Job Info for 0924-06-663

County: EL PASO Highway: VA Date: 06/30/2022 (2 years ago) Engineer's Estimate: $849,610 Control Number: 0924-06-663
Project: C 924-6-663 District: EL PASO Time: 80 WORKING DAYS Type: LANDSCAPE DEVELOPMENT
HCS
Pay Estimates: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14
Plans: Plans | Proposal

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $849,609.70
HORIZONE CONSTRUCTION I, LTD   $995,591.48 1
17.18% | $145,981.78
DOUBLE H CONTRACTING INC.   $1,076,406.50 2
26.69% | $226,796.80
8.12% | $80,815.02
ALLIED PAVING CO.   $1,080,911.15 3
27.22% | $231,301.45
8.57% | $85,319.67
0.42% | $4,504.65
MARTINEZ BROS. CONTRACTORS, LLC   $1,648,742.88 4
94.06% | $799,133.18
65.6% | $653,151.40
52.53% | $567,831.73
Subcontractor Percentage Amount
ZAYZA IRRIGATION AND LANDSCAPE 66.69% $663,959.96
AMERICHOICE CONSTRUCTION LLC 11.93% $118,774.06
APACHE BARRICADE & SIGN 2.54% $25,288.02
Total: 81.16% $808,022.04

Bid Items

Items: 24, 0 filtered
EL PASO VA  |  EL PASO  |  0924-06-663  |  06/30/2022  |  $849,610  |  C 924-6-663  |  LANDSCAPE DEVELOPMENT  |  80 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate HORIZONE CONSTRUCTION I, LTD DOUBLE H CONTRACTING INC. ALLIED PAVING CO. MARTINEZ BROS. CONTRACTORS, LLC
100 6001 PREPARING ROW AC 1.040 $6,800.000 $68,644.860 $10,000.000 $155,540.000 $19,000.000
104 6011 REMOVING CONC (MEDIANS) SY 2,543.000 $20.000 $13.100 $20.000 $16.680 $28.000
110 6003 EXCAVATION (SPECIAL) CY 1,280.000 $50.000 $28.660 $65.000 $18.460 $28.000
134 6005 BACKFILL TY A CY 1,129.000 $70.000 $26.940 $65.000 $16.640 $35.000
161 6011 GENERAL USE COMPOST (1") SY 18,275.000 $4.000 $2.010 $3.000 $1.970 $4.000
168 6001 VEGETATIVE WATERING MG 4.000 $50.000 $267.500 $1,000.000 $262.500 $185.420
170 6001 IRRIGATION SYSTEM LS 1.000 $75,000.000 $383,155.470 $135,000.000 $364,443.680 $817,360.000
192 6004 PLANT MATERIAL (5-GAL) EA 1,476.000 $39.000 $38.630 $60.000 $49.720 $61.440
192 6014 PLANT SOIL MIX CY 371.000 $65.000 $64.690 $50.000 $63.480 $61.930
192 6016 PLANT BED PREPARATION SY 18,275.000 $2.100 $2.000 $3.500 $1.960 $3.270
192 6017 VEGETATION BARRIER SY 7,598.000 $1.900 $2.820 $3.000 $2.770 $3.710
192 6031 PLANT MATERIAL (5 GAL) (SHRUB) EA 1,457.000 $45.000 $33.050 $60.000 $32.430 $61.430
193 6001 PLANT MAINTENANCE MO 12.000 $1,500.000 $1,690.600 $2,250.000 $1,659.000 $1,020.000
193 6005 PLANT REPLACEMENT (5-GAL) EA 440.000 $45.000 $44.940 $60.000 $38.850 $61.430
193 6006 VEGETATIVE WATERING MG 12.000 $100.000 $267.500 $2,500.000 $262.500 $185.420
193 6007 IRRIGATION SYSTEM OPER AND MAINT MO 12.000 $700.000 $470.800 $2,250.000 $462.000 $780.000
500 6001 MOBILIZATION LS 1.000 $75,000.000 $28,997.810 $98,000.000 $23,000.000 $45,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 4.000 $7,550.000 $6,339.540 $10,000.000 $8,000.000 $8,125.000
506 6040 BIODEG EROSN CONT LOGS (INSTL) (8") LF 220.000 $5.000 $6.690 $10.000 $5.000 $12.000
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 220.000 $2.000 $2.610 $10.000 $2.000 $5.000
1005 6001 LOOSE AGGR FOR GROUNDCOVER (TYPE I) CY 865.000 $110.000 $75.920 $90.000 $90.630 $119.630
1005 6002 LOOSE AGGR FOR GROUNDCOVER (TYPE II) CY 320.000 $90.000 $76.650 $90.000 $89.490 $101.360
6001 6001 PORTABLE CHANGEABLE MESSAGE SIGN DAY 60.000 $120.000 $50.720 $150.000 $100.000 $125.000
6185 6002 TMA (STATIONARY) DAY 60.000 $250.000 $285.280 $250.000 $275.000 $410.000
Totals: $849,609.70 $995,591.48 $1,076,406.50 $1,080,911.15 $1,648,742.88