EL PASO BU 54-A (0167-02-079)

Items: 37

County: EL PASO
Length: N/A
Highway: BU 54-A
District: EL PASO
Control Number: 0167-02-079
DBE Goal: N/A
Project: STP 2023(614)HES
Guaranty: N/A
Time: 140 WORKING DAYS
Engineer's Estimate: $2,584,046.97
Date: 04/05/2023 (3 years ago)
Contract Number: N/A
Type: HAZARD ELIMINATION & SAFETY
Mail/Deliver Bids To: N/A
JONATHAN CONCHA
ALDO MADRID
MONICA RUIZ
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (1)
E
Engineer's Estimate
$2,584,046.97
$2,840,216.63
Over/Under Est: 9.91% $256,169.66
Subcontractor Percentage Amount
HARDY HOLE DRILLING 4.15% $123,135.64
SYNERGY PROJECT CONTRACTORS, INC. 3.99% $118,388.24
2H, LLC 2.15% $63,793.16
BORDER DRILLING LLC 1.42% $42,133.16
APACHE BARRICADE & SIGN 0.00% $0.00
Total: 11.71% $347,450.20

Bid Items & Bid Tabulations

37 Total 0 of 37
EL PASO  |  BU 54-A  |  EL PASO  |  0167-02-079  |  04/05/2023  |  $2,584,046.97  |  STP 2023(614)HES  |  HAZARD ELIM & SAFETY  |  140 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TRI STATE ELECTRIC, LTD.
EXCAVATION (SPECIAL)
CY 2.700 $5,000.000 $1,250.000
DRILL SHAFT (HIGH MAST POLE) (60 IN)
LF 352.000 $425.000 $767.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 366.000 $425.000 $330.000
RIPRAP (CONC)(4 IN)
CY 28.160 $518.870 $415.000
MOBILIZATION
LS 1.000 $30,000.000 $183,600.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $8,000.000 $9,500.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 30.000 $6.000 $5.620
BIODEG EROSN CONT LOGS (REMOVE)
LF 30.000 $2.000 $2.440
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)
LF 500.000 $22.090 $20.000
PORT CTB (STKPL)(F-SHAPE)(TY 1)
LF 500.000 $15.060 $21.000
PERM CTB (F-SHAPE) (TY 1)
LF 380.000 $88.260 $125.000
MTL W-BEAM GD FEN (STEEL POST)
LF 450.000 $40.470 $55.120
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,981.820 $5,000.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 7.000 $1,881.250 $3,000.000
REMOVE METAL BEAM GUARD FENCE
LF 400.000 $5.500 $8.500
GUARDRAIL END TREATMENT (INSTALL)
EA 7.000 $3,526.670 $6,000.000
CRASH CUSH ATTEN (DES SOURCE)
EA 1.000 $2,866.670 $2,650.000
CRASH CUSH ATTEN (REMOVE)
EA 1.000 $1,088.380 $1,000.000
REMOVE RD IL ASM (CTB MOUNT)
EA 22.000 $1,050.000 $750.000
REMOVE RD IL ASM (TRANS-BASE)
EA 8.000 $1,548.000 $750.000
REPLACE LUMINAIRE W/LED (150W EQ)
EA 16.000 $620.000 $750.000
IN RD IL (TY SA) 30T-4-4 (250W EQ) LED
EA 36.000 $4,200.000 $5,336.880
IN RD IL (TY SA) 50T-12 (400W EQ) LED
EA 15.000 $4,000.000 $6,236.000
HI MST IL POLE (150 FT)( 80 MPH)
EA 11.000 $47,000.000 $42,620.000
CONDT (PVC) (SCH 40) (2")
LF 13,565.000 $25.000 $20.000
CONDT (PVC) (SCH 40) (2") (BORE)
LF 4,665.000 $40.000 $30.500
CONDT (RM) (2")
LF 290.000 $43.000 $45.000
ELEC CONDR (NO.6) INSULATED
LF 57,725.000 $4.000 $2.890
GROUND BOX TY A (122311)W/APRON
EA 53.000 $1,525.000 $1,500.000
ELC SRV TY A 240/480 060(NS)SS(E)GC(O)
EA 2.000 $10,000.000 $10,500.000
ELC SRV TY A 240/480 100(NS)SS(E)GC(O)
EA 2.000 $8,800.000 $11,000.000
ELC SRV TY A 240/480 100(NS)SS(E)GC(U)
EA 2.000 $7,500.000 $8,500.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 100.000 $125.000 $150.000
LED HI MST IL ASM (6 FIXT)(SYM)(TY S)
EA 3.000 $24,152.840 $37,500.000
LED HI MST IL ASM (6 FIXT) (ASYM)(TY B)
EA 8.000 $32,000.000 $37,500.000
TMA (STATIONARY)
DAY 100.000 $125.000 $300.000
SMART PHOTOCONTROL
EA 87.000 $100.000 $250.000
Totals: $2,584,046.969 $2,840,216.630