Job Info for 0924-00-109

County: EL PASO Highway: VA Date: 03/08/2023 (1 year ago) Engineer's Estimate: $1,431,813 Control Number: 0924-00-109
Project: C 924-00-109 District: EL PASO Time: 340 WORKING DAYS Type: BRIDGE MAINTENANCE
HCS
Pay Estimates: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14
Plans: Plans | Proposal

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $1,431,813.45
DAN WILLIAMS COMPANY   $2,271,557.75 1
58.65% | $839,744.30
Subcontractor Percentage Amount
PMI PAVEMENT MARKING, LLC 4.03% $91,543.78
S & S BRIDGE PAINTING, INC. 1.23% $27,940.16
MAJOR MOTION LOGISTICS, LLC 0.01% $227.16
Total: 5.27% $119,711.10

Bid Items

Items: 58, 0 filtered
EL PASO VA  |  EL PASO  |  0924-00-109  |  03/08/2023  |  $1,431,813  |  C 924-00-109  |  BRIDGE MAINT  |  340 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate DAN WILLIAMS COMPANY
104 6010 REMOVING CONC (RIPRAP) CY 70.000 $75.000 $200.000
104 6021 REMOVING CONC (CURB) LF 12.000 $7.500 $35.000
132 6001 EMBANKMENT (FINAL)(ORD COMP)(TY A) CY 13.000 $20.000 $150.000
354 6021 PLANE ASPH CONC PAV(0" TO 2") SY 556.000 $2.000 $10.000
354 6022 PLANE ASPH CONC PAV(0" TO 3") SY 2,214.000 $2.500 $15.000
401 6001 FLOWABLE BACKFILL CY 742.000 $240.000 $650.000
403 6006 TEMPORARY SPL SHORING (COFFERDAM) SF 240.000 $5.000 $1.000
429 6001 CONC STR REPAIR(CLEAN & COAT WTH EPOXY) SF 76.000 $350.000 $400.000
429 6007 CONC STR REPAIR (VERTICAL & OVERHEAD) SF 290.000 $195.000 $500.000
429 6011 CONC STR REPR(REMOV AND REPL WINGWALL) CY 1.000 $8,000.000 $4,000.000
429 6018 CONC STR REP (REMOVE AND REPL BM END) CY 1.000 $1,000.000 $10,000.000
432 6002 RIPRAP (CONC)(5 IN) CY 70.000 $500.000 $1,600.000
432 6033 RIPRAP (STONE PROTECTION)(18 IN) CY 83.000 $145.000 $450.000
432 6038 BEDDING MATERIAL (3 IN) CY 8.000 $100.000 $500.000
438 6001 CLEANING AND SEALING EXISTING JOINTS LF 515.000 $35.000 $30.000
446 6002 CLEAN & PAINT EXIST STR (SYSTEM II) LS 2.000 $10,000.000 $75,000.000
480 6002 CLEAN EXIST CULVERTS CY 131.000 $30.000 $150.000
500 6001 MOBILIZATION LS 1.000 $150,000.000 $205,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 16.000 $18,000.000 $15,000.000
506 6040 BIODEG EROSN CONT LOGS (INSTL) (8") LF 4,672.000 $9.000 $6.750
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 4,672.000 $4.000 $2.500
510 6001 ONE-WAY TRAF CONT (FLAGGER CONT) HR 208.000 $135.000 $85.000
512 6001 PORT CTB (FUR & INST)(SGL SLOPE)(TY 1) LF 210.000 $75.000 $125.000
512 6025 PORT CTB (MOVE)(SGL SLP)(TY 1) LF 210.000 $5.000 $6.000
512 6049 PORT CTB (REMOVE)(SGL SLP)(TY 1) LF 210.000 $12.000 $30.000
529 6002 CONC CURB (TY II) LF 12.000 $19.000 $175.000
545 6003 CRASH CUSH ATTEN (MOVE & RESET) EA 2.000 $1,200.000 $750.000
545 6005 CRASH CUSH ATTEN (REMOVE) EA 2.000 $1,000.000 $750.000
545 6019 CRASH CUSH ATTEN (INSTL)(S)(N)(TL3) EA 2.000 $10,000.000 $11,000.000
662 6050 WK ZN PAV MRK REMOV (REFL) TY II-A-A EA 2,700.000 $4.000 $15.000
662 6109 WK ZN PAV MRK SHT TERM (TAB)TY W EA 100.000 $1.000 $2.150
666 6171 REFL PAV MRK TY II (W) 6" (BRK) LF 215.000 $0.350 $0.950
666 6174 REFL PAV MRK TY II (W) 6" (SLD) LF 3,020.000 $0.350 $0.950
666 6208 REFL PAV MRK TY II (Y) 6" (BRK) LF 1,080.000 $0.200 $0.950
666 6210 REFL PAV MRK TY II (Y) 6" (SLD) LF 860.000 $0.350 $0.950
666 6309 RE PM W/RET REQ TY I (W)6"(SLD)(100MIL) LF 2,160.000 $0.650 $0.950
666 6321 RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL) LF 270.000 $1.000 $0.950
672 6010 REFL PAV MRKR TY II-C-R EA 14.000 $5.000 $15.000
672 6012 TRAFFIC BUTTON TY I-C EA 2,700.000 $5.700 $15.000
677 6001 ELIM EXT PAV MRK & MRKS (4") LF 2,430.000 $0.500 $1.300
700 6001 POTHOLE REPAIR (STANDARD) SY 4.000 $88.000 $1,200.000
712 6008 JT / CRCK SEAL (RUBBER - ASPHALT) LMI 0.380 $540.000 $50,000.000
752 6003 TREE TRIMMING / BRUSH REMOVAL MI 0.040 $10,000.000 $60,000.000
760 6001 DITCH CLEANING AND RESHAPING (FOOT) LF 120.000 $15.000 $35.000
770 6001 REPAIR RAIL ELEMENT (W - BEAM) LF 13.000 $30.000 $50.000
770 6017 REALIGN POSTS EA 1.000 $25.000 $75.000
770 6018 INSTALL BLOCKOUT (TYPE SPECIFIED) EA 1.000 $16.000 $100.000
770 6024 REPLACE TERMINAL ANCHOR POSTS EA 2.000 $300.000 $150.000
780 6002 CNC CRACK REPAIR (DISCRETE)(INJECT) LF 322.000 $115.000 $90.000
784 6072 REP STL BRDG MEMB (WELD REPAIR) EA 1.000 $100.000 $2,000.000
785 6006 BRIDGE JOINT REPAIR (HEADER) LF 7.000 $175.000 $500.000
785 6013 BRIDGE JOINT REPLACEMENT (HEADER) LF 498.000 $350.000 $225.000
3076 6026 D-GR HMA TY-C SAC-A PG70-22 (EXEMPT) TON 854.000 $125.000 $280.000
3076 6066 TACK COAT GAL 415.000 $7.000 $30.000
4002 6001 REPLACE ELASTOMERIC BEARING PADS EA 6.000 $14,000.000 $7,500.000
6056 6001 PREFORMED IN-LANE(TRANS) RUMBLE STRIP LF 2,016.000 $8.500 $18.000
6185 6002 TMA (STATIONARY) DAY 76.000 $275.000 $350.000
6185 6005 TMA (MOBILE OPERATION) DAY 18.000 $475.000 $550.000
Totals: $1,431,813.45 $2,271,557.75