Show Job Controls
Bid Cobra

ECTOR IH0020 (6431-24-001)

Items: 25

County: ECTOR
Length: N/A
Highway: IH0020
District: ODESSA
Control Number: 6431-24-001
DBE Goal: N/A
Project: RMC - 643124001
Guaranty: N/A
Time: 365 CALENDAR DAYS
Engineer's Estimate: $293,350.00
Date: 03/08/2023 (3 years ago)
Contract Number: N/A
Type: METAL BEAM GUARD FENCE REPAIR
Mail/Deliver Bids To: N/A
SERGIO MIRANDA
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (4)
E
Engineer's Estimate
$293,350.00
$189,980.00
Over/Under Est: -35.24% -$103,370.00
$321,235.00
Over/Under Est: 9.51% $27,885.00
Amt Left: 69.09% $131,255.00
Over/Under Est: 11.22% $32,910.00
Amt Left: 71.73% $136,280.00
Delta: -1.56% -$5,025.00
Over/Under Est: 37.43% $109,792.50
Amt Left: 112.2% $213,162.50
Delta: -23.56% -$76,882.50

Bid Items & Bid Tabulations

25 Total 0 of 25
ECTOR  |  IH0020  |  ODESSA  |  6431-24-001  |  03/08/2023  |  $293,350.00  |  RMC - 643124001  |  METAL BEAM GUARD FENCE REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ROSS SA ENTERPRISE LLC
E.V.G. ENTERPRISE
ABOVE ALL CONSTRUCTION
TALBRAN ENTERPRISES LLC
MOBILIZATION (CALLOUT)
EA 10.000 $500.000 $1.000 $500.000 $1.000 $550.000
MOBILIZATION (EMERGENCY)
EA 30.000 $800.000 $1.000 $500.000 $300.000 $660.000
TERMINAL ANCHOR SECTION
EA 5.000 $10.000 $100.000 $10.000 $500.000 $11.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 15.000 $1,200.000 $100.000 $1,500.000 $1,500.000 $963.000
MTL BM GD FEN TRANS (31"-28")(25')
EA 15.000 $50.000 $1.000 $650.000 $500.000 $165.000
REMOVE TERMINAL ANCHOR SECTION
EA 5.000 $200.000 $1.000 $10.000 $500.000 $52.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 10.000 $50.000 $1.000 $10.000 $300.000 $154.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 200.000 $30.000 $1.000 $40.000 $25.000 $30.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 100.000 $30.000 $1.000 $40.000 $25.000 $30.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 5,000.000 $25.000 $10.000 $25.000 $28.000 $31.000
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 50.000 $40.000 $1.000 $25.000 $50.000 $35.500
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 15.000 $40.000 $1.000 $25.000 $50.000 $35.500
REPAIR RAIL ELEMENT (CURVED RAIL)
LF 150.000 $30.000 $1.000 $25.000 $50.000 $39.000
REM / REPL TIMBER/STL POST W/O CONC FND
EA 400.000 $40.000 $1.000 $150.000 $50.000 $44.000
REM / REPL TIMBER / STL POST W/CONC FND
EA 10.000 $50.000 $175.000 $10.000 $200.000 $165.000
REPAIR STEEL POST WITH BASE PLATE
EA 20.000 $10.000 $1.000 $10.000 $300.000 $6.000
REALIGN POSTS
EA 150.000 $15.000 $1.000 $10.000 $50.000 $40.000
REMOVE & REPLACE BLOCKOUT
EA 400.000 $10.000 $25.000 $20.000 $25.000 $14.500
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 5.000 $3,800.000 $7,800.000 $3,750.000 $3,500.000 $4,180.000
POST AND CABLE FENCE(REMV / REPL POSTS)
EA 100.000 $100.000 $35.000 $1.000 $30.000 $110.000
POST AND CABLE FENCE(RMV/REPL CNC ANCH)
EA 10.000 $100.000 $50.000 $1.000 $500.000 $9.000
POST AND CABLE FENCE (REMV/ REPL CABLE)
LF 1,000.000 $5.000 $4.000 $1.000 $5.000 $3.000
POST AND CABLE FENCE (REPAIR)
LF 3,000.000 $10.000 $1.000 $1.000 $5.000 $10.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 75.000 $100.000 $1.000 $100.000 $100.000 $550.000
TMA (STATIONARY)
DAY 75.000 $100.000 $1,000.000 $350.000 $300.000 $660.000
Totals: $293,350.000 $189,980.000 $321,235.000 $326,260.000 $403,142.500