIM EXT PAV MRK & MRKS (WORD)
EA 8.000 $105.000 $200.000 $123.200 $123.600 $132.000 $150.000 $121.000
PAV SURF PREP FOR MRK (4")
LF 16,153.000 $0.200 $0.300 $0.112 $0.100 $0.110 $0.120 $0.110
PAV SURF PREP FOR MRK (6")
LF 6,830.000 $0.150 $0.400 $0.134 $0.150 $0.200 $0.200 $0.130
PAV SURF PREP FOR MRK (8")
LF 5,106.000 $0.400 $0.600 $0.168 $0.210 $0.250 $0.250 $0.170
PAV SURF PREP FOR MRK (24")
LF 3,879.000 $2.750 $0.750 $0.918 $0.520 $0.550 $0.600 $0.900
PAV SURF PREP FOR MRK (ARROW)
EA 43.000 $22.750 $60.000 $33.600 $20.600 $23.000 $30.000 $33.000
PAV SURF PREP FOR MRK (WORD)
EA 43.000 $23.200 $60.000 $33.600 $20.600 $23.000 $30.000 $33.000
PAV SURF PREP FOR MRK (18")(YLD TRI)
EA 28.000 $15.000 $12.000 $4.200 $5.150 $5.500 $6.000 $4.130
INSTALL OF SIGNAL RELATED SIGNS
EA 12.000 $500.000 $500.000 $236.000 $430.270 $460.000 $800.000 $17.600
LOOSE AGGR FOR GROUNDCOVER (TYPE II)
CY 159.000 $33.750 $160.000 $51.920 $70.760 $80.000 $148.000 $120.780
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 190.000 $100.000 $95.000 $123.000 $100.000 $95.000 $125.000 $99.000
TMA (STATIONARY)
DAY 330.000 $185.000 $180.000 $205.000 $175.000 $180.000 $125.000 $147.400
Totals: $1,619,625.650 $1,569,799.200 $1,570,352.610 $1,633,407.020 $1,851,960.680 $2,103,607.810 $2,212,255.768