Show Job Controls
Bid Cobra

EL PASO IH 10 (2121-02-174)

Items: 54

County: EL PASO
Length: N/A
Highway: IH 10
District: EL PASO
Control Number: 2121-02-174
DBE Goal: N/A
Project: C 2121-2-174
Guaranty: N/A
Time: 80 WORKING DAYS
Engineer's Estimate: $2,536,213.84
Date: 08/05/2020 (5 years ago)
Contract Number: N/A
Type: INSTALLATION OF CONCRETE TRAFFIC BARRIER
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (7)
E
Engineer's Estimate
$2,536,213.84
Over/Under Est: -11.86% -$300,712.14
Over/Under Est: 4.57% $115,793.41
Amt Left: 18.63% $416,505.55
$2,682,661.55
Over/Under Est: 5.77% $146,447.71
Amt Left: 20% $447,159.85
Delta: -1.16% -$30,654.30
Over/Under Est: 14.37% $364,540.76
Amt Left: 29.76% $665,252.90
Delta: -8.13% -$218,093.05
$2,987,802.61
Over/Under Est: 17.81% $451,588.77
Amt Left: 33.65% $752,300.91
Delta: -3.00% -$87,048.01
Over/Under Est: 23.88% $605,622.36
Amt Left: 40.54% $906,334.50
Delta: -5.16% -$154,033.59
Over/Under Est: 28.32% $718,353.86
Amt Left: 45.59% $1,019,066.00
Delta: -3.59% -$112,731.50

Bid Items & Bid Tabulations

54 Total 0 of 54
EL PASO  |  IH 10  |  EL PASO  |  2121-02-174  |  08/05/2020  |  $2,536,213.84  |  C 2121-2-174  |  INSTL OF CONC TRAF BARRIER  |  80 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
SYNERGY PROJECT CONTRACTORS, INC.
J. A. R. CONCRETE, INC.
DAN WILLIAMS COMPANY
INTERNATIONAL EAGLE ENTERPRISES, INC.
J.D. ABRAMS, L.P.
LESNA CONSTRUCTION, INC.
DOUBLE H CONTRACTING INC.
PREPARING ROW
STA 59.000 $1,601.000 $1,223.750 $465.000 $1,500.000 $400.000 $3,000.000 $1,500.000 $500.000
REMOVING CONC (RIPRAP)
SY 1,139.000 $9.730 $8.900 $14.000 $16.000 $16.000 $20.000 $11.000 $20.000
REMOVING STAB BASE AND ASPH PAV (6")
SY 8,611.000 $3.020 $4.450 $4.000 $1.750 $4.000 $7.000 $4.000 $2.500
EXCAVATION (SPECIAL)
CY 7.100 $13.670 $445.000 $1,500.000 $1,000.000 $1,200.000 $1,200.000 $1,050.000 $1,500.000
PROOF ROLLING
HR 20.000 $78.840 $61.190 $55.000 $55.000 $50.000 $150.000 $150.000 $50.000
PRIME COAT (AE-P)
GAL 1,267.000 $4.160 $6.120 $7.000 $4.500 $6.000 $5.000 $6.500 $6.000
ASPH (AC-10)
GAL 3,794.000 $2.170 $2.230 $4.000 $4.000 $5.000 $4.000 $6.500 $6.000
AGGR (TY-PB GR-4)
CY 92.000 $77.230 $72.310 $92.000 $135.000 $150.000 $150.000 $100.000 $400.000
DRILL SHAFT (HIGH MAST POLE) (60 IN)
LF 175.000 $580.850 $500.630 $1,460.000 $1,600.000 $1,560.000 $1,500.000 $1,605.000 $1,700.000
RIPRAP (CONC)(4 IN)
CY 18.000 $348.780 $361.560 $550.000 $650.000 $400.000 $800.000 $500.000 $1,200.000
MOBILIZATION
LS 1.000 $301,000.000 $89,000.000 $225,000.000 $75,000.000 $75,000.000 $270,000.000 $185,000.000 $175,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 4.000 $13,389.970 $4,450.000 $6,500.000 $11,500.000 $8,000.000 $30,000.000 $10,000.000 $5,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 40.000 $25.000 $18.910 $45.000 $35.000 $80.000 $75.000 $28.000 $50.000
ROCK FILTER DAMS (REMOVE)
LF 40.000 $9.630 $6.680 $35.000 $9.500 $20.000 $30.000 $8.000 $25.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,142.000 $3.000 $3.340 $3.000 $2.850 $3.800 $5.000 $4.000 $3.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,142.000 $0.800 $2.230 $1.500 $0.900 $1.000 $1.000 $1.000 $2.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 360.000 $5.000 $7.790 $5.500 $7.000 $5.000 $8.000 $6.000 $10.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 360.000 $1.060 $2.230 $2.500 $1.500 $1.000 $2.000 $0.750 $5.000
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)
LF 7,890.000 $9.090 $7.790 $5.000 $3.000 $10.000 $5.000 $11.000 $10.000
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 7,260.000 $6.080 $4.450 $4.000 $1.500 $4.000 $2.000 $7.000 $8.000
PORT CTB (STKPL)(F-SHAPE)(TY 1)
LF 7,890.000 $10.250 $8.900 $5.000 $3.000 $8.000 $3.000 $7.000 $5.000
PERM CTB (SGL SLOPE) (TY 1) (42 )
LF 8,695.000 $76.950 $76.760 $75.000 $82.000 $85.000 $59.000 $86.000 $102.000
PERM CTB (SGL SLOPE) (TY 3) (42 )
LF 85.000 $181.500 $183.560 $123.640 $160.000 $100.000 $300.000 $110.000 $250.000
MTL W-BEAM GD FEN (STEEL POST)
LF 2,061.000 $25.450 $25.590 $26.000 $22.000 $25.000 $31.000 $30.000 $28.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 2.000 $2,060.610 $2,336.250 $1,915.000 $2,400.000 $2,000.000 $2,500.000 $2,500.000 $2,250.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 1.000 $1,354.910 $2,002.500 $2,225.000 $1,250.000 $1,300.000 $1,800.000 $1,750.000 $1,500.000
REMOVE METAL BEAM GUARD FENCE
LF 4,437.000 $2.580 $3.340 $3.000 $3.500 $2.000 $3.750 $4.000 $5.000
REMOVE TERMINAL ANCHOR SECTION
EA 1.000 $254.620 $556.250 $1,650.000 $350.000 $500.000 $415.000 $500.000 $750.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 1.000 $300.000 $1,056.880 $1,650.000 $350.000 $800.000 $350.000 $500.000 $750.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000 $1,200.000 $890.000 $1,500.000 $650.000 $1,000.000 $1,200.000 $2,000.000 $5,000.000
CRASH CUSH ATTEN (STKPL)
EA 2.000 $1,214.770 $890.000 $1,500.000 $700.000 $600.000 $1,300.000 $900.000 $2,500.000
CRASH CUSH ATTEN (INSTL)(R)(N)(TL3)
EA 5.000 $16,590.400 $33,375.000 $21,650.000 $22,000.000 $25,000.000 $20,000.000 $19,500.000 $22,000.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 2.000 $7,946.140 $10,568.750 $9,670.000 $7,500.000 $15,000.000 $15,000.000 $12,500.000 $22,000.000
REMOVE RD IL ASM (SHOE-BASE)
EA 37.000 $1,000.710 $1,112.500 $1,067.000 $1,075.000 $1,200.000 $1,067.000 $1,175.000 $1,250.000
REMOVE RD IL ASM (CTB MOUNT)
EA 1.000 $260.000 $222.500 $1,225.000 $1,260.000 $1,400.000 $1,255.000 $1,380.000 $1,450.000
HI MST IL POLE (150 FT)( 80 MPH)
EA 7.000 $27,851.870 $26,700.000 $33,600.000 $41,000.000 $46,500.000 $42,000.000 $44,800.000 $45,000.000
CONDT (PVC) (SCH 40) (2")
LF 4,520.000 $9.250 $16.690 $33.650 $33.750 $35.500 $35.000 $37.000 $38.000
CONDT (PVC) (SCH 40) (2") (BORE)
LF 120.000 $24.000 $28.930 $58.000 $60.000 $66.000 $58.000 $64.000 $62.000
ELEC CONDR (NO.4) INSULATED
LF 14,190.000 $2.040 $2.230 $4.150 $4.150 $4.500 $4.250 $4.500 $4.500
GROUND BOX TY A (122311)W/APRON
EA 10.000 $1,374.100 $1,946.880 $1,434.000 $1,500.000 $1,570.000 $1,500.000 $1,577.000 $1,700.000
REMOVE GROUND BOX
EA 1.000 $157.230 $155.750 $189.000 $200.000 $300.000 $200.000 $208.000 $300.000
REMOVE ELECTRICAL SERVICES
EA 1.000 $786.660 $1,168.130 $1,213.000 $1,250.000 $1,800.000 $1,300.000 $1,334.000 $1,500.000
ELC SRV TY A 240/480 060(NS)SS(E)GC(O)
EA 1.000 $5,830.150 $6,675.000 $7,684.000 $8,000.000 $9,000.000 $8,000.000 $8,452.000 $7,900.000
REF PROF PAV MRK TY I(Y)6"(SLD)(100MIL)
LF 5,748.000 $0.840 $1.670 $1.600 $1.600 $1.750 $1.500 $1.650 $1.650
ELIM EXT PAV MRK & MRKS (4")
LF 5,748.000 $0.750 $0.670 $0.750 $0.650 $1.500 $0.900 $1.000 $0.750
PAV SURF PREP FOR MRK (6")
LF 5,748.000 $0.040 $0.330 $0.350 $0.350 $0.750 $0.220 $0.250 $0.750
D-GR HMA TY-C SAC-A PG70-22
TON 2,785.000 $89.000 $83.440 $65.000 $70.000 $78.000 $84.000 $83.000 $85.000
TACK COAT
GAL 1,267.000 $3.250 $2.230 $5.250 $4.500 $6.000 $8.000 $6.500 $5.000
REMOVE CONDUCTOR
LF 140.000 $1.110 $1.110 $2.050 $2.050 $4.000 $2.040 $2.250 $5.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $11,759.190 $4,450.000 $5,200.000 $6,000.000 $8,000.000 $4,000.000 $15,000.000 $2,500.000
LED HI MST IL ASM (6 FIXT)(SYM)(TY S)
EA 4.000 $27,333.400 $3,037.500 $36,923.000 $37,000.000 $41,000.000 $40,000.000 $40,600.000 $39,500.000
LED HI MST IL ASM (6 FIXT)(ASYM)(TY A)
EA 3.000 $26,465.460 $27,812.500 $34,560.000 $35,000.000 $38,000.000 $35,000.000 $38,000.000 $38,500.000
REPLC LED HI MST IL(6 FIXT)(SYM)(TY S)
EA 1.000 $8,700.000 $10,012.500 $14,556.000 $15,000.000 $16,000.000 $15,000.000 $16,000.000 $14,950.000
TMA (STATIONARY)
DAY 160.000 $154.810 $130.160 $90.000 $240.000 $170.000 $125.000 $200.000 $250.000
Totals: $2,536,213.837 $2,235,501.700 $2,652,007.250 $2,682,661.550 $2,900,754.600 $2,987,802.610 $3,141,836.200 $3,254,567.700