|
|
REMOVING CONC (RIPRAP)
|
SY
|
20.800
|
$10.000
|
$12.600
|
$100.000
|
$18.000
|
$46.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (2")
|
SY
|
282.000
|
$5.000
|
$13.650
|
$35.000
|
$4.250
|
$64.450
|
|
|
REMOVING STAB BASE & ASPH PAV (5" - 6")
|
SY
|
331,405.000
|
$5.000
|
$2.450
|
$3.500
|
$3.000
|
$4.400
|
|
|
OBLITERATING ABANDONED ROAD
|
STA
|
7.000
|
$2,000.000
|
$1,700.000
|
$1,400.000
|
$2,000.000
|
$1,353.540
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
15,028.000
|
$8.000
|
$21.000
|
$19.000
|
$11.000
|
$22.410
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY A)
|
CY
|
4,737.000
|
$12.000
|
$11.000
|
$97.000
|
$5.000
|
$27.380
|
|
|
BACKFILL (TY B)
|
STA
|
928.000
|
$150.000
|
$264.000
|
$155.000
|
$180.000
|
$151.070
|
|
|
BLADING
|
STA
|
27.500
|
$150.000
|
$390.000
|
$1,027.000
|
$240.000
|
$640.470
|
|
|
BLADING
|
HR
|
44.000
|
$200.000
|
$350.000
|
$326.000
|
$150.000
|
$176.130
|
|
|
DRILL SEEDING (PERM) (RURAL) (SANDY)
|
SY
|
238,846.000
|
$0.200
|
$0.150
|
$0.140
|
$1.000
|
$0.220
|
|
|
BONDED FBR MTRX SEED (TEMP)(WARM)
|
SY
|
62,742.000
|
$1.000
|
$0.630
|
$1.000
|
$1.000
|
$0.910
|
|
|
PROOF ROLLING
|
HR
|
44.000
|
$100.000
|
$150.000
|
$90.000
|
$100.000
|
$152.840
|
|
|
FL BS (CMP IN PLC)(TY A GR 4) (6")
|
SY
|
55,601.000
|
$15.000
|
$9.000
|
$9.000
|
$14.000
|
$14.300
|
|
|
REWORK BS MTL (TY B) (6") (ORD COMP)
|
SY
|
8,760.000
|
$2.500
|
$10.000
|
$7.000
|
$5.000
|
$19.200
|
|
|
REWORK BS MTL (TY D)(SURF)(ORD COMP)
|
SY
|
331,405.000
|
$1.100
|
$0.780
|
$1.500
|
$3.000
|
$1.020
|
|
|
REWORK BS MTL (TY B) (12")(ORD COMP)
|
SY
|
3,217.000
|
$6.000
|
$18.000
|
$14.000
|
$5.000
|
$24.910
|
|
|
PRIME COAT (AE-P)
|
GAL
|
78,063.000
|
$4.250
|
$3.900
|
$5.000
|
$5.000
|
$5.900
|
|
|
FOG SEAL (CSS-1H)
|
GAL
|
73,044.000
|
$6.000
|
$3.100
|
$3.300
|
$5.000
|
$3.870
|
|
|
ASPH (AC-20-5TR)
|
GAL
|
155,826.000
|
$3.250
|
$2.850
|
$4.000
|
$5.000
|
$4.180
|
|
|
AGGR(TY-PB GR-4 SAC-A)
|
CY
|
4,428.000
|
$80.000
|
$85.500
|
$150.000
|
$165.000
|
$214.440
|
|
|
STONE-MTRX-ASPH SMAR-F SAC-A
|
TON
|
41,823.000
|
$120.000
|
$110.000
|
$134.000
|
$132.500
|
$182.930
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(3")
|
SY
|
1,100.000
|
$50.000
|
$50.000
|
$61.000
|
$20.000
|
$84.170
|
|
|
STRUCT EXCAV
|
CY
|
103.100
|
$10.000
|
$13.650
|
$200.000
|
$50.000
|
$57.500
|
|
|
CEM STABIL BKFL
|
CY
|
18.500
|
$250.000
|
$375.900
|
$300.000
|
$2,885.000
|
$258.750
|
|
|
DRILL SHAFT (NON - REINFORCED) (12 IN)
|
LF
|
28.000
|
$140.000
|
$157.500
|
$210.000
|
$100.000
|
$207.000
|
|
|
DRILL SHAFT (SIGN MTS) (24 IN)
|
LF
|
53.000
|
$200.000
|
$246.750
|
$260.000
|
$180.000
|
$207.000
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
72.000
|
$250.000
|
$420.000
|
$410.000
|
$200.000
|
$263.350
|
|
|
CL A CONC (COLLAR)
|
EA
|
5.000
|
$1,500.000
|
$1,260.000
|
$1,300.000
|
$2,000.000
|
$1,150.000
|
|
|
CL A CONC (PLUG)
|
EA
|
4.000
|
$1,500.000
|
$910.350
|
$1,260.000
|
$3,000.000
|
$1,725.000
|
|
|
CL C CONC (CRASHWALL)
|
CY
|
79.400
|
$1,000.000
|
$943.950
|
$1,250.000
|
$850.000
|
$3,093.500
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
2.500
|
$550.000
|
$1,235.850
|
$3,500.000
|
$650.000
|
$747.500
|
|
|
RIPRAP (CONC)(CL B)
|
CY
|
2.800
|
$500.000
|
$850.500
|
$1,675.000
|
$725.000
|
$920.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
5.200
|
$550.000
|
$955.500
|
$1,800.000
|
$425.000
|
$1,857.250
|
|
|
CMP AR (GAL STL DES 2)
|
LF
|
207.000
|
$80.000
|
$109.200
|
$100.000
|
$80.000
|
$109.250
|
|
|
CMP AR (GAL STL DES 3)
|
LF
|
9.000
|
$100.000
|
$386.400
|
$258.000
|
$200.000
|
$126.500
|
|
|
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
|
LF
|
3.500
|
$800.000
|
$1,386.000
|
$3,530.000
|
$1,725.000
|
$920.000
|
|
|
CONC BOX CULV (3 FT X 3 FT)(EXTEND)
|
LF
|
6.500
|
$1,000.000
|
$1,398.600
|
$2,520.000
|
$1,100.000
|
$1,150.000
|
|
|
RC PIPE (CL III)(15 IN)
|
LF
|
8.000
|
$100.000
|
$425.250
|
$480.000
|
$185.000
|
$126.500
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
44.000
|
$100.000
|
$378.000
|
$220.000
|
$160.000
|
$172.500
|
|
|
SET (REPLACE PIPE RUNNER)
|
EA
|
1.000
|
$2,500.000
|
$5,267.850
|
$2,000.000
|
$700.000
|
$3,593.750
|
|
|
SET (TY I)(S=3 FT)(HW= 3 FT)(6:1)(C)
|
EA
|
1.000
|
$7,500.000
|
$8,851.500
|
$15,000.000
|
$5,000.000
|
$11,500.000
|
|
|
SET (TY I)(S=3 FT)(HW= 4 FT)(6:1)(C)
|
EA
|
1.000
|
$8,000.000
|
$13,807.500
|
$21,000.000
|
$6,000.000
|
$12,650.000
|
|
|
SET (TY II) (15 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$2,000.000
|
$961.800
|
$2,600.000
|
$2,500.000
|
$1,725.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$2,500.000
|
$961.800
|
$3,100.000
|
$2,500.000
|
$2,645.000
|
|
|
SET (TY II) (DES 2) (CMP) (6: 1) (P)
|
EA
|
4.000
|
$2,000.000
|
$961.800
|
$1,700.000
|
$1,600.000
|
$2,300.000
|
|
|
SET (TY II) (DES 3) (CMP) (4: 1) (C)
|
EA
|
1.000
|
$2,000.000
|
$961.800
|
$1,700.000
|
$1,600.000
|
$3,450.000
|
|
|
GRATE
|
EA
|
3.000
|
$1,000.000
|
$1,488.900
|
$1,500.000
|
$650.000
|
$1,725.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
11.000
|
$2,000.000
|
$2,613.450
|
$5,200.000
|
$750.000
|
$5,204.020
|
|
|
REMOV STR (SET)
|
EA
|
6.000
|
$600.000
|
$536.550
|
$2,400.000
|
$700.000
|
$1,725.000
|
|
|
REMOV STR (PIPE)
|
EA
|
2.000
|
$1,500.000
|
$1,883.700
|
$2,100.000
|
$2,125.000
|
$575.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$2,080,000.000
|
$652,000.000
|
$2,785,000.000
|
$2,800,000.000
|
$1,605,779.800
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
16.000
|
$10,000.000
|
$10,000.000
|
$41,500.000
|
$10,000.000
|
$26,401.110
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
1,200.000
|
$7.000
|
$8.620
|
$10.000
|
$7.000
|
$8.600
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,200.000
|
$2.000
|
$3.000
|
$1.000
|
$1.000
|
$1.700
|
|
|
PERM CTB (SGL SLOPE) (TY 3) (42 )
|
LF
|
86.000
|
$125.000
|
$515.550
|
$440.000
|
$45.000
|
$839.500
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
139,710.000
|
$0.150
|
$0.130
|
$0.120
|
$0.100
|
$0.140
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
300.000
|
$5.000
|
$31.410
|
$9.000
|
$10.000
|
$17.250
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
4.000
|
$25,000.000
|
$26,250.000
|
$22,000.000
|
$21,000.000
|
$38,525.000
|
|
|
RELOCATE RD IL ASM (TRANS-BASE)
|
EA
|
1.000
|
$5,000.000
|
$2,625.000
|
$3,100.000
|
$2,500.000
|
$2,765.750
|
|
|
IN RD IL (TY SA) 50T-10 (400W EQ) LED
|
EA
|
8.000
|
$5,000.000
|
$6,300.000
|
$6,100.000
|
$3,500.000
|
$5,051.570
|
|
|
CONDT (PVC) (SCH 40) (1")
|
LF
|
147.000
|
$8.000
|
$7.350
|
$11.000
|
$7.000
|
$9.030
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
1,529.000
|
$10.000
|
$8.400
|
$11.000
|
$9.000
|
$12.660
|
|
|
CONDT (PVC) (SCH 40) (2") (BORE)
|
LF
|
517.000
|
$22.000
|
$47.250
|
$57.000
|
$20.000
|
$29.150
|
|
|
CONDT (RM) (3/4")
|
LF
|
31.000
|
$25.000
|
$52.500
|
$102.000
|
$19.000
|
$26.420
|
|
|
CONDT (RM) (1 1/4")
|
LF
|
41.000
|
$25.000
|
$52.500
|
$102.000
|
$18.000
|
$22.230
|
|
|
ELEC CONDR (NO.10) BARE
|
LF
|
397.000
|
$3.000
|
$1.050
|
$2.100
|
$1.000
|
$1.440
|
|
|
ELEC CONDR (NO.10) INSULATED
|
LF
|
794.000
|
$3.000
|
$1.310
|
$2.100
|
$1.000
|
$1.470
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
1,872.000
|
$1.400
|
$1.580
|
$1.600
|
$1.000
|
$1.830
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
3,744.000
|
$1.600
|
$1.840
|
$1.800
|
$1.000
|
$1.960
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
287.000
|
$3.000
|
$2.100
|
$2.600
|
$1.300
|
$2.010
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
574.000
|
$3.000
|
$2.360
|
$2.800
|
$1.400
|
$2.150
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
7.000
|
$1,000.000
|
$1,260.000
|
$1,600.000
|
$900.000
|
$1,098.250
|
|
|
REMOVE GROUND BOX
|
EA
|
2.000
|
$400.000
|
$525.000
|
$550.000
|
$215.000
|
$271.390
|
|
|
ELC SRV TY A 240/480 100(NS)SS(E)SP(O)
|
EA
|
1.000
|
$5,000.000
|
$8,925.050
|
$8,700.000
|
$5,000.000
|
$6,348.860
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
831.000
|
$40.000
|
$36.750
|
$42.000
|
$25.000
|
$32.070
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY A)
|
SF
|
132.000
|
$70.000
|
$33.600
|
$35.000
|
$37.000
|
$39.100
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
112.000
|
$700.000
|
$745.500
|
$760.000
|
$800.000
|
$851.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
39.000
|
$950.000
|
$865.200
|
$880.000
|
$940.000
|
$989.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
6.000
|
$950.000
|
$1,095.160
|
$1,200.000
|
$1,200.000
|
$1,250.050
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
14.000
|
$900.000
|
$1,100.400
|
$1,210.000
|
$1,200.000
|
$1,253.500
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
150.000
|
$130.000
|
$120.000
|
$100.000
|
$85.000
|
$89.620
|
|
|
REMOVE BRDG MNT CLEARANCE SIGN ASSM
|
EA
|
2.000
|
$800.000
|
$183.750
|
$510.000
|
$700.000
|
$805.060
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
4,362.000
|
$9.000
|
$5.780
|
$7.000
|
$12.000
|
$10.260
|
|
|
REMOVE LRSA
|
EA
|
9.000
|
$1,000.000
|
$1,050.000
|
$1,300.000
|
$1,100.000
|
$1,290.100
|
|
|
INSTL DEL ASSM (D-DY)SZ 1(FLX)GND
|
EA
|
22.000
|
$100.000
|
$96.600
|
$107.000
|
$115.000
|
$120.750
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
9.000
|
$100.000
|
$103.950
|
$109.000
|
$117.000
|
$123.050
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
50,190.000
|
$0.250
|
$0.160
|
$0.160
|
$0.150
|
$0.170
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
204,368.000
|
$0.160
|
$0.150
|
$0.150
|
$0.150
|
$0.160
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(DOT)
|
LF
|
16,136.000
|
$0.550
|
$0.250
|
$0.250
|
$0.250
|
$0.280
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
30,748.000
|
$0.550
|
$0.400
|
$0.400
|
$0.400
|
$0.440
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
656.000
|
$4.000
|
$4.200
|
$4.100
|
$4.000
|
$4.600
|
|
|
WK ZN PAV MRK NON-REMOV (W)(ARROW)
|
EA
|
108.000
|
$65.000
|
$36.750
|
$36.000
|
$35.000
|
$40.250
|
|
|
WK ZN PAV MRK NON-REMOV(W)(WORD)
|
EA
|
108.000
|
$90.000
|
$94.500
|
$100.000
|
$90.000
|
$103.500
|
|
|
WK ZN PAV MRK NON-REMOV(W)36"(YLD TRI)
|
EA
|
112.000
|
$20.000
|
$8.400
|
$9.000
|
$8.000
|
$9.200
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
470.000
|
$0.200
|
$0.370
|
$0.400
|
$0.350
|
$0.400
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
191,940.000
|
$0.200
|
$0.150
|
$0.150
|
$0.140
|
$0.160
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-C-R
|
EA
|
5,019.000
|
$3.500
|
$3.940
|
$5.000
|
$4.000
|
$4.310
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
37,473.000
|
$1.100
|
$1.000
|
$2.000
|
$1.000
|
$3.410
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
423.000
|
$0.900
|
$1.950
|
$2.000
|
$1.000
|
$3.500
|
|
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
|
LF
|
7,480.000
|
$6.000
|
$0.530
|
$0.550
|
$0.500
|
$0.580
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
15,240.000
|
$0.500
|
$0.790
|
$0.800
|
$0.750
|
$0.860
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
328.000
|
$10.000
|
$12.600
|
$12.500
|
$12.000
|
$13.800
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
24,970.000
|
$0.300
|
$0.370
|
$0.400
|
$0.350
|
$0.400
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
108,015.000
|
$0.500
|
$0.370
|
$0.400
|
$0.350
|
$0.400
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
470.000
|
$0.300
|
$1.580
|
$1.750
|
$1.500
|
$1.730
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
101,360.000
|
$0.300
|
$0.370
|
$0.400
|
$0.350
|
$0.400
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
54.000
|
$225.000
|
$189.000
|
$200.000
|
$180.000
|
$207.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
55.000
|
$225.000
|
$252.000
|
$250.000
|
$240.000
|
$276.000
|
|
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
|
EA
|
56.000
|
$30.000
|
$26.250
|
$26.000
|
$25.000
|
$28.750
|
|
REFL PAV MRKR TY I-C
|
EA
|
53.000
|
$3.500
|
$6.300
|
$6.100
|
$6.000
|
$6.900
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
28.000
|
$3.000
|
$14.700
|
$15.000
|
$14.000
|
$16.100
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
2,441.000
|
$4.000
|
$3.680
|
$3.750
|
$3.500
|
$4.030
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
4.000
|
$250.000
|
$630.000
|
$800.000
|
$250.000
|
$287.500
|
|
|
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
|
EA
|
2.000
|
$11,000.000
|
$13,125.000
|
$13,000.000
|
$7,650.000
|
$7,475.000
|
|
|
REMOVE SHOULDER TEXTURING
|
LF
|
82,166.000
|
$4.000
|
$2.750
|
$3.300
|
$5.000
|
$9.820
|
|
|
SP MIXES SP-B SAC-B PG70-22
|
TON
|
117,986.000
|
$95.000
|
$76.150
|
$97.000
|
$107.000
|
$109.520
|
|
|
TACK COAT
|
GAL
|
23,239.000
|
$3.000
|
$2.730
|
$6.000
|
$4.000
|
$8.310
|
|
|
BONDING COURSE
|
GAL
|
76,042.000
|
$3.000
|
$3.400
|
$3.500
|
$4.000
|
$5.840
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
28.000
|
$120.000
|
$550.000
|
$75.000
|
$70.000
|
$121.060
|
|
|
TMA (STATIONARY)
|
DAY
|
760.000
|
$250.000
|
$100.000
|
$200.000
|
$200.000
|
$422.380
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
117.000
|
$200.000
|
$450.000
|
$540.000
|
$220.000
|
$545.960
|
|
Totals: |
$25,485,437.730
|
$20,119,999.990
|
$28,040,317.990
|
$28,945,309.350
|
$32,045,678.000
|