ECTOR VA (0906-00-172)

Items: 28

County: ECTOR
Length: N/A
Highway: VA
District: ODESSA
Control Number: 0906-00-172
DBE Goal: N/A
Project: STP 2017(590)
Guaranty: N/A
Time: 91 WORKING DAYS
Engineer's Estimate: $573,714.62
Date: 02/02/2017 (9 years ago)
Contract Number: N/A
Type: ADA UPGRADE
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$573,714.62
$464,333.00
Over/Under Est: -19.07% -$109,381.62
Over/Under Est: 23.02% $132,094.38
Amt Left: 52% $241,476.00
Over/Under Est: 27.6% $158,342.88
Amt Left: 57.66% $267,724.50
Delta: -3.72% -$26,248.50
Over/Under Est: 62.03% $355,903.74
Amt Left: 100.21% $465,285.36
Delta: -26.99% -$197,560.86

Bid Items & Bid Tabulations

28 Total 0 of 28
ECTOR  |  VA  |  ODESSA  |  0906-00-172  |  02/02/2017  |  $573,714.62  |  STP 2017(590)  |  ADA UPGRADE  |  91 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TI-ZACK CONCRETE, INC.
CHAMPION INFRASTRUCTURE, LLC
FNH CONSTRUCTION, LLC
SALINAS CONSTRUCTION TECHNOLOGIES, LTD.
REMOVING CONC (DRIVEWAYS)
SY 10.000 $15.000 $25.000 $80.000 $100.000 $297.110
REMOVING CONC (CURB OR CURB & GUTTER)
LF 1,051.000 $12.000 $8.000 $35.000 $20.000 $17.340
REMOVING CONC (SIDEWALK OR RAMP)
SY 25.000 $14.000 $25.000 $60.000 $100.000 $124.160
REMOVING STAB BASE AND ASPH PAV (6")
SY 352.000 $4.400 $25.000 $80.000 $20.000 $35.270
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 157.000 $15.000 $25.000 $90.000 $55.000 $105.290
EMULS ASPH (BS OR SUBGR TRT)(CSS-1H)
GAL 32.000 $2.040 $10.000 $400.000 $100.000 $61.080
HMCL ACP TY-D SAC-B AC-0.6
TON 142.000 $110.000 $200.000 $400.000 $200.000 $367.900
CL A CONC (MISC)
CY 8.000 $500.000 $1,000.000 $950.000 $1,000.000 $1,361.460
CL A CONC (STEPS)
CY 2.000 $137.000 $1,500.000 $2,800.000 $1,000.000 $5,678.580
RIPRAP (CONC)(4 IN)
CY 2.000 $950.000 $1,000.000 $1,600.000 $1,000.000 $2,899.370
RAIL (HANDRAIL)(TY A)
LF 135.000 $152.000 $100.000 $420.000 $185.000 $281.770
RAIL (HANDRAIL)(TY B)
LF 10.500 $60.000 $100.000 $640.000 $185.000 $420.210
MOBILIZATION
LS 1.000 $36,043.020 $50,000.000 $50,000.000 $72,500.000 $251,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 4.000 $10,000.000 $1,000.000 $4,500.000 $15,000.000 $7,875.000
CONC CURB & GUTTER (TY II)
LF 1,514.000 $38.000 $35.000 $65.000 $55.000 $53.160
CONC CURB (SPECIAL) (TYPE II)
LF 78.000 $29.000 $45.000 $100.000 $100.000 $85.810
DRIVEWAYS (CONC)
SY 97.000 $95.000 $100.000 $320.000 $85.000 $168.970
CONC SIDEWALKS (4")
SY 1,580.000 $112.000 $100.000 $60.000 $75.000 $123.000
CURB RAMPS (TY 1)
SY 80.000 $189.460 $100.000 $120.000 $250.000 $130.460
CURB RAMPS (TY 3)
SY 29.000 $137.000 $100.000 $120.000 $250.000 $179.030
CURB RAMPS (TY 7)
SY 298.000 $166.640 $100.000 $120.000 $250.000 $164.470
CURB RAMPS (TY 10)
SY 362.000 $169.460 $100.000 $150.000 $250.000 $186.740
CURB RAMPS (TY 21)
SY 136.000 $177.180 $100.000 $180.000 $250.000 $150.460
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 5.000 $550.000 $450.000 $900.000 $650.000 $632.250
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 168.000 $17.000 $25.000 $20.000 $20.000 $17.310
ELIM EXT PAV MRK & MRKS (12")
LF 371.000 $2.000 $5.000 $4.000 $20.000 $9.170
RETROFIT DET WARN SURF(SURF APPLIED)
SF 230.000 $50.000 $15.000 $80.000 $85.000 $18.870
STONE MASONRY (ROCK WALL)
SF 56.000 $350.000 $100.000 $350.000 $200.000 $84.930
Totals: $573,714.620 $464,333.000 $705,809.000 $732,057.500 $929,618.365