County: EL PASO Highway: VA Date: 07/10/2018 (6 years ago) Engineer's Estimate: $503,337 Control Number: 0924-06-578
Project: NH 1802(477) District: EL PASO Time: 60 WORKING DAYS Type: VEGETATION LANDSCAPE

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $503,336.95
ZTEX CONSTRUCTION, INC.   $585,213.55 1
16.27% | $81,876.60
ACCENT LANDSCAPE CONTRACTORS, INC.   $693,368.94 2
37.75% | $190,031.99
18.48% | $108,155.39
DOUBLE H CONTRACTING INC.   $729,158.35 3
44.86% | $225,821.40
24.6% | $143,944.80
5.16% | $35,789.41
SYNERGY PROJECT CONSULTANTS, INC.   $735,046.32 4
46.03% | $231,709.37
25.6% | $149,832.77
0.81% | $5,887.97
APEX LANDSCAPE & IRRIGATION, LLC   $1,172,587.50 5
132.96% | $669,250.55
100.37% | $587,373.95
59.53% | $437,541.18

Bid Items

Items: 31, 0 filtered
EL PASO VA  |  EL PASO  |  0924-06-578  |  07/10/2018  |  $503,337  |  NH 1802(477)  |  VEGETATION LANDSCAPE  |  60 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate ZTEX CONSTRUCTION, INC. ACCENT LANDSCAPE CONTRACTORS, INC. DOUBLE H CONTRACTING INC. SYNERGY PROJECT CONSULTANTS, INC. APEX LANDSCAPE & IRRIGATION, LLC
100 6001 PREPARING ROW AC 3.600 $2,500.000 $2,500.000 $13,975.000 $5,000.000 $18,940.000 $12,500.000
100 6013 PREP ROW (TREE) (2" TO 12" DIA) EA 5.000 $195.000 $245.000 $200.000 $500.000 $217.000 $500.000
110 6003 EXCAVATION (SPECIAL) CY 177.500 $8.000 $44.500 $32.000 $50.000 $26.500 $45.000
170 6001 IRRIGATION SYSTEM LS 1.000 $88,000.000 $68,422.000 $97,935.000 $60,000.000 $38,290.000 $225,000.000
192 6004 PLANT MATERIAL (5-GAL) EA 1,406.000 $3.000 $27.000 $26.970 $50.000 $23.900 $35.000
192 6013 MULCH SY 656.000 $3.000 $8.100 $3.970 $7.000 $3.980 $50.000
192 6014 PLANT SOIL MIX CY 78.000 $29.000 $52.700 $36.000 $50.000 $40.000 $55.000
192 6015 LANDSCAPE EDGE LF 3,900.000 $8.000 $3.600 $4.970 $7.000 $13.700 $25.000
192 6016 PLANT BED PREPARATION SY 2,184.000 $4.000 $0.600 $4.390 $7.500 $3.200 $6.000
192 6017 VEGETATION BARRIER SY 12,449.000 $1.000 $1.300 $1.680 $1.150 $3.300 $4.000
192 6024 PLANT MATERIAL (30 GAL) (TREE) EA 93.000 $150.000 $310.600 $300.000 $550.000 $141.920 $300.000
192 6031 PLANT MATERIAL (5 GAL) (SHRUB) EA 278.000 $17.000 $26.400 $26.500 $40.000 $28.700 $35.000
192 6050 PLANT MATERIAL (MIN 6' TRNK HT) (PALM) EA 8.000 $450.000 $526.400 $600.000 $450.000 $503.000 $500.000
192 6056 PLANT MATERIAL (MIN 6'HT) (BARE ROOT) EA 11.000 $25.000 $94.800 $100.000 $500.000 $300.000 $500.000
192 6058 PLANT MATERIAL (20 GAL)(TREE) EA 315.000 $100.000 $289.500 $279.350 $235.000 $240.000 $250.000
193 6001 PLANT MAINTENANCE MO 12.000 $2,000.000 $947.400 $1,350.000 $1,500.000 $1,920.900 $4,500.000
193 6005 PLANT REPLACEMENT (5-GAL) EA 167.000 $22.000 $21.100 $25.000 $40.000 $36.500 $25.000
193 6007 IRRIGATION SYSTEM OPER AND MAINT MO 12.000 $1,390.000 $189.500 $300.000 $1,500.000 $1,341.600 $1,200.000
193 6010 PLANT REPLACEMENT (30 GAL) EA 9.000 $150.000 $368.500 $300.000 $520.000 $137.800 $300.000
193 6017 PLANT REPLACEMENT (20 GAL) EA 32.000 $100.000 $379.000 $279.350 $250.000 $33.500 $200.000
500 6001 MOBILIZATION LS 1.000 $43,712.450 $45,000.000 $20,000.000 $50,000.000 $20,003.200 $70,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 3.000 $7,500.000 $15,000.000 $12,000.000 $10,000.000 $7,366.200 $6,500.000
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 8,170.000 $2.400 $3.200 $2.950 $3.500 $2.600 $2.000
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 8,170.000 $0.700 $0.600 $1.000 $3.500 $0.760 $1.000
506 6040 BIODEG EROSN CONT LOGS (INSTL) (8") LF 670.000 $5.000 $7.900 $3.500 $20.000 $4.150 $2.000
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 670.000 $1.000 $2.700 $1.500 $5.000 $1.040 $1.000
529 6033 CONC CURB (LANDSCAPE) LF 3,785.000 $22.700 $7.800 $15.000 $18.000 $19.000 $25.000
1005 6001 LOOSE AGGR FOR GROUNDCOVER (TYPE I) CY 626.000 $50.000 $54.000 $63.970 $70.000 $148.230 $200.000
1005 6002 LOOSE AGGR FOR GROUNDCOVER (TYPE II) CY 360.000 $50.000 $54.000 $59.730 $70.000 $223.400 $200.000
1005 6003 LOOSE AGGR FOR GROUNDCOVER (TYPE III) CY 145.000 $55.000 $70.000 $79.350 $70.000 $69.850 $200.000
6185 6001 TMA (STATIONARY) EA 2.000 $700.000 $16,700.000 $29,500.000 $500.000 $1,000.200 $500.000
Totals: $503,336.95 $585,213.55 $693,368.94 $729,158.35 $735,046.32 $1,172,587.50