Show Job Controls
Bid Cobra

EL PASO VA (0924-00-099)

Items: 66

County: EL PASO
Length: N/A
Highway: VA
District: EL PASO
Control Number: 0924-00-099
DBE Goal: N/A
Project: STP 2018(932)
Guaranty: N/A
Time: 168 WORKING DAYS
Engineer's Estimate: $2,076,391.50
Date: 06/05/2018 (8 years ago)
Contract Number: N/A
Type: FY 2018 BRIDGE MAINTENANCE
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$2,076,391.50
$2,093,680.00
Over/Under Est: 0.83% $17,288.50
$2,654,473.32
Over/Under Est: 27.84% $578,081.82
Amt Left: 26.79% $560,793.32
Over/Under Est: 36.25% $752,746.10
Amt Left: 35.13% $735,457.60
Delta: -6.58% -$174,664.28
Over/Under Est: 44.39% $921,708.15
Amt Left: 43.2% $904,419.65
Delta: -5.97% -$168,962.05

Bid Items & Bid Tabulations

66 Total 0 of 66
EL PASO  |  VA  |  EL PASO  |  0924-00-099  |  06/05/2018  |  $2,076,391.50  |  STP 2018(932)  |  FY 2018 BRIDGE MAINT  |  168 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
DAN WILLIAMS COMPANY
DCI CONTRACTING, INC.
SCR CIVIL CONSTRUCTION, LLC
SYNERGY PROJECT CONSULTANTS, INC.
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 396.000 $35.000 $80.000 $25.050 $66.000 $57.000
BULLDOZER WORK
HR 40.000 $110.000 $85.000 $109.800 $210.000 $351.690
D-GR HMA(SQ) TY-C PG70-22
TON 226.000 $100.000 $160.000 $305.000 $260.000 $125.070
PLANE ASPH CONC PAV (2")
SY 2,052.000 $5.000 $8.000 $6.170 $13.000 $13.050
CEM STABIL BKFL
CY 5.000 $115.000 $400.000 $351.360 $310.000 $80.560
CL C CONC (COLUMN)(HPC)
CY 1.500 $2,000.000 $3,000.000 $3,904.030 $5,100.000 $1,403.070
CL C CONC (RAIL FOUNDATION)(HPC)
CY 2.800 $485.000 $1,400.000 $2,962.900 $2,475.000 $950.750
CONC STR REPAIR (EPOXY MORTAR)
SF 17.000 $100.000 $250.000 $251.220 $270.000 $116.340
CONC STR REPAIR(DECK REP(PART DEPTH))
SF 42.000 $75.000 $180.000 $145.280 $100.000 $140.090
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 1,096.500 $170.000 $180.000 $142.450 $111.000 $194.090
CONC STR REPAIR (STANDARD)
SF 1,079.000 $170.000 $85.000 $147.050 $111.000 $165.910
RIPRAP (CONC)(6 IN)
CY 50.000 $425.000 $750.000 $712.850 $800.000 $650.680
RIPRAP (MOW STRIP)(4 IN)
CY 139.000 $475.000 $700.000 $795.240 $940.000 $550.440
RETROFIT RAIL (TY T551)
LF 2,307.000 $170.000 $125.000 $155.710 $284.000 $187.480
GABION MATTRESSES (PVC)(12 IN)
SY 946.000 $55.000 $80.000 $110.880 $145.000 $80.000
GABIONS (PVC)( 3FT X 3 FT)
CY 184.000 $202.000 $260.000 $342.210 $373.000 $650.060
GABIONS (3FT X 1.5FT)(PVC)
CY 92.000 $840.000 $260.000 $368.290 $373.000 $480.170
MOBILIZATION
LS 1.000 $59,672.000 $200,000.000 $240,828.000 $282,000.000 $554,367.840
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 9.000 $8,700.000 $10,500.000 $10,505.570 $16,000.000 $9,798.830
TEMP SEDMT CONT FENCE (INSTALL)
LF 400.000 $2.750 $6.000 $3.660 $22.000 $2.720
TEMP SEDMT CONT FENCE (REMOVE)
LF 400.000 $1.000 $2.000 $3.660 $8.000 $0.790
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 1,310.000 $60.000 $60.000 $113.970 $125.000 $35.110
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)
LF 985.000 $9.500 $22.000 $83.010 $10.000 $21.320
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 7,345.000 $10.000 $5.000 $17.300 $17.000 $7.800
PORT CTB (STKPL)(F-SHAPE)(TY 1)
LF 2,105.000 $15.000 $15.000 $31.320 $15.000 $9.870
MTL W-BEAM GD FEN (TIM POST)
LF 1,650.000 $25.000 $30.000 $23.180 $26.000 $25.850
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 10.000 $1,800.000 $3,600.000 $2,684.000 $1,800.000 $2,228.100
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 6.000 $1,000.000 $1,300.000 $1,220.000 $1,500.000 $3,014.460
MTL BM GD FEN TRANS (NON - SYM)
EA 6.000 $820.000 $900.000 $1,220.000 $1,300.000 $2,040.440
REMOVE METAL BEAM GUARD FENCE
LF 1,695.000 $3.500 $5.000 $7.320 $9.000 $3.710
REMOVE TERMINAL ANCHOR SECTION
EA 10.000 $225.000 $200.000 $258.640 $500.000 $323.510
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 50.000 $125.000 $50.000 $122.000 $5.000 $291.880
GUARDRAIL END TREATMENT (INSTALL)
EA 10.000 $2,250.000 $3,000.000 $2,433.900 $2,800.000 $3,501.900
CRASH CUSH ATTEN (INSTL)
EA 6.000 $10,400.000 $7,500.000 $11,590.000 $3,000.000 $15,007.510
CRASH CUSH ATTEN (MOVE & RESET)
EA 9.000 $1,700.000 $800.000 $948.900 $4,000.000 $1,933.380
CRASH CUSH ATTEN (REMOVE)
EA 6.000 $750.000 $1,000.000 $813.340 $1,000.000 $1,031.960
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 13.000 $150.000 $40.000 $97.600 $30.000 $200.070
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 3.000 $25.000 $40.000 $73.200 $30.000 $194.590
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
EA 12.000 $40.000 $40.000 $73.200 $40.000 $164.830
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 9.000 $25.000 $40.000 $73.200 $40.000 $144.790
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 9.000 $18.000 $40.000 $73.200 $30.000 $195.570
INSTL DEL ASSM (D-SY)SZ (BRF)GF1
EA 12.000 $25.000 $40.000 $73.200 $40.000 $164.310
INSTL OM ASSM (OM-2Y)(WC)GND
EA 4.000 $75.000 $40.000 $73.200 $40.000 $249.090
REMOVE DELIN & OBJECT MARKER ASSMS
EA 10.000 $25.000 $12.000 $28.060 $100.000 $18.280
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 9,340.000 $1.250 $2.500 $2.080 $2.650 $2.740
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 5,890.000 $1.400 $2.500 $2.080 $2.650 $2.740
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 560.000 $1.250 $2.500 $1.830 $2.700 $2.800
REFL PAV MRK TY II (W) 8" (SLD)
LF 560.000 $0.550 $1.500 $1.220 $1.450 $1.520
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 870.000 $1.300 $1.300 $1.220 $1.350 $1.400
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 8,180.000 $0.300 $1.300 $0.310 $1.350 $1.400
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 4,160.000 $0.350 $1.300 $0.370 $1.450 $1.520
RE PM W/RET REQ TY II (W) 4" (BRK)
LF 870.000 $0.400 $0.700 $0.370 $0.750 $0.780
RE PM W/RET REQ TY II (W) 4" (SLD)
LF 8,180.000 $0.250 $0.700 $0.370 $0.750 $0.760
RE PM W/RET REQ TY II (Y) 4" (SLD)
LF 4,160.000 $0.400 $0.700 $0.370 $0.750 $0.760
REFL PAV MRKR TY I-C
EA 34.000 $3.250 $12.000 $3.660 $13.400 $14.010
REFL PAV MRKR TY II-A-A
EA 92.000 $3.000 $12.000 $3.660 $13.400 $14.010
REFL PAV MRKR TY II-C-R
EA 38.000 $3.500 $12.000 $4.880 $13.400 $14.010
ELIM EXT PAV MRK & MRKS (4")
LF 26,200.000 $0.450 $1.000 $0.610 $1.050 $1.050
ELIM EXT PAV MRK & MRKS (8")
LF 560.000 $1.300 $2.000 $1.220 $2.050 $2.100
PAV SURF PREP FOR MRK (4")
LF 13,210.000 $0.100 $0.400 $0.130 $0.400 $0.400
PAV SURF PREP FOR MRK (8")
LF 560.000 $0.750 $0.700 $0.610 $0.750 $0.770
CONC CRCK REPR(DISCRETE)(ROUT AND SEAL)
LF 468.000 $17.000 $50.000 $61.000 $68.000 $106.050
ASPHALT PLUG EXP JOINT
LF 1,655.000 $190.000 $150.000 $185.380 $108.000 $195.230
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 240.000 $125.000 $100.000 $78.800 $50.000 $86.400
TMSP RADAR SPEED CONTROL MONITOR
DAY 180.000 $150.000 $100.000 $67.790 $52.000 $103.910
TMA (STATIONARY)
EA 10.000 $5,000.000 $4,000.000 $10,540.800 $8,000.000 $13,000.810
Totals: $2,076,391.500 $2,093,680.000 $2,654,473.330 $2,829,137.600 $2,998,099.660