PREPARING ROW
|
STA
|
204.000
|
$300.000
|
$10,000.000
|
$16,875.000
|
$10,000.000
|
|
|
REMOVING CONC (PAV)
|
SY
|
917.000
|
$35.000
|
$15.000
|
$29.620
|
$25.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
9,847.000
|
$40.000
|
$18.000
|
$15.340
|
$20.000
|
|
|
REMOVING CONC (CTB)
|
LF
|
2,518.000
|
$15.000
|
$15.000
|
$14.390
|
$22.000
|
|
|
REMOVING CONC (RETAINING WALLS)
|
SY
|
1,177.000
|
$60.000
|
$100.000
|
$28.460
|
$45.000
|
|
|
REMOVING CONC (APPR SLAB)
|
SY
|
2,574.000
|
$60.000
|
$25.000
|
$32.580
|
$32.000
|
|
|
REMOVING CONC (CURB OR CURB & GUTTER)
|
LF
|
4,318.000
|
$12.000
|
$6.000
|
$5.920
|
$5.500
|
|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
17,036.000
|
$7.000
|
$6.000
|
$4.130
|
$5.500
|
|
|
REMOVING STAB BASE AND ASPH PAV (0-4")
|
SY
|
2,574.000
|
$11.000
|
$6.000
|
$3.620
|
$12.000
|
|
|
REMOVING STAB BASE & ASPH PAV(26"-32")
|
SY
|
186.000
|
$15.000
|
$32.000
|
$53.780
|
$35.000
|
|
|
REMOVING STAB BASE & ASPH PV(10 TO 16")
|
SY
|
189,475.000
|
$14.000
|
$8.500
|
$6.100
|
$8.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
272,709.000
|
$15.000
|
$14.000
|
$16.000
|
$17.000
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
16,632.000
|
$18.000
|
$20.000
|
$22.290
|
$17.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
104,435.000
|
$15.000
|
$10.000
|
$18.000
|
$12.000
|
|
|
BACKFILL (TY B)
|
STA
|
12.000
|
$300.000
|
$550.000
|
$561.560
|
$1,500.000
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
2,269.000
|
$0.300
|
$1.300
|
$4.000
|
$0.800
|
|
|
FERTILIZER
|
AC
|
0.500
|
$1,430.000
|
$1,600.000
|
$2,000.000
|
$3,650.000
|
|
|
VEGETATIVE WATERING
|
MG
|
57.000
|
$26.000
|
$53.000
|
$100.000
|
$40.000
|
|
|
VEGETATION BARRIER
|
SY
|
747,362.000
|
$1.500
|
$1.780
|
$1.500
|
$2.350
|
|
|
PLANT MATERIAL (30 GAL) (TREE)
|
EA
|
228.000
|
$400.000
|
$904.000
|
$750.000
|
$470.000
|
|
|
PLANT MATERIAL (3 GAL) (SHRUB)
|
EA
|
1,572.000
|
$20.000
|
$118.000
|
$38.000
|
$30.000
|
|
|
PLANT MATERIAL (10 GAL) (SHRUB)
|
EA
|
1,363.000
|
$35.000
|
$217.000
|
$130.000
|
$165.000
|
|
|
PLANT MATERIAL (15 GAL) (SHRUB)
|
EA
|
913.000
|
$45.000
|
$348.000
|
$150.000
|
$180.000
|
|
|
PLANT BED PREP (TYPE I)
|
SY
|
29,865.000
|
$4.000
|
$25.000
|
$6.000
|
$2.500
|
|
|
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
|
CY
|
3,581.000
|
$60.000
|
$61.450
|
$76.790
|
$80.000
|
|
|
FL BS (CMP IN PLC)(TY A GR 5)(8")
|
SY
|
13,467.000
|
$15.000
|
$14.000
|
$17.540
|
$20.000
|
|
|
CEMENT
|
TON
|
1,493.000
|
$225.000
|
$217.000
|
$367.870
|
$340.000
|
|
|
CEMENT TREAT (SUBGRADE)(6")
|
SY
|
298,948.000
|
$2.500
|
$2.500
|
$2.240
|
$1.500
|
|
|
PRIME COAT (MULTI OPTION)
|
GAL
|
61,895.000
|
$5.000
|
$4.800
|
$7.820
|
$6.500
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
882.000
|
$2.750
|
$26.000
|
$4.400
|
$25.000
|
|
|
CONC PVMT (CONT REINF - CRCP) (13")
|
SY
|
284,844.000
|
$88.000
|
$83.350
|
$90.650
|
$115.000
|
|
|
STRUCT EXCAV (BOX)
|
CY
|
3,038.000
|
$8.000
|
$1.000
|
$30.000
|
$1.000
|
|
|
STRUCT EXCAV (PIPE)
|
CY
|
4,691.000
|
$7.000
|
$1.000
|
$30.000
|
$1.000
|
|
|
CEM STABIL BKFL
|
CY
|
5,020.800
|
$150.000
|
$125.000
|
$182.200
|
$275.000
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
993.000
|
$150.000
|
$150.000
|
$46.560
|
$95.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
4,199.000
|
$5.000
|
$3.000
|
$2.010
|
$3.500
|
|
|
TEMPORARY SPL SHORING
|
SF
|
56,345.000
|
$25.000
|
$15.000
|
$15.770
|
$48.000
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
206.000
|
$170.000
|
$225.000
|
$251.230
|
$300.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
8,906.000
|
$300.000
|
$400.000
|
$330.520
|
$335.000
|
|
|
DRILL SHAFT (NON - REINFORCED) (12 IN)
|
LF
|
7.000
|
$130.000
|
$270.000
|
$269.400
|
$300.000
|
|
|
DRILL SHAFT (SIGN MTS) (24 IN)
|
LF
|
106.000
|
$420.000
|
$316.000
|
$316.000
|
$350.000
|
|
|
DRILL SHAFT (SIGN MTS) (48 IN)
|
LF
|
260.000
|
$500.000
|
$670.000
|
$669.560
|
$700.000
|
|
|
DRILL SHAFT (HIGH MAST POLE) (60 IN)
|
LF
|
1,015.000
|
$770.000
|
$767.000
|
$766.240
|
$800.000
|
|
|
DRILL SHAFT (SIGN MTS) (60 IN)
|
LF
|
68.000
|
$660.000
|
$719.000
|
$718.900
|
$725.000
|
|
|
CL A CONC (FLUME)
|
CY
|
133.000
|
$650.000
|
$653.000
|
$524.350
|
$600.000
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
893.900
|
$1,200.000
|
$1,073.000
|
$1,380.710
|
$1,600.000
|
|
|
CL C CONC (BENT)(HPC)
|
CY
|
637.700
|
$1,400.000
|
$1,360.000
|
$2,264.440
|
$2,200.000
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
433.800
|
$1,300.000
|
$908.000
|
$2,008.560
|
$1,250.000
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
68.000
|
$625.000
|
$613.000
|
$680.200
|
$700.000
|
|
|
CL C CONC (COLLAR)
|
EA
|
10.000
|
$5,050.000
|
$1,985.000
|
$1,764.530
|
$1,150.000
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
150,502.000
|
$25.000
|
$29.000
|
$28.290
|
$40.000
|
|
|
APPROACH SLAB (HPC)
|
CY
|
1,464.000
|
$650.000
|
$700.000
|
$591.460
|
$750.000
|
|
|
RETAINING WALL (SPREAD FOOTING)
|
SF
|
40,361.000
|
$75.000
|
$74.000
|
$78.600
|
$95.000
|
|
|
PRESTR CONC BOX BEAM (5XB20)
|
LF
|
12,673.620
|
$350.000
|
$290.000
|
$347.950
|
$375.000
|
|
|
PRESTR CONC BOX BEAM (5XB28)
|
LF
|
3,573.040
|
$338.000
|
$290.000
|
$346.130
|
$375.000
|
|
|
PRESTR CONC BOX BEAM (5XB40)
|
LF
|
3,184.000
|
$360.000
|
$290.000
|
$351.730
|
$375.000
|
|
|
CONCRETE PAINT FINISH
|
SF
|
280,652.000
|
$1.000
|
$0.400
|
$0.400
|
$0.510
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
3,684.000
|
$450.000
|
$700.000
|
$496.410
|
$500.000
|
|
|
RIPRAP (CONC)(CL B)(RR8&RR9)
|
CY
|
1,411.900
|
$450.000
|
$700.000
|
$519.500
|
$550.000
|
|
|
RIPRAP (CONC)(CL B)(5 IN)
|
CY
|
838.000
|
$485.000
|
$600.000
|
$443.940
|
$450.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(12 IN)
|
CY
|
1,905.000
|
$85.000
|
$50.000
|
$129.830
|
$135.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(24 IN)
|
CY
|
199.000
|
$258.000
|
$50.000
|
$181.170
|
$165.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
305.000
|
$150.000
|
$50.000
|
$147.190
|
$150.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
2,611.000
|
$175.000
|
$50.000
|
$163.770
|
$125.000
|
|
|
RIPRAP (CONC)(FLUME)
|
CY
|
197.000
|
$475.000
|
$700.000
|
$500.860
|
$900.000
|
|
|
RAIL (TY SSTR)
|
LF
|
4,943.000
|
$75.000
|
$75.000
|
$57.870
|
$75.000
|
|
|
RAIL (TY SSTR) (W/DRAIN SLOTS)
|
LF
|
4,039.000
|
$95.000
|
$65.000
|
$60.910
|
$75.000
|
|
|
RAIL (TY SSTR) (W/DRAIN SLOT) (HPC)
|
LF
|
2,564.000
|
$120.000
|
$70.000
|
$73.100
|
$80.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
1,861.000
|
$200.000
|
$235.000
|
$239.960
|
$225.000
|
|
|
GABION MATTRESSES (GALV)(18 IN)
|
SY
|
166.000
|
$225.000
|
$210.000
|
$225.140
|
$185.000
|
|
|
CONC BOX CULV (6 FT X 6 FT)(EXTEND)
|
LF
|
23.000
|
$1,160.000
|
$750.000
|
$2,059.360
|
$1,250.000
|
|
|
CONC BOX CULV (8 FT X 7 FT)(EXTEND)
|
LF
|
78.000
|
$1,000.000
|
$900.000
|
$1,374.980
|
$1,350.000
|
|
|
CONC BOX CULV (10 FT X 4 FT)
|
LF
|
425.000
|
$1,095.000
|
$1,000.000
|
$1,558.570
|
$1,300.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
4,241.000
|
$115.000
|
$145.000
|
$118.750
|
$125.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
11.000
|
$230.000
|
$365.000
|
$859.420
|
$400.000
|
|
|
MANH (COMPL)(PRM)(60IN)
|
EA
|
1.000
|
$9,300.000
|
$7,400.000
|
$8,706.810
|
$7,500.000
|
|
|
JCTBOX(COMPL)(PJB)(4FTX4FT)
|
EA
|
1.000
|
$8,000.000
|
$6,100.000
|
$7,886.000
|
$6,500.000
|
|
|
INLET (COMPL)(PCO)(3FT)(BOTH)
|
EA
|
5.000
|
$10,000.000
|
$8,000.000
|
$10,172.580
|
$9,500.000
|
|
|
INLET (COMPL)(PMBD)(4FT)
|
EA
|
8.000
|
$7,500.000
|
$8,000.000
|
$10,087.510
|
$8,500.000
|
|
|
INLET (COMPL)(PSL)(RC)(4FTX4FT)
|
EA
|
11.000
|
$8,000.000
|
$6,300.000
|
$8,229.750
|
$8,000.000
|
|
|
INLET (COMPL)(PSL)(FG)(4FTX4FT-4FTX4FT)
|
EA
|
7.000
|
$8,100.000
|
$7,000.000
|
$8,940.200
|
$8,500.000
|
|
|
INLET (COMPL)(PSL)(FG)(3FTX5FT-3FTX5FT)
|
EA
|
1.000
|
$10,000.000
|
$8,700.000
|
$10,945.090
|
$9,500.000
|
|
|
INLET(COMPL)(PSL)(SFG)(3FTX3FT-3FTX3FT)
|
EA
|
2.000
|
$7,500.000
|
$7,100.000
|
$9,073.550
|
$8,500.000
|
|
|
INLET(COMPL)(PSL)(SFG)(4FTX4FT-4FTX4FT)
|
EA
|
10.000
|
$8,000.000
|
$7,900.000
|
$10,009.340
|
$9,000.000
|
|
|
INLET(COMPL)(PAZD)(FG)(3FTX3FT-3FTX3FT)
|
EA
|
6.000
|
$8,000.000
|
$7,800.000
|
$8,745.920
|
$8,000.000
|
|
|
HEADWALL (CH - FW - 0) (DIA= 36 IN)
|
EA
|
1.000
|
$8,000.000
|
$9,900.000
|
$25,484.500
|
$14,000.000
|
|
|
WINGWALL (PW - 1) (HW=10 FT)
|
EA
|
1.000
|
$56,000.000
|
$44,000.000
|
$51,664.680
|
$35,000.000
|
|
|
WINGWALL (PW - 1) (HW=9 FT)
|
EA
|
1.000
|
$50,000.000
|
$46,000.000
|
$46,334.600
|
$40,000.000
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (P)
|
EA
|
4.000
|
$1,800.000
|
$1,500.000
|
$2,556.790
|
$2,500.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
3.000
|
$2,200.000
|
$2,100.000
|
$3,185.020
|
$2,500.000
|
|
|
ADJUSTING MANHOLES & INLETS
|
EA
|
5.000
|
$2,000.000
|
$4,100.000
|
$1,858.600
|
$5,500.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
3.000
|
$3,500.000
|
$4,000.000
|
$6,493.140
|
$7,500.000
|
|
|
REMOV STR (INLET)
|
EA
|
15.000
|
$1,300.000
|
$1,125.000
|
$2,201.840
|
$1,600.000
|
|
|
REMOV STR (MANHOLE)
|
EA
|
1.000
|
$1,100.000
|
$1,350.000
|
$3,216.520
|
$1,800.000
|
|
|
REMOV STR (SET)
|
EA
|
3.000
|
$600.000
|
$400.000
|
$2,201.840
|
$500.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
1.000
|
$2,200.000
|
$7,100.000
|
$3,216.520
|
$4,000.000
|
|
|
REMOV STR (PIPE)
|
LF
|
1,333.000
|
$50.000
|
$25.000
|
$24.180
|
$32.000
|
|
|
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
|
EA
|
4.000
|
$50,000.000
|
$30,000.000
|
$45,153.340
|
$65,000.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
10.000
|
$100,000.000
|
$50,000.000
|
$75,424.820
|
$75,000.000
|
|
|
REMOV STR (DRAINAGE FLUME)
|
EA
|
32.000
|
$1,800.000
|
$315.000
|
$1,602.880
|
$1,400.000
|
|
|
REMOVE STR (GABION)
|
LF
|
121.000
|
$75.000
|
$50.000
|
$29.430
|
$185.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$5,831,140.000
|
$12,525,000.000
|
$12,000,000.000
|
$11,800,500.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
43.000
|
$20,000.000
|
$25,000.000
|
$21,332.290
|
$35,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
1,330.000
|
$28.600
|
$45.500
|
$41.760
|
$73.500
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
1,330.000
|
$2.000
|
$18.500
|
$5.900
|
$20.250
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
2,072.000
|
$25.000
|
$26.700
|
$30.560
|
$31.100
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
2,072.000
|
$2.500
|
$3.050
|
$7.470
|
$10.900
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
830.000
|
$6.000
|
$6.200
|
$3.510
|
$7.750
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
830.000
|
$1.300
|
$3.350
|
$1.500
|
$2.750
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
925.000
|
$6.250
|
$6.500
|
$5.240
|
$8.500
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
925.000
|
$2.500
|
$4.000
|
$1.170
|
$5.250
|
|
|
CONSTRUCTING DETOURS (TY 1)
|
SY
|
37,965.000
|
$35.000
|
$55.000
|
$20.410
|
$28.000
|
|
|
CONSTRUCTING DETOURS (TY 2)
|
SY
|
1,515.000
|
$55.000
|
$59.000
|
$47.140
|
$74.000
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
34,122.000
|
$87.000
|
$110.000
|
$102.720
|
$105.000
|
|
|
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
|
LF
|
18,000.000
|
$11.000
|
$6.600
|
$8.660
|
$8.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
53,845.000
|
$12.000
|
$3.000
|
$7.500
|
$3.050
|
|
|
PORT CTB (STKPL)(SGL SLP)(TY 1)
|
LF
|
52,417.000
|
$10.000
|
$5.400
|
$8.660
|
$5.000
|
|
|
PERM CTB (SGL SLOPE) (TY 1) (42 )
|
LF
|
18,625.000
|
$60.000
|
$56.000
|
$81.220
|
$110.000
|
|
|
PERM CTB (SGL SLOPE) (TY 3) (42 )
|
LF
|
363.000
|
$150.000
|
$169.000
|
$172.590
|
$325.000
|
|
|
PERM CONC TRF BARR (SGL SLP) (TY 1 SPL)
|
LF
|
1,401.000
|
$250.000
|
$272.000
|
$314.720
|
$500.000
|
|
|
CONC CURB (TY I)
|
LF
|
9,144.000
|
$18.000
|
$15.000
|
$11.950
|
$18.000
|
|
|
CONC CURB (TY II)
|
LF
|
516.000
|
$25.000
|
$20.000
|
$22.480
|
$30.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
5,172.000
|
$30.000
|
$21.000
|
$22.710
|
$28.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
71,195.000
|
$0.400
|
$0.700
|
$0.820
|
$1.100
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
11,600.000
|
$35.000
|
$34.000
|
$29.440
|
$30.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
29.000
|
$2,600.000
|
$2,305.000
|
$2,335.030
|
$3,500.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
21.000
|
$1,750.000
|
$1,755.000
|
$2,538.070
|
$2,000.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
10,740.000
|
$5.000
|
$3.150
|
$3.050
|
$5.500
|
|
|
REMOVE DOWNSTREAM ANCHOR TERMINAL
|
EA
|
33.000
|
$350.000
|
$310.000
|
$406.090
|
$400.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
63.000
|
$350.000
|
$230.000
|
$406.090
|
$400.000
|
|
|
REMOVE CABLE BARRIER
|
LF
|
16,558.000
|
$3.500
|
$5.200
|
$2.030
|
$5.500
|
|
|
REMOVE CABLE BARRIER TERMINAL SECTION
|
EA
|
16.000
|
$600.000
|
$570.000
|
$812.180
|
$850.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
18.000
|
$3,200.000
|
$3,325.000
|
$3,654.820
|
$4,000.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
35.000
|
$350.000
|
$335.000
|
$406.090
|
$400.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
18.000
|
$715.000
|
$655.000
|
$1,522.840
|
$800.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
32.000
|
$1,000.000
|
$750.000
|
$1,827.410
|
$1,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
32.000
|
$27,000.000
|
$9,850.000
|
$29,238.580
|
$26,000.000
|
|
|
REMOVE RD IL ASM (TRANS-BASE)
|
EA
|
47.000
|
$1,200.000
|
$1,070.000
|
$1,065.890
|
$1,100.000
|
|
|
REMOVE RD IL ASM (U/P)
|
EA
|
4.000
|
$350.000
|
$892.000
|
$892.000
|
$900.000
|
|
|
REPLACE LUMINAIRE W/LED (150W EQ)
|
EA
|
2.000
|
$750.000
|
$721.000
|
$720.310
|
$750.000
|
|
|
IN RD IL (U/P) (TY 1) (150W EQ) LED
|
EA
|
2.000
|
$2,500.000
|
$3,640.000
|
$3,636.100
|
$3,700.000
|
|
|
HI MST IL POLE (150 FT)( 80 MPH)
|
EA
|
29.000
|
$47,000.000
|
$57,000.000
|
$56,992.110
|
$58,000.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
20,395.000
|
$15.000
|
$29.700
|
$29.680
|
$30.000
|
|
|
CONDT (PVC) (SCH 40) (2") (BORE)
|
LF
|
1,285.000
|
$20.000
|
$37.050
|
$37.050
|
$37.250
|
|
|
CONDT (RM) (3/4")
|
LF
|
120.000
|
$31.000
|
$27.900
|
$27.860
|
$30.000
|
|
|
CONDT (RM) (2")
|
LF
|
1,160.000
|
$45.000
|
$46.100
|
$46.060
|
$46.500
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
10,150.000
|
$4.000
|
$3.150
|
$3.120
|
$3.150
|
|
|
ELEC CONDR (NO.4) INSULATED
|
LF
|
78,045.000
|
$3.500
|
$4.000
|
$3.970
|
$4.000
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
84.000
|
$1,550.000
|
$1,672.000
|
$1,671.050
|
$1,700.000
|
|
|
REMOVE GROUND BOX
|
EA
|
7.000
|
$300.000
|
$300.000
|
$300.000
|
$300.000
|
|
|
REMOVE ELECTRICAL SERVICES
|
EA
|
1.000
|
$500.000
|
$1,200.000
|
$1,200.000
|
$1,200.000
|
|
|
ELC SRV TY A 240/480 100(NS)AL(E)EX(O)
|
EA
|
2.000
|
$11,000.000
|
$9,842.000
|
$9,842.000
|
$10,000.000
|
|
|
ELC SRV TY A 240/480 100(NS)SS(E)GC(O)
|
EA
|
2.000
|
$11,000.000
|
$10,202.000
|
$10,202.000
|
$10,500.000
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
1,372.000
|
$40.000
|
$36.300
|
$36.280
|
$36.500
|
|
|
ALUMINUM SIGNS (TY O)
|
SF
|
2,013.000
|
$40.000
|
$43.800
|
$43.770
|
$44.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
13.000
|
$950.000
|
$1,105.000
|
$1,104.810
|
$1,150.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
|
EA
|
2.000
|
$1,500.000
|
$3,340.000
|
$3,337.500
|
$3,500.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
69.000
|
$1,000.000
|
$1,240.000
|
$1,237.850
|
$1,250.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(2)SA(P)
|
EA
|
1.000
|
$1,200.000
|
$1,100.000
|
$1,099.870
|
$1,100.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
10.000
|
$1,250.000
|
$1,445.000
|
$1,444.030
|
$1,450.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
28.000
|
$1,500.000
|
$1,145.000
|
$1,142.460
|
$1,150.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
|
EA
|
13.000
|
$1,250.000
|
$1,590.000
|
$1,588.000
|
$1,600.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-2EXT)
|
EA
|
1.000
|
$1,400.000
|
$1,630.000
|
$1,625.400
|
$1,650.000
|
|
|
IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL)
|
EA
|
7.000
|
$1,800.000
|
$1,850.000
|
$1,847.600
|
$1,850.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
|
EA
|
4.000
|
$3,150.000
|
$3,970.000
|
$3,966.000
|
$4,000.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
103.000
|
$225.000
|
$232.000
|
$231.950
|
$250.000
|
|
|
REMOVE BRDG MNT CLEARANCE SIGN ASSM
|
EA
|
4.000
|
$750.000
|
$2,980.000
|
$2,977.400
|
$3,000.000
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
7,259.000
|
$8.000
|
$8.850
|
$8.840
|
$9.000
|
|
|
REMOVE LRSA
|
EA
|
10.000
|
$1,000.000
|
$2,450.000
|
$2,450.000
|
$2,450.000
|
|
|
INS OH SN SUP(30 FT CANT)(CIRC TUBE)
|
EA
|
7.000
|
$100,000.000
|
$96,362.000
|
$96,362.000
|
$100,000.000
|
|
|
INS OH SN SUP(155 FT BRDG)(CIRC TUBE)
|
EA
|
1.000
|
$440,000.000
|
$472,000.000
|
$472,000.000
|
$500,000.000
|
|
|
REMOVE OVERHD SIGN SUP
|
EA
|
2.000
|
$10,000.000
|
$15,771.000
|
$15,771.000
|
$16,000.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
132.000
|
$24.000
|
$26.000
|
$29.920
|
$30.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
|
EA
|
73.000
|
$24.000
|
$26.000
|
$29.910
|
$30.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
|
EA
|
226.000
|
$40.000
|
$27.000
|
$35.410
|
$30.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
225.000
|
$30.000
|
$29.000
|
$32.270
|
$55.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
|
EA
|
82.000
|
$30.000
|
$29.000
|
$32.280
|
$55.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
|
EA
|
89.000
|
$50.000
|
$54.000
|
$36.700
|
$90.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(WFLX)SRF
|
EA
|
21.000
|
$120.000
|
$93.000
|
$110.440
|
$120.000
|
|
|
INSTL DEL ASSM (D-DW)SZ 1(WFLX)GND
|
EA
|
7.000
|
$160.000
|
$54.000
|
$81.280
|
$90.000
|
|
|
WK ZN PAV MRK REMOV (REFL) TY I-A
|
LF
|
109,619.000
|
$3.000
|
$1.100
|
$1.340
|
$1.080
|
|
|
WK ZN PAV MRK REMOV (REFL) TY I-C
|
LF
|
121,958.000
|
$3.750
|
$1.100
|
$1.340
|
$1.080
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY W
|
LF
|
121,958.000
|
$3.500
|
$1.000
|
$1.210
|
$0.980
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
|
LF
|
109,619.000
|
$1.450
|
$1.000
|
$1.210
|
$0.980
|
|
|
WK ZN PAV MRK REMOV (W)4"(DOT)
|
LF
|
100.000
|
$1.200
|
$1.100
|
$1.340
|
$1.080
|
|
|
WK ZN PAV MRK REMOV (W)8"(SLD)
|
LF
|
19,370.000
|
$2.570
|
$1.100
|
$1.340
|
$1.080
|
|
REFL PAV MRK TY I (W)6"(LNDP)(090MIL)
|
LF
|
580.000
|
$3.000
|
$2.050
|
$2.480
|
$2.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
24,020.000
|
$2.000
|
$1.180
|
$1.420
|
$1.150
|
|
REFL PAV MRK TY I (W)12"(LNDP)(090MIL)
|
LF
|
2,992.000
|
$4.000
|
$2.660
|
$3.220
|
$2.600
|
|
REFL PAV MRK TY I (W)12"(SLD)(090MIL)
|
LF
|
7,120.000
|
$3.000
|
$2.660
|
$3.220
|
$2.600
|
|
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
|
LF
|
20.000
|
$10.000
|
$5.370
|
$6.500
|
$5.250
|
|
REFL PAV MRK TY I (W)(ARROW)(090MIL)
|
EA
|
29.000
|
$150.000
|
$179.000
|
$216.670
|
$175.000
|
|
REFL PAV MRK TY I(W)(UTURN ARW)(090MIL)
|
EA
|
2.000
|
$140.000
|
$241.000
|
$290.960
|
$235.000
|
|
REFL PAV MRK TY I(W)(LNDP ARW)(090MIL)
|
EA
|
2.000
|
$200.000
|
$220.000
|
$266.200
|
$215.000
|
|
REFL PAV MRK TY I (W)(NUMBER)(090MIL)
|
EA
|
7.000
|
$160.000
|
$128.000
|
$154.770
|
$125.000
|
|
REFL PAV MRK TY I (W)(WORD)(090MIL)
|
EA
|
24.000
|
$220.000
|
$190.000
|
$229.050
|
$185.000
|
|
REFL PAV MRK TY II (W) 6" (BRK)
|
LF
|
6,540.000
|
$0.700
|
$0.560
|
$0.680
|
$0.550
|
|
REFL PAV MRK TY II (W) 6" (LNDP)
|
LF
|
580.000
|
$1.500
|
$0.560
|
$0.680
|
$0.550
|
|
REFL PAV MRK TY II (W) 6" (SLD)
|
LF
|
75,870.000
|
$0.700
|
$0.510
|
$0.620
|
$0.500
|
|
REFL PAV MRK TY II (W) 8" (SLD)
|
LF
|
24,020.000
|
$0.500
|
$0.610
|
$0.740
|
$0.600
|
|
REFL PAV MRK TY II (W) 12" (LNDP)
|
LF
|
2,965.000
|
$1.500
|
$0.660
|
$0.800
|
$0.650
|
|
REFL PAV MRK TY II (W) 12" (SLD)
|
LF
|
6,855.000
|
$2.000
|
$1.480
|
$1.800
|
$1.450
|
|
REFL PAV MRK TY II (W) 24" (SLD)
|
LF
|
20.000
|
$6.000
|
$3.580
|
$4.330
|
$3.500
|
|
REFL PAV MRK TY II (W) (ARROW)
|
EA
|
29.000
|
$90.000
|
$149.000
|
$179.530
|
$145.000
|
|
REFL PAV MRK TY II (W) (UTURN ARROW)
|
EA
|
2.000
|
$110.000
|
$164.000
|
$198.100
|
$160.000
|
|
REFL PAV MRK TY II (W) (LNDP ARW)
|
EA
|
2.000
|
$130.000
|
$163.000
|
$196.860
|
$159.000
|
|
REFL PAV MRK TY II (W) (NUMBER)
|
EA
|
7.000
|
$80.000
|
$128.000
|
$154.770
|
$125.000
|
|
REFL PAV MRK TY II (W) (WORD)
|
EA
|
24.000
|
$90.000
|
$159.000
|
$191.910
|
$155.000
|
|
REFL PAV MRK TY II (W) (SYMBOL)
|
EA
|
16.000
|
$300.000
|
$138.000
|
$167.150
|
$135.000
|
|
REFL PAV MRK TY II (Y) 6" (SLD)
|
LF
|
78,645.000
|
$0.500
|
$0.510
|
$0.620
|
$0.500
|
|
|
PAVEMENT SEALER 10"
|
LF
|
23,070.000
|
$0.250
|
$0.400
|
$0.480
|
$0.390
|
|
|
REF PROF PAV MRK TY I(W)6"(SLD)(090MIL)
|
LF
|
45,215.000
|
$1.250
|
$1.720
|
$2.080
|
$1.680
|
|
|
REF PROF PAV MRK TY I(Y)6"(SLD)(090MIL)
|
LF
|
37,895.000
|
$1.000
|
$1.720
|
$2.080
|
$1.680
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(090MIL)
|
LF
|
8,190.000
|
$1.500
|
$0.990
|
$1.200
|
$0.970
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
|
LF
|
33,282.000
|
$1.500
|
$0.970
|
$1.180
|
$0.950
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
|
LF
|
44,594.000
|
$1.500
|
$0.970
|
$1.180
|
$0.950
|
|
PREFAB PAV MRK TY B (W)(6")(BRK)CNTST
|
LF
|
23,070.000
|
$14.000
|
$15.300
|
$18.510
|
$14.950
|
|
PREFAB PAV MRK TY C (MULTI) (SHIELD)
|
EA
|
16.000
|
$3,000.000
|
$2,148.000
|
$2,600.060
|
$2,100.000
|
|
PLOWABLE REFL PAV MRKR TY II-C-R
|
EA
|
188.000
|
$35.000
|
$29.750
|
$40.860
|
$33.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
24.000
|
$6.000
|
$4.450
|
$5.390
|
$4.350
|
|
REFL PAV MRKR TY I-R
|
EA
|
224.000
|
$6.000
|
$4.450
|
$5.390
|
$4.350
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
16.000
|
$6.000
|
$4.450
|
$5.390
|
$4.350
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
3,622.000
|
$5.000
|
$4.450
|
$5.390
|
$4.350
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
157,159.000
|
$0.500
|
$0.380
|
$0.460
|
$0.370
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
9,620.000
|
$1.000
|
$0.410
|
$0.500
|
$0.400
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
7,605.000
|
$1.020
|
$0.480
|
$0.580
|
$0.470
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
10.000
|
$125.000
|
$25.600
|
$30.950
|
$25.000
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
2.000
|
$138.000
|
$30.700
|
$37.150
|
$30.000
|
|
|
ELIM EXT PAV MRK & MRKRS(PLOWABLE RPMS)
|
EA
|
112.000
|
$2.000
|
$15.350
|
$18.570
|
$15.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
169,171.000
|
$2.000
|
$0.190
|
$0.240
|
$0.190
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
24,020.000
|
$0.250
|
$0.210
|
$0.260
|
$0.210
|
|
|
PAV SURF PREP FOR MRK (10")
|
LF
|
23,070.000
|
$0.350
|
$0.250
|
$0.300
|
$0.240
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
10,112.000
|
$0.400
|
$0.280
|
$0.330
|
$0.270
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
20.000
|
$5.000
|
$0.310
|
$0.370
|
$0.300
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
31.000
|
$60.000
|
$12.300
|
$14.860
|
$12.000
|
|
|
PAV SURF PREP FOR MRK (UTURN ARR)
|
EA
|
2.000
|
$60.000
|
$41.000
|
$49.530
|
$40.000
|
|
|
PAV SURF PREP FOR MRK (NUMBER)
|
EA
|
7.000
|
$75.000
|
$12.300
|
$14.860
|
$12.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
24.000
|
$70.000
|
$12.300
|
$14.860
|
$12.000
|
|
|
PAV SURF PREP FOR MRKS (SHIELD)
|
EA
|
16.000
|
$100.000
|
$50.150
|
$60.670
|
$49.000
|
|
|
CLEANING / SWEEPING (CENTER MEDIAN)
|
CYC
|
60.000
|
$1,800.000
|
$2,182.000
|
$2,580.960
|
$3,050.000
|
|
|
CLEANING / SWEEPING (OUTSIDE MAIN LANE)
|
CYC
|
60.000
|
$1,800.000
|
$2,182.000
|
$2,580.960
|
$3,050.000
|
|
|
LANDSCAPE AMENITY (TY 1)
|
EA
|
43.000
|
$12,000.000
|
$25,970.000
|
$27,520.130
|
$27,500.000
|
|
|
LANDSCAPE AMENITY (TY 2)
|
EA
|
17.000
|
$7,500.000
|
$15,000.000
|
$15,932.240
|
$16,500.000
|
|
|
LANDSCAPE AMENITY (TY 3)
|
EA
|
33.000
|
$30,000.000
|
$31,011.000
|
$31,624.220
|
$32,000.000
|
|
|
LANDSCAPE AMENITY (TY 4)
|
EA
|
30.000
|
$22,000.000
|
$23,706.000
|
$23,935.850
|
$24,000.000
|
|
|
LANDSCAPE AMENITY (TY 5)
|
EA
|
19.000
|
$14,000.000
|
$19,305.000
|
$19,302.940
|
$20,000.000
|
|
|
LOOSE AGGR FOR GROUNDCOVER (TYPE I)
|
CY
|
46,711.000
|
$45.000
|
$111.700
|
$85.000
|
$75.000
|
|
|
RMV,STCKPL,CLN,RELY LOSE AGRGT & BLDRS
|
STA
|
37.000
|
$2,650.000
|
$6,600.000
|
$6,801.010
|
$3,000.000
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
65,607.000
|
$105.000
|
$88.600
|
$97.750
|
$115.000
|
|
|
SP MIXES SP-C SAC-A PG70-22
|
TON
|
2,323.000
|
$140.000
|
$116.300
|
$106.520
|
$170.000
|
|
|
ORNAMENTAL STEEL STRUCTURE
|
SF
|
5,815.000
|
$1,390.000
|
$458.000
|
$474.990
|
$850.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$12,000.000
|
$25,000.000
|
$9,282.610
|
$22,000.000
|
|
|
FIBER OPTIC PATCH PANEL (12 POSITION)
|
EA
|
4.000
|
$3,300.000
|
$3,214.000
|
$3,213.500
|
$3,250.000
|
|
|
ITS GRND MNT CAB (TY 6) (CONF 2) (REM)
|
EA
|
1.000
|
$3,200.000
|
$5,145.000
|
$5,144.660
|
$5,200.000
|
|
|
CCTV FIELD EQUIP (DIGITAL) (INSTL ONLY)
|
EA
|
3.000
|
$5,500.000
|
$5,484.000
|
$5,483.330
|
$5,500.000
|
|
|
REMOVE CCTV FIELD EQUIPMENT
|
EA
|
3.000
|
$1,200.000
|
$1,296.000
|
$1,296.000
|
$1,300.000
|
|
|
CONDUIT (PREPARE)
|
LF
|
630.000
|
$3.000
|
$10.000
|
$10.000
|
$10.000
|
|
|
GROUND BOX (PREPARE)
|
EA
|
4.000
|
$500.000
|
$590.000
|
$590.000
|
$590.000
|
|
|
REMOVE ITS RADIO
|
EA
|
8.000
|
$1,500.000
|
$2,533.000
|
$2,532.860
|
$2,600.000
|
|
|
ITS POLE (60 FT)(REM)
|
EA
|
7.000
|
$1,500.000
|
$3,845.000
|
$3,844.240
|
$3,900.000
|
|
|
REMOVE DRUM SIGN ASSEMBLY
|
EA
|
4.000
|
$1,650.000
|
$1,583.000
|
$1,583.000
|
$1,600.000
|
|
|
INSTALLATION OF FES (FIELD CABINET)
|
EA
|
3.000
|
$1,300.000
|
$1,433.000
|
$1,433.000
|
$1,450.000
|
|
|
LED HI MST IL ASM (6 FIXT)(SYM)(TY S)
|
EA
|
4.000
|
$37,500.000
|
$39,002.000
|
$39,002.000
|
$40,000.000
|
|
|
LED HI MST IL ASM (6 FIXT)(ASYM)(TY A)
|
EA
|
22.000
|
$38,750.000
|
$35,000.000
|
$35,000.000
|
$35,000.000
|
|
|
LED HI MST IL AM(6 FIXT)ASYM(TY A)SHLD
|
EA
|
3.000
|
$40,000.000
|
$40,101.000
|
$40,101.000
|
$40,500.000
|
|
|
REMOVE EXISTING CABLES (FIBER)
|
LF
|
525.000
|
$2.000
|
$4.000
|
$3.980
|
$4.000
|
|
|
REMOVE EXISTING CABLES (POWER)
|
LF
|
315.000
|
$2.000
|
$2.250
|
$2.230
|
$2.250
|
|
|
TMA (STATIONARY)
|
DAY
|
1,788.000
|
$245.000
|
$542.000
|
$232.070
|
$305.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
844.000
|
$540.000
|
$866.000
|
$348.100
|
$430.000
|
|
|
ITS RVSD (DC ONLY) (INSTALL ONLY)
|
EA
|
3.000
|
$1,000.000
|
$750.000
|
$750.000
|
$750.000
|
|
|
ITS RVSD (DC ONLY) (REMOVE)
|
EA
|
1.000
|
$700.000
|
$555.000
|
$555.000
|
$555.000
|
|
|
SYSTEM INTEGRATION
|
LS
|
1.000
|
$170,000.000
|
$35,000.000
|
$35,000.000
|
$45,000.000
|
|
|
BACKLIT W/ PERIMETER LED RDSD SGN
|
EA
|
28.000
|
$4,100.000
|
$4,015.000
|
$4,014.950
|
$4,200.000
|
|
|
LED AESTHETIC LIGHT ASSEMBLY
|
EA
|
2.000
|
$394,965.000
|
$408,000.000
|
$322,532.830
|
$350,000.000
|
|
Totals: |
$115,716,761.070
|
$119,997,852.220
|
$123,650,650.349
|
$139,215,670.950
|