Show Job Controls
Bid Cobra

ECTOR BI 20-E (0005-01-113)

Items: 195

County: ECTOR
Length: N/A
Highway: BI 20-E
District: ODESSA
Control Number: 0005-01-113
DBE Goal: N/A
Project: F 2022(584)
Guaranty: N/A
Time: 598 WORKING DAYS
Engineer's Estimate: $24,270,548.72
Date: 03/07/2023 (3 years ago)
Contract Number: N/A
Type: PREVENTIVE MAINTENANCE
Mail/Deliver Bids To: N/A
ODA-PRELETTINGQUESTIONS
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$24,270,548.72
$23,137,298.38
Over/Under Est: -4.67% -$1,133,250.34
Over/Under Est: 10.01% $2,428,272.11
Amt Left: 15.39% $3,561,522.45
Subcontractor Percentage Amount
SOUTHWEST ROAD & SAFETY CONTRACTORS, LTD. 2.03% $497,134.91
4-WAY HAULERS, LLC 1.71% $418,768.82
PEYSON TRANSPORT, LLC 1.71% $418,768.82
DIAMOND C LOGISTICS TX LLC 1.71% $418,768.82
A BROTHERS MILLING, LLC 1.33% $325,709.08
1 PRIORITY ENVIRONMENTAL SERVICES, LLC 1.21% $296,321.80
DOUBLE A CONTRACTING, L.P. 1.18% $288,974.97
WILLIS ELECTRIC CO., LP 0.81% $198,364.18
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. 0.76% $186,119.48
SK CONCRETE SERVICES LLC 0.18% $44,080.93
ACT SAW CUTTING & REMOVAL 0.16% $39,183.05
FC TRAFFIC CONTROL, INC. 0.14% $34,285.17
RUBIO'S PAVING 0.07% $17,142.58
HJC FARMS, INC. 0.05% $12,244.70
FIBERTEX, LLC 0.03% $7,346.82
Total: 13.08% $3,203,214.13

Bid Items & Bid Tabulations

195 Total 0 of 195
ECTOR  |  BI 20-E  |  ODESSA  |  0005-01-113  |  03/07/2023  |  $24,270,548.72  |  F 2022(584)  |  PREVENT MAINT  |  598 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
RAGLE CONSTRUCTION, INC.
JONES BROS. DIRT & PAVING CONTRACTORS, INC.
REMOVING CONC (PAV)
SY 624.000 $65.000 $30.000 $45.450
REMOVING CONC (RIPRAP)
SY 81.000 $50.000 $19.000 $50.000
REMOVING CONC (MEDIANS)
SY 798.000 $50.000 $30.000 $51.000
REMOVING CONC (SIDEWALKS)
SY 1,576.000 $17.500 $17.000 $48.000
REMOVING CONC (DRIVEWAYS)
SY 1,190.000 $45.000 $16.000 $51.550
REMOVING CONC (CURB AND GUTTER)
LF 3,842.000 $20.000 $10.500 $47.000
REMOVING STAB BASE AND ASPH PAV (2"-6")
SY 105,057.000 $14.000 $10.500 $6.300
REMOVING STAB BASE & ASPH PAV (12"-14")
SY 78,619.000 $18.000 $11.000 $13.900
EXCAVATION (ROADWAY)
CY 16,957.000 $35.000 $50.000 $24.500
EMBANKMENT (FINAL)(ORD COMP)(TY D)
CY 2,936.000 $35.000 $30.000 $48.250
BLADING
HR 340.000 $234.200 $147.000 $400.000
DRILL SEEDING (PERM) (RURAL) (SANDY)
SY 162,524.000 $0.200 $0.190 $0.220
PROOF ROLLING
HR 40.000 $150.000 $100.000 $175.000
FL BS (CMP IN PLC)(TY A GR 4) (6")
SY 10,092.000 $11.100 $9.200 $30.500
FL BS (CMP IN PLC)(TY A GR 4) (8")
SY 91,199.000 $28.000 $11.000 $16.500
REWORK BS MTL (TY D)(SURF)(ORD COMP)
SY 100,067.000 $1.500 $1.000 $1.250
PRIME COAT (AE-P)
GAL 40,284.000 $5.100 $4.390 $4.750
CONC PVMT (CONT REINF - CRCP) (10")
SY 1,842.000 $115.000 $111.000 $255.000
STRUCT EXCAV
CY 493.000 $65.000 $26.000 $21.410
CEM STABIL BKFL
CY 408.000 $325.000 $94.000 $316.280
CUT & RESTORE ASPH PAVING
SY 323.000 $150.000 $92.000 $130.000
CL C CONC (RAIL FOUNDATION)
CY 4.250 $1,200.000 $925.000 $4,600.000
CL C CONC (COLLAR)
EA 1.000 $1,700.000 $2,500.000 $2,606.560
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 322.000 $250.000 $190.000 $897.000
RIPRAP (CONC)(4 IN)
CY 7.000 $760.000 $900.000 $1,380.000
RIPRAP (MOW STRIP)(4 IN)
CY 281.000 $790.000 $665.000 $805.000
RAIL (TY SSTR)
LF 269.000 $162.000 $121.000 $212.750
RAIL (HANDRAIL)(TY D)
LF 130.000 $175.000 $182.000 $172.500
RAIL (HANDRAIL)(TY F)
LF 208.000 $195.000 $186.000 $155.250
RETROFIT RAIL (TY T631)
LF 94.500 $150.000 $107.000 $115.000
RETROFIT RAIL (TY SSTR)
LF 681.000 $200.000 $242.000 $966.000
CONC BOX CULV (4 FT X 2 FT)
LF 246.000 $420.000 $465.000 $490.520
CONC BOX CULV (5 FT X 2 FT)
LF 257.000 $700.000 $572.000 $632.440
CONC BOX CULV (5 FT X 2 FT)(EXTEND)
LF 24.000 $800.000 $1,180.000 $1,127.630
RC PIPE (CL III)(15 IN)
LF 85.000 $80.000 $92.000 $136.830
RC PIPE (CL III)(18 IN)
LF 158.000 $125.000 $89.000 $135.420
RC PIPE (CL III)(24 IN)
LF 804.000 $140.000 $101.000 $181.720
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
EA 1.000 $6,000.000 $4,500.000 $5,775.000
INLET(COMPL)(RECESS CURB)(10')
EA 1.000 $3,500.000 $7,100.000 $10,844.000
HEADWALL (CH - FW - 15) (DIA= 24 IN)
EA 1.000 $7,285.000 $6,370.000 $17,103.000
HEADWALL (CH - FW - 30) (DIA= 24 IN)
EA 1.000 $7,925.000 $10,150.000 $17,420.000
HEADWALL (CH - FW - 45) (DIA= 24 IN)
EA 2.000 $8,000.000 $13,000.000 $18,400.000
HEADWALL (CH - PW - 0) (DIA= 24 IN)
EA 2.000 $8,000.000 $6,400.000 $20,030.000
WINGWALL (FW - S) (HW=3 FT)
EA 2.000 $8,700.000 $13,700.000 $20,670.000
WINGWALL (PW - 1) (HW=3 FT)
EA 1.000 $11,000.000 $13,700.000 $20,665.000
WINGWALL (PW - 1) (HW=4 FT)
EA 2.000 $31,000.000 $13,700.000 $21,863.000
SET (TY I)(S=3 FT)(HW=2FT)(6:1)(C)
EA 3.000 $7,840.000 $17,200.000 $14,185.000
SET (TY I)(S= 4 FT)(HW= 2 FT)(6:1) (P)
EA 6.000 $8,000.000 $18,000.000 $12,472.000
SET (TY I) (S= 4 FT) (HW= 2FT) (6: 1) C
EA 2.000 $8,000.000 $17,200.000 $13,115.000
SET (TY I)(S= 4 FT)(HW= 4 FT)(4:1) (C)
EA 3.000 $12,000.000 $17,300.000 $14,513.000
SET (TY I)(S= 4 FT)(HW= 4 FT)(6:1) (C)
EA 1.000 $13,000.000 $17,600.000 $17,445.000
SET (TY I)(S= 5 FT)(HW= 2 FT)(6:1) (P)
EA 6.000 $8,526.000 $18,200.000 $15,468.000
SET (TY II) (12 IN) (RCP) (4: 1) (C)
EA 1.000 $1,400.000 $1,400.000 $3,505.000
SET (TY II) (12 IN) (RCP) (6: 1) (C)
EA 1.000 $1,400.000 $1,550.000 $3,822.000
SET (TY II) (15 IN) (RCP) (4: 1) (C)
EA 1.000 $1,600.000 $1,410.000 $3,514.000
SET (TY II) (15 IN) (RCP) (6: 1) (C)
EA 1.000 $1,325.000 $1,490.000 $4,060.000
SET (TY II) (18 IN) (RCP) (6: 1) (C)
EA 1.000 $1,750.000 $1,740.000 $4,060.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 6.000 $1,750.000 $1,600.000 $3,304.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 4.000 $2,000.000 $1,750.000 $3,950.000
SET (TY II) (24 IN) (RCP) (4: 1) (P)
EA 2.000 $2,000.000 $2,200.000 $4,620.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 9.000 $5,000.000 $2,400.000 $4,772.000
ADJUSTING MANHOLES (SANITARY)
EA 5.000 $1,200.000 $2,500.000 $920.000
ADJUSTING MANHOLES (WATER VALVE BOX)
EA 23.000 $1,250.000 $1,100.000 $517.500
ADJUSTING INLET (CAP)
EA 1.000 $1,770.000 $3,000.000 $9,200.000
CLEAN EXIST CULVERTS
EA 1.000 $2,180.000 $10,000.000 $4,054.000
REMOV STR (INLET)
EA 1.000 $978.000 $1,210.000 $4,054.000
REMOV STR (SET)
EA 23.000 $820.000 $605.000 $2,175.000
REMOV STR (WINGWALL)
EA 2.000 $1,500.000 $2,500.000 $3,330.000
REMOV STR (HEADWALL)
EA 23.000 $1,336.000 $1,700.000 $2,680.000
REMOV STR (PIPE)
LF 1,176.000 $55.000 $18.000 $21.750
REMOV STR (RR TRACK)
LF 80.000 $60.000 $27.000 $500.000
MOBILIZATION
LS 1.000 $2,427,054.870 $2,310,000.000 $2,550,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 30.000 $22,000.000 $36,150.000 $75,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 60.000 $55.000 $76.340 $87.790
ROCK FILTER DAMS (INSTALL) (TY 4)
LF 75.000 $25.000 $84.080 $96.690
ROCK FILTER DAMS (REMOVE)
LF 135.000 $15.000 $22.070 $25.380
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 936.000 $28.000 $55.050 $63.310
CONSTRUCTION EXITS (REMOVE)
SY 936.000 $10.000 $12.840 $14.770
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,619.000 $4.000 $4.920 $10.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,619.000 $1.000 $1.160 $5.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 6,057.000 $7.400 $8.950 $10.290
BIODEG EROSN CONT LOGS (REMOVE)
LF 6,057.000 $2.250 $1.160 $1.330
CONSTRUCTING DETOURS
SY 3,797.000 $65.000 $72.000 $150.000
CONC CURB & GUTTER (TY I)
LF 7,077.000 $50.000 $25.000 $69.000
CONC CURB & GUTTER (TY II)
LF 2,266.000 $60.000 $26.000 $69.000
DRIVEWAYS (CONC)
SY 1,577.000 $220.000 $106.000 $300.000
DRIVEWAYS (ACP)
SY 5,589.000 $140.000 $45.000 $175.000
DRIVEWAYS (BASE)
SY 99.000 $26.500 $29.000 $133.000
CONC SIDEWALKS (4")
SY 3,444.000 $155.000 $59.000 $109.250
CURB RAMPS (TY 2)
EA 7.000 $5,550.000 $2,000.000 $3,910.000
CURB RAMPS (TY 10)
EA 7.000 $4,970.000 $1,900.000 $3,910.000
CONC MEDIAN
SY 769.000 $200.000 $81.000 $93.150
MTL W-BEAM GD FEN (STEEL POST)
LF 5,713.000 $35.000 $31.000 $37.950
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 9.000 $3,285.000 $2,390.000 $3,105.000
SHORT RADIUS
LF 143.000 $90.000 $170.000 $43.700
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 8.000 $1,860.000 $1,255.000 $1,725.000
MTL BM GD FEN (LONG SPAN SYSTEM)
LF 50.000 $29.000 $26.500 $879.750
REMOVE METAL BEAM GUARD FENCE
LF 7,001.000 $2.850 $1.850 $2.880
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 2.000 $300.000 $210.000 $287.500
GUARDRAIL END TREATMENT (INSTALL)
EA 7.000 $3,600.000 $2,910.000 $3,795.000
GUARDRAIL END TREATMENT (REMOVE)
EA 8.000 $432.500 $320.000 $287.500
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 2.000 $390.000 $255.000 $519.800
MAILBOX INSTALL-D (TWW-POST) TY 4
EA 1.000 $440.000 $334.000 $587.650
CONDT (PVC) (SCH 80) (2")
LF 20.000 $19.400 $15.000 $34.500
CONDT (PVC) (SCH 80) (2") (BORE)
LF 140.000 $39.800 $30.000 $46.000
CONDT (PVC) (SCH 80) (3")
LF 35.000 $29.050 $20.000 $46.000
CONDT (PVC) (SCH 80) (3") (BORE)
LF 90.000 $35.000 $40.000 $57.500
ELEC CONDR (NO.6) BARE
LF 387.000 $2.800 $3.000 $2.300
GROUND BOX TY D (162922)W/APRON
EA 6.000 $2,130.000 $1,200.000 $2,875.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 105.000 $800.000 $655.000 $997.050
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 9.000 $800.000 $658.000 $1,115.500
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 26.000 $1,000.000 $835.000 $1,158.050
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 1.000 $1,484.000 $1,012.000 $1,388.050
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
EA 2.000 $840.000 $735.000 $1,113.200
IN SM RD SN SUP&AM TY10BWG(1)SB(P-BM)
EA 5.000 $850.000 $730.000 $1,160.350
IN SM RD SN SUP&AM TYFRP(1)UB(P)
EA 1.000 $635.000 $680.000 $998.200
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 7.000 $1,246.000 $845.000 $1,201.750
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
EA 16.000 $1,215.000 $885.000 $1,446.700
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 5.000 $1,385.000 $890.000 $1,230.500
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 4.000 $1,545.000 $1,335.000 $1,790.550
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
EA 2.000 $1,902.000 $1,230.000 $1,558.250
IN SM RD SN SUP&AM TYS80(1)SA(U-2EXT)
EA 1.000 $1,445.000 $1,325.000 $1,657.150
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 1.000 $1,885.000 $1,230.000 $1,745.700
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
EA 1.000 $1,690.000 $1,400.000 $1,688.200
IN SM RD SN SUP&AM TYS80(1)SB(P-BM)
EA 2.000 $1,190.000 $995.000 $1,309.850
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 2.000 $1,000.000 $630.000 $916.550
REMOVE SM RD SN SUP&AM
EA 262.000 $150.000 $74.000 $200.000
IN SRSS & AM (RAIL)(90 MPH)(P MOUNT)
EA 2.000 $3,500.000 $3,105.000 $6,274.400
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 9.000 $29.750 $21.000 $21.850
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 25.000 $32.000 $29.000 $21.850
INSTL OM ASSM (OM-2Y)(WC)GND
EA 34.000 $77.000 $140.000 $134.550
INSTL OM ASSM (OM-3L)(TWT)GND
EA 5.000 $325.000 $370.000 $696.900
INSTL OM ASSM (OM-3R)(TWT)GND
EA 4.000 $326.250 $370.000 $696.900
REMOVE DELIN & OBJECT MARKER ASSMS
EA 91.000 $30.000 $10.000 $121.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BR)
EA 42.000 $33.750 $49.000 $54.050
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
EA 44.000 $91.000 $120.000 $98.900
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND(BI)
EA 5.000 $76.000 $123.000 $101.200
INSTL DEL ASSM (D-DW)SZ 1(WFLX)GND
EA 5.000 $94.250 $123.000 $101.200
INSTL DEL ASSM (D-DY)SZ 1(YFLX)GND
EA 46.000 $81.250 $123.000 $101.200
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 10,895.000 $0.700 $0.220 $0.250
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 23,540.000 $0.350 $0.220 $0.250
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 865.000 $0.350 $0.890 $1.020
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 108,795.000 $0.450 $0.220 $0.250
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 795.000 $2.100 $2.000 $2.300
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 2,308.000 $10.250 $5.000 $5.750
WK ZN PAV MRK REMOV (W)36"(YLD TRI)
EA 56.000 $31.900 $12.000 $13.800
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 1,504.000 $0.800 $2.000 $2.800
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 124.000 $0.850 $2.000 $2.800
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 80.000 $2.100 $3.000 $3.450
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 5,405.000 $1.300 $1.100 $1.270
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 464.000 $4.400 $5.000 $5.750
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 3,063.000 $7.750 $6.000 $6.900
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
LF 1,000.000 $5.250 $3.000 $3.450
REFL PAV MRK TY I(Y)(MED NOSE)(100MIL)
EA 8.000 $505.000 $250.000 $287.500
PAVEMENT SEALER 6"
LF 810.000 $0.200 $0.750 $0.860
PAVEMENT SEALER 8"
LF 15.000 $0.450 $1.200 $1.380
PAVEMENT SEALER 24"
LF 270.000 $0.600 $3.500 $4.030
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 1,290.000 $0.800 $0.890 $1.020
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 78,092.000 $0.700 $0.890 $1.020
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
LF 3,470.000 $0.750 $0.890 $1.020
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 56,219.000 $0.750 $0.890 $1.020
PREFAB PAV MRK TY C (W) (ARROW)
EA 23.000 $288.000 $280.000 $322.000
PREFAB PAV MRK TY C (W) (DBL ARROW)
EA 7.000 $600.000 $550.000 $632.500
PREFAB PAV MRK TY C (W) (WORD)
EA 20.000 $400.000 $350.000 $402.500
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 146.000 $45.850 $30.000 $34.500
REFL PAV MRKR TY II-A-A
EA 950.000 $5.380 $4.500 $5.180
REFL PAV MRKR TY II-C-R
EA 242.000 $5.600 $4.500 $5.180
ELIM EXT PAV MRK & MRKS (4")
LF 48,985.000 $0.750 $0.950 $1.090
ELIM EXT PAV MRK & MRKS (24")
LF 101.000 $3.800 $5.000 $5.750
ELIM EXT PAV MRK & MRKS (36")(YLD TRI)
EA 32.000 $15.300 $20.000 $23.000
PAV SURF PREP FOR MRK (6")
LF 810.000 $0.050 $0.500 $0.580
PAV SURF PREP FOR MRK (8")
LF 15.000 $0.100 $0.500 $0.580
PAV SURF PREP FOR MRK (24")
LF 270.000 $0.650 $4.000 $4.600
PED SIG SEC (LED)(COUNTDOWN)
EA 4.000 $1,085.000 $1,000.000 $1,035.000
TRF SIG CBL (TY A)(14 AWG)(4 CONDR)
LF 450.000 $4.050 $5.000 $3.450
TRF SIG CBL (TY C)(14 AWG)(2 CONDR)
LF 426.000 $2.000 $5.000 $2.300
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
EA 8.000 $13,500.000 $10,000.000 $14,375.000
RELOCT RDSD FLSH BCN AM (SOLAR PWRD)
EA 4.000 $8,000.000 $10,000.000 $2,875.000
PEDESTRIAN PUSH BUTTON POLE
EA 4.000 $3,392.500 $2,500.000 $3,910.000
PED DETECT PUSH BUTTON (APS)
EA 4.000 $1,063.000 $1,000.000 $1,552.500
PED DETECTOR CONTROLLER UNIT
EA 2.000 $4,500.000 $5,000.000 $3,162.500
TREE REMOVAL (24" - 30" DIA)
EA 3.000 $5,000.000 $4,583.330 $15,000.000
DITCH CLEAN / RESHAPING(CU YD IN PLACE)
CY 14,783.000 $15.000 $8.000 $25.000
BRIDGE JOINT REPAIR (FULL DEPTH)
LF 41.000 $550.000 $700.000 $2,645.000
BRIDGE JOINT REPLACEMENT (SEJ)
LF 82.000 $700.000 $720.000 $2,875.000
SP MIXES SP-B SAC-B PG70-22
TON 40,353.000 $136.000 $200.000 $132.000
SP MIXES SP-C SAC-B PG70-22
TON 3,560.000 $138.000 $200.000 $270.000
TOM-C SAC-A
TON 10,664.000 $181.000 $165.000 $162.000
TACK COAT
GAL 15,987.000 $5.000 $5.000 $4.190
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $20,000.000 $50,000.000 $26,250.000
GROUND BOX (ADJUST)
EA 1.000 $300.000 $500.000 $1,150.000
BBU SYSTEM (EXTERNAL BATT CABINET)
EA 1.000 $10,360.000 $15,000.000 $13,800.000
DEAD END ROADWAY BARRICADE
LF 16.000 $75.000 $155.000 $120.750
TMA (STATIONARY)
DAY 155.000 $192.000 $400.000 $225.000
TMA (MOBILE OPERATION)
DAY 38.000 $500.000 $900.000 $1,275.000
Totals: $24,270,548.720 $23,137,298.380 $26,698,820.830