Show Job Controls
Bid Cobra

ECTOR FM 1882 (2005-03-009)

Items: 59

County: ECTOR
Length: 0.0000 MILES
Highway: FM 1882
District: ODESSA
Control Number: 2005-03-009
DBE Goal: 0.0%
Project: F 2B24(001)
Guaranty: $100,000.00
Time: 181 WORKING DAYS
Engineer's Estimate: $7,771,644.52
Date: 04/07/2026 (8 weeks ago)
Contract Number: 4263005
Type: REHABILITATE EXISTING ROADWAY
Project ID: A00196643
Contract Type: Federal
Project Description: REHAB FM 1882 BETWEEN SP 450 AND BI 20 (INCLUSIVE)
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$7,771,644.52
Over/Under Est: 31.93% $2,481,721.04
Over/Under Est: 39.64% $3,081,022.48
Amt Left: 5.84% $599,301.44
$11,147,742.80
Over/Under Est: 43.44% $3,376,098.28
Amt Left: 8.72% $894,377.24
Delta: -2.72% -$295,075.80

Bid Items & Bid Tabulations

59 Total 0 of 59
ECTOR  |  FM 1882  |  ODESSA  |  2005-03-009  |  04/07/2026  |  $7,771,644.52  |  F 2B24(001)  |  REHAB EXIST ROADWAY  |  181 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
JONES BROS. DIRT & PAVING CONTRACTORS, INC.
RAGLE CONSTRUCTION, INC.
REECE ALBERT, INC.
REMOV CONC (DRIVEWAYS)
SY 25.000 $40.000 $59.400 $34.000 $128.430
RMV (9") TRT/UNTRT BASE & ASPH PAV
SY 101,162.000 $7.000 $9.500 $7.500 $7.600
BLADING
HR 30.000 $342.000 $450.000 $158.500 $917.230
PROOF ROLLING
HR 30.000 $155.000 $175.000 $135.500 $178.650
REWORK BS MTL (TY D)(10")(ORD COMP)
SY 101,162.000 $1.000 $0.680 $2.000 $0.730
PRIME COAT (AE-P)
GAL 20,234.000 $4.500 $4.820 $6.250 $6.650
FOG SEAL (CSS-1H)
GAL 20,234.000 $5.000 $4.110 $5.500 $5.350
SP MIXES SP-B SAC-B PG70-22
TON 44,514.000 $91.000 $128.000 $133.000 $147.720
TOM-C PG76-22 SAC-A
TON 5,820.000 $140.000 $183.000 $150.000 $244.720
TACK COAT
GAL 25,293.000 $4.000 $4.110 $6.000 $2.790
FLEXIBLE PAVEMENT STRUCTURE REPAIR(9")
SY 100.000 $104.500 $375.000 $200.000 $195.530
PLANE ASPH CONC PAV (1" TO 2")
SY 516.000 $3.000 $15.250 $9.000 $10.530
CL C CONC (RAIL FOUNDATION)
CY 3.100 $500.000 $4,400.000 $1,250.000 $4,423.090
RETROFIT RAIL (TY C1W)
LF 128.000 $320.000 $440.000 $461.000 $442.310
ADJUSTING MANHOLES
EA 3.000 $2,500.000 $5,445.000 $2,110.000 $4,982.920
MOBILIZATION
LS 1.000 $441,036.480 $335,000.000 $1,000,000.000 $384,238.020
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 9.000 $20,000.000 $45,000.000 $58,000.000 $18,715.840
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $13,000.000 $19,250.000 $15,500.000 $10,715.860
TMA (STATIONARY)
DAY 172.000 $225.000 $137.500 $287.000 $367.750
TMA (MOBILE OPERATION)
DAY 68.000 $400.000 $935.000 $625.000 $854.140
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 167.000 $14.000 $28.000 $9.000 $19.260
BIODEG EROSN CONT LOGS (REMOVE)
LF 167.000 $2.500 $12.000 $3.000 $13.610
DRIVEWAYS (CONC)
SY 25.000 $110.000 $192.500 $225.000 $261.510
DRIVEWAYS (ACP)
SY 25.000 $60.000 $750.000 $235.000 $300.700
ALUMINUM SIGNS (TY A)
SF 783.000 $46.000 $90.750 $46.000 $91.230
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 58.000 $750.000 $734.800 $668.000 $1,050.480
REMOVE SM RD SN SUP&AM
EA 54.000 $130.000 $410.000 $150.000 $160.340
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 382.000 $8.000 $3.300 $7.500 $3.320
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 179,732.000 $0.270 $0.180 $0.420 $0.180
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 8,987.000 $0.500 $2.500 $1.000 $2.120
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
LF 4,829.000 $0.900 $0.640 $0.770 $0.640
REFL PAV MRK TY I (Y)6"(BRK)(100MIL)
LF 3,071.000 $0.900 $0.680 $0.760 $0.690
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 20,527.000 $1.400 $0.640 $0.760 $0.640
PREFAB PM TY C (W)(8")(SLD)
LF 2,876.000 $11.000 $2.750 $1.000 $2.760
PREFAB PM TY C (W)(24")(SLD)
LF 2,958.000 $16.000 $12.100 $14.000 $12.160
PREFAB PM TY C (W)(ARROW)
EA 45.000 $250.000 $231.000 $225.000 $232.210
PREFAB PM TY C (W)(WORD)
EA 19.000 $280.000 $275.000 $325.000 $276.440
PREFAB PM TY C (W)(18")(YLD TRI)
EA 38.000 $24.000 $19.800 $50.000 $19.900
REFL PAV MRKR TY I-C
EA 386.000 $5.850 $3.850 $5.000 $3.870
REFL PAV MRKR TY II-A-A
EA 206.000 $4.600 $3.850 $5.000 $3.870
ELIM EXT PM & MRKS (4")
LF 31,303.000 $0.800 $0.720 $0.750 $0.720
ELIM EXT PM & MRKS (24")
LF 2,958.000 $7.000 $2.200 $2.500 $2.210
ELIM EXT PM & MRKS (ARROW)
EA 45.000 $80.000 $38.500 $100.000 $38.700
ELIM EXT PM & MRKS (WORD)
EA 19.000 $80.000 $38.500 $150.000 $38.700
INSTALL HWY TRF SIG (UPGRADE)
EA 9.000 $12,759.000 $25,300.000 $12,000.000 $25,432.750
VEH SIG SEC (12")LED(GRN)
EA 21.000 $375.000 $660.000 $425.000 $663.460
VEH SIG SEC (12")LED(GRN ARW)
EA 27.000 $375.000 $660.000 $425.000 $663.460
VEH SIG SEC (12")LED(YEL)
EA 21.000 $375.000 $660.000 $425.000 $663.460
VEH SIG SEC (12")LED(YEL ARW)
EA 54.000 $375.000 $660.000 $425.000 $663.460
VEH SIG SEC (12")LED(RED)
EA 21.000 $375.000 $660.000 $425.000 $663.460
VEH SIG SEC (12")LED(RED ARW)
EA 28.000 $375.000 $660.000 $425.000 $663.460
BACKPLATE W/REF BRDR(3 SEC)(VENT)ALUM
EA 21.000 $225.000 $247.500 $235.000 $248.800
BACKPLATE W/REF BRDR(4 SEC)(VENT)ALUM
EA 27.000 $250.000 $275.000 $250.000 $276.440
PED DETECT PUSH BUTTON (APS)
EA 38.000 $1,100.000 $1,100.000 $1,000.000 $1,105.770
PED DETECTOR CONTROLLER UNIT
EA 6.000 $1,000.000 $5,500.000 $4,500.000 $5,528.860
INSTALL BBU SYSTEM
EA 9.000 $15,000.000 $12,100.000 $9,500.000 $12,163.490
DRAIN INLET CLEANING
EA 11.000 $287.500 $2,750.000 $1,300.000 $2,211.540
BONDING COURSE
GAL 10,116.000 $3.000 $2.610 $6.500 $2.810
VIDEO IMAGING AND RADAR DETECTOR
EA 19.000 $14,180.000 $12,100.000 $12,000.000 $12,163.490
Totals: $7,771,644.520 $10,253,365.560 $10,852,667.000 $11,147,742.799
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $10,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $10,000.00
Total: $20,000.00