ECTOR VARIOUS (0906-00-263)

Items: 64

County: ECTOR
Length: 0.0000 MILES
Highway: VARIOUS
District: ODESSA
Control Number: 0906-00-263
DBE Goal: 0.0%
Project: F 2026(501)
Guaranty: $15,000.00
Time: 94 WORKING DAYS
Engineer's Estimate: $765,278.50
Date: 07/02/2026 1:00 PM CDT (16 days ago)
Contract Number: 7263225
Type: TRAFFIC SIGNAL PROGRAM (2026)
Project ID: A00187816
Contract Type: FEDERAL
Project Description: TRAFFIC SIGNAL PROGRAM (2026)
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
VALERIE ALVARADO
ODA-PRELETTINGQUESTIONS
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$765,278.50
$688,360.54
Over/Under Est: -10.05% -$76,917.96
Over/Under Est: 3.49% $26,688.20
Amt Left: 15.05% $103,606.16
Over/Under Est: 50.21% $384,258.60
Amt Left: 67% $461,176.56
Delta: -45.15% -$357,570.40

Bid Items & Bid Tabulations

64 Total 0 of 64
ECTOR  |  VARIOUS  |  ODESSA  |  0906-00-263  |  07/02/2026 1:00 PM CDT  |  $765,278.50  |  F 2026(501)  |  TRAF SIGNAL PROGRAM (2026)  |  94 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
JASCO
VACA UNDERGROUND UTILITIES INC
WILLIS ELECTRIC CO., LP
TOM-C PG76-22 SAC-A
TON 1,114.220 $183.000 $178.090 $280.000 $300.000
DRILL SHAFT (24 IN)
LF 25.000 $300.000 $224.420 $200.000 $275.000
DRILL SHAFT (36 IN)
LF 56.000 $400.000 $301.170 $300.000 $500.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 16.000 $473.000 $224.420 $300.000 $425.000
RIPRAP (CONC)(4 IN)
CY 55.000 $700.000 $853.300 $650.000 $1,010.000
RIPRAP (CONC)(CL B)
CY 1.000 $749.720 $1,200.000 $750.000 $1,725.000
MOBILIZATION
LS 1.000 $32,498.000 $25,000.000 $35,000.000 $110,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 4.000 $10,259.010 $2,800.000 $2,100.000 $3,500.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $9,300.000 $7,500.000 $2,500.000 $2,500.000
TMA (STATIONARY)
DAY 80.000 $148.760 $255.000 $150.000 $250.000
TMA (MOBILE OPERATION)
DAY 12.000 $214.190 $279.420 $150.000 $250.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 20.000 $8.320 $9.000 $1.000 $15.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 20.000 $2.870 $2.000 $1.000 $1.000
CONC CURB & GUTTER (TY II)
LF 619.000 $45.710 $49.740 $25.000 $125.000
IN RD IL (TY SA) 50T-10 (400W EQ) LED
EA 2.000 $7,319.180 $6,595.000 $7,000.000 $7,000.000
CONDT (PVC) (SCH 40) (2") (BORE)
LF 1,025.000 $32.080 $33.000 $25.000 $50.000
CONDT (PVC) (SCH 40) (3") (BORE)
LF 402.000 $35.000 $22.430 $25.000 $55.000
ELEC CONDR (NO.12) INSULATED
LF 568.000 $3.670 $2.140 $2.000 $1.250
ELEC CONDR (NO.8) INSULATED
LF 1,100.000 $2.600 $2.470 $2.500 $2.000
ELEC CONDR (NO.6) BARE
LF 1,358.000 $2.380 $2.630 $2.500 $2.000
GROUND BOX TY A (122311)W/APRON
EA 2.000 $2,043.590 $1,520.120 $1,200.000 $1,750.000
GROUND BOX TY C (162911)W/APRON
EA 6.000 $1,729.550 $1,718.940 $1,300.000 $2,150.000
ELC SRV TY A 240/480 060(NS)SS(E)SP(O)
EA 1.000 $12,001.830 $10,484.660 $7,500.000 $11,000.000
ELC SRV TY D 120/240 060(NS)SS(N)SP(O)
EA 1.000 $8,525.000 $7,847.860 $6,500.000 $10,000.000
ALUMINUM SIGNS (TY A)
SF 40.000 $46.770 $46.410 $35.000 $65.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 16.000 $98.120 $781.670 $775.000 $1,000.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 2.000 $99.120 $991.710 $1,300.000 $1,750.000
REMOVE SM RD SN SUP&AM
EA 12.000 $99.120 $139.740 $175.000 $150.000
INSTL OM ASSM (OM-3R)(WFLX)SRF
EA 8.000 $650.000 $512.500 $350.000 $1,000.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 135.000 $2.440 $34.450 $4.850 $4.900
RE PROFILE PM TY I(W)6"(SLD)(100MIL)
LF 1,202.000 $3.530 $0.660 $4.550 $4.600
RE PROFILE PM TY I(Y)6"(SLD)(100MIL)
LF 1,212.000 $4.260 $0.680 $4.550 $4.600
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
LF 562.000 $2.350 $0.550 $4.550 $4.600
PREFAB PM TY C (W)(24")(SLD)
LF 73.000 $12.860 $18.470 $23.000 $23.000
PREFAB PM TY C (W)(ARROW)
EA 2.000 $250.000 $245.990 $340.000 $345.000
PREFAB PM TY C (W)(WORD)
EA 2.000 $265.000 $250.000 $585.000 $485.000
PREFAB PM TY C (W)(36")(YLD TRI)
EA 10.000 $71.000 $34.450 $85.000 $85.000
REFL PAV MRKR TY I-C
EA 16.000 $20.000 $4.130 $11.400 $11.500
REFL PAV MRKR TY II-A-A
EA 56.000 $14.680 $3.890 $11.400 $11.500
ELIM EXT PM & MRKS (6")
LF 1,600.000 $4.000 $1.220 $4.550 $4.600
ELIM EXT PM & MRKS (8")
LF 240.000 $2.850 $2.640 $4.550 $4.600
ELIM EXT PM & MRKS (24")
LF 40.000 $4.040 $5.070 $6.800 $7.000
ELIM EXT PM & MRKS (ARROW)
EA 1.000 $75.000 $82.790 $155.000 $155.000
INSTALL HWY TRF SIG (SYSTEM)
EA 1.000 $45,000.000 $43,486.900 $40,000.000 $67,500.000
VEH SIG SEC (12")LED(GRN)
EA 10.000 $390.000 $363.220 $375.000 $350.000
VEH SIG SEC (12")LED(GRN ARW)
EA 4.000 $390.000 $376.990 $375.000 $350.000
VEH SIG SEC (12")LED(YEL)
EA 10.000 $390.000 $353.570 $375.000 $350.000
VEH SIG SEC (12")LED(YEL ARW)
EA 4.000 $390.000 $364.060 $375.000 $350.000
VEH SIG SEC (12")LED(RED)
EA 10.000 $390.000 $355.830 $375.000 $350.000
VEH SIG SEC (12")LED(RED ARW)
EA 8.000 $390.000 $359.210 $375.000 $350.000
BACKPLATE W/REFL BRDR(3 SEC)ALUM
EA 10.000 $211.000 $193.800 $175.000 $200.000
BACKPLATE W/REFL BRDR(4 SEC)ALUM
EA 4.000 $200.000 $257.870 $210.000 $225.000
TRF SIG CBL (TY A)(12 AWG)(5 CONDR)
LF 344.000 $4.800 $3.480 $3.750 $5.000
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
LF 224.000 $5.120 $4.430 $5.000 $6.000
TRF SIG CBL (TY A)(12 AWG)(12 CONDR)
LF 1,230.000 $10.000 $6.500 $8.000 $8.000
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
EA 2.000 $8,420.170 $7,912.800 $7,500.000 $11,000.000
INS TRF SIG PL AM(S)1 ARM(40')LUM
EA 2.000 $20,000.000 $16,232.170 $15,500.000 $21,000.000
INS TRF SIG PL AM(S)1 ARM(44')LUM
EA 2.000 $20,000.000 $16,897.520 $16,000.000 $23,000.000
INSTALL BBU SYSTEM
EA 1.000 $11,000.000 $6,900.000 $7,500.000 $12,500.000
INSTALL RADAR VEHICLE DETECTION SYSTEM
EA 1.000 $3,261.360 $2,635.400 $35,000.000 $55,000.000
BONDING COURSE
GAL 2,026.000 $3.560 $4.090 $5.750 $5.250
ITS COM CBL (ETHERNET)
LF 183.000 $4.130 $3.690 $1.750 $2.500
VID IMAGE AND RADAR COM CABLE (COAX)
LF 1,230.000 $4.000 $2.620 $2.000 $2.500
CCTV FIELD EQUIP (DIGITAL) (INSTL ONLY)
EA 1.000 $7,612.570 $2,996.300 $1,500.000 $5,000.000
Totals: $765,278.500 $688,360.540 $791,966.700 $1,149,537.100
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
PUBLIC UTILITY FORCE ACCT WORK (PART) $100,000.00
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $10,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $10,000.00
Total: $120,000.00